CN207047996U - A kind of terrace pavement system of ecological luminous stone - Google Patents

A kind of terrace pavement system of ecological luminous stone Download PDF

Info

Publication number
CN207047996U
CN207047996U CN201720695813.6U CN201720695813U CN207047996U CN 207047996 U CN207047996 U CN 207047996U CN 201720695813 U CN201720695813 U CN 201720695813U CN 207047996 U CN207047996 U CN 207047996U
Authority
CN
China
Prior art keywords
layer
ecological
luminous stone
luminous
pavement system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720695813.6U
Other languages
Chinese (zh)
Inventor
周晓琼
高思佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Erif (shanghai) Planning And Design Consulting Ltd By Share Ltd
Original Assignee
Erif (shanghai) Planning And Design Consulting Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Erif (shanghai) Planning And Design Consulting Ltd By Share Ltd filed Critical Erif (shanghai) Planning And Design Consulting Ltd By Share Ltd
Priority to CN201720695813.6U priority Critical patent/CN207047996U/en
Application granted granted Critical
Publication of CN207047996U publication Critical patent/CN207047996U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

It the utility model is related to a kind of terrace pavement system of ecological luminous stone, the system includes rammed earth layer, the blotter being from bottom to top laid in successively on rammed earth layer, plain concrete bed course, cement mortar binder course and luminous stone pave-load layer, hypogee is provided with described rammed earth layer, the top of the hypogee is provided with heat-insulation layer and waterproof layer, and described waterproof layer is provided with siphon drainage unit.Compared with prior art, Tthe utility model system overall structure is simple, it is green, economic and practical is good, convenient construction, good permeability, using luminous stone pave-load layer, the luminous impulse at night on road surface can be achieved, recycling can be also collected to rainwater, can effectively avoid causing sewage to exclude the technical problem so as to cause hypogee to ooze tide in time using drain bar or french drain merely.

Description

A kind of terrace pavement system of ecological luminous stone
Technical field
The utility model belongs to Civil Engineering Design technical field, is related to a kind of terrace pavement system of ecological luminous stone.
Background technology
Urban construction also changes the original ecological environment of the Nature while human living space is created.Urbanization One of key character is exactly that original natural vegetation is constantly substituted by building and non-permeable hardened ground, so as to change Natural soils vegetation and the natural permeable attribute of underlayer.City hardened ground accounts for the suitable ratio of whole urban area area Example, the quality of its ecological benefits play vital effect for urban ecological environment.Therefore, select ecological benefits good It is to improve city square and urban district ecology and the importance of physical environment that hardened ground, which is mated formation,.
The hardened ground design of traditional urban road, square is primarily upon the technical performance indexs such as its durability and vision The requirement of aesthetic, thus the old-fashioned pavement material such as concrete, masonry is largely used as paving structure.But these are old There is obvious ecological environment defect in formula pavement material, ecological benefits are relatively low.Therefore, new environment-protection type floor pavement material should Transport and give birth to, compared with old-fashioned pavement material, permeable pavement embodies the theory of " with Harmonizing with Environment " well.It is good in construction There is unique advantage in terms of the physics such as city sound well, light, heat and ecological environment.Play urban afforestation, water body and mat formation The comprehensive benefit of ecological environment, it is the important channel for improving human settlement environment in city.It is a kind of emerging city that ecological environment-friendly type, which is mated formation, City mats formation pattern, is recombinated and is distilled by using new material, or by original pavement material, so as to reach eliminate it is old The purpose of the problems such as the hardened ground that formula pavement material is brought, water pollution.
Luminous stone, also known as noctilucence stone, it is a kind of artificial stone.It is by long-afterglow luminescent powder and unsaturated-resin or ceramic material Expect to form for Raw material processing.The product surface smooth pieces, shape such as natural cobblestone, there is corrosion-resistant, resistance to water logging, it is sun-resistant The advantages that, daytime or have light irradiation in the case of, light can be fully absorbed in 10 minutes, night or dark environment Under, can emit a brilliant light line, and the continuous illumination time was more than 12 hours.
In physical planning design, hypogee is usually built below terrace, in the prior art in the green of hypogee Change in drainage system, the most frequently used is exactly drainage blanket and french drain.There is limitation in traditional blind drainage, local draining is unobstructed, But it cannot be guaranteed that all drainings of most of region are unobstructed, easily cause ponding, if row does not fall easily with causing upper strata ponding for a long time Rotten of face plant, if waterproof layer for a long time in the environment of ponding, easily causes waterproof layer localized seepage, it can not only waste a large amount of Human and material resources, financial resources, it is important to be also greatly reduced the service life of whole building thing.
Utility model content
The purpose of this utility model is exactly a kind of green in order to be provided the defects of overcoming above-mentioned prior art to exist, Economic and practical is good, convenient construction, good permeability, and drainage is good, can the effective ecological luminous stone of beautifying city road environment Terrace pavement system.
The purpose of this utility model can be achieved through the following technical solutions:
A kind of terrace pavement system of ecological luminous stone, the system include rammed earth layer, are from bottom to top laid in successively Blotter, plain concrete bed course, cement mortar binder course and luminous stone pave-load layer on rammed earth layer, described rammed earth Hypogee is provided with layer, the top of the hypogee is provided with heat-insulation layer and waterproof layer, and described waterproof layer is arranged provided with siphon Water unit.
Described siphon drainage unit includes being laid in the drain bar and siphon drainage groove that on waterproof layer and are connected with each other, top Portion extends to terrace surface and siphon drainage groove is connected with the extraneous siphon pipe being connected, by drainpipe with siphon drainage groove The rainwater collection header that connects, the liquid level gauge being arranged in rainwater collection header, the sparge pipe being connected with rainwater collection header, it is arranged on spray Suction pump on water pipe and the electric controller electrically connected respectively with liquid level gauge, suction pump.
Described drain bar, the surrounding of siphon drainage groove are soil matrix, are provided between drain bar and siphon drainage groove and soil matrix Filter layer.
Described filter layer is geotextile layer or nonwoven layer.
Observation well, described drainpipe one end and siphon drainage are provided between described siphon drainage groove and rainwater collection header Groove is connected, and the other end is connected through observation well with rainwater collection header.
The periphery of described luminous stone pave-load layer is provided with granite and burns surface side stone edge sealing.
The bottom that described granite burns surface side stone edge sealing is plugged in plain concrete bed course.
The thickness of described luminous stone pave-load layer is 50-80mm, and the surface undulation of luminous stone pave-load layer is not more than 3mm。
The thickness of described cement mortar binder course is 30-40mm, and the thickness of described plain concrete bed course is 90-120mm, institute The thickness for the blotter stated is 100-110mm.
Described plain concrete bed course is C20 element concrete bed courses.
In the utility model, the luminous stone employed in described luminous stone pave-load layer is self-luminous cobblestone, can be carried out Used after crushing as dispensing, minimum grain size available for road moulding, the embodiment of artistic concept, is dredged guide, excited up to millimeter Storage light condition is low, and high brightness duration length, high-low temperature resistant, electrical insulation capability is good, and intensity hardness is good, corrosion-resistant, chemically stable Property is good.Described siphon pipe can not only make permeation functions but also can observe drainage situation.
The terrace pavement system of the utility model ecology luminous stone is in practical application, the unnecessary rainwater of terrace passes through terrace Leak into drain bar, the rainwater following current being collected on drain bar is collected into siphon drainage groove, is then passed through by drainpipe Observation well stream is crossed to enter in rainwater collection header, and the liquid level gauge being arranged in rainwater collection header passes the liquid level signal detected in real time Electric controller is delivered to, when liquid level reaches setting value in rainwater collection header, electric controller controls the pump work that draws water, suction pump Rainwater collection header reclaimed water is extracted out, outwards sprayed water through sparge pipe, and then realize collection and the recycling of rainwater resource.
Compared with prior art, the utility model has the characteristics that:
1) luminous stone pave-load layer, continuous illumination time at night length are used, the luminous guide at night that road surface can be achieved is made With, and can beautify the environment, road surface wearability is good, has the effect of sound deadening shock absorption, service life length;
2) rainwater oozed out in soil can be carried out by collection and uniform disposal using siphon drainage unit, finally carries out recycling Utilize, so as to not only save water resource, avoid the waste of the energy, and can avoids using drain bar or french drain to cause dirt merely The technical problem that water can not exclude to cause hypogee to ooze tide in time.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model
Description of symbols in figure:
1-rammed earth layer, 2-blotter, 3-plain concrete bed course, 4-cement mortar binder course, 5-luminous stone are mated formation Layer, 6-hypogee, 7-heat-insulation layer, 8-waterproof layer, 9-drain bar, 10-siphon drainage groove, 11-siphon pipe, 12-rain Water collection tank, 13-sparge pipe, 14-granite burn surface side stone edge sealing, 15-observation well, 16-drainpipe.
Embodiment
The utility model is described in detail with specific embodiment below in conjunction with the accompanying drawings.
Embodiment 1:
As shown in figure 1, a kind of terrace pavement system of ecological luminous stone, the system includes rammed earth layer 1, from bottom to top Blotter 2, plain concrete bed course 3, cement mortar binder course 4 and the luminous stone pave-load layer being laid in successively on rammed earth layer 1 5, it is provided with hypogee 6 in rammed earth layer 1, the top of the hypogee 6 is provided with heat-insulation layer 7 and waterproof layer 8, on waterproof layer 8 Provided with siphon drainage unit.
Wherein, siphon drainage unit includes being laid in the drain bar 9 and siphon drainage groove on waterproof layer 8 and being connected with each other 10th, top extends to terrace surface and by siphon drainage groove 10 with the extraneous siphon pipe 11 being connected, by drainpipe 16 and rainbow Rainwater collection header 12 that suction tank 10 is connected, the liquid level gauge being arranged in rainwater collection header 12, with the phase of rainwater collection header 12 The sparge pipe 13 (sparge pipe 13 is provided with some water jets) of connection, the suction pump being arranged on sparge pipe 13 and respectively with liquid Position meter, the electric controller of suction pump electrical connection.Drain bar 9, the surrounding of siphon drainage groove 10 are soil matrix, drain bar 9 and siphon Filter layer is provided between rhone 10 and soil matrix.Filter layer is geotextile layer or nonwoven layer.Siphon drainage groove 10 and rainwater collection Observation well 15 is provided between header 12, the one end of drainpipe 16 is connected with siphon drainage groove 10, and the other end passes through observation well 15 and rain Water collection tank 12 connects.
The periphery of luminous stone pave-load layer 5 is provided with granite and burns surface side stone edge sealing 14.Granite burns the bottom of surface side stone edge sealing 14 Portion is plugged in plain concrete bed course 3.Plain concrete bed course 3 is C20 element concrete bed courses.
In the present embodiment, the thickness of luminous stone pave-load layer 5 is 50mm, and the surface undulation of luminous stone pave-load layer 5 is little In 3mm.The thickness of cement mortar binder course 4 is 30mm, and the thickness of plain concrete bed course 3 is 100mm, and the thickness of blotter 2 is 100mm。
In practical application, the unnecessary rainwater of terrace is leaked into drain bar 9 by terrace, it is collected on drain bar 9 Rainwater following current is collected into siphon drainage groove 10, then flows into rainwater collection header 12 by observation well 15 by drainpipe 16 In, and the liquid level signal detected is sent to electric controller by the liquid level gauge being arranged in rainwater collection header 12 in real time, treats rain When liquid level reaches setting value in water collection tank 12, electric controller controls the pump work that draws water, and suction pump is by rainwater collection header 12 Water is extracted out, is outwards sprayed water through sparge pipe 13, and then realize collection and the recycling of rainwater resource.
Embodiment 2:
In the present embodiment, the thickness of luminous stone pave-load layer 5 is 80mm, and the surface undulation of luminous stone pave-load layer 5 is little In 3mm.The thickness of cement mortar binder course 4 is 40mm, and the thickness of plain concrete bed course 3 is 120mm, and the thickness of blotter 2 is 110mm。
Remaining is the same as embodiment 1.
Embodiment 3:
In the present embodiment, the thickness of luminous stone pave-load layer 5 is 60mm, and the surface undulation of luminous stone pave-load layer 5 is little In 3mm.The thickness of cement mortar binder course 4 is 35mm, and the thickness of plain concrete bed course 3 is 90mm, and the thickness of blotter 2 is 105mm。
Remaining is the same as embodiment 1.
Embodiment 4:
In the present embodiment, the thickness of luminous stone pave-load layer 5 is 70mm, and the surface undulation of luminous stone pave-load layer 5 is little In 3mm.The thickness of cement mortar binder course 4 is 30mm, and the thickness of plain concrete bed course 3 is 110mm, and the thickness of blotter 2 is 100mm。
Remaining is the same as embodiment 1.
The above-mentioned description to embodiment is understood that for ease of those skilled in the art and using practicality It is new.Person skilled in the art obviously can easily make various modifications to these embodiments, and illustrating herein General Principle be applied in other embodiment without by performing creative labour.Therefore, the utility model is not limited to above-mentioned Embodiment, those skilled in the art according to announcement of the present utility model, do not depart from improvement that the utility model category made and Modification all should be within the scope of protection of the utility model.

Claims (10)

  1. A kind of 1. terrace pavement system of ecological luminous stone, it is characterised in that the system include rammed earth layer (1), by lower and On be laid in blotter (2) on rammed earth layer (1), plain concrete bed course (3), cement mortar binder course (4) and hair successively Light stone pave-load layer (5), hypogee (6) are provided with described rammed earth layer (1), the top of the hypogee (6), which is provided with, to be protected Warm layer (7) and waterproof layer (8), described waterproof layer (8) are provided with siphon drainage unit.
  2. A kind of 2. terrace pavement system of ecological luminous stone according to claim 1, it is characterised in that described siphon row Water unit includes being laid on waterproof layer (8) and the drain bar (9) being connected with each other and siphon drainage groove (10), top and extends to ground Level ground surface and by siphon drainage groove (10) with the external world be connected siphon pipe (11), by drainpipe (16) and siphon drainage groove (10) the rainwater collection header (12) that is connected, the liquid level gauge being arranged in rainwater collection header (12), with rainwater collection header (12) phase Sparge pipe (13), the suction pump being arranged on sparge pipe (13) and the electricity electrically connected respectively with liquid level gauge, suction pump of connection Airgun controller.
  3. A kind of 3. terrace pavement system of ecological luminous stone according to claim 2, it is characterised in that described drain bar (9), the surrounding of siphon drainage groove (10) is soil matrix, and drain bar (9) and siphon drainage groove (10) are provided with filter layer between soil matrix.
  4. A kind of 4. terrace pavement system of ecological luminous stone according to claim 3, it is characterised in that described filter layer For geotextile layer or nonwoven layer.
  5. A kind of 5. terrace pavement system of ecological luminous stone according to claim 2, it is characterised in that described siphon row Observation well (15), described drainpipe (16) one end and siphon drainage groove are provided between tank (10) and rainwater collection header (12) (10) connect, the other end is connected through observation well (15) with rainwater collection header (12).
  6. A kind of 6. terrace pavement system of ecological luminous stone according to any one of claim 1 to 5, it is characterised in that institute The periphery for the luminous stone pave-load layer (5) stated is provided with granite and burns surface side stone edge sealing (14).
  7. A kind of 7. terrace pavement system of ecological luminous stone according to claim 6, it is characterised in that described granite The bottom for burning surface side stone edge sealing (14) is plugged in plain concrete bed course (3).
  8. A kind of 8. terrace pavement system of ecological luminous stone according to claim 6, it is characterised in that described luminous stone The thickness of pave-load layer (5) is 50-80mm, and the surface undulation of luminous stone pave-load layer (5) is not more than 3mm.
  9. A kind of 9. terrace pavement system of ecological luminous stone according to claim 8, it is characterised in that described cement bonded sand The thickness for starching binder course (4) is 30-40mm, and the thickness of described plain concrete bed course (3) is 90-120mm, described blotter (2) thickness is 100-110mm.
  10. A kind of 10. terrace pavement system of ecological luminous stone according to claim 9, it is characterised in that described plain concrete Bed course (3) is C20 element concrete bed courses.
CN201720695813.6U 2017-06-15 2017-06-15 A kind of terrace pavement system of ecological luminous stone Expired - Fee Related CN207047996U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720695813.6U CN207047996U (en) 2017-06-15 2017-06-15 A kind of terrace pavement system of ecological luminous stone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720695813.6U CN207047996U (en) 2017-06-15 2017-06-15 A kind of terrace pavement system of ecological luminous stone

Publications (1)

Publication Number Publication Date
CN207047996U true CN207047996U (en) 2018-02-27

Family

ID=61493668

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720695813.6U Expired - Fee Related CN207047996U (en) 2017-06-15 2017-06-15 A kind of terrace pavement system of ecological luminous stone

Country Status (1)

Country Link
CN (1) CN207047996U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107237386A (en) * 2017-06-15 2017-10-10 埃瑞弗(上海)规划设计工程咨询股份有限公司 A kind of terrace pavement system of ecological luminous stone

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107237386A (en) * 2017-06-15 2017-10-10 埃瑞弗(上海)规划设计工程咨询股份有限公司 A kind of terrace pavement system of ecological luminous stone

Similar Documents

Publication Publication Date Title
CN107237386A (en) A kind of terrace pavement system of ecological luminous stone
CN202945619U (en) Basement wall and baseplate waterproof and drainage structure
CN106087632B (en) A kind of laying brick for having both row's water storage function based on sponge urban construction
CN206289491U (en) A kind of pavement, greenery patches harvest water system
CN107034767A (en) A kind of full pervious concrete pavement structure of regeneration aggregate and its construction method
CN106758638A (en) A kind of city sponge brick and its construction technology
CN206784315U (en) Ecological riverway shore protection
CN105735082A (en) Water-permeable planting formwork frame and multifunctional water-permeable pavement structure system and pavement method thereof
CN205711609U (en) Framed and the multi-functional porous pavement structural system of permeable plantation
CN104047215A (en) Method for changing cement concrete pavement into pervious concrete pavement
CN201678926U (en) Novel combined type water-permeable sidewalk
CN109972475A (en) A kind of ecological permeable paving structure
CN202627166U (en) Novel water-discharging ecological zone for town road
CN105484132B (en) A kind of construction method that novel water permeable pavement is mated formation
CN204608556U (en) A kind of water permeable pavement
CN207047996U (en) A kind of terrace pavement system of ecological luminous stone
CN206545257U (en) A kind of novel greening band water storage structure
CN206385425U (en) A kind of ecological permeable road surface
CN208362838U (en) A kind of porous pavement
CN206828912U (en) A kind of full pervious concrete pavement structure of regeneration aggregate
CN207484214U (en) A kind of water permeability and water storage ability terrace
CN109235187A (en) A kind of porous pavement method for paving being easy to construct and have landscape effect
CN205907557U (en) Water permeable pavement structure
CN202787015U (en) Landscape ecology framework
CN206090204U (en) Height ecological road surface structure of permeating water

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180227

Termination date: 20200615

CF01 Termination of patent right due to non-payment of annual fee