CN206782635U - System for being transported outward to Ash - Google Patents
System for being transported outward to Ash Download PDFInfo
- Publication number
- CN206782635U CN206782635U CN201720470690.6U CN201720470690U CN206782635U CN 206782635 U CN206782635 U CN 206782635U CN 201720470690 U CN201720470690 U CN 201720470690U CN 206782635 U CN206782635 U CN 206782635U
- Authority
- CN
- China
- Prior art keywords
- grey
- ash
- fortune
- train
- transported outward
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Loading Or Unloading Of Vehicles (AREA)
Abstract
The utility model provides a kind of system for being transported outward to Ash, including ribbon conveyer (1), the train being sequentially connected fill ash part (2), the grey train (3) of fortune, unload grey ditch (4), pipe conveyer (5), unload grey point (6), the grey equipment 8 of fortune and Hui Chang.The utility model has automaticity high, and accident rate is low, and also has the advantages that reliable and practical, saving operation maintenance expense, freight volume are big, suitable for grey field apart from remote power plant.
Description
Technical field
It the utility model is related to a kind of outward transport system, especially a kind of system for being transported outward to Ash.
Background technology
At present, the domestic time of putting into operation it is longer coal-burning power plant it is commonplace, although the solid emission ash of power plant has
Recycle value, but demand of many northwestward power plant in local is less, the freight charges of great number cause Power Plant Ash to fill,
Many domestic waste ash pond reserves are close to design load, and grey transport becomes the new problem of power plant, the Automobile Transportation of long range,
There is safety and it is costly the problem of.
The content of the invention
Weak point present in regarding to the issue above, the utility model provide a kind of automaticity height, and accident rate is low,
And also there is the big system for being transported outward to Ash of reliable and practical, saving operation maintenance expense, freight volume.
To achieve the above object, a kind of system for being transported outward to Ash of the utility model offer, including according to
Ribbon conveyer (1), the train dress grey partly (2) of secondary connection, transport grey train (3), unload grey ditch (4), pipe conveyer
(5) grey point (6), the grey equipment (8) of fortune and grey field (9), are unloaded.
The above-mentioned system for being transported outward to Ash, wherein, the train dress ash part (2) fills ash by train
Building (23), form with surge bunker (21) that is on its interior and docking successively and weighing cabin (22).
The above-mentioned system for being transported outward to Ash, wherein, it is provided with the inside for unloading grey point (6) multiple
Bulk cement storage tank (61).
The above-mentioned system for being transported outward to Ash, wherein, the grey equipment (8) of fortune is the grey automobile of fortune or shifting
Put formula felting conveyor.
The above-mentioned system for being transported outward to Ash, wherein, it is provided with the bottom for unloading grey ditch (4) multiple
Transport grey dolly (41).
The above-mentioned system for being transported outward to Ash, wherein, unload grey ditch (4) and the tube-shaped belt described
It is additionally provided with transfer station (7) between conveyer (5), the both ends of the transfer station (7) dolly (41) grey with the fortune and described respectively
Pipe conveyer (5) is connected.
Compared with prior art, the utility model has advantages below:
The utility model has automaticity high, and accident rate is low, and also has reliable and practical, saving operation maintenance
Take, the advantages that freight volume is big, suitable for grey field apart from remote power plant.
Brief description of the drawings
Fig. 1 is first embodiment structured flowchart of the present utility model;
Fig. 2 is second embodiment structured flowchart of the present utility model.
Main Reference Numerals are described as follows:
1- ribbon conveyers;2- trains fill grey part;21- surge bunkers;22- weighing cabins;23- train Zhuan Hui buildings;3- fortune ashes
Train;4- unloads grey ditch;41- transports grey dolly;5- pipe conveyers;6- unloads grey point;61- bulk cement storage tanks;7- transfer stations;8- fortune ashes
Equipment;9- ashes field
Embodiment
As shown in figure 1, the system for being transported outward to Ash that the present embodiment provides, including the band being sequentially connected
Formula conveyer 1, train fill grey part 2, the grey train 3 of fortune, unload grey ditch 4, pipe conveyer 5, unload ash point 6, the grey equipment 8 of fortune with
Grey field 9.
