CN108775036A CN201810600480.3A CN201810600480A CN108775036A CN 108775036 A CN108775036 A CN 108775036A CN 201810600480 A CN201810600480 A CN 201810600480A CN 108775036 A CN108775036 A CN 108775036A
Authority
CN
China
Prior art keywords
old
stake holes
pile
pile body
casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810600480.3A
Other languages
Chinese (zh)
Inventor
王雄
李洪勋
雷斌
高子建
吴晓玲
袁维明
崔炳辰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Engineering And Geological Foundation Engineering Co Ltd
Shenzhen Gongkan Geotechnical Group Co Ltd
Original Assignee
Shenzhen Engineering And Geological Foundation Engineering Co Ltd
Shenzhen Gongkan Geotechnical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Engineering And Geological Foundation Engineering Co Ltd, Shenzhen Gongkan Geotechnical Group Co Ltd filed Critical Shenzhen Engineering And Geological Foundation Engineering Co Ltd
Priority to CN201810600480.3A priority Critical patent/CN108775036A/en
Publication of CN108775036A publication Critical patent/CN108775036A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • E02D9/02Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing

Abstract

The present invention relates to the technical fields of rotary digging bored concrete pile, disclose a kind of construction method for replacing bored concrete pile, include the following steps:(1) full-rotating drill sinking sleeve under the periphery of old pile body makes old pile body be isolated with the soil body to the bottom of old pile body, extracts old pile body, forms old stake holes;(2) old stake holes backfills soil-cement, and backfill while pulls out casing;(3) soil-cement is tamped, stands one week;(4) outer casing, then embedded interior casing are buried, for interior casing in outer casing, outer casing is equipped with location structure;The lower part of interior casing sinks down into the lower section of the bottom of old stake holes;(5) soil body for excavating the inside of interior casing forms new stake holes;(6) steel reinforcement cage is transferred, concrete perfusion forms new pile body.Entirety pulls out old pile body, and work efficiency higher is conducive to recycle and manage;Old stake holes backfill, reduces the hidden danger of quality of new stake holes;By this construction method the replacement of old pile body and new pile body is realized in urban project update.

