CN204959735U - Drilling bored concrete pile harmless clad steel of installing and removing in profundal zone protects section of thick bamboo crowd structure - Google Patents

Drilling bored concrete pile harmless clad steel of installing and removing in profundal zone protects section of thick bamboo crowd structure Download PDF

Info

Publication number
CN204959735U
CN204959735U CN201520514453.6U CN201520514453U CN204959735U CN 204959735 U CN204959735 U CN 204959735U CN 201520514453 U CN201520514453 U CN 201520514453U CN 204959735 U CN204959735 U CN 204959735U
Authority
CN
China
Prior art keywords
steel
thick bamboo
section
pile casting
protects
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520514453.6U
Other languages
Chinese (zh)
Inventor
王新泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and bridge engineering Group Co.,Ltd of Jiangxi Province
Original Assignee
Hangzhou Jiangrun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiangrun Technology Co Ltd filed Critical Hangzhou Jiangrun Technology Co Ltd
Priority to CN201520514453.6U priority Critical patent/CN204959735U/en
Application granted granted Critical
Publication of CN204959735U publication Critical patent/CN204959735U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a drilling bored concrete pile harmless clad steel of installing and removing in profundal zone protects section of thick bamboo crowd structure, the clad steel protects section of thick bamboo crowd and includes that outside steel protects a section of thick bamboo (1) and inboard steel protects a section of thick bamboo (2), outside steel protects a section of thick bamboo (1) and is formed by the welding of steel sheet book system, and its lower extreme inner wall welding loop bracket (3) sets up one vertical baffle (4) on the bracket, set up in the recess of bracket upper end a rubber gasket (5), outside steel protects a section of thick bamboo (1) and protects section of thick bamboo crowd through upper and lower three steel truss (15) formation steel, outside steel protects section of thick bamboo crowd upper end and set up the interim platform of construction steel platform as drilled pile (12) construction on steel truss (15), inboard steel protects a section of thick bamboo (2) and protects a section of thick bamboo (2) and set up a plurality of levels to jack (6) and a plurality of perpendicularity monitoring box (8) along the lateral wall for two lamella half roundss protect a section of thick bamboo, inboard steel, and the lower extreme sets up 2 perpendicularly to the jack. The utility model relates to an adopt the clad steel to protect under the engineering specifications that the drilling bored concrete pile is complicated in the hydrologic condition, the riverbed overburden is thin, aquatic concrete pile body appearance quality is higher of section of thick bamboo crowd construction that construction quality is high, fast, the height is rateed to material recycle, gain better technological economic benefits.

Description

Profundal zone bored pile harmless mounting or dismounting clad steel casing group structure
Technical field
The utility model relates to a kind of profundal zone bored pile harmless mounting or dismounting clad steel casing group constructing structure, belong to the pile foundation construction field of bridge engineering, be applicable to the construction of large diameter bored pile in water, be particularly useful for hydrologic condition complexity, Riverbed is thinner, concrete in water pile body presentation quality is higher bored pile construction.
Background technology
When pile foundation construction is carried out in the section complicated in hydrologic condition, Riverbed is thinner, the sinking of steel pile casting is technological difficulties, stability in order to ensure steel pile casting needs the embedded depth increasing steel pile casting, and the thinner section lower floor of covering layer mostly is harder rock stratum, steel pile casting is difficult to enter comparatively in competent bed, and building-in depth deficiency has a strong impact on the cylinder stability that steel protects.In addition, cast-in-place concrete pile sometimes needs to use as bridge pier in water and using upper part, and its appearance requirement is higher, can not occur the hole quality problems such as groove, pitted skin.
In view of the bored pile construction under these execution conditions, the steel pile casting of employing routine carries out the stability that bored pile construction is difficult to ensure steel pile casting, or significantly increase construction costs to meet stability requirement, complete after pile strength reaches certain requirement in concreting, conventional steel casing is difficult to even cannot extract recycling, loss great deal of steel.
In sum, although existing bored pile adopts conventional structure to achieve certain effect under similar execution conditions, but still existence needs improvements.Given this, according to the needs of current engineering reality, need a kind of steel pile casting of utility model good stability badly, recycle the profundal zone bored pile construction structure convenient, pile body presentation quality is high.
Utility model content
The purpose of this utility model overcomes deficiency of the prior art, provides the profundal zone bored pile harmless mounting or dismounting clad steel casing that a kind of interior outside steel pile casting is is easily installed and removed, easy construction is fast, cost is low group structure.
A kind of profundal zone bored pile harmless mounting or dismounting clad steel casing group structure, described clad steel casing group comprises outside steel pile casting and inner side steel pile casting; Outside steel pile casting is rolled by steel plate and is welded, and its lower end inner wall welds a loop bracket, bracket is arranged a vertical baffle plate, arranges a rubber sheet gasket in bracket upper recess; Outside steel pile casting forms steel pile casting group by upper and lower three road steel trusss; Steel pile casting group upper end, outside arranges the temporary platform of construction steel platform as drilled pile construction on steel truss; Inner side steel pile casting is two lobe half rounds casings, inner side steel pile casting arranges multiple level to jack and multiple verticality monitor box along sidewall, lower end arranges a Vertical dimension jack, vertically interval arranges hinge, rubber pad groove and rubber pad, arranges closing device with relative hinge positions.
As preferably: described closing device, is made up of spring and slippage cylinder, wherein access hydraulic pressure in slippage cylinder interval forms folding jack.
The beneficial effects of the utility model are:
(1) stability of steel pile casting when adopting outside steel pile casting group can guarantee that building-in depth is limited when Riverbed is thinner, reduce difficulty and the cost of construction, upper end steel truss being laid steel plate can as temporary construction platform;
(2) inner side steel pile casting integrated system adopts two lobe half rounds casings, the folding of half rounds casing is controlled by level jack, closed during sinking, be separated when removing, the mounting or dismounting of convenient inner side steel pile casting, reduce the impact on pile concrete surface, improve pile body apparent mass;
(3) steel pile casting lower end, inner side is bearing in by rubber sheet gasket on the steel bracket of outside steel pile casting lower end inner wall, and the existence of rubber sheet gasket effectively prevent concrete slurry and enters space between the steel pile casting of medial and lateral;
(4) steel pile casting lower end, inner side arranges vertical jack, when occurring that the adhesion impact of steel pile casting lower end, inner side hangs out, can hang out inner side steel pile casting easily by applying a jacking force;
(5) inner side steel pile casting inwall arranges verticality monitor box, and in the steel pile casting sinking process of inner side, the verticality of Real-Time Monitoring steel pile casting and position, adjusted automatically by level jackization.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation;
Fig. 2 is outside steel pile casting group johning knot composition;
Fig. 3 is outside steel pile casting group layout plan;
Fig. 4 is inner side steel pile casting two lobe half rounds casing combination assumption diagram;
Fig. 5 is inner side steel pile casting two lobe half rounds casing closing device detail drawing;
Description of reference numerals: steel pile casting outside 1-, steel pile casting inside 2-, 3-bracket, 4-baffle plate, 5-rubber sheet gasket, 6-level to jack, 7-Vertical dimension jack, 8-verticality monitor box, 9-pipeline vertical channel, 10-base plate, 11-System Control Center, 12-bored pile, 13-riverbed line, 14-construction steel platform, 15-steel truss, 16-hinge, 17-rubber pad groove, 18-rubber pad, 19-closing device, 191-slippage cylinder, 192-spring, 193-folding jack.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described further.Although the utility model will be described in conjunction with preferred embodiment, should know, not represent the utility model restriction in the described embodiment.On the contrary, the utility model will contain can be included in attached claims limit scope of the present utility model in alternative, modified and equivalent.
As shown in Figures 1 to 5, profundal zone bored pile harmless mounting or dismounting clad steel casing group is made up of outside steel pile casting group and inner side steel pile casting integrated system, outside steel pile casting group integral manufacturing, sinking, steel pile casting closed lifting in inner side hangs out into position, separation lifting, the harmless mounting or dismounting construction of completing.
Large diameter bored pile 12 diameter 2.5m, the long 100m of stake, depth of water 10m, Riverbed thickness 3m, it is lower is harder scar; Clad steel casing all adopts the Q235A steel plate of thickness 20mm to make, outside steel pile casting 1 diameter 2.8m, length 15m, inner side steel pile casting 2 diameter 2.55m, length 11m; Loop bracket 3 is welded on the inwall of outside steel pile casting 1, and its internal diameter is 2.5m, maximum gauge 200mm, minimum thickness 100mm, its overhead gage thickness 10mm, height 100mm; Outside steel pile casting 1 is combined into steel pile casting group by upper and lower three road steel trusss 15, and upper strata steel truss is simultaneously as the bearing structure of temporary steel platform 14, and temporary steel platform size is 10 × 10m; Inner side steel pile casting 2 arranges 12 levels to jack 6 and 12 verticality monitor box 8 altogether along sidewall, lower end arranges 2 Vertical dimension jack 7, vertically a hinge 16 is set every 1m, rubber pad groove 17 and rubber pad 18, rubber pad groove 17 side pieces is of a size of 10 × 30mm, thickness 100mm, rubber pad 18 is of a size of 10 × 30 × 100mm, closing device 19 is set with hinge 16 relative position, be made up of spring 192 and slippage cylinder 191, wherein access hydraulic pressure in slippage cylinder 191 interval forms folding jack 193.
The main construction course that above-mentioned profundal zone bored pile can't harm mounting or dismounting clad steel casing group is as follows:
Step one, outside steel pile casting group make: several outsides steel pile casting 1 is linked as entirety by upper and lower three road steel trusss 15, and each outside steel pile casting lower end inside arranges bracket 3 and rubber sheet gasket 5;
Step 2, outside steel pile casting group sinking are constructed: employing boats and ships etc., as temporary construction platform, enter predeterminated position, cast anchor fixing, adopt pile press press-in outside steel pile casting group;
Step 3, castinplace pile 12 drilling construction: adopt pile foundation boring machinery and mud off pore-forming;
Step 4, inner side steel pile casting 2 installation in position: inner side steel pile casting integrated system is lifted in the steel pile casting 1 of outside, be placed on the bracket 3 of outside steel pile casting bottom it, steel pile casting 1 top outside top is shelved on, passes through the integrated verticality monitor box 8 of sidewall simultaneously and level adjusts verticality and the position of inner side steel pile casting in real time to jack 6;
Step 5, transfer reinforcing cage and concrete perfusion: hang in boring by the reinforcing cage made, behind clear hole, carry out underwater gliders;
Step 6, dismounting inner side steel pile casting 2: treat that pile concrete reaches some strength, utilize the thrust of folding jack 193 by two lobes of inner side steel pile casting separately, and utilize the thrust of the Vertical dimension jack 7 bottom casing by inner side steel pile casting from bracket 3 separately, then inner side steel pile casting 2 is hung out;
Step 7, dismounting outside steel pile casting group: after treating that all bored piles are all constructed, steel pile casting group outside integral lifting, and move to next construction location.

