CN206815340U - A kind of filling pile head abolishes device - Google Patents
A kind of filling pile head abolishes device Download PDFInfo
- Publication number
- CN206815340U CN206815340U CN201720602667.8U CN201720602667U CN206815340U CN 206815340 U CN206815340 U CN 206815340U CN 201720602667 U CN201720602667 U CN 201720602667U CN 206815340 U CN206815340 U CN 206815340U
- Authority
- CN
- China
- Prior art keywords
- device body
- bar
- cage
- abolishes
- pile head
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Device is abolished the utility model discloses a kind of filling pile head, including multiple coaxial annular casings, between the top of annular casing an integrally-built device body is fixedly connected as by attachment means, gap between the outermost annular casing of device body annular casing adjacent thereto is cage bar locating clip layer, and shackle plate has been fixed with the top of device body and the reinforcing bar for making the spacer bar of steel reinforcement cage pass through and be positioned to the spacer bar of steel reinforcement cage wears a mouthful support.Abolish device reduce bond stress between cage bar and pile crown concrete, eliminate pick it is while hindering cage bar risk that pile crownization is greatly small, block-by-block can be carried out to pile crown to abolish, reduce the performance requirement to lifting appliance, improve construction efficiency and the scope of application that original pile crown abolishes construction, reduce construction fugitive dust, reduce construction cost.
Description
Technical field
Civil engineering foundation construction technical field is the utility model is related to, dress is abolished in particular to a kind of filling pile head
Put.
Background technology
Cast-in-place concrete pile is because of its reliable in quality, and construction technology is ripe, and ground adaptability is strong, and bearing capacity is good, extensive
Applied to all kinds of foundation engineerings.In the construction of cast-in-place concrete pile, to ensure the quality of pile crown concrete, pile foundation termination is avoided
Adulterate laitance, the specification of mud, it is desirable to which concrete perfusion will exceed filling pile head the absolute altitude 0.5~1.0m, Ran Houzai of setting
Cut the part (being referred to as broken pile head) exceeded.It is universal at present to cut the concrete for exceeding setting filling pile head part
Removed using artificial chisel or method that human assistance small-sized machine is abolished.This method because the surrounding from pile crown is inwardly abolished,
On the one hand the risk picked and hinder cage bar during abolishing be present, be on the other hand relatively large in diameter and then abolished by pile body on the inside of pile crown cage bar
Thickness considerable influence, exist and abolish that workload is big, and labor intensity is big, speed of application is slow, and it is big, dangerous higher to abolish process airborne dust
The shortcomings of, especially inapplicable large diameter pile foundation pile crown abolishes operation, and large diameter pile foundation belongs to current Bored Pile of Bridge
Development trend.
Utility model content
The purpose of this utility model seeks to the deficiency for solving above-mentioned background technology, there is provided a kind of easy for construction, artificial labor
Fatigue resistance is small, the safe filling pile head for abolishing operation suitable for large diameter pile foundation pile crown abolishes device.
In order to achieve this, filling pile head designed by the utility model abolishes device, including multiple coaxial rings
Shape casing, an integrally-built device body, described device are fixedly connected as by attachment means between the top of annular casing
Gap between the outermost annular casing of body annular casing adjacent thereto is cage bar locating clip layer, described device body
Top has been fixed with shackle plate and for passing through the spacer bar of steel reinforcement cage and the spacer bar of steel reinforcement cage being positioned
Reinforcing bar wears a mouthful support.
Specifically, the attachment means are the connection strength plate being fixedly connected at the top of multiple coaxial annular casings or are fixed on
Device top plate at the top of multiple coaxial annular casings, if device top plate, then through hole perfusion is opened up in the middle part of device top plate
Concrete, if the outer wall for being coupled strength plate, the then inwall of the outermost annular casing of device body annular casing adjacent thereto
The distance between be less than cage bar diameter so that cage bar cage bar position interlayer in position.
Preferably, at least two liftings relative to the axisymmetrical for abolishing device are fixed with the top of described device body
Otic placode.
