CN205077499U
CN205077499U CN201520871841.XU CN201520871841U CN205077499U CN 205077499 U CN205077499 U CN 205077499U CN 201520871841 U CN201520871841 U CN 201520871841U CN 205077499 U CN205077499 U CN 205077499U
Authority
CN
China
Prior art keywords
campshed
connection component
lateral connection
double
tie
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520871841.XU
Other languages
Chinese (zh)
Inventor
王晓燕
吴勇
刘俊轩
张恩超
魏聪明
周麟
杨成
雷春燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Construction and Investment Holding Group Co Ltd
Original Assignee
YUNNAN CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUNNAN CONSTRUCTION ENGINEERING GROUP Co Ltd filed Critical YUNNAN CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority to CN201520871841.XU priority Critical patent/CN205077499U/en
Application granted granted Critical
Publication of CN205077499U publication Critical patent/CN205077499U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides a double row pile supporting construction with transverse connection component, including preceding campshed (1) that lies in building foundation department, it stablizes back campshed (2) of stratum (5) outward to be arranged in the foundation ditch, connect tie -beam (3) between the pile bolck of pile bolck and back campshed (2) of campshed (1) in the front, transverse connection member (4) of (2) two liang of two stakes that tie for of difference traversing preceding campshed (1) and back campshed, preceding campshed (1), back campshed (2), tie -beam (3), double row pile supporting construction is made up into in transverse connection component (4). The utility model discloses can overcome the restriction in external space, have to have the better effect of strutting, and construction convenience, process are simple, whole supporting construction is reasonable, firm.

Description

A kind of Retaining Structure with Double-row Piles with lateral connection component
Technical field
The utility model relates to building operations Retaining Structure with Double-row Piles technical field.
Background technology
In recent years, along with the quickening of urban construction, City Building is more and more intensive, and land resources is more and more nervous, and geological conditions worse and worse, much plans to build building and seizes every opportunity, and often builds very nearby at distance existing building, city turnpike road.Forbid due to a lot of area or limit the soil used beyond building line, so while making full use of soil, bringing following problems to building foundation pit smooth construction:
(1) because the building planned to build is very near from existing building, city turnpike road distance, cause can not adopting when building foundation pit is constructed and put slope and excavate, and soil-nail wall support, pile-anchor retaining can not be used;
(2) adopt campshed to add the support pattern of inner support, although technical scheme is feasible, execute that cost is higher, operation is numerous and diverse, the construction period is longer, to soil excavation and main structure body construction infection comparatively serious;
(3) although traditional Double-row-piles Structure good integrity, anti-side rigidity is large, has certain restriction, be difficult to meet design requirement to displacement; The cantilever segment limited length of cantilevered Retaining Structure with Double-row Piles, and supporting safety factor is lower, and slope deforming is larger.
For the problems referred to above, need to find a kind of restriction that can overcome free surrounding space, there is again good supporting effect and easy construction and the simple New Supporting pattern of operation.
Summary of the invention
The utility model object solves above-mentioned prior art Problems existing, a kind of Retaining Structure with Double-row Piles with lateral connection component is provided, to solve the restriction being subject to free surrounding space in urban architecture pattern foundation pit supporting structure, make pattern foundation pit supporting structure difficulty, weak effect, technical difficulty and high in cost of production problem.
The purpose of this utility model is achieved through the following technical solutions:
A kind of Retaining Structure with Double-row Piles with lateral connection component, include before building foundation pit place campshed, rear campshed in the outer good ground of foundation ditch, be connected to before tie-beam between the stake top of campshed and the stake top of rear campshed, be horizontally through the lateral connection component of front campshed and rear campshed two piles arranged side by side between two respectively, front campshed, rear campshed, tie-beam, lateral connection Component composition become Retaining Structure with Double-row Piles.
Tie-beam described in the utility model is the monolithic construction beam of on-the-spot continuous pouring.Described lateral connection component is reinforced concrete member or steel strand or anchor cable, and the front-end and back-end of lateral connection component are separately fixed on front campshed and rear campshed.Described front campshed, rear campshed are square or circular stake reinforced concrete pile, and front campshed and rear campshed are embedded with horizontal sleeve pipe, and front campshed, through horizontal sleeve pipe, is connected with rear campshed by lateral connection component.
The utility model relies on the lateral connection component arranged between front campshed, rear campshed, can significantly reduce taking of the underground space, is applicable to the existing building that is close to and important traffic route around.Lateral connection component also effectively increases the factor of safety against overturning of double-row pile, and suitably can reduce the building-in depth of front campshed and the pile body length of rear campshed, reduces construction cost, shortens the construction period.Adopt the utility model, can make to form tensile stress between front campshed and rear campshed, improve the pile body force-bearing situation of total, optimize the whole supporting and protection structure of double-row pile, make whole supporting and protection structure become more reasonable, firm.
Accompanying drawing explanation
Fig. 1 is perspective view of the present utility model;
Fig. 2 is the schematic diagram that lateral connection component connects front campshed and rear campshed.
Detailed description of the invention
Followingly by reference to the accompanying drawings the technical solution of the utility model to be described in detail.
The Retaining Structure with Double-row Piles with lateral connection component as shown in Figure 1, mainly comprise before building foundation pit 7 place campshed 1, rear campshed 2 in the outer good ground 5 of foundation ditch, be connected to before tie-beam 3 between the stake top of campshed and the stake top of rear campshed, be horizontally through the lateral connection component 4 of front campshed 1 and rear campshed 2 adjacent two piles arranged side by side between two respectively, front campshed 1, rear campshed 2, tie-beam 3, lateral connection component 4 have been combined into Retaining Structure with Double-row Piles.Tie-beam 3 of the present utility model adopts cast-in-site mode, is the monolithic construction beam that continuous pouring is shaping.Lateral connection component 4 can adopt reinforced concrete member, also can adopt steel strand, or adopts anchor cable, and the front-end and back-end of lateral connection component 4 are separately fixed at front campshed 1 with on rear campshed 2.Front campshed 1, rear campshed 2 are square bar rib concrete pile or circular stake reinforced concrete pile.According to designing requirement, when the inside reinforcing cage of the front campshed of making and rear campshed, i.e. pre-buried horizontal sleeve pipe 6.When carrying out Retaining Structure with Double-row Piles construction, by boring, the horizontal sleeve pipe in front campshed and the horizontal sleeve pipe in rear campshed are connected, between often adjacent two piles (a front campshed and after campshed) by one or more pre-buried sleeve pipe 6 through one or more lateral connection component 4, by lateral connection component 4 by front campshed 1 and rear campshed 2 by being connected.
The utility model is mainly used in the restriction being subject to free surrounding space in urban architecture pattern foundation pit supporting structure, with the construction of existing building, the very near occasion of city turnpike road distance.
The utility model is in work progress, and construction sequence is as follows:
The first step: according to designing requirement, carries out surveying setting-out, determines front campshed, rear campshed position;
Second step: in the front campshed determined, the boring of rear campshed position;
3rd step: the reinforcing cage making front campshed, rear campshed, and on reinforcing cage, press the pre-buried horizontal sleeve pipe of design attitude, the quantity of horizontal sleeve pipe is determined according to design;
4th step: the construction carrying out front campshed, rear campshed and stake top continuous beam;
5th step: excavation pit, when constructing to the horizontal sleeve pipe position of front campshed, aims at front-seat pipe casing and rear campshed sleeve pipe is holed, make front-seat pipe casing and rear campshed sleeve pipe through;
6th step: by lateral connection component through front-seat pipe casing and rear campshed sleeve pipe, and two ends joint location is reinforced;
One deck under last excavation pit, arranges lateral connection component as also needed, repeat step 5, step 6.

Claims (4)

1. one kind has the Retaining Structure with Double-row Piles of lateral connection component, it is characterized in that, include the front campshed (1) being positioned at building foundation pit (7) place, be arranged in the rear campshed (2) of the outer good ground (5) of foundation ditch, be connected to the tie-beam (3) between the stake top of front campshed (1) and the stake top of rear campshed (2), be horizontally through the lateral connection component (4) of front campshed (1) and rear campshed (2) two piles arranged side by side between two respectively, front campshed (1), rear campshed (2), tie-beam (3), lateral connection component (4) is combined into Retaining Structure with Double-row Piles.
2. a kind of Retaining Structure with Double-row Piles with lateral connection component according to claim 1, is characterized in that, the monolithic construction beam that described tie-beam (3) is on-the-spot continuous pouring.
3. a kind of Retaining Structure with Double-row Piles with lateral connection component according to claim 1 and 2, it is characterized in that, described lateral connection component (4) is reinforced concrete member or steel strand or anchor cable, and the front-end and back-end of lateral connection component (4) are separately fixed at front campshed (1) with on rear campshed (2).
4. a kind of Retaining Structure with Double-row Piles with lateral connection component according to claim 1 and 2, it is characterized in that, described front campshed (1), rear campshed (2) are square or circular stake reinforced concrete pile, front campshed (1) and rear campshed (2) are embedded with horizontal sleeve pipe (6), front campshed (1), through horizontal sleeve pipe, is connected with rear campshed (2) by lateral connection component (4).
CN201520871841.XU 2015-11-04 2015-11-04 Double row pile supporting construction with transverse connection component Active CN205077499U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520871841.XU CN205077499U (en) 2015-11-04 2015-11-04 Double row pile supporting construction with transverse connection component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520871841.XU CN205077499U (en) 2015-11-04 2015-11-04 Double row pile supporting construction with transverse connection component

Publications (1)

Publication Number Publication Date
CN205077499U true CN205077499U (en) 2016-03-09

Family

ID=55429914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520871841.XU Active CN205077499U (en) 2015-11-04 2015-11-04 Double row pile supporting construction with transverse connection component

Country Status (1)

Country Link
CN (1) CN205077499U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105970973A (en) * 2016-06-29 2016-09-28 广州市市政工程设计研究总院 Soft soil foundation pit double-row piles supporting structure considering soil-arch and deformation space effect
CN106884432A (en) * 2017-04-21 2017-06-23 中国十九冶集团有限公司 Foundation pit supporting structure and construction method thereof
CN111021369A (en) * 2019-12-31 2020-04-17 深圳宏业基岩土科技股份有限公司 Chair type double-row pile anchor construction method
CN111648378A (en) * 2020-06-16 2020-09-11 深圳市勘察测绘院(集团)有限公司 Square-round pile combined foundation pit supporting method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105970973A (en) * 2016-06-29 2016-09-28 广州市市政工程设计研究总院 Soft soil foundation pit double-row piles supporting structure considering soil-arch and deformation space effect
CN106884432A (en) * 2017-04-21 2017-06-23 中国十九冶集团有限公司 Foundation pit supporting structure and construction method thereof
CN111021369A (en) * 2019-12-31 2020-04-17 深圳宏业基岩土科技股份有限公司 Chair type double-row pile anchor construction method
CN111648378A (en) * 2020-06-16 2020-09-11 深圳市勘察测绘院(集团)有限公司 Square-round pile combined foundation pit supporting method

Similar Documents

Publication Publication Date Title
CN203756182U (en) Support structure applied to shallow road tunnel in weak rock area
CN105041349B (en) A kind of excavating construction method that station is digged on the basis of Subway Tunnel shield tunnel
CN102758632B (en) Rock stratum double initial support layering method for establishing large-scale underground structure
CN110017144B (en) Loess tunnel three-step construction method considering substrate reinforcement treatment
CN103898916B (en) Mini stake Composite Braced Retaining Structure and construction method
CN103758134A (en) Combined double-row pile supporting system and construction method thereof
CN205077499U (en) Double row pile supporting construction with transverse connection component
CN104929648A (en) Method for constructing branch guide pits of tunnels
CN104533446A (en) Construction method and structure of two-layer preliminary support for preventing geological disaster of large-section weak surrounding rock tunnel
CN105064397A (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN108278116B (en) Shallow-buried large-span pipe curtain supporting system and construction method thereof
CN203905018U (en) Supporting and protecting system with combined double-row piles in combination with oblique anchors
CN203729308U (en) Double-row pile supporting system of reinforced concrete pile combined structural steel cement mixing pile wall
CN103590408A (en) Novel double-row pile beam vertical anchor supporting system and construction method thereof
CN105256812A (en) Prefabricated assembly type concrete supporting structure for foundation pit and construction method of prefabricated assembly type concrete supporting structure
CN105370289A (en) Ultra-long shallow-buried excavation construction method for existing pipeline in complex environment
CN105089670A (en) Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel
CN109457709A (en) A kind of supporting construction and construction method of double-row pile combination wide-angle anchor cable
CN112095626A (en) Foundation pit supporting structure serving as corridor underpinning pile foundation and construction method thereof
CN104863177A (en) Composite retaining wall structure and construction method thereof
CN206752667U (en) A kind of basement barrier wall structure
CN105909262B (en) A kind of bored tunnel driving method
CN203729309U (en) Support system with combined double-row piles combined with vertical prestressed anchor bolts
CN212801573U (en) Tunnel entrance side and heading slope pre-reinforcing steel pipe pile
CN109538236A (en) A kind of tunnel structure and tunnel construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20170104

Address after: 650501 Yunnan Province Economic Development Zone of Kunming city information industry base, Forest Creek Road No. 188

Patentee after: Yunnan Construction Investment Holding Group Co., Ltd.

Address before: Guandu information industry base in Yunnan province Kunming city forest road 650501 No. 188 construction development building

Patentee before: Yunnan Construction Engineering Group Co., Ltd.