Claims (2)

1. a profundal zone bored pile harmless mounting or dismounting clad steel casing group structure, is characterized in that: described clad steel casing group comprises outside steel pile casting (1) and inner side steel pile casting (2); Outside steel pile casting (1) is rolled by steel plate and is welded, and its lower end inner wall welds a loop bracket (3), bracket is arranged a vertical baffle plate (4), arranges a rubber sheet gasket (5) in bracket upper recess; Outside steel pile casting (1) forms steel pile casting group by upper and lower three road steel trusss (15); Steel pile casting group upper end, outside arranges the temporary platform that construction steel platform is constructed as drilled pile (12) on steel truss (15); Inner side steel pile casting (2) is two lobe half rounds casings, inner side steel pile casting (2) arranges multiple level to jack (6) and multiple verticality monitor box (8) along sidewall, lower end arranges 2 Vertical dimension jack (7), vertically interval arranges hinge (16), rubber pad groove (17) and rubber pad (18), arranges closing device (19) with hinge (16) relative position.
2. profundal zone according to claim 1 bored pile harmless mounting or dismounting clad steel casing group structure, it is characterized in that: described closing device (19), be made up of spring (192) and slippage cylinder (191), wherein access hydraulic pressure in slippage cylinder (191) interval forms folding jack (193).
CN201520514453.6U 2015-07-15 2015-07-15 Drilling bored concrete pile harmless clad steel of installing and removing in profundal zone protects section of thick bamboo crowd structure Active CN204959735U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520514453.6U CN204959735U (en) 2015-07-15 2015-07-15 Drilling bored concrete pile harmless clad steel of installing and removing in profundal zone protects section of thick bamboo crowd structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520514453.6U CN204959735U (en) 2015-07-15 2015-07-15 Drilling bored concrete pile harmless clad steel of installing and removing in profundal zone protects section of thick bamboo crowd structure

Publications (1)

Publication Number Publication Date
CN204959735U true CN204959735U (en) 2016-01-13

Family

ID=55054810

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520514453.6U Active CN204959735U (en) 2015-07-15 2015-07-15 Drilling bored concrete pile harmless clad steel of installing and removing in profundal zone protects section of thick bamboo crowd structure

Country Status (1)

Country Link
CN (1) CN204959735U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105002890A (en) * 2015-07-15 2015-10-28 杭州江润科技有限公司 Abyssal region cast-in-situ bored pile nondestructive assembly and disassembly double-layer steel casing group structure and construction method
CN107044121A (en) * 2017-05-24 2017-08-15 响水县金桥化工设备制造有限公司 A kind of surfacecti proteon damping device of steel pile casting
CN108342983A (en) * 2018-01-15 2018-07-31 中铁大桥局集团有限公司 Underwater steel pile casting connects high method in constructing for deep-water bridge foundation
CN108560543A (en) * 2018-05-30 2018-09-21 中国二十二冶集团有限公司 Underwater cast-in-place pile casing construction method
CN108775036A (en) * 2018-06-12 2018-11-09 深圳市工勘基础工程有限公司 A kind of construction method for replacing bored concrete pile
CN110952533A (en) * 2019-11-26 2020-04-03 浙江大学城市学院 Underwater anti-slip bored pile foundation and construction method thereof
CN114929969A (en) * 2019-12-06 2022-08-19 邹胜斌 Modular intelligent retaining wall cast-in-place pile and construction process thereof

