CN206762048U - A kind of escape device for board house - Google Patents
A kind of escape device for board house Download PDFInfo
- Publication number
- CN206762048U CN206762048U CN201720287404.2U CN201720287404U CN206762048U CN 206762048 U CN206762048 U CN 206762048U CN 201720287404 U CN201720287404 U CN 201720287404U CN 206762048 U CN206762048 U CN 206762048U
- Authority
- CN
- China
- Prior art keywords
- rescue
- board house
- escape
- door
- fixing device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model discloses a kind of escape device for board house, escape device includes the first fixing device with board house second floor guardrail and board house pillar fixed setting and is fixedly installed on ground and coordinates the second fixing device of escape with the first fixing device, first fixing device includes the rescue door set with board house second floor guardrail in same level, the U-shaped rescue fence being fixedly connected with rescue door and rescue door, the rescue bottom plate of rescue fence bottom fixed setting, rescue bottom plate center is provided with escape circular hole;Second fixing device includes through escape circular hole and extends to the rescue vertical rod on board house roof, and rescue rod end is provided with the connecting rod being fixedly connected with board house framework, and rescue vertical rod bottom is fixedly connected with the concrete block poured on the ground.Escape device of the present utility model for board house, the effect of efficiently evacuation trapped personnel is served, there is higher security, greatly reduce casualty rate when accident occurs for construction site.
Description
Technical field
Technical field of building construction is the utility model is related to, more particularly to a kind of escape device for board house.
Background technology
As building trade continues to develop, and the continuous improvement of China's economic level, increasing high-rise building are built
Into increasing people enters high-rise building and handles official business and live.Skyscraper building greatly improve the utilization rate in existing soil,
More populations, which are accommodated, for city is made that tremendous contribution.In the construction job site of high-rise building, to save the area and dismounting
It is convenient, it will usually usual using interim dormitory and office of the double-deck board house as workmen, the corridor of interim board house second floor
It is narrow, and escape stair only is provided with corridor one or both ends, when the accidents such as fire occur, except fire in itself
Directly personal property injury can be caused, crucial moment evacuating personnel channel congestion, thing is easily trampled during evacuation
Therefore or the casualty accident such as jump out of the building, can cause greatly to lose to the construction of whole building thing and the health of construction worker, drop
Low efficiency of construction.Therefore, how passway for escaping efficiently, safe is set on the interim double-deck board house of construction site, is made
Trapped personnel can be as early as possible escape, be the problem of building trade is paid close attention to all the time.
Utility model content
For defect present in prior art or deficiency, the utility model innovatively proposes a kind of for board house
Escape device, the effect of efficiently evacuation trapped personnel is served, there is higher security, greatly reduce construction site
Casualty rate during accident occurs.
What the technical solution of the utility model was realized in:
A kind of escape device for board house, the escape device includes fixes with board house second floor guardrail and board house pillar
Set the first fixing device and be fixedly installed on ground and with the first fixing device coordinate escape the second fixing device, it is described
First fixing device include set with board house second floor guardrail in same level rescue door, with it is described rescue door be fixedly connected
U-shaped rescue fence and installed with rescue door, the rescue bottom plate of rescue fence bottom fixed setting, the rescue bottom plate centre bit
Escape circular hole is equipped with, the one end on the rescue plate outer side side is provided with the diagonal brace being fixedly connected with board house pillar, and the other end leads to
Diagonal brace is crossed to be fixedly connected with stull;Second fixing device includes through escape circular hole and extends to the rescue on board house roof
Vertical rod, the rescue rod end are provided with the connecting rod being fixedly connected with board house framework, and the rescue vertical rod bottom is with pouring
Concrete block on the ground is fixedly connected, and the concrete block surface is equipped with foam-rubber cushion.
Preferably, the rescue door and rescue fence form by square tubes soldering.
Preferably, the rescue fence is consistent with board house second floor guardrail height and width is arranged to 1-1.2m.
Preferably, the drag hook for opening it or closing is provided with the rescue door, the drag hook includes and rescue door
The fixed neck of hook and the gib head that can be hooked on board house second floor guardrail.
Preferably, the diameter of the escape circular hole is arranged to 60-70cm.
Compared with prior art, the beneficial effects of the utility model are:
The utility model discloses a kind of escape device for board house, simple in construction, cost is low, can be adapted to be generalized to build
Job site is built to apply to interim board house.This new escape device increases on the guardrail of existing board house rescue door, with rescuing
Rescue fence and rescue bottom plate that door is fixedly connected, the escape circular hole that rescue bottom plate center is set are helped, trapped personnel can lead to
Cross escape circular hole and hug rescue vertical rod and take advantage of a situation and slide to foam-rubber cushion, the impulsive force that the foam-rubber cushion of laying can slide to trapped personnel
Play a part of buffering, escape device can improve the escape probability of trapped personnel using simply when the accidents such as fire occur.This
The new escape device for board house, the effect of efficiently evacuation trapped personnel is served, there is higher security, drop significantly
Casualty rate during accident occurs for low construction site.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is top view of the present utility model;
Reference:1st, board house roof;2nd, vertical rod is rescued;3rd, board house second floor guardrail;4th, fence is rescued;5th, diagonal brace;6th, it is horizontal
Support;7th, board house pillar;8th, foam-rubber cushion;9th, concrete block;10th, corridor;11st, door is rescued;12nd, escape circular hole;13rd, connecting rod;14、
Rescue bottom plate.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
As shown in figure 1 and 2, the utility model provides a kind of escape device for board house, the escape device bag
Include the first fixing device with board house second floor guardrail 3 and the fixed setting of board house pillar 7 and be fixedly installed on ground and with first
Fixing device coordinates the second fixing device of escape.
First fixing device includes the rescue door 11 set with board house second floor guardrail 3 in same level, rescued with described
Help the U-shaped rescue fence 4 that door 11 is fixedly connected and the rescue bottom plate 14 being fixedly installed with rescue door 11, rescue fence 4 bottom, institute
State rescue door 11 and rescue fence 4 form by square tubes soldering, rescue fence 4 and the board house second floor guardrail 3 it is highly consistent and
Width is arranged to 1-1.2m, and the rescue bottom plate 14 is steel plate, is provided with the center of rescue bottom plate 14 logical as rescue
The escape circular hole 12 in road, the diameter of the escape circular hole 12 are arranged to 60-70cm;It is provided with and opens it on the rescue door 11
Or the drag hook closed, the drag hook include and the rescue fixed neck of hook of door 11 and the hook that can be hooked on board house second floor guardrail 3
Head;One end of the rescue outer side edges of bottom plate 14 is provided with the diagonal brace 5 being fixedly connected with board house pillar 7, and the other end passes through diagonal brace 5
It is fixedly connected with stull 6, diagonal brace 5, stull 6 are fixedly connected with the cooperation of board house second floor guardrail 3, enhance the first fixing device
Stability and support force.
Second fixing device includes through escape circular hole 12 and extends to the rescue vertical rod 2 on board house roof 1, the rescue
The top of vertical rod 2 is provided with the connecting rod 13 being fixedly connected with board house framework, and the rescue bottom of vertical rod 2 is with pouring on the ground
Concrete block 9 is fixedly connected, and the surface of concrete block 9 is equipped with foam-rubber cushion 8, and the foam-rubber cushion 8 of laying can be slided to trapped personnel
Under impulsive force play a part of buffering.
When the burst accidents such as fire occur for the board house of construction site, escape personnel can open rescue door 11, lead to
Crossing escape circular hole 12, to hug rescue vertical rod 2 smooth on foam-rubber cushion 8, and the accidents such as fire can occur for escape device using simple
The escape probability of Shi Tigao trapped personnels.
The preferred embodiment of utility model is the foregoing is only, it is all in this reality not to limit the utility model
Within new spirit and principle, any modification, equivalent substitution and improvements made etc., it should be included in of the present utility model
Within protection domain.
Claims (5)
- A kind of 1. escape device for board house, it is characterised in that:The escape device includes and board house second floor guardrail and plate The first fixing device and be fixedly installed on ground and coordinate the second of escape to consolidate with the first fixing device that house post is fixedly installed Determine device, first fixing device includes the rescue door set with board house second floor guardrail in same level, rescued with described Help the U-shaped rescue fence that door is fixedly connected and the rescue bottom plate being fixedly installed with rescue door, rescue fence bottom, the rescue bottom Plate center is provided with escape circular hole, the one end on the rescue plate outer side side be provided be fixedly connected with board house pillar it is oblique Support, the other end are fixedly connected by diagonal brace with stull;Second fixing device includes through escape circular hole and extends to plate The rescue vertical rod on room roof, the rescue rod end are provided with the connecting rod being fixedly connected with board house framework, and the rescue is vertical Bar bottom is fixedly connected with the concrete block poured on the ground, and the concrete block surface is equipped with foam-rubber cushion.