Description

A kind of construction method for replacing bored concrete pile
Technical field
The present invention relates to the technical field for replacing bored concrete pile, more particularly to a kind of construction method for replacing bored concrete pile.
Background technology
With the needs of urban construction and development, can be gradually decreased for the land used of Yingcheng City construction, therefore, urban renewal is The trend of urban modernization construction, still, there are the old foundation piles of a large amount of existing buildings in the place of this intermediate item, new build occur Project pile foundation is overlapping with old stake or partly overlapping phenomenon occurs.
Currently, for the processing of the old stake of urban renewal project, under normal circumstances, using impact crushing method, using jump bit The concrete of old stake and steel reinforcement cage are crushed from top to bottom, in such method impact process, often need to replace electromagnet, Ensure the absorption of old reinforcing bar, cumbersome, speed of application is slow, and processing time length, comprehensive cost are high.
In addition, old stake is constructed after abolishing when new pile, the backfill in old stake holes easily generates collapse hole situation, makes new foundation pile Construction quality be difficult to be effectively ensured.
Invention content
The purpose of the present invention is to provide a kind of construction methods for replacing bored concrete pile, it is intended to solve in the prior art in city In project update, it is difficult to realize the problem of old pile body is replaced with new pile body.
The invention is realized in this way a kind of construction method for replacing bored concrete pile, includes the following steps:
(1) the old pile body on construction ground is pulled out;Cushion cap concrete around the pile crown and pile crown of old stake is abolished, pile crown steel is made Muscle reveals;Using full-rotating drill, sinking sleeve makes old pile body and the soil body to the bottom of old pile body under the periphery of old pile body Isolation, is integrally extracted old pile body by crane;After old pile body is pulled out, old stake holes is formed;
(2) full-rotating drill has bucket, backfills soil-cement in the old stake holes by the bucket, institute It states full-rotating drill and gradually pulls out described sleeve pipe upward while backfilling soil-cement;
(3) soil-cement in old stake holes is tamped by the bucket, by roll compacting with soil-cement Old stake holes stands one week;
(4) according to design requirement, after burying outer casing in the construction ground using hydraulic vibration driver, then embedded interior casing, The interior casing has gap in the outer casing between the interior casing and the outer casing;The outer casing is set There is the location structure being pre-positioned to the stake position center of the interior casing, when the interior casing sinks, the positioning knot Structure extends to the gap and contradicts the outer surface of the interior casing;The lower part of the interior casing sinks down into the bottom of the old stake holes The lower section in portion;
(5) soil body in the inside of interior casing is excavated using Spiral digging machine, forms new stake holes;
(6) steel reinforcement cage is vertically transferred using crane, the steel reinforcement cage is transferred to design position, using cage body limiting device The fixed steel reinforcement cage;Filling concrete is carried out by the way that conduit is perfused, perfusion condensation forms new pile body.
Further, connecting plate is connected on the pile body reinforcing bar, the connecting plate is connected to transverse direction by steel wire rope The transverse bar of arrangement drives the transverse bar to rotate so that the old pile body is in described sleeve pipe using the full convolution drilling machine Rotation, until the old pile body is detached with the soil body.
Further, the connecting plate is equipped with buckle, the stress when transverse bar is equipped with multiple liftings for the crane Lifting lug;The buckle and the lifting lug are fixed in the both ends of steel wire rope respectively.
Further, when carrying out the old stake holes backfill, if without more ponding in the old stake holes, using soil-cement It is backfilled, the ranging from 3-8% of cement mixed weight.
Further, the hydraulic vibration driver is equipped with the hydraulically operated fixture for the outer casing and the interior casing to be clamped; When the outer casing or the interior casing is clamped in the hydraulically operated fixture, the outer casing and the interior casing are perpendicular in institute respectively State construction ground arrangement.
Further, the location structure includes multiple locating rods, and the locating rod extends to institute through the outer casing It states gap and forms positioning end;When the interior casing sinks to the inside of the outer casing, multiple locating rods are around described interior Casing arranges that the positioning end of the locating rod contradicts the outer surface of the interior casing respectively.
