- CN205024719U CN205024719U CN201520769847.6U CN201520769847U CN205024719U CN 205024719 U CN205024719 U CN 205024719U CN 201520769847 U CN201520769847 U CN 201520769847U CN 205024719 U CN205024719 U CN 205024719U
- Authority
- CN
- China
- Prior art keywords
- pile foundation
- diaphragm wall
- integrated
- vertical supporting
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 53
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 20
- 230000003014 reinforcing effect Effects 0.000 claims description 26
- 238000009740 moulding (composite fabrication) Methods 0.000 claims description 18
- 230000002787 reinforcement Effects 0.000 claims description 15
- 239000004567 concrete Substances 0.000 claims description 14
- 230000010354 integration Effects 0.000 claims description 7
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 238000000034 method Methods 0.000 description 5
- 238000004062 sedimentation Methods 0.000 description 5
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000001360 synchronised effect Effects 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The utility model provides a pile foundation and integrated reverse construction vertical braces system of underground continuous wall, including reinforced concrete structure's underground continuous wall, and follow the reinforced concrete structure's of underground continuous wall's bottom downwardly extending setting pile foundation, underground continuous wall with as an organic wholeization of pile foundation reinforced concrete pours the completion. The utility model discloses can improve vertical bearing ability and holistic rigidity demand to can reduce the bulk settling of vertical braces system and inhomogeneous subsiding.
Description
Technical field
The utility model relates to technical field of building construction, is particularly a kind ofly applicable to the Pile Foundation reverse construction vertical supporting system integrated with diaphragm wall.
Background technology
Along with developing rapidly of China's building trade, highrise building, even super highrise building adopt the object of construction production of reverse construction to increase gradually.In reverse construction process, the load of underground beam slab and the vertical load of superstructure need vertical supporting System Take and are passed to basis, so the design and construction of vertical supporting system becomes the inverse important and difficult issues done in the design and construction stage of whole engineering in contrary working method engineering.The form of " one pile for one column " or " many, a post " that the general vertical supporting system of bearing structural beam slab load and construction load adopts structural column to combine with engineering pile usually.According to practical engineering experience, " one pile for one column " vertical supporting system that conventional angle splice joint lattice column and stand column pile form only can bear 2 ~ 3 layers of superstructure load.And the steel post that bearing capacity is higher " one pile for one column " bears 6 ~ 8 layers of superstructure load only.And the speed of application of superstructure is wanted far faster than the speed of underground structure adverse construction method, but due to conventional vertical supporting system bearing power restriction, superstructure is usually constructed to need to suspend to underground structure after the restriction number of plies and is completed, and vertical supporting system just can continue the construction of superstructure after can providing enough supporting capacity.Therefore, the routine " one pile for one column " that reverse construction adopts usually or " many, a post " vertical supporting system bearing power deficiency become the key affecting superstructure speed of application, this to a certain degree can delay Engineering Overall progress, reduces the advantage that the upper and lower synchronous construction of highrise building contrary sequence method shortens construction period.In addition, the vertical supporting system of " one pile for one column " or " many, a post " of prior art, due to its comparatively scattering device, when stress point is positioned at the corresponding position of stake, a sedimentation can be produced, and be uneven sedimentation, therefore had a strong impact on the supporting capacity of vertical supporting system and overall rigidity, the vertical supporting system particularly below Core Walls Structure position is more obvious.
Utility model content
Technical problem to be solved in the utility model is, the reverse construction vertical supporting system providing a kind of pile foundation integrated with diaphragm wall, to improve vertical bearing capacity and overall rigidity requirement, and the bulk settling of vertical supporting system and uneven sedimentation can be reduced.
In order to solve the problems of the technologies described above, the technical solution of the utility model is: the reverse construction vertical supporting system that a kind of pile foundation is integrated with diaphragm wall, comprise the diaphragm wall of reinforced concrete structure, and along the bottom of described diaphragm wall the pile foundation of reinforced concrete structure extended downwards, the integrated pouring construction of described diaphragm wall and described basis.
Further, the reverse construction vertical supporting system that the pile foundation that the utility model provides is integrated with diaphragm wall, described diaphragm wall, comprise the continuous wall trench underground being positioned at below ground location corresponding to core tube of high-rise building and arranging, be provided with diaphragm wall reinforcing cage in described continuous wall trench underground, described continuous wall trench underground and underground connection wall reinforcing cage have built concrete.
Further, the reverse construction vertical supporting system that the pile foundation that the utility model provides is integrated with diaphragm wall, described pile foundation, comprise and be positioned at described continuous wall trench underground several pile foundation pore-formings connected with described continuous wall trench underground are evenly set with downward-extension, be provided with pile foundation reinforcement cage in each described pile foundation pore-forming, described pile foundation pore-forming and pile foundation reinforcement cage have built concrete; Described continuous wall trench underground, diaphragm wall reinforcing cage and described pile foundation pore-forming, pile foundation reinforcement cage primary concreting concrete form diaphragm wall and the pile foundation of the integration of reinforced concrete structure.
Further, described pile foundation reinforcement cage is provided with reserved section reinforcing bar, and described reserved section reinforcing bar inserts in described diaphragm wall reinforcing cage.
Further, the reverse construction vertical supporting system that the pile foundation that the utility model provides is integrated with diaphragm wall, the periphery of described diaphragm wall is provided with auxiliary pile basis.
Further, the reverse construction vertical supporting system that the pile foundation that the utility model provides is integrated with diaphragm wall, described auxiliary pile basis, comprises engineering pile and structural column.
Further, the reverse construction vertical supporting system that the pile foundation that the utility model provides is integrated with diaphragm wall, described structural column is the lattice column of steel post or angle splice joint.
Compared with prior art, the reverse construction vertical supporting system that the utility model pile foundation is integrated with diaphragm wall, comprise the diaphragm wall of the reinforced concrete structure that integration is built, and the pile foundation of the reinforced concrete structure extended downwards along the bottom of described diaphragm wall.With the vertical supporting system of employing pile foundation structure pure in alternative prior art.That is, the upper/lower positions accordingly of the Core Walls Structure of highrise building adopts the integration diaphragm wall of building and pile foundation to constitute integrated reverse construction vertical supporting system by the utility model.Because diaphragm wall is reinforced concrete structure, its vertical bearing stress and integral rigidity are far longer than bearing stress and the rigidity of the vertical supporting system adopting separately pile foundation, in addition, the pile foundation extended bottom diaphragm wall has consolidated and strengthened again stability and the reliability of diaphragm wall, and namely pile foundation further improves bearing stress and the rigidity of diaphragm wall.In addition, reverse construction vertical supporting system of the present utility model, owing to have employed the diaphragm wall of reinforced concrete structure as support, compared with the vertical supporting system of " one pile for one column " in prior art or " many, a post ", the support system of its corresponding Core Walls Structure position is comparatively concentrated, therefore, it is possible to reduce the bulk settling of this support system and uneven sedimentation.In addition, after the reverse construction vertical supporting system adopting pile foundation of the present utility model integrated with diaphragm wall, in reverse construction process, without the need to waiting for that Underground Construction completes the construction that just can proceed superstructure, thus accelerate the construction speed of the superstructure of highrise building, there is raising efficiency of construction, shorten the effect of construction period.
Accompanying drawing explanation
Fig. 1 is the structural representation of the continuous wall trench underground of the utility model one embodiment;
Fig. 2 is the continuous wall trench underground of the utility model one embodiment and the structural representation of through pile foundation pore-forming thereof;
Fig. 3 is the structural representation of the utility model one embodiment pile foundation reverse construction vertical supporting system integrated with diaphragm wall;
Fig. 4 is the pile foundation of the utility model one embodiment and the cross-sectional view of ground, underground diaphragm wall.
Shown in figure: 110, diaphragm wall, 111, continuous wall trench underground, 112, diaphragm wall reinforcing cage, 120, pile foundation, 121 pile foundation pore-formings, 122, pile foundation reinforcement cage, 130, concrete, 140, auxiliary pile basis, 141, engineering pile, 142, structural column, 150, bracing of foundation pit wall, 200, ground.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in detail:
Please refer to Fig. 1-4, the reverse construction vertical supporting system that present embodiment provides a kind of pile foundation integrated with diaphragm wall, comprise the diaphragm wall 110 of reinforced concrete structure, and along the bottom of described diaphragm wall 110 pile foundation 120 of reinforced concrete structure extended downwards, described diaphragm wall 110 has been built with the integrated steel concrete of described pile foundation 120.
The reverse construction vertical supporting system that the pile foundation that present embodiment provides is integrated with diaphragm wall, the diaphragm wall 110 of the reinforced concrete structure adopting integration to build and pile foundation 120, and the bottom that pile foundation 120 is positioned at diaphragm wall 110 is extended downwards.Because diaphragm wall 110 is reinforced concrete structure, its vertical bearing stress and integral rigidity are far longer than bearing stress and the rigidity of the vertical supporting system adopting separately pile foundation, in addition, pile foundation 120 extended bottom diaphragm wall 110 has consolidated and strengthened again stability and the reliability of diaphragm wall 110, and namely pile foundation 120 further improves bearing stress and the rigidity of diaphragm wall 110.Define the composite construction of diaphragm wall 110 and pile foundation 120.In addition, the reverse construction vertical supporting system of present embodiment, owing to have employed the diaphragm wall 110 of reinforced concrete structure as support, compared with the vertical supporting system of " one pile for one column " in prior art or " many, a post ", the support system of its corresponding Core Walls Structure position is comparatively concentrated, therefore, it is possible to reduce the bulk settling of this support system and uneven sedimentation.In addition, after the reverse construction vertical supporting system adopting the pile foundation of present embodiment integrated with diaphragm wall, in reverse construction process, without the need to waiting for that Underground Construction completes the construction that just can proceed superstructure, thus accelerate the construction speed of the superstructure of highrise building, there is raising efficiency of construction, shorten the effect of construction period.
Please refer to Fig. 1, Fig. 3, in present embodiment, diaphragm wall 110, comprise the continuous wall trench underground 111 being positioned at below position, core tube of high-rise building corresponding ground 200 and arranging, be provided with diaphragm wall reinforcing cage 112 in described continuous wall trench underground 111, described continuous wall trench underground 111 and underground connection wall reinforcing cage 112 have built concrete 130.This kind of structure, is conducive to forming Stability Analysis of Structures and the strong diaphragm wall 110 of vertical bearing capacity.The diaphragm wall 110 of reinforced concrete structure is firmer compared with the body of wall of brick structure or independent cement structures.
Please refer to Fig. 2, Fig. 3, in present embodiment, pile foundation 120, comprise and be positioned at described continuous wall trench underground 111 several pile foundation pore-formings 121 connected with described continuous wall trench underground 111 are evenly set with downward-extension, be provided with pile foundation reinforcement cage 122 in each described pile foundation pore-forming 121, described pile foundation pore-forming 121 and pile foundation reinforcement cage 122 have built concrete 130; Described continuous wall trench underground 111, diaphragm wall reinforcing cage 122 and pile foundation pore-forming 121, pile foundation reinforcement cage 122 primary concreting concrete form diaphragm wall 110 and the pile foundation 120 of the integration of reinforced concrete structure.Pile foundation pore-forming 121 and continuous wall trench underground 111 connect be convenient to synchronous in pile foundation pore-forming 121 and continuous wall trench underground 111 concreting 130, constructability.
Please refer to Fig. 4, in present embodiment, described pile foundation reinforcement cage 122 is provided with reserved section reinforcing bar 123, and described reserved section reinforcing bar 123 inserts in described diaphragm wall reinforcing cage 112.Reserved section reinforcing bar 123, make concrete in continuous wall trench underground 111 and pile foundation pore-forming 121 concreting and penetrate into pile foundation reinforcement cage 122 and diaphragm wall reinforcing cage 112 time, make the structure of the diaphragm wall 110 of the integration of formation and pile foundation 120 more stable, and form integrated support system.Namely after reserved section reinforcing bar 123 is inserted into diaphragm wall reinforcing cage 112, when concreting 130, concrete will penetrate into the junction of reserved section reinforcing bar 123 and diaphragm wall reinforcing cage 112, thus make diaphragm wall reinforcing cage 112 more stable with building of pile foundation reinforcement cage 122, shaping structures one.
Please refer to Fig. 1-3, the reverse construction vertical supporting system that the pile foundation that present embodiment provides is integrated with diaphragm wall, the periphery of described diaphragm wall 110 is provided with auxiliary pile basis 140.Wherein, described auxiliary pile basis 130, comprises engineering pile 141 and structural column 142.Wherein, described structural column 142 can be the lattice column of steel post or angle splice joint.Auxiliary pile basis 140 is for the bearing capacity of the superstructure outside supporting core cylinder.
Please refer to Fig. 1-3, present embodiment, bracing of foundation pit wall 150 can also be set on the border of foundation ditch, to prevent the situations such as Ji Fang border soil body landslide.
The utility model is not limited to above-mentioned detailed description of the invention, and all various changes done in the spirit and scope of claims of the present utility model, all within protection domain of the present utility model.
Claims (7)
1. the reverse construction vertical supporting system that a pile foundation is integrated with diaphragm wall, it is characterized in that, comprise the diaphragm wall of reinforced concrete structure, and along the bottom of described diaphragm wall the pile foundation of reinforced concrete structure extended downwards, described diaphragm wall and the integrated steel concrete of described pile foundation have been built.
2. the reverse construction vertical supporting system that pile foundation as claimed in claim 1 is integrated with diaphragm wall, it is characterized in that, described diaphragm wall, comprise the continuous wall trench underground being positioned at below ground location corresponding to core tube of high-rise building and arranging, be provided with diaphragm wall reinforcing cage in described continuous wall trench underground, described continuous wall trench underground and underground connection wall reinforcing cage have built concrete.
3. the reverse construction vertical supporting system that pile foundation as claimed in claim 2 is integrated with diaphragm wall, it is characterized in that, described pile foundation, comprise and be positioned at described continuous wall trench underground several pile foundation pore-formings connected with described continuous wall trench underground are evenly set with downward-extension, be provided with pile foundation reinforcement cage in each described pile foundation pore-forming, described pile foundation pore-forming and pile foundation reinforcement cage have built concrete; Described continuous wall trench underground, diaphragm wall reinforcing cage and described pile foundation pore-forming, pile foundation reinforcement cage primary concreting concrete form diaphragm wall and the pile foundation of the integration of reinforced concrete structure.
4. the reverse construction vertical supporting system that pile foundation as claimed in claim 3 is integrated with diaphragm wall, it is characterized in that, described pile foundation reinforcement cage is provided with reserved section reinforcing bar, and described reserved section reinforcing bar inserts in described diaphragm wall reinforcing cage.
5. the reverse construction vertical supporting system that pile foundation as claimed in claim 1 is integrated with diaphragm wall, it is characterized in that, the periphery of described diaphragm wall is provided with auxiliary pile basis.
6. the reverse construction vertical supporting system that pile foundation as claimed in claim 5 is integrated with diaphragm wall, is characterized in that, described auxiliary pile basis, comprises engineering pile and structural column.