Wherein, train fill grey part 2 by train Zhuan Hui buildings 23, with surge bunker 21 that is on its interior and docking successively and claim
Weight storehouse 22 is formed.
Multiple bulk cement storage tanks 61 are provided with the inside for unloading ash point 6.
Grey equipment 8 is transported to transport grey automobile or displacement type felting conveyor.
In the present embodiment, grey equipment 8 is transported to transport grey automobile, and Power Plant Ash is transported to grey field by transporting grey automobile.
As shown in Fig. 2 the system for being transported outward to Ash that the present embodiment provides, including the band being sequentially connected
Formula conveyer 1, train fill grey part 2, the grey train 3 of fortune, unload grey ditch 4, pipe conveyer 5, unload ash point 6, the grey equipment 8 of fortune with
Grey field 9.
Wherein, train fill grey part 2 by train Zhuan Hui buildings 23, with surge bunker 21 that is on its interior and docking successively and claim
Weight storehouse 22 is formed.
Multiple grey dollies 41 of fortune are provided with the bottom for unloading grey ditch 4.
Transfer station 7 is additionally provided between grey ditch 4 and pipe conveyer 5 unloading, the both ends of transfer station 7 are small with fortune ash respectively
Car 41 is connected with pipe conveyer 5.
Multiple bulk cement storage tanks 61 are provided with the inside for unloading ash point 6.
Grey equipment 8 is transported to transport grey automobile or displacement type felting conveyor.
In the present embodiment, it is displacement type felting conveyor to transport grey equipment 8, by displacement type felting conveyor by Power Plant Ash
It is transported to grey field 9.
Operating process of the present utility model is:
Power Plant Ash fills grey part by Leather Belt Conveyance to train, is transported after entrucking by train to unloading grey ditch.So
Afterwards, according to actual landform and requirement, one kind in pipe conveyer, the grey automobile of fortune or displacement type felting conveyor can be selected
Or diversified forms, Power Plant Ash is transported to grey field.
By taking the Togtoh power plant of the Datang world as an example, Inner Mongol Datang world Togtoh, which generates electricity, has the existing installed capacity of factory to be
5400000 kilowatts (8 × 600MW+2 × 300MW), began to use from unit operation in 2003, had produced total storage ash 53,000,000 so far
Ton, reach storage ash quantity that is original and extending grey field, and the grey field of new addressing is located at away from power plant about at 13.5km;The former design of power plant
To carry out coal mode and carry out coal for train, but be that automobile carrys out coal up to half in operation, original railway line transport power affluence is more, therefore
Meet the utility model scope of application.
Datang world Togtoh power plant transport every year ash quantity by 5,200,000 tons calculating, use motor transport cost for:Worker's work
Money:34 ten thousand yuan of people X8=2,720,000 yuan;Automobile Transportation outsourcing expense:5200000 tX13kmX1.4 member/(kmt)=94,640,000 yuan,
97,360,000 yuan altogether.
Using the operating cost (identical haul distance calculating) after the utility model:Wage for workmen:58 people X8 ten thousand yuan=4,640,000
Member;The train running cost of overhaul is used:5200000 0.15 yuan/(kmt)=10,140,000 yuan of t X 13km X, consider the belt feeder electricity charge and
Repair and maintenance takes 5,000,000 yuan, amounts to 19,780,000 yuan, saves 77,580,000 yuan of operating cost.It is clear that save operating cost effect
It is considerable.
, it is necessary to which the newly-built special grey identitypath of fortune, in this example, transporting grey railway line can use a part former in highway transportation
There are transporting coal industrial siding, the construction investment cost of saving.
Preferred embodiment of the present utility model is the foregoing is only, is merely illustrative for invention, and it is unrestricted
Property.Those skilled in the art understands, many changes can be carried out to it in the spirit and scope that invention claim is limited,
Modification, in addition it is equivalent, but fall within the scope of protection of the utility model.