Further, during filling concrete, the height that lining rope detection concrete rises is used for multiple times, and in this process, Concrete Continuous Perfusion.
Further, the perfusion depth of tremie control is in 2-6m.
Further, the Spiral digging machine excavates the soil body of the inside of the interior casing, forms new stake holes;It is wanted according to design It asks, the new stake holes is in coincidence status or described in intersection or the new stake holes and the old stake holes with the old stake holes New stake holes is in the old separated state of stake holes or the new stake holes in the old stake holes.
Compared with prior art, a kind of construction method for replacing bored concrete pile provided by the invention, using full-rotating drill knot It closes loop wheel machine and integrally pulls out old pile body, work efficiency higher, and be conducive to the recycling and management of live building waste, to ambient enviroment shadow Sound is small, realizes environmentally protective construction;Old stake holes is backfilled using soil-cement, not only reduces the quality of new pile pore-forming Hidden danger also provides good site condition for large-scale rotary digging construction equipment machine-walking;It is sunk to by hydraulic vibration driver vibrations Outer casing and interior casing, the soil body in the inside for excavating interior casing by Spiral digging machine, form new stake holes;It is applied using inside and outside double casings Work technique, effectively prevents that collapse hole phenomenon occurs, improves the embedded efficiency and quality of interior casing, finally lifts steel reinforcement cage and carries out Filling concrete forms new pile body, and old pile body and new pile body are realized in urban project update by this construction method It replaces.
Description of the drawings
Fig. 1 is the schematic diagram that a kind of new stake holes of construction method for replacing bored concrete pile provided in an embodiment of the present invention is formed;
Fig. 2 is a kind of three-dimensional signal for hanging out old pile body of construction method for replacing bored concrete pile provided in an embodiment of the present invention Figure;
Fig. 3 is the connection structure that a kind of old pile body of construction method for replacing bored concrete pile provided in an embodiment of the present invention is pulled out Stereoscopic schematic diagram;
Fig. 4 is that a kind of inbuilt solid of double casings of construction method for replacing bored concrete pile provided in an embodiment of the present invention is shown It is intended to.
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
The same or similar label correspond to the same or similar components in the attached drawing of the present embodiment;In description of the invention In, it is to be understood that if there is the orientation or positional relationship of the instructions such as term "upper", "lower", "left", "right" for based on attached drawing institute The orientation or positional relationship shown, is merely for convenience of description of the present invention and simplification of the description, and does not indicate or imply the indicated dress It sets or element must have a particular orientation, with specific azimuth configuration and operation, therefore the use of position relationship described in attached drawing Language only for illustration, should not be understood as the limitation to this patent, for the ordinary skill in the art, can be with The concrete meaning of above-mentioned term is understood as the case may be.
The realization of the present invention is described in detail below in conjunction with specific embodiment.
Referring to Fig.1 shown in -4, preferred embodiment is provided for the present invention.
A kind of construction method for replacing bored concrete pile provided by the invention, for solving in urban project update, it is difficult to real The problem of existing old pile body is replaced with new pile body.
A kind of construction method for replacing bored concrete pile, includes the following steps:
(1) the old pile body 30 on construction ground is pulled out;Cushion cap concrete around the pile crown and pile crown of old stake is abolished, pile crown is made Reinforcing bar 32 reveals;Using full-rotating drill 50, sinking sleeve 80 makes to the bottom of old pile body 30 under the periphery of old pile body 30 Old pile body 30 is isolated with the soil body, is extracted 30 entirety of old pile body by crane 40;After old pile body 30 is pulled out, old stake holes 31 is formed;
(2) full-rotating drill 50 has bucket, soil-cement 20 is backfilled in old stake holes 31 by bucket, full circle swinging is bored Machine 50 gradually pulls out casing 80 upward while backfilling soil-cement 20;
(3) soil-cement 20 in old stake holes 31 is tamped by bucket, by roll compacting have soil-cement 20 Old stake holes 31 stand one week;
(4) according to design requirement, after burying outer casing 12 in construction ground using hydraulic vibration driver 60, then embedded interior casing 10, interior casing 10 has gap in outer casing 12 between interior casing 10 and outer casing 12;Outer casing 12 is equipped with positioning and ties The stake position center of structure, the internal casing of location structure 10 is pre-positioned, when interior casing 10 sinks, between location structure extends to Gap and the outer surface for contradicting interior casing 10;The lower part of interior casing 10 sinks down into the lower section of the bottom of old stake holes 31;
(5) soil body in the inside of interior casing 10 is excavated using Spiral digging machine, forms new stake holes 11;
(6) using crane 40, vertically decentralization steel reinforcement cage, steel reinforcement cage are transferred to design position, solid using cage body limiting device Determine steel reinforcement cage;Filling concrete is carried out by the way that conduit is perfused, perfusion condensation forms new pile body.
A kind of construction method of above-mentioned replacement bored concrete pile integrally pulls out old pile body using full-rotating drill 50 in conjunction with loop wheel machine 30, work efficiency higher, and be conducive to the recycling and management of live building waste, and it is small to surrounding environment influence, it realizes environmentally protective Construction;Old stake holes 31 is backfilled using soil-cement 20, not only reduces the hidden danger of quality of new pile pore-forming, is also large size Rotary digging construction equipment machine-walking provides good site condition;Outer casing and interior shield are sunk to by the vibrations of hydraulic vibration driver 60 Cylinder 10, excavates the soil body of the inside of interior casing, forms new stake holes 11;Using inside and outside double casing construction technologies, effectively prevent sending out Raw collapse hole phenomenon, improves the embedded efficiency and quality of interior casing 10, finally, lifts steel reinforcement cage and carries out filling concrete, New pile body is formed, by this construction method, in urban project update, realizes that old pile body is replaced with new pile body.
Before old pile body 30 is pulled out, cushion cap concrete around the pile crown and pile crown of old pile body 30 is abolished first, is dug out Pile crown reinforcing bar 32;Loop wheel machine is welded by connecting plate 34 and pile crown reinforcing bar 32, convenient for pulling out for old pile body 30.
Furthermore pile crown reinforcing bar 32 is connected with connecting plate 34;Connecting plate 34 is connected to the cross of lateral arrangement by steel wire rope 35 To on bar 36, transverse bar 36 is driven to rotate using full convolution drilling machine 50 so that the rotation in casing 80 of old pile body 30, until old stake Body 30 is detached with the soil body;It is convenient for pulling out old pile body in this way.
Transverse bar 36 is sling by crane 40, transverse bar 36 drives connecting plate 34 by steel wire rope 35, old to drive Pile body 30 is whole to be extracted;In this way, the work efficiency that old pile body 30 is pulled out is high, also, be conducive to recycling and the pipe of live building waste Reason.
Alternatively, after old pile body 30 is detached with the soil body, lifting lug 37 is connected using the suspender of crane 40, passes through 35 band of steel wire rope Dynamic connecting plate 34, to drive old pile body 30 integrally to extract.
Connecting plate 34 is equipped with buckle 33, and transverse bar 36 is equipped with the lifting lug 37 of multiple stress when being lifted by crane for crane 40;Steel wire The both ends difference fixed card buckle 33 and lifting lug 37 of rope 35;Under the action of buckling 33 with lifting lug 37, it is convenient for the peace of steel wire rope 35 If meanwhile steel wire rope 35 can be recycled;In addition, under the cooperation of each buckle 33, lifting lug 37 and steel wire rope 35, old pile body 30 That pulls out more stablizes, and improves working security.
Before full-rotating drill 50 is in place, place around smooth old pile foundation, consequently facilitating full-rotating drill 50 is in place.
Buildings in general pile foundation mostly uses pile for prestressed pipe and bored concrete pile, pile for prestressed pipe diameter it is common for 500mm, 600mm, bored concrete pile foundation stake diameter are generally 600mm, 800mm, big stake diameter about 1000mm, 1200mm or so.
The diameter of 50 casing 80 of full-rotating drill, stake of 80 diameter of casing than old pile body 30 are determined according to the diameter of old pile foundation The big 400mm of diameter.
The both sides of full-rotating drill 50 are respectively equipped with counter-force seat 70, and 70 pairs of full-rotating drills 50 of counter-force seat play support and make With;Enhance the safety in utilization of full-rotating drill 50.
When carrying out the backfill of old stake holes 31, if being backfilled using soil-cement 20, water without more ponding in old stake holes 31 The range 3-8% of mud incorporation, it is ensured that backfill intensity avoids backfill section uneven, loose easy collapse hole, to ensure the pile of new pile Quality.
If there is more ponding in old stake holes 31, backfilled using graded broken stone, it is ensured that backfill intensity avoids backfill section not , loose easy collapse hole, to ensure the pile quality of new pile.
Hydraulic vibration driver 60 is equipped with hydraulically operated fixture 61, and hydraulically operated fixture 61 is for being clamped outer casing 12 and interior casing 10;Work as liquid When outer casing 12 or interior casing 10 is clamped in pressure fixture 61, outer casing 12 and interior casing 10 are perpendicular in construction ground arrangement respectively;From And enhance the up rightness that outer casing and interior casing 10 sink.
Furthermore location structure includes multiple locating rods 13, and locating rod 13 extends to gap through outer casing 12 and forms positioning End;When interior casing 10 sinks to the inside of outer casing 12, multiple locating rods 13 are arranged around interior casing 10, the positioning of locating rod 13 End contradicts the outer surface of interior casing 10 respectively;Under the mating reaction of locating rod 13 and outer casing 12, make the positioning of interior casing 10 Accurately, it is convenient for 10 sinking verticality of casing in control, makes the quality that follow-up new pile body is formed more preferably.
The depth ratio of the depth that interior casing 10 sinks and old stake holes 31 is 12:10;When new 11 pore-forming of stake holes, by mud balance It suitably tunes up, to play reinforcement effect to backfill position.
Specifically, during filling concrete, the height that lining rope detection concrete rises is used for multiple times, grasps concrete at any time Fluence is poured, prevents collapse hole phenomenon and occurs, meanwhile, it avoids that perfusion is caused to waste.
During filling concrete, concrete Continuous Perfusion;It avoids perfusion conduit that plugging occurs, causes perfusion accident.
Depth of tremie control is perfused in 2-6m;Ensure the effect of perfusion.
Spiral digging machine excavates the soil body of the inside of interior casing 10, forms new stake holes 11, and new stake holes 11 is in intersect with old stake holes 31 State;The replacement for completing bored concrete pile in this way promotes the pile quality of new pile body while saving place.
New stake holes 11 and old stake holes 31 are in coincidence status, realize the replacement of old stake holes 31 and new stake holes 11, while being ensured new The pile quality of pile body.
New stake holes 11 and 31 separated state of old stake holes, realize the replacement of old stake holes 31 and new stake holes 11, while ensureing new The pile quality of pile body.
New stake holes 11 is in the inside of old stake holes 31, realizes the replacement of old stake holes 31 and new stake holes 11, while ensureing new pile The pile quality of body.
The construction procedure of reinforcing bar cage hoisting and filling concrete is as follows:
1), steel reinforcement cage main reinforcement welding is connected using mechanical sleeve, to ensure main reinforcement protective layer thickness, steel reinforcement cage each week Concrete protective block is arranged in side spacing 3-5m.
2), steel reinforcement cage is hung using crane 40, alignment hole position when lifting, hang it is straight help steady, slowly transfer.Cage body, which is transferred to, to be set It after counting position, is fixed using cage body limiting device in aperture, prevents steel reinforcement cage from occurring altering under floating when concrete is perfused
3) catheter installation, is perfused.Before perfusion, the suitable conduit of diameter is selected;Before downcomer, every section conduit is carried out detailed It checks, the sealing water pressure test need to be done when using for the first time;Catheter connector bit encryption seal and coating butter, it is ensured that sealing can It leans on, conduit bottom is from bottom hole 300-500mm.When transferring conduit, tune, which connects, matches catheter length.
4), before perfusion, after borehole cleaning, water proof plug is put into conduit, water proof plug uses rubber ball, installs first watering Hopper covers sealing baffle, then carries out concrete material perfusion.To ensure first watering quality, ensure concrete first watering buried depth 0.8 Meter or more, suitable hopper is measured using side and carries out first watering.
5), during filling concrete, concrete lifting height is detected through common lining rope, promotes dismounting conduit in due course, conduit buries Deep control is forbidden conduit bottom end proposing concrete face in 2-6m;Concrete pouring is carried out continuously, and to avoid plugging, causes perfusion thing Therefore.
6) height difference that special messenger measures depth of tremie and the inside and outside concrete face of pipe, is set, Underwater Concrete cast record is filled in, grasps at any time every Pile concrete pours fluence, prevents collapse hole phenomenon and occurs.
7), consider that stake top has certain laitance, the superfilled 80~100cm of height of stake top concrete, to ensure stake top concrete strength, simultaneously It avoids again superfilled too many and causes to waste.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention All any modification, equivalent and improvement etc., should all be included in the protection scope of the present invention made by within refreshing and principle.

Claims (10)

1. a kind of construction method for replacing bored concrete pile, which is characterized in that include the following steps:
(1) the old pile body on construction ground is pulled out;Cushion cap concrete around the pile crown and pile crown of old stake is abolished, keeps pile crown reinforcing bar aobvious Expose;Using full-rotating drill, sinking sleeve makes old pile body be isolated with the soil body to the bottom of old pile body under the periphery of old pile body, Old pile body is integrally extracted by crane;After old pile body is pulled out, old stake holes is formed;
(2) full-rotating drill has bucket, and soil-cement is backfilled in the old stake holes by the bucket, described complete Slewing drilling machine gradually pulls out described sleeve pipe upward while backfilling soil-cement;
(3) soil-cement in old stake holes is tamped by the bucket, the old stake with soil-cement of compacting will be rolled Hole stands one week;
(4) according to design requirement, after burying outer casing in the construction ground using hydraulic vibration driver, then embedded interior casing, it is described Interior casing has gap in the outer casing between the interior casing and the outer casing;The outer casing be equipped with pair The location structure that the stake position center of the interior casing is pre-positioned, when the interior casing sinks, the location structure prolongs It extends to the gap and contradicts the outer surface of the interior casing;The lower part of the interior casing sinks down into the bottom of the old stake holes Lower section;
(5) soil body in the inside of interior casing is excavated using Spiral digging machine, forms new stake holes;
(6) steel reinforcement cage is vertically transferred using crane, the steel reinforcement cage is transferred to design position, is fixed using cage body limiting device The steel reinforcement cage;Filling concrete is carried out by the way that conduit is perfused, perfusion condensation forms new pile body.
2. a kind of construction method for replacing bored concrete pile as described in claim 1, which is characterized in that connect on the pile body reinforcing bar It is connected to connecting plate, the connecting plate, in the transverse bar of lateral arrangement, is driven by steel wire rope connection using the full convolution drilling machine The transverse bar rotation so that the old pile body rotates in described sleeve pipe, until the old pile body is detached with the soil body.
3. a kind of construction method for replacing bored concrete pile as claimed in claim 2, which is characterized in that the connecting plate is equipped with card Button, the lifting lug of stress when the transverse bar is equipped with multiple liftings for the crane;The card is fixed at the both ends of steel wire rope respectively Button and the lifting lug.
4. a kind of construction method of replacement bored concrete pile as described in claim 1-3 any one, which is characterized in that described in progress When old stake holes backfill, backfilled using soil-cement, the ranging from 3-8% of cement mixed weight.
5. a kind of construction method of replacement bored concrete pile as described in claim 1-3 any one, which is characterized in that the hydraulic pressure Vibration hammer is equipped with the hydraulically operated fixture for the outer casing and the interior casing to be clamped;The outer casing is clamped in the hydraulically operated fixture Or when the interior casing, the outer casing and interior casing is perpendicular respectively is arranged in the construction ground.
6. a kind of construction equipment for replacing bored concrete pile as claimed in claim 5, which is characterized in that the hydraulic vibration driver is equipped with Hydraulically operated fixture described in two groups, hydraulically operated fixture described in two groups is in same level and positioned opposite;The hydraulically operated fixture includes two Towards or away from from grip block;From top to bottom, the thickness of the grip block gradually decreases.
7. a kind of construction method of replacement bored concrete pile as described in claim 1-3 any one, which is characterized in that the positioning Structure includes multiple locating rods, and the locating rod extends to the gap through the outer casing and forms positioning end;When described interior When casing sinks to the inside of the outer casing, multiple locating rods are around the interior casing arrangement, the positioning of the locating rod End contradicts the outer surface of the interior casing respectively.
8. a kind of construction method of replacement bored concrete pile as described in claim 1-3 any one, which is characterized in that concrete fills During note, the height that lining rope detection concrete rises is used for multiple times, and in this process;Concrete Continuous Perfusion.
9. a kind of construction method of replacement bored concrete pile as described in claim 1-3 any one, which is characterized in that the perfusion The scope control of depth of tremie is in 2-6m.
10. a kind of construction method of replacement bored concrete pile as described in claim 1-3 any one, which is characterized in that the rotation Digging machine excavates the soil body of the inside of the interior casing, forms new stake holes;According to design requirement, the new stake holes and the old stake holes With the old stake holes it is in detach with the old stake holes in coincidence status or the new stake holes in intersection or the new stake holes State or the new stake holes are in the old stake holes.
CN201810600480.3A 2018-06-12 2018-06-12 A kind of construction method for replacing bored concrete pile Pending CN108775036A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810600480.3A CN108775036A (en) 2018-06-12 2018-06-12 A kind of construction method for replacing bored concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810600480.3A CN108775036A (en) 2018-06-12 2018-06-12 A kind of construction method for replacing bored concrete pile

Publications (1)

Publication Number Publication Date
CN108775036A true CN108775036A (en) 2018-11-09

Family

ID=64026031

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810600480.3A Pending CN108775036A (en) 2018-06-12 2018-06-12 A kind of construction method for replacing bored concrete pile

Country Status (1)

Country Link
CN (1) CN108775036A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111305209A (en) * 2020-02-25 2020-06-19 深圳市工勘岩土集团有限公司 Sinking method for super-long steel casing of large-diameter super-deep cast-in-place pile
CN113529714A (en) * 2021-07-17 2021-10-22 南京桥新建设有限公司 Construction method for replacing old pile

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101008478B1 (en) * 2008-07-07 2011-01-14 지에스건설 주식회사 Geogrid structure preventing bulging failure of stone column and method constructing the stone column by the geogrid structure
KR20110130239A (en) * 2010-05-27 2011-12-05 최승희 Field infused post and constructing method thereof
CN103266599A (en) * 2013-05-13 2013-08-28 汇通路桥建设集团有限公司 Construction method of rotating drilling dry-drilled piles of sand soil interlayer foundation
CN104831708A (en) * 2015-03-20 2015-08-12 深圳市工勘岩土集团有限公司 Foundation excavation retaining and protecting cast-in-situ bored pile construction method and equipment thereof
CN204959735U (en) * 2015-07-15 2016-01-13 杭州江润科技有限公司 Drilling bored concrete pile harmless clad steel of installing and removing in profundal zone protects section of thick bamboo crowd structure
CN105672255A (en) * 2016-02-22 2016-06-15 深圳市工勘岩土集团有限公司 Double pile casing construction method for controlling perpendicularity
CN106988302A (en) * 2017-04-21 2017-07-28 江苏地基工程有限公司 A kind of high inclination-angle competent bed rotary digging pile driving construction engineering method
CN107338795A (en) * 2017-06-09 2017-11-10 中铁建大桥工程局集团第五工程有限公司 A kind of full-sleeve pulls out post row's formula bored pile construction method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101008478B1 (en) * 2008-07-07 2011-01-14 지에스건설 주식회사 Geogrid structure preventing bulging failure of stone column and method constructing the stone column by the geogrid structure
KR20110130239A (en) * 2010-05-27 2011-12-05 최승희 Field infused post and constructing method thereof
CN103266599A (en) * 2013-05-13 2013-08-28 汇通路桥建设集团有限公司 Construction method of rotating drilling dry-drilled piles of sand soil interlayer foundation
CN104831708A (en) * 2015-03-20 2015-08-12 深圳市工勘岩土集团有限公司 Foundation excavation retaining and protecting cast-in-situ bored pile construction method and equipment thereof
CN204959735U (en) * 2015-07-15 2016-01-13 杭州江润科技有限公司 Drilling bored concrete pile harmless clad steel of installing and removing in profundal zone protects section of thick bamboo crowd structure
CN105672255A (en) * 2016-02-22 2016-06-15 深圳市工勘岩土集团有限公司 Double pile casing construction method for controlling perpendicularity
CN106988302A (en) * 2017-04-21 2017-07-28 江苏地基工程有限公司 A kind of high inclination-angle competent bed rotary digging pile driving construction engineering method
CN107338795A (en) * 2017-06-09 2017-11-10 中铁建大桥工程局集团第五工程有限公司 A kind of full-sleeve pulls out post row's formula bored pile construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111305209A (en) * 2020-02-25 2020-06-19 深圳市工勘岩土集团有限公司 Sinking method for super-long steel casing of large-diameter super-deep cast-in-place pile
CN113529714A (en) * 2021-07-17 2021-10-22 南京桥新建设有限公司 Construction method for replacing old pile

Similar Documents

Publication Publication Date Title
CN110424381A (en) A kind of process for rotary digging drilling hole stake
CN106988302B (en) A kind of high inclination-angle competent bed rotary digging pile driving construction engineering method
CN103195058B (en) Be convenient to solution cavity and grow the method that regional bridge pier adopts many casings to construct
CN107938676A (en) A kind of pile base construction method for passing through full packing type solution cavity
CN104846829B (en) Shield-reserved penetration composite type foundation pit support wall and construction method thereof
CN104499479B (en) It is a kind of to pass through the dug pile construction method that sand gravel backfills layer
CN107724383B (en) Rotary digging cast-in-place pile construction method
CN108166483A (en) Bored pile construction method
CN106930276A (en) The deep hole blasting of rotary digging bored concrete pile and the construction method of conduit rotary digging removing obstacles
CN105239598A (en) Integral sinking construction method for well-type full-automatic stereo garage
CN110629747A (en) Full-casing full-rotation construction process for pile foundation under complex geological conditions
CN104532853B (en) Deep foundation pit supporting method and system characterized by steel reinforced cement-soil piles, bolts easy to detach and automatic monitoring and early warning
CN107642041A (en) The hollow clump of piles anchorage of super-large diameter
CN107905221A (en) A kind of method for being accurately positioned percussive drilling bored concrete pile
CN209538258U (en) A kind of construction equipment for replacing bored concrete pile
CN113174958A (en) Construction method for foundation pit of adjacent road under poor ground condition
CN110158579A (en) A kind of bored pile construction method
CN107653878A (en) Cast-in-situ bored pile is reusable to be longitudinally separated formula steel pile casting construction
CN104480929B (en) A kind of pile wall interaction construction method that interlocking pile is applied to permanent outer wall of basement
CN106758759B (en) A kind of trestle pile foundation and its anchoring process for deep water drift net riverbed
CN108775036A (en) A kind of construction method for replacing bored concrete pile
CN106703034A (en) Construction device and construction method for pulling out piles through cooperation of rotating drilling machine and sleeve drill bit
CN109610473A (en) A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration
CN207484290U (en) The hollow clump of piles anchorage of super-large diameter
CN212052725U (en) Karst cave area stake construction structures

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181109