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105002890A (en) * 2015-07-15 2015-10-28 杭州江润科技有限公司 Abyssal region cast-in-situ bored pile nondestructive assembly and disassembly double-layer steel casing group structure and construction method
CN105002890B (en) * 2015-07-15 2017-03-08 杭州江润科技有限公司 A kind of profundal zone cast-in-situ bored pile is lossless to assemble and disassemble double-deck steel pile casting group structure and construction method
CN107044121A (en) * 2017-05-24 2017-08-15 响水县金桥化工设备制造有限公司 A kind of surfacecti proteon damping device of steel pile casting
CN108342983A (en) * 2018-01-15 2018-07-31 中铁大桥局集团有限公司 Underwater steel pile casting connects high method in constructing for deep-water bridge foundation
CN108560543A (en) * 2018-05-30 2018-09-21 中国二十二冶集团有限公司 Underwater cast-in-place pile casing construction method
CN108775036A (en) * 2018-06-12 2018-11-09 深圳市工勘基础工程有限公司 A kind of construction method for replacing bored concrete pile
CN110952533A (en) * 2019-11-26 2020-04-03 浙江大学城市学院 Underwater anti-slip bored pile foundation and construction method thereof
CN114929969A (en) * 2019-12-06 2022-08-19 邹胜斌 Modular intelligent retaining wall cast-in-place pile and construction process thereof
CN114929969B (en) * 2019-12-06 2023-08-18 邹胜斌 Modularized intelligent wall-protecting cast-in-place pile and construction process thereof

Similar Documents

Publication Publication Date Title
CN204959735U (en) Drilling bored concrete pile harmless clad steel of installing and removing in profundal zone protects section of thick bamboo crowd structure
CN105002890A (en) Abyssal region cast-in-situ bored pile nondestructive assembly and disassembly double-layer steel casing group structure and construction method
CN103510531B (en) A kind of split type open caisson staking Compound Anchorage basis and construction method thereof
CN106758841B (en) A kind of whole construction process of the double rope face low-pylon cable-stayed bridges of double tower
CN106013053B (en) A kind of steel sheet pile construction method for supporting for being used to build underground garage open caisson
CN110820763A (en) Truss type cast-in-situ bored pile supporting method for mucky soil deep foundation pit
CN101718092A (en) Environment micro-turbulence static pressing pile construction technology under low-headroom condition
CN104947686B (en) Soft clay area basement supporting construction
CN205636706U (en) Normal position soil pressure test device
CN113550340A (en) Construction method of deepwater foundation of double-wall steel cofferdam without sealing bottom under deepwater rock entering condition
CN102979039A (en) Elevated trestle bridge construction method on covering-free steep bare rock in deepwater and rapid stream
CN108005096A (en) A kind of suspension type wall submersion construction method for city vertical shaft construction
CN107905112B (en) Unequal-height steel hanging box cofferdam bottom plate structure
CN108153988B (en) Method for determining design parameters of deep horizontal water-stop curtain of foundation pit of strongly permeable stratum
JP3918461B2 (en) Construction method for underwater foundation
CN212452681U (en) In-situ protection device for pressure pipeline in underground foundation pit
CN103572770A (en) Pile box hydraulic structure object and building method thereof
CN106087996B (en) Manual digging pile construction method based on self leveling backpressure device
CN109989407B (en) Roadbed pile tube curtain supporting structure behind newly-added two-line platform of railway
CN110055973B (en) Foundation pit enclosure structure under high-speed railway bridge with limited construction space and water stopping method
CN109024657B (en) Construction method of super high-rise core tube deep pit edge tower crane foundation under complex conditions
CN109322315A (en) A kind of retaining structure and its construction method for high Steep Slope Embankment location
CN203639929U (en) Split open caisson and pile composite anchor foundation
CN103147469B (en) Vertical compression-resistance static load test method for foundation pile of high-rise building
CN106930274B (en) A kind of a full set of cylinder rotatory boring castinplace pile construction method that reinforcing bar cage location is fixed

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Zhao Ronggao

Inventor after: Ding Junming

Inventor after: Wu Haijun

Inventor after: Dong Zhihua

Inventor after: Wu Suwu

Inventor after: Xiahou Tengfu

Inventor before: Wang Xinquan

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20180419

Address after: 330002 1352 Jinggangshan Avenue, Xihu District, Nanchang, Jiangxi.

Patentee after: Road and bridge engineering Group Co.,Ltd of Jiangxi Province

Address before: Gongshu District Shi Xiang Road Hangzhou city Zhejiang province 310015 and Hangzhou Road intersection C Wanda Plaza office building room 1901

Patentee before: Hangzhou Jiang Run Science and Technology Ltd.

TR01 Transfer of patent right