7. the reverse construction vertical supporting system that pile foundation as claimed in claim 6 is integrated with diaphragm wall, it is characterized in that, described structural column is the lattice column of steel post or angle splice joint.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520769847.6U CN205024719U (en) | 2015-09-30 | 2015-09-30 | Pile foundation and integrated reverse construction vertical braces system of underground continuous wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520769847.6U CN205024719U (en) | 2015-09-30 | 2015-09-30 | Pile foundation and integrated reverse construction vertical braces system of underground continuous wall |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205024719U true CN205024719U (en) | 2016-02-10 |
Family
ID=55257264
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520769847.6U Expired - Fee Related CN205024719U (en) | 2015-09-30 | 2015-09-30 | Pile foundation and integrated reverse construction vertical braces system of underground continuous wall |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205024719U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105756075A (en) * | 2016-02-29 | 2016-07-13 | 山东电力工程咨询院有限公司 | Horizontal bearing combined foundation based on piles and underground continuous wall and method |
| CN107044132A (en) * | 2017-02-22 | 2017-08-15 | 常熟建工建设集团有限公司 | A kind of construction method of quake-resistant safety ground |
| CN109083128A (en) * | 2018-09-10 | 2018-12-25 | 浙江吉通地空建筑科技有限公司 | Fashioned iron column assembled underground continuous wall with high-bearing capacity |
-
2015
- 2015-09-30 CN CN201520769847.6U patent/CN205024719U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105756075A (en) * | 2016-02-29 | 2016-07-13 | 山东电力工程咨询院有限公司 | Horizontal bearing combined foundation based on piles and underground continuous wall and method |
| CN107044132A (en) * | 2017-02-22 | 2017-08-15 | 常熟建工建设集团有限公司 | A kind of construction method of quake-resistant safety ground |
| CN107044132B (en) * | 2017-02-22 | 2019-01-01 | 常熟建工建设集团有限公司 | A kind of construction method of quake-resistant safety ground |
| CN109083128A (en) * | 2018-09-10 | 2018-12-25 | 浙江吉通地空建筑科技有限公司 | Fashioned iron column assembled underground continuous wall with high-bearing capacity |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104746435A (en) | Wide-angle Y-shaped pier column construction method | |
| CN103334439A (en) | Long-span reinforced concrete inner support structure of rectangular deep foundation pit and construction method of structure | |
| CN103953114B (en) | Steel frame-reinforced masonry shear wall combinative structure and construction method thereof | |
| CN101775844A (en) | Connecting joint of ring beam of steel core concrete column used for topdown construction method foundation pit engineering | |
| CN106121039A (en) | Villages and small towns masonry structure assembled integral ring beam and construction column combination technique | |
| CN107905251A (en) | A kind of module prestressing force Retaining Wall and its assembly method | |
| CN203654294U (en) | Foundation pit supporting structure used in reverse building method | |
| CN102691302B (en) | Concrete structure for supporting deep foundation pit | |
| CN105113537A (en) | Vertical support system constructed through reverse construction method and method for vertical support system | |
| CN103726586A (en) | H-shaped steel and steel plate framework assembly shear wall with interfaces with grooves and manufacturing method | |
| CN107443550A (en) | Prefabricated cushion cap template and its installation method | |
| CN111501771A (en) | Application method of multi-elliptical-ring combined support in deep large-sludge foundation pit engineering | |
| CN202787055U (en) | Pier fixed connection structure of steel structure overhead bridge | |
| CN204590038U (en) | A kind of permanent foundation pit supporting construction | |
| CN103104102A (en) | Construction method for underground storey-addition reconstruction | |
| CN205024719U (en) | Pile foundation and integrated reverse construction vertical braces system of underground continuous wall | |
| CN205242441U (en) | Oval contrary shaft of doing of suspension type | |
| CN103911989A (en) | Underwater pouring root type foundation with retaining wall and construction method thereof | |
| CN104005414A (en) | Method for constructing large-diameter reinforced concrete cast-in-place pile supporting stand column | |
| CN103122642A (en) | Construction method of vertical post support change | |
| CN102392417B (en) | Dual-cantilever bearing support structure for large steel pipe and installation method | |
| CN204001705U (en) | Outer wall of basement single surface formwork constructing structure based on earth anchor truss | |
| CN106988319A (en) | A kind of rapid constructing method of large deep foundation pit agent structure side wall | |
| CN207567784U (en) | Deep basal pit combined type supporting | |
| CN205421332U (en) | Contrary coincide underground continuous wall that does of a core section of thick bamboo |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160210 |