- 2. the escape device according to claim 1 for board house, it is characterised in that:The rescue door and rescue fence are equal Formed by square tubes soldering.
- 3. the escape device according to claim 1 for board house, it is characterised in that:The rescue fence and board house second floor Guardrail height is consistent and width is arranged to 1-1.2m.
- 4. the escape device according to claim 3 for board house, it is characterised in that:It is provided with the rescue door by it The drag hook opened or closed, the drag hook include and the rescue fixed neck of hook of door and the hook that can be hooked on board house second floor guardrail Head.
- 5. the escape device according to claim 1 for board house, it is characterised in that:The diameter of the escape circular hole is set For 60-70cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720287404.2U CN206762048U (en) | 2017-03-23 | 2017-03-23 | A kind of escape device for board house |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720287404.2U CN206762048U (en) | 2017-03-23 | 2017-03-23 | A kind of escape device for board house |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206762048U true CN206762048U (en) | 2017-12-19 |
Family
ID=60633515
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720287404.2U Expired - Fee Related CN206762048U (en) | 2017-03-23 | 2017-03-23 | A kind of escape device for board house |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206762048U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110201322A (en) * | 2019-05-09 | 2019-09-06 | 五冶集团上海有限公司 | A kind of movable plank house escape bar production method |
CN112211373A (en) * | 2019-07-10 | 2021-01-12 | 中石化广州工程有限公司 | Fire station slide bar shaft protection system |
-
2017
- 2017-03-23 CN CN201720287404.2U patent/CN206762048U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110201322A (en) * | 2019-05-09 | 2019-09-06 | 五冶集团上海有限公司 | A kind of movable plank house escape bar production method |
CN112211373A (en) * | 2019-07-10 | 2021-01-12 | 中石化广州工程有限公司 | Fire station slide bar shaft protection system |
CN112211373B (en) * | 2019-07-10 | 2022-04-05 | 中石化广州工程有限公司 | Fire station slide bar shaft protection system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103206074B (en) | Elevator shaft template construction method, platform and support | |
CN103982040B (en) | A kind of construction of super highrise building vertical multi-transportation device | |
CN206053274U (en) | The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose | |
CN206762048U (en) | A kind of escape device for board house | |
CN205036063U (en) | A operation platform that encorbelments for building inside is encorbelmented position and is under construction | |
CN202370234U (en) | Tool type elevator hoistway construction platform | |
CN205296799U (en) | Construction of elevator well and protection platform | |
CN206928624U (en) | A kind of heavy ladder cage for high-altitude building | |
CN207063484U (en) | Movable operating platform for corridor construction | |
CN208071235U (en) | A kind of bearing and lifting system of steel truss frame integral hoisting | |
CN208039787U (en) | High-altitude edge-facing operation assembly operation platform | |
CN206660332U (en) | One kind building board house escape device | |
CN205134921U (en) | Building outer wall concrete constructional column hangs construction platform | |
CN107829553A (en) | A kind of elevator hoistways construction platform system | |
CN202209051U (en) | Discharging platform for high-rise building construction | |
CN204098465U (en) | Lifting false work falls in a kind of frame guide rail formula | |
CN206785299U (en) | A kind of Emergency Ladder for construction board house | |
CN206636153U (en) | Indoor individual layer scaffold | |
CN202808127U (en) | External construction elevator without platform frame | |
CN202081639U (en) | Steel truss tool type supporting structure for concrete framework industrial building templates | |
CN207314895U (en) | Building outer wall opening full-closed system | |
CN207348787U (en) | One kind maintenance cat ladder platform | |
CN218714986U (en) | Totally-enclosed climbing frame pocket net structure of super high-rise building | |
CN206888536U (en) | One kind can have enough to meet the need split heads | |
CN207822341U (en) | A kind of fire-fighting anchor point fixing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171219 Termination date: 20190323 |
|
CF01 | Termination of patent right due to non-payment of annual fee |