Claims (6)
1. a kind of system for being transported outward to Ash, it is characterised in that including the ribbon conveyer being sequentially connected
(1), train dress ash part (2), the grey train (3) of fortune, unload grey ditch (4), pipe conveyer (5), unload grey point (6), fortune ash is set
Standby (8) and grey field (9).
2. the system according to claim 1 for being transported outward to Ash, it is characterised in that the train dress ash
Partly (2) are formed by train Zhuan Hui buildings (23), with surge bunker (21) that is on its interior and docking successively and weighing cabin (22).
3. the system according to claim 1 for being transported outward to Ash, it is characterised in that unload grey point described
(6) inside is provided with multiple bulk cement storage tanks (61).
4. the system according to claim 3 for being transported outward to Ash, it is characterised in that the grey equipment of fortune
(8) it is the grey automobile of fortune or displacement type felting conveyor.
5. according to any described system for being transported outward to Ash in Claims 1-4, it is characterised in that
The bottom for unloading grey ditch (4) is provided with multiple grey dollies (41) of fortune.
6. the system according to claim 5 for being transported outward to Ash, it is characterised in that unload grey ditch described
(4) be additionally provided with transfer station (7) between the pipe conveyer (5), the both ends of the transfer station (7) respectively with the fortune
Grey dolly (41) is connected with the pipe conveyer (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720470690.6U CN206782635U (en) | 2017-04-28 | 2017-04-28 | System for being transported outward to Ash |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720470690.6U CN206782635U (en) | 2017-04-28 | 2017-04-28 | System for being transported outward to Ash |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206782635U true CN206782635U (en) | 2017-12-22 |
Family
ID=60710307
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720470690.6U Active CN206782635U (en) | 2017-04-28 | 2017-04-28 | System for being transported outward to Ash |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206782635U (en) |
-
2017
- 2017-04-28 CN CN201720470690.6U patent/CN206782635U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102381569B (en) | Fixed-point quantitative automatic loading method of bulk sulfur | |
CN102114985A (en) | Bulk loading and unloading method | |
CN101823630A (en) | Containerized transport method of a large quantity of solid bulk cargos as well as solid bulk cargo container and decrater thereof | |
CN104527649B (en) | A kind of railway is without marshalling yard's system of shunting | |
CN206782635U (en) | System for being transported outward to Ash | |
CN113968488B (en) | Intelligent and environment-friendly quick loading method and system for building aggregate | |
CN101792835B (en) | Feeding system for blast furnace ore and coke channel system | |
CN107364728A (en) | A kind of Coal Transport method | |
CN205328281U (en) | Goods transfer equipment | |
CN201686702U (en) | Feeding device for blast furnace ore and coke groove system | |
CN212653651U (en) | Automatic lifting device for concrete aggregate | |
CN212981745U (en) | Directly get novel bulk cargo export wharf structure of formula | |
CN203781104U (en) | Universal container for powder and liquid transportation | |
CN208470834U (en) | A kind of material-transporting system of pneumatic conveying and the combination of orbit transports advantage | |
CN211732870U (en) | Freight transportation system for railway and pipe-belt combined transportation | |
CN210594354U (en) | Multifunctional modularized polyolefin granule bulk material filling system | |
CN101457595B (en) | Storing position and storehouse collocation method convenient to multiple transport manners | |
CN203780748U (en) | Novel automatic bulk chemical powderchain plate conveying system for ships | |
CN202116054U (en) | Long-distance creeping type conveying distribution structure for aluminum oxide materials | |
Li et al. | Transshipment equipments for road-rail intermodal transport | |
CN102887374B (en) | Loose-packed gel material parallel ash-unloading system | |
CN205086910U (en) | Railway shunting -free marshalling station system | |
CN204917047U (en) | A conveyor for blast furnace raw materials | |
Neumann et al. | Conti® MegaPipe–A New Dimension in Closed-Trough Belt Technology | |
CN202346391U (en) | Trolley distributor for bucket conveyors |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |