CN205036062U - Cantilever frame for construction of hollow part inside building - Google Patents

Cantilever frame for construction of hollow part inside building Download PDF

Info

Publication number
CN205036062U
CN205036062U CN201520621255.XU CN201520621255U CN205036062U CN 205036062 U CN205036062 U CN 205036062U CN 201520621255 U CN201520621255 U CN 201520621255U CN 205036062 U CN205036062 U CN 205036062U
Authority
CN
China
Prior art keywords
construction
operating platform
pedestal
support body
suspension scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520621255.XU
Other languages
Chinese (zh)
Inventor
李玉昊
熊松柏
姜桃红
武建乐
陈帅
熊雪松
靳雨涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
China Construction Second Bureau Decoration Engineering Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
China Construction Second Bureau Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd, China Construction Second Bureau Decoration Engineering Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201520621255.XU priority Critical patent/CN205036062U/en
Application granted granted Critical
Publication of CN205036062U publication Critical patent/CN205036062U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a frame of encorbelmenting for building inside portion of choosing to empty construction, it includes: the universal wheel is arranged at the bottom of the base; the counterweight is arranged on the base and is close to one end of the base; the lower part of the support frame is fixed on the base and is close to the other end of the base; the operating platform is fixed on the upper part of the supporting frame; the projection of the operating platform on the plane of the base extends out of the other end of the base. The utility model discloses the advantage does: the space occupation is small, and the stability is high; the decoration construction requirement of the special position of the on-site side wall is met, the requirement of various cross construction operations is met, the problem of construction space among various types is solved, the limited space can be fully utilized, the space utilization rate is maximized, and the construction progress is accelerated.

Description

The suspension scaffold of sky position construction is chosen for building interior
Technical field
The utility model belongs to building interior decoration construction technical field, particularly relates to a kind of suspension scaffold choosing the construction of sky position for building interior.
Background technology
In building construction process, there are many decorations of choosing sky position, especially in the majority with pedestrian street, large scale business square.Such as long street lateral wall, the decorations at the positions such as hollow ceiling.Conventional scheme adopts " fastener type steel pipe scaffold ", and domestic conventional fastener type steel pipe scaffold is that cast iron makes, its advantage: install simple, be convenient to dismounting etc.Shortcoming is: space hold is large.Jenny scaffold shortcoming is safety, poor stability.The two does not all reach the decoration construction requirement of on-the-spot lateral wall specific position.
The feature of Applied in Business Pedestrian Street construction is: area of space is little, and construction density is high.Relatively narrow and small mainly due to Applied in Business Pedestrian Street construction area area, constructor on the scene is more simultaneously, and the operation of each work post crossed construction is frequent, and the construction space problem rationally solved between each work post is particularly important.But fastener type steel pipe scaffold takies a large amount of construction spaces, while causing ceiling and lateral wall construction, ground paving cannot be carried out simultaneously, schedule delays.
Summary of the invention
The purpose of this utility model be to provide a kind of for building interior choose sky position construction suspension scaffold, with solve prior art financial cost high, take the technical problem that construction space is large, security and stability is poor.
The technical scheme that the utility model solves the problems of the technologies described above is as follows: a kind of suspension scaffold choosing the construction of sky position for building interior, and it comprises:
Pedestal, the bottom of described pedestal is provided with universal wheel;
Mass, described mass is arranged on described pedestal, near one end of described pedestal;
Bracing frame, the bottom of support frame as described above is fixed on described pedestal, near the other end of described pedestal;
Operating platform, described operating platform is fixed on the top of support frame as described above; Described operating platform extends the other end of described pedestal in the projection of pedestal place plane.
The utility model chooses the suspension scaffold of sky position construction as above for building interior, further, also comprise half space, described half space is fixed on the medium position of support frame as described above, and is positioned at the below of described operating platform.
The utility model chooses the suspension scaffold of sky position construction as above for building interior, further, described half space comprises half space steelframe and half space woodwork plate.
The utility model chooses the suspension scaffold of sky position construction as above for building interior, further, operating platform comprises operating platform steelframe and operating platform woodwork plate, and described operating platform woodwork plate is provided with perforate;
Suspension scaffold also comprises cat ladder, and described cat ladder is connected between described half space and described perforate;
Constructor enters described perforate by operating platform by cat ladder, climbs up described operating platform.
The utility model chooses the suspension scaffold of sky position construction as above for building interior, further, also comprise protective guard, described protective guard is arranged on described operating platform.
The utility model chooses the suspension scaffold of sky position construction as above for building interior, further, support frame as described above comprises:
First support body, described first support body is fixed on described pedestal;
Second support body, described second support body is fixed on described pedestal, and parallel with described first support body;
Described half space while be fixedly connected on described first support body and the second support body; Described half space extends the other end of described pedestal in the projection of pedestal place plane.
The utility model chooses the suspension scaffold of sky position construction as above for building interior, further, described mass comprises article putting groove and sandstone; Described sandstone is contained in described article putting groove.
The beneficial effects of the utility model are: suspension scaffold space hold is little, and stability is high.Solve the decoration construction requirement of on-the-spot lateral wall specific position, meet each work post crossed construction operation needs, solve the construction space problem between each work post, limited space can be made full use of, space availability ratio is maximized, accelerating construction progress.
The protective guard of operating platform will make detachable form, to meet diverse location, the construction of differing heights ceiling and movement requirement.
Accompanying drawing explanation
By detailed description done in conjunction with the following drawings, above-mentioned and/or other aspects of the present utility model and advantage will become clearer and be easier to understand, and these accompanying drawings just schematically, do not limit the utility model, wherein:
Fig. 1 is the front schematic view of the suspension scaffold of a kind of embodiment of the utility model;
Fig. 2 is the side schematic view of the suspension scaffold of a kind of embodiment of the utility model;
Fig. 3 is the schematic top plan view of the suspension scaffold of a kind of embodiment of the utility model.
In accompanying drawing, the list of parts representated by each label is as follows:
1, pedestal, 11, universal wheel, 12, article putting groove, 13, angle steel, 14, sandstone, 2, bracing frame, 21, the first support body, the 22, second support body, 23, connecting rod, 3, half space, 31, half space steelframe, 32, half space woodwork plate, 33, cat ladder, 4, operating platform, 41, operating platform steelframe, 42, operating platform woodwork plate, 43, perforate, 5, protective guard.
Detailed description of the invention
Hereinafter, embodiment of choosing the suspension scaffold of sky position construction for building interior of the present utility model is described with reference to the accompanying drawings.
The embodiment recorded at this is specific detailed description of the invention of the present utility model, for illustration of design of the present utility model, is all explanatory and exemplary, should not be construed as the restriction to the utility model embodiment and the utility model scope.Except the embodiment recorded at this, those skilled in the art can also adopt other technical scheme apparent based on the content disclosed in the application's claims and manual, and these technical schemes comprise the technical scheme making any apparent substitutions and modifications adopted the embodiment recorded at this.
The accompanying drawing of this manual is schematic diagram, and aid illustration design of the present utility model schematically shows shape and the correlation thereof of each several part.Note that the structure of each parts for the ease of clearly showing the utility model embodiment, not according to identical scale between each accompanying drawing.Identical reference marker is for representing identical part.
Fig. 1-Fig. 3 illustrates the suspension scaffold of a kind of embodiment of the utility model, and it comprises:
Pedestal 1, the bottom of described pedestal is provided with universal wheel 11;
Mass, described mass is arranged on described pedestal 1, near one end of described pedestal;
Bracing frame 2, the bottom of support frame as described above is fixed on described pedestal 1, near the other end of described pedestal;
Operating platform 4, described operating platform 4 is fixed on the top of support frame as described above 2; Described operating platform extends the other end of described pedestal in the projection of pedestal place plane.
The work progress of the utility model above-described embodiment is as follows: suspension scaffold is pushed to construction and encorbelments near position, operating platform is positioned at below construction location.Constructor climbs up operating platform, carries out decoration construction on the operational platform.Due to the existence of mass, the overall stress balance of constructor's suspension scaffold after climbing up operating platform can be ensured, can not overturning.The utility model suspension scaffold space hold is little, and stability is high.Solve the decoration construction requirement of on-the-spot lateral wall specific position, meet each work post crossed construction operation needs, solve the construction space problem between each work post, accelerating construction progress.
Have a rest when fatigue for the ease of constructor, the utility model above-described embodiment for building interior choose sky position construction suspension scaffold can also improve as follows, suspension scaffold also comprises half space 3, described half space is fixed on the medium position of support frame as described above 2, and is positioned at the below of described operating platform.In one embodiment, described half space comprises half space steelframe 31 and half space woodwork plate 32.Half space steelframe 31 is fixedly connected with support frame as described above 2, and described woodwork plate 32 is laid on described half space steelframe 31.Such as half space steelframe 31 adopts 40 × 40mm angle steel to be welded, and woodwork plate 32 is the core-board that 12mm is thick.
Operating platform is climbed up for the ease of constructor, to choose in the specific implementation process of the suspension scaffold of sky position construction for building interior the utility model is above-mentioned, operating platform 4 comprises operating platform steelframe 41 and operating platform woodwork plate 42, and described operating platform woodwork plate 42 is provided with perforate; In one embodiment, bore size is 450 × 600mm;
Suspension scaffold also comprises cat ladder 33, and described cat ladder 33 is connected between described half space 3 and described perforate 43;
Constructor enters described perforate by operating platform by cat ladder, climbs up described operating platform.After constructor climbs up operating platform, with cover plate by described bored closure.
In order to improve safety when constructor constructs on the operational platform, the utility model above-described embodiment for building interior choose sky position construction suspension scaffold can also improve as follows, it also comprises protective guard 5, and described protective guard 5 is arranged on described operating platform 4.As shown in Figure 1, described protective guard 5 only blocks the side of operating platform 4 in one embodiment.In addition, according to security needs, protective guard can block the both sides of operating platform, three sides or surrounding, improves safety.In a more preferred embodiment, the protective guard of operating platform will make detachable form, to meet diverse location, the construction of differing heights ceiling and movement requirement.
Choosing for building interior in the suspension scaffold of sky position construction at the utility model above-described embodiment, support frame as described above 2 comprises:
First support body 21, described first support body is fixed on described pedestal; Described first support body is rectangle; In the middle of rectangle, there is connecting rod 23, increase the stability of the first support body;
Second support body 22, described second support body is fixed on described pedestal, and described second support body is rectangle, and parallel with described first support body;
Described half space 3 while be fixedly connected on described first support body 21 and the second support body 22; Described half space 3 extends the other end of described pedestal in the projection of pedestal 1 place plane.
Choosing for building interior in the suspension scaffold of sky position construction at the utility model above-described embodiment, described mass comprises article putting groove 12 and sandstone 14; Described sandstone 14 is contained in described article putting groove 12.As shown in Figure 1, the enclosing that article putting groove 12 is made by angle steel 13 is fixedly connected with pedestal.
Each technical characteristic of above-mentioned disclosure is not limited to that disclosed with combination that is further feature, other combination that those skilled in the art also can carry out between each technical characteristic according to the object of invention, is as the criterion with the object realizing the utility model.

Claims (10)

1. choose a suspension scaffold for sky position construction for building interior, it is characterized in that, comprising:
Pedestal, the bottom of described pedestal is provided with universal wheel;
Mass, described mass is arranged on described pedestal, near one end of described pedestal;
Bracing frame, the bottom of support frame as described above is fixed on described pedestal, near the other end of described pedestal;
Operating platform, described operating platform is fixed on the top of support frame as described above; Described operating platform extends the other end of described pedestal in the projection of pedestal place plane.
2. the suspension scaffold choosing the construction of sky position for building interior according to claim 1, it is characterized in that, also comprise half space, described half space is fixed on the medium position of support frame as described above, and is positioned at the below of described operating platform.
3. the suspension scaffold choosing the construction of sky position for building interior according to claim 2, it is characterized in that, described half space comprises half space steelframe and half space woodwork plate.
4. the suspension scaffold choosing the construction of sky position for building interior according to Claims 2 or 3, it is characterized in that, operating platform comprises operating platform steelframe and operating platform woodwork plate, and described operating platform woodwork plate is provided with perforate;
Suspension scaffold also comprises cat ladder, and described cat ladder is connected between described half space and described perforate;
Constructor enters described perforate by operating platform by cat ladder, climbs up described operating platform.
5. the suspension scaffold choosing the construction of sky position for building interior according to any one of claim 1-3, it is characterized in that, also comprise protective guard, described protective guard is arranged on described operating platform.
6. the suspension scaffold choosing the construction of sky position for building interior according to claim 4, it is characterized in that, also comprise protective guard, described protective guard is arranged on described operating platform.
7. the suspension scaffold choosing the construction of sky position for building interior according to Claims 2 or 3, it is characterized in that, support frame as described above comprises:
First support body, described first support body is fixed on described pedestal;
Second support body, described second support body is fixed on described pedestal, and parallel with described first support body;
Described half space while be fixedly connected on