CN205036063U - A operation platform that encorbelments for building inside is encorbelmented position and is under construction - Google Patents

A operation platform that encorbelments for building inside is encorbelmented position and is under construction Download PDF

Info

Publication number
CN205036063U
CN205036063U CN201520621266.8U CN201520621266U CN205036063U CN 205036063 U CN205036063 U CN 205036063U CN 201520621266 U CN201520621266 U CN 201520621266U CN 205036063 U CN205036063 U CN 205036063U
Authority
CN
China
Prior art keywords
operating platform
construction
encorbelmenting
half space
choosing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520621266.8U
Other languages
Chinese (zh)
Inventor
李玉昊
熊松柏
姜桃红
武建乐
陈帅
熊雪松
靳雨涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
China Construction Second Bureau Decoration Engineering Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
China Construction Second Bureau Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd, China Construction Second Bureau Decoration Engineering Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201520621266.8U priority Critical patent/CN205036063U/en
Application granted granted Critical
Publication of CN205036063U publication Critical patent/CN205036063U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses an overhanging operation platform for the construction of an overhanging part in a building, which comprises a base with a frame structure, wherein a support frame is fixedly arranged at the right end of the base, an operation platform is arranged at the top end of the support frame, and the right side of the operation platform is extended to form an overhanging part extending out of the base; a counterweight is placed at the left end of the base; the bottom of the base is provided with universal wheels. A rest platform is erected on the waist of the support frame, and a ladder stand is erected between the rest platform and the overhanging part of the operating platform. The utility model has the advantages of simple structure, low cost, small space occupation and high stability; the decoration construction requirements of special positions such as on-site side walls or hollow spaces are met, the requirements of various cross construction operations are met, the problem of construction space among various types of work is solved, the limited space can be fully utilized, the space utilization rate is maximized, and the construction progress is accelerated.

Description

A kind of operating platform of encorbelmenting choosing the construction of sky position for building interior
Technical field
The utility model belongs to building interior decoration construction technical field, particularly relates to a kind of operating platform of encorbelmenting choosing the construction of sky position for building interior.
Background technology
In building construction process, there are many decorations of choosing sky position, especially in the majority with pedestrian street, large scale business square.Such as the decorations at the position such as long street lateral wall or hollow ceiling.Conventional scheme adopts " fastener type steel pipe scaffold ", domestic conventional fastener type steel pipe scaffold or jenny scaffold, fastener type steel pipe scaffold is that cast iron makes, its advantage be install simple, be convenient to dismounting, shortcoming is that space hold is large, takies a large amount of construction spaces, while causing ceiling and lateral wall construction, ground paving cannot be carried out simultaneously, schedule delays, and there is the problem of safety and poor stability in jenny scaffold, the two does not all reach the decoration construction requirement of on-the-spot lateral wall specific position.
The construction characteristic of Applied in Business Pedestrian Street is that area of space is little, construction density is high, relatively narrow and small mainly due to Applied in Business Pedestrian Street construction area area, constructor on the scene is more simultaneously, and the operation of each work post crossed construction is frequent, therefore, the construction space problem how rationally solved between each work post is particularly important.
Utility model content
The purpose of this utility model is to provide a kind of operating platform of encorbelmenting choosing the construction of sky position for building interior, solve that the design of existing operating platform is complicated, space hold large, take a large amount of construction spaces, cause ceiling and lateral wall construction while ground paving cannot carry out simultaneously, schedule delays, raising financial cost and the technical problem of security and stability difference.
For realizing above-mentioned technical purpose, the utility model adopts following technical scheme:
A kind of operating platform of encorbelmenting choosing the construction of sky position for building interior, comprise the pedestal of frame construction, it is characterized in that: the right-hand member of described pedestal is installed with bracing frame, operating platform is established on the top of support frame as described above, and the right side of described operating platform extends the part of encorbelmenting being formed and stretch out outside pedestal; The left end of described pedestal places mass; The bottom of described pedestal is provided with universal wheel.
As optimal technical scheme of the present utility model, described operating platform comprises operating platform skeleton and is layered on the operating platform woodwork plate on half space skeleton.
Preferred further, the waist of support frame as described above is erected with half space, and described half space is positioned at the below of operating platform.
Preferred further, the right side of described half space extends the part of encorbelmenting being formed and stretch out outside pedestal.
Further, described half space comprises half space skeleton and is layered on the half space woodwork plate on half space skeleton.
Preferred further, described half space and encorbelmenting between part of operating platform are erected with cat ladder, the part of encorbelmenting of described operating platform has opening, and the bottom of described cat ladder is fixed on half space, and top rides over side in opening along upper or be fixed on around openings operating platform bottom surface.
Preferred further, the detachable protective guard installed is established at the edge of described operating platform.
Preferred further, support frame as described above comprises the first framework and second framework of parallel correspondence setting, and described first framework is identical with the shape of the second framework, establishes connecting rod in framework; Left one side of something of described half space is fixed between the first framework and the second framework.
Further preferred, described mass comprises article putting groove and is contained in the sandstone in described article putting groove, and the pedestal of the enclosing that described article putting groove is made by angle steel and bottom is fixed.
Preferred, be provided with diagonal brace between described pedestal and bracing frame.
Compared with prior art, the beneficial effects of the utility model are:
The utility model product space takies little, stability is high, solve the decoration construction requirement of on-the-spot lateral wall specific position, meet each work post crossed construction operation needs, solve the construction space problem between each work post, limited space can be made full use of, space availability ratio is maximized, accelerating construction progress.The protective guard of operating platform is detachable form, meets diverse location, the construction of differing heights ceiling and movement requirement.
Accompanying drawing explanation
Fig. 1 is the elevation of the operating platform of encorbelmenting that the utility model relates to;
Fig. 2 is the left view of the operating platform of encorbelmenting that the utility model relates to;
Fig. 3 is the top view of the operating platform of encorbelmenting that the utility model relates to.
Reference numeral: 1-pedestal, 2-bracing frame, 21-first framework, 22-second framework, 23-connecting rod, 3-half space, 31-half space skeleton, 32-half space woodwork plate, 4-operating platform, 41-operating platform skeleton, 42-operating platform woodwork plate, 43-opening, 5-protective guard, 6-mass, 7-angle steel, 8-universal wheel, 9-cat ladder, 10-diagonal brace.
Detailed description of the invention
Be further described the utility model content below in conjunction with accompanying drawing, accompanying drawing is schematic diagram, is not limited to the utility model.For the ease of clearly showing the structure of each parts of the utility model embodiment, not according to identical scale between each accompanying drawing.The operating platform of encorbelmenting that Fig. 1 ~ 3 are a kind of embodiment of the utility model, it comprises:
Pedestal 1, the bottom of pedestal is provided with universal wheel 8;
Bracing frame 2, is fixed on one end of pedestal 1, is provided with diagonal brace 10 between pedestal 1 and bracing frame 2;
Mass 6, is arranged on pedestal 1, near the other end of pedestal 1;
Operating platform 4, is fixed on the top of bracing frame 2, extends the other end of pedestal in the projection of pedestal place plane.
Have a rest when fatigue for the ease of constructor, half space 3 also established by operating platform of encorbelmenting, and half space 3 is fixed on the medium position of bracing frame 2, and is positioned at the below of operating platform 4.Half space 3 can comprise the half space skeleton 31 setting up into platform and the half space woodwork plate 32 be layered on half space skeleton 31.Half space skeleton 31 is fixedly connected with the top of bracing frame 2 girder steel, and half space skeleton 31 adopts 40 × 40mm angle steel to be welded, the core-board that half space woodwork plate 32 adopts 12mm thick.
Operating platform is climbed up for the ease of constructor, operating platform 4 is made up of operating platform skeleton 41 and the operating platform woodwork plate 42 be layered on operating platform skeleton 41, and operating platform woodwork plate 42 is provided with perforate 43, the supporting cover plate having closed opening hole 43, bore size can adopt 450 × 600mm; In addition, cat ladder 9 is set, is connected between half space 3 and perforate 43; Constructor enters perforate 43 by operating platform by cat ladder, climbs up operating platform 4.After constructor climbs up operating platform 4, with cover plate by bored closure.
In order to improve the safety of constructor when operating platform is constructed, improve as follows further, operation platform 4 is established the detachable protective guard 5 installed.As shown in Figure 1, the protective guard 5 in the present embodiment only blocks the side of operating platform 4.According to security needs, can in the both sides of operating platform, three sides or surrounding set up defences guardrail 5, improves safety.Preferably, detachable form made by protective guard 5, to meet diverse location, the construction of differing heights ceiling and movement requirement.
Above-mentioned bracing frame 2 can comprise: the first framework 21, first framework is fixed on pedestal; In the middle of rectangle, there is connecting rod 23, increase the stability of the first framework; First framework 22, second framework is fixed on pedestal, and with the first frame parallel; Half space 3 while be fixedly connected on the first framework 21 and the second framework 22; Half space 3 extends the other end of pedestal in the projection of pedestal 1 place plane.
Above-mentioned mass 6 can comprise article putting groove and be contained in the sandstone in article putting groove.As shown in Figure 1, the enclosing that article putting groove is made by angle steel 7 is fixedly connected with pedestal 1.
The work progress of above-described embodiment is as follows: operating platform of encorbelmenting is shifted construction onto and encorbelmented near position, and operating platform is positioned at below construction location.Constructor climbs up operating platform 4, and operating platform 4 carries out decoration construction.Due to the existence of mass 6, the overall stress balance of constructor after climbing up operating platform can be ensured, can not overturning.The utility model operating platform space hold of encorbelmenting is little, and stability is high.Solve the decoration construction requirement of on-the-spot lateral wall specific position, meet the needs of each work post crossed construction operation, solve the construction space problem between each work post, accelerate construction speed.
The embodiment recorded at this is specific detailed description of the invention of the present utility model, for illustration of design of the present utility model, is all explanatory and exemplary, should not be construed as the restriction to the utility model embodiment and the utility model scope.Each technical characteristic of above-mentioned disclosure is not limited to the combination disclosed, those skilled in the art also can according to utility model object carry out between each technical characteristic other combination, be as the criterion with the object realizing the utility model.

Claims (10)

1. choose the operating platform of encorbelmenting of sky position construction for building interior for one kind, comprise the pedestal (1) of frame construction, it is characterized in that: the right-hand member of described pedestal (1) is installed with bracing frame (2), operating platform (4) is established on the top of support frame as described above (2), and the right side of described operating platform (4) extends formation and stretches out pedestal (1) part of encorbelmenting outward; The left end of described pedestal (1) places mass (6); The bottom of described pedestal (1) is provided with universal wheel (8).
2. a kind of operating platform of encorbelmenting choosing the construction of sky position for building interior according to claim 1, is characterized in that: described operating platform (4) comprises operating platform skeleton (41) and is layered on the operating platform woodwork plate (42) on half space skeleton.
3. a kind of operating platform of encorbelmenting choosing the construction of sky position for building interior according to claim 1 and 2, it is characterized in that: the waist of support frame as described above (2) is erected with half space (3), and described half space (3) is positioned at the below of operating platform (4).
4. a kind of operating platform of encorbelmenting choosing the construction of sky position for building interior according to claim 3, is characterized in that: the right side of described half space (3) extends formation and stretches out pedestal (1) part of encorbelmenting outward.
5. a kind of operating platform of encorbelmenting choosing the construction of sky position for building interior according to claim 3, is characterized in that: described half space (3) comprises half space skeleton (31) and is layered on the half space woodwork plate (32) on half space skeleton.
6. a kind of operating platform of encorbelmenting choosing the construction of sky position for building interior according to claim 4 or 5, it is characterized in that: described half space (3) and encorbelmenting between part of operating platform (4) are erected with cat ladder (33), the part of encorbelmenting of described operating platform (4) there is opening (43), the bottom of described cat ladder (33) is fixed on half space (3), and top rides over side in opening (43) along upper or be fixed on opening (43) around on operating platform (4) bottom surface.
7. a kind of operating platform of encorbelmenting choosing the construction of sky position for building interior according to claim 6, is characterized in that: the edge of described operating platform (4) is provided with the detachable protective guard (5) installed.
8. a kind of operating platform of encorbelmenting choosing the construction of sky position for building interior according to claim 6, it is characterized in that: support frame as described above (2) comprises the first framework (21) and second framework (22) of parallel correspondence setting, described first framework (21) is identical with the shape of the second framework (22), is provided with connecting rod (23) in framework; Left one side of something of described half space (3) is fixed between the first framework (21) and the second framework (22).
9. a kind of operating platform of encorbelmenting choosing the construction of sky position for building interior according to claim 7 or 8, it is characterized in that: described mass (6) comprises article putting groove and is contained in sandstone in described article putting groove, the enclosing that described article putting groove is made by angle steel (7) is fixing with the pedestal (1) of bottom.
10. a kind of operating platform of encorbelmenting choosing the construction of sky position for building interior according to claim 9, is characterized in that: be provided with diagonal brace (3) between described pedestal (1) and bracing frame (2).
CN201520621266.8U 2015-08-18 2015-08-18 A operation platform that encorbelments for building inside is encorbelmented position and is under construction Expired - Fee Related CN205036063U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520621266.8U CN205036063U (en) 2015-08-18 2015-08-18 A operation platform that encorbelments for building inside is encorbelmented position and is under construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520621266.8U CN205036063U (en) 2015-08-18 2015-08-18 A operation platform that encorbelments for building inside is encorbelmented position and is under construction

Publications (1)

Publication Number Publication Date
CN205036063U true CN205036063U (en) 2016-02-17

Family

ID=55294973

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520621266.8U Expired - Fee Related CN205036063U (en) 2015-08-18 2015-08-18 A operation platform that encorbelments for building inside is encorbelmented position and is under construction

Country Status (1)

Country Link
CN (1) CN205036063U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106382001A (en) * 2016-08-31 2017-02-08 中建三局第建设工程有限责任公司 Parapet wall mold supporting frame capable of being moved and revolved
CN106939794A (en) * 2017-03-14 2017-07-11 中国十七冶集团有限公司 One kind is with detachable guard rail anchor bar of waterproof plate in tunnels chassis
CN108442678A (en) * 2018-05-01 2018-08-24 浙江绿城房屋服务系统有限公司 Slope roof type skin repair crosshead and its construction method
CN112096033A (en) * 2020-09-24 2020-12-18 标龙建设集团有限公司 Movable steel cantilever device
CN113833244A (en) * 2021-09-09 2021-12-24 中建八局西南建设工程有限公司 Overhanging type mobile operation platform

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106382001A (en) * 2016-08-31 2017-02-08 中建三局第建设工程有限责任公司 Parapet wall mold supporting frame capable of being moved and revolved
CN106939794A (en) * 2017-03-14 2017-07-11 中国十七冶集团有限公司 One kind is with detachable guard rail anchor bar of waterproof plate in tunnels chassis
CN108442678A (en) * 2018-05-01 2018-08-24 浙江绿城房屋服务系统有限公司 Slope roof type skin repair crosshead and its construction method
CN112096033A (en) * 2020-09-24 2020-12-18 标龙建设集团有限公司 Movable steel cantilever device
CN113833244A (en) * 2021-09-09 2021-12-24 中建八局西南建设工程有限公司 Overhanging type mobile operation platform

Similar Documents

Publication Publication Date Title
CN205036063U (en) A operation platform that encorbelments for building inside is encorbelmented position and is under construction
CN203487803U (en) Safety protection structure for elevator shaft construction
CN205475250U (en) Pin -connected panel steel stair in foundation ditch
CN205036062U (en) Cantilever frame for construction of hollow part inside building
CN206048160U (en) A kind of height-adjustable split heads
CN102733586A (en) Scaffold cart
CN208039787U (en) High-altitude edge-facing operation assembly operation platform
CN208056519U (en) A kind of detachable edge protection column
CN217106090U (en) Protective device for bottom of overhanging type scaffold
CN206762048U (en) A kind of escape device for board house
CN204626257U (en) A kind of bridge column construction operation platform
CN206256702U (en) A kind of 3 D stereo operating platform installed for steel columns of steel structures
CN205531268U (en) A moving platform guide rail strutting arrangement for daylighting top construction
CN204703542U (en) The assembled passage of a kind of Construction of Steel Structure regularization
CN208235587U (en) A kind of large-span deep foundation pit underground power house rack assembling construction platform
CN210887994U (en) Multi-use architecture construction platform of adjustable height
CN210195200U (en) Hanging flower basket device of encorbelmenting of high parapet
CN209874424U (en) Building assembled safety scaffold
CN208329667U (en) A kind of horizontal hard protection system of integrated form floor edge
CN207362706U (en) Load carrying type hanging basket operating platform
CN206205475U (en) A kind of vertical opening protective device of shear wall structure
CN110748140A (en) Track beam hanging basket special for stepped curtain wall
CN206805907U (en) The experience apparatus of steel construction potential safety hazard
CN204919419U (en) Municipal administration environmental protection protection network
CN205894282U (en) Modular assembly run -up log cabin

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160217

Termination date: 20160818

CF01 Termination of patent right due to non-payment of annual fee