Preferably, two reinforcing bars relative to the axisymmetrical of device body are fixed with the top of described device body and wear mouth
Support, it is the square set that the reinforcing bar being fixed at the top of device body is surrounded that the reinforcing bar, which wears mouthful support,.
Further, the height of described device body is more than pile crown and abolishes the hole top of segment length and stake holes to the length of cage bar
Sum.
The beneficial effects of the utility model are:1st, safety:By the way that cage bar position is abolished into concrete thickness at utmost
Ground is thinning so that cage bar position is clearly presented on operating personnel at the moment, farthest protects cage bar.2nd, it is quick:Institute
There is cage bar disposably to press from both sides shield, at the same reduce abolish concrete subregion abolish difficulty, improve and abolish operation work efficiency, it is especially suitable
Construction is abolished for large diameter pile foundation pile crown.3rd, it is economical:Device low manufacture cost, turnover rate is high, while improves effect, drops
Low construction cost.4th, it is environmentally friendly:Piecemeal, which is abolished, can greatly reduce and noise content, can meet that the construction in densely inhabited district will
Ask.
Brief description of the drawings
Fig. 1 is that top is that the device of abolishing for being coupled strength plate is sheathed at the top of steel reinforcement cage and is positioned in stake holes in the utility model
Top view;
Fig. 2 is the sectional view of A-A in Fig. 1;
Fig. 3 is the sectional view of B-B in Fig. 1;
Fig. 4 is that top is that the device of abolishing of device top plate is sheathed at the top of steel reinforcement cage and is positioned in stake holes in the utility model
Top view;
Fig. 5 is the sectional view of C-C in Fig. 4;
Fig. 6 is the sectional view of D-D in Fig. 4;
Fig. 7 is the front view of suspension ring in the utility model;
Wherein, 1-device body (1.1-annular casing, 1.2-be coupled strength plate, 1.3-device top plate), 2-suspension ring
(2.1-dowel, 2.2-semi-circular shape ear muscle), 3-cage bar positioning interlayer, 4-shackle plate is played, 5-reinforcing bar wears a mouthful support, 6-
Cage bar, 7-stake holes, 9-bearing rod, 10-stirrup, 11-through hole.
Embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Abolishing device has two kinds of structure types:
Filling pile head as shown in Fig. 1-3 abolishes device, including three coaxial annular casings 1.1, annular casing
Between 1.1 top an integrally-built device body 1 is fixedly connected as by being coupled strength plate 1.2.Device body 1 is outermost
Gap between annular casing annular casing adjacent thereto is cage bar locating clip layer 3, the outermost annular casing of device body 1
The distance between the inwall outer wall of annular casing adjacent thereto be less than the diameter of cage bar 6.
As shown in Fig. 4-6, including two coaxial annular casings 1.1, pass through device between the top of annular casing 1.1
Top plate 1.3 is fixedly connected as an integrally-built device body 1.The outermost annular casing of device body 1 ring adjacent thereto
Gap between shape casing is cage bar locating clip layer 3, and the middle part of device top plate 1.3 is provided with the through hole 11 of concrete perfusion.
The top of the device body 1 of two kinds of structures is respectively and fixedly provided with two and plays hanger relative to the axisymmetrical for abolishing device
The reinforcing bar of plate 4 and two axisymmetricals relative to device body 1 wears mouthful support 5, and reinforcing bar wears mouthful support 5 to be fixed on device sheet
The square set that the reinforcing bar at the top of body 1 is surrounded.The height of device body 1 is all higher than the hole that pile crown abolishes segment length and stake holes 7
Push up the length sum of cage bar 6.
When attachment means for connection strength plate 2 when, the inwall of the outermost annular casing of device body 1 annular adjacent thereto
The distance between outer wall of casing is slightly less than the diameter of cage bar 6, so that cage bar 6 positions in cage bar locating clip 3, can also pass through
Reinforcing bar is passed through in reinforcing bar wears mouthful support 5, device whereabouts is abolished in limitation, to ensure positioning of the cage bar in cage bar locating clip 3.
The construction method for abolishing device designed by the utility model comprises the following steps:
1), before stake holes drilling, decentralization final section steel reinforcement cage is completed, in the outermost annular casing of device body 1
Releasing agent is coated with the outer wall of inwall and annular casing adjacent thereto.Device body 1 is arranged and is fixed on final section steel
The top of muscle cage, by fiber band passed through after shackle plate 4 with the banding fixed of cage bar 6.
2), the final section steel reinforcement cage for being provided with device body 1 is put into stake holes 7, the spacer bar of steel reinforcement cage is worn
Cross reinforcing bar and wear mouthful support 5, and two of spacer bar is placed on the sleeper for be layed in ground and is fixed, filled into stake holes 7
Concrete is noted, forms pile foundation;At the end of concreting is fast, multiple suspension ring 2 are inserted on the top of pile crown concrete, such as Fig. 7
It is shown:Suspension ring 2 include two vertical dowels 2.1, and semi-circular shape ear muscle 2.2 is fixedly connected between the top of two dowels,
Bearing rod 9 is fixedly connected between multiple suspension ring 2.
3), after pile foundation concrete reaches initial setting strength, the spacer bar of steel reinforcement cage is removed, wears the steel wire rope of loop wheel machine
Cross shackle plate 4 and extracted device body 1 by loop wheel machine;
4), after pile foundation concrete reaches the intensity of code requirement, cushion cap foundation ditch is excavated, when cushion cap excavation of foundation pit is completed simultaneously
, can be by hand hammer, chock by outer and interior the concrete of pile crown section is peeled off and transported from level to level after excavating out pile crown section.Also can be first
Section is first abolished to pile crown using air drill and digs out ring groove, then throws several chocks into, and chock is entered by external force
Row taps, and pile crown is abolished into section concrete wedge breaks after the degree that can be pulled off to loop wheel machine, by wire rope rope on suspension ring, passes through loop wheel machine
Hoisting wirerope integrally hangs out the pile crown part for needing to cut after separation.
The utility model abolishes section concrete progress subregion to pile crown by abolishing device, is mixed reducing cage bar 6 with pile crown
Bond stress between solidifying soil, eliminate and pick while hindering 6 risk of cage bar that pile crownization is greatly small, realize pile crown block-by-block and abolish, reduce
To the performance requirement of lifting appliance, the construction efficiency and the scope of application of original pile crown breaking construction method are improved, reduce
Construction fugitive dust, reduce construction cost.With applied widely, constructing operation is easy, and speed of application is very fast, reliable construction quality
The advantages of.Meet the requirement of green construction, the large diameter pile foundation pile crown that is particularly suitable for use in abolishes construction.
It is described above, only it is preferred embodiment of the present utility model, not structure of the present utility model is done any
Formal limitation.Every any simple modification made according to the technical essence of the utility model to above example, it is equal
Change and modification, in the range of still falling within the technical solution of the utility model.
Claims (5)
1. a kind of filling pile head abolishes device, it is characterised in that:It includes multiple coaxial annular casings (1.1), annular
Between the top of casing (1.1) an integrally-built device body (1), described device body are fixedly connected as by attachment means
(1) gap between outermost annular casing annular casing adjacent thereto is cage bar locating clip layer (3), described device body
(1) shackle plate (4) has been fixed with the top of and for making the spacer bar of steel reinforcement cage pass through and enter to the spacer bar of steel reinforcement cage
The reinforcing bar of row positioning wears a mouthful support (5).
2. a kind of filling pile head as claimed in claim 1 abolishes device, it is characterised in that:The attachment means are fixation
Connect the connection strength plate (1.2) at the top of multiple coaxial annular casings (1.1), the outermost annular shield of described device body (1)
The distance between inwall outer wall of annular casing adjacent thereto of cylinder is less than the diameter of cage bar (6).
3. a kind of filling pile head as claimed in claim 1 abolishes device, it is characterised in that:The attachment means are fixation
Device top plate (1.3) at the top of multiple coaxial annular casings (1.1), described device top plate are provided with perfusion in the middle part of (1.3)
The through hole (11) of concrete.
4. a kind of filling pile head as claimed in claim 1 abolishes device, it is characterised in that:Described device body (1)
Top is fixed with least two and plays shackle plate (4) relative to the axisymmetrical for abolishing device;The top of described device body (1)
The reinforcing bar for being fixed with two axisymmetricals relative to device body (1) wears a mouthful support (5), and the reinforcing bar wears a mouthful support (5) and is
The square set that the reinforcing bar being fixed at the top of device body (1) is surrounded.
5. a kind of filling pile head as claimed in claim 1 abolishes device, it is characterised in that:Described device body (1)
Highly it is more than pile crown and abolishes the hole top of segment length and stake holes (7) to the length sum of cage bar (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720602667.8U CN206815340U (en) | 2017-05-26 | 2017-05-26 | A kind of filling pile head abolishes device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720602667.8U CN206815340U (en) | 2017-05-26 | 2017-05-26 | A kind of filling pile head abolishes device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206815340U true CN206815340U (en) | 2017-12-29 |
Family
ID=60757568
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720602667.8U Expired - Fee Related CN206815340U (en) | 2017-05-26 | 2017-05-26 | A kind of filling pile head abolishes device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206815340U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106996107A (en) * | 2017-05-26 | 2017-08-01 | 中交第二航务工程局有限公司 | A kind of filling pile head abolishes device and its construction method |
-
2017
- 2017-05-26 CN CN201720602667.8U patent/CN206815340U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106996107A (en) * | 2017-05-26 | 2017-08-01 | 中交第二航务工程局有限公司 | A kind of filling pile head abolishes device and its construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106996107A (en) | A kind of filling pile head abolishes device and its construction method | |
CN105297729B (en) | Bridge pile foundation pile head breaking device and method | |
CN106968251A (en) | A kind of concrete filling pile head abolishes device and its construction method | |
CN105298390B (en) | A kind of equipment of exploiting ocean oil | |
CN108678752B (en) | Shaft equipment rapid installation process | |
CN110118084B (en) | Ultra-deep shaft construction method | |
CN104727308B (en) | Immersed tube compaction pile or cast-in-place concrete pile construction device and method | |
JP6284255B1 (en) | Pile cap and pile drawing method | |
CN106149684A (en) | A kind of full-sleeve long screw auger drilling deposited pile construction method | |
CN104631460A (en) | Girdling splitting type integral pile breaking method | |
CN110130346A (en) | Hammer the prefabricated pile pile-sinking device and construction method in conjunction with static pressure | |
CN104895072A (en) | A pre-stressed anchor cable and a pre-stressed anchor cable one-time forming construction method | |
CN206815340U (en) | A kind of filling pile head abolishes device | |
CN108842792B (en) | Layered lifting and unloading type ground pulling anchor rod and construction method | |
CN106948347A (en) | Pile extracting method and pile pulling system | |
CN107938685A (en) | A kind of new diagonal brace composite support device | |
CN110016911A (en) | A kind of depth casing mechanical hole building bore forming technique | |
CN210370522U (en) | Drilling pile machine provided with double guide rails and double drilling machines | |
CN106968252A (en) | Pile pulling recharge method and pile pulling recharge system | |
CN113047329B (en) | Plum-blossom-shaped pile foundation anchor rod composite foundation structure and construction method thereof | |
CN206902712U (en) | Pile pulling recharge system | |
CN108775036A (en) | A kind of construction method for replacing bored concrete pile | |
CN111155513B (en) | Full-slewing drilling machine and hydraulic vibration hammer cooperative well drilling method | |
CN211143058U (en) | Bored concrete pile convenient to broken pile head | |
CN107059872A (en) | Oblique cord pile extracting method and oblique cord pile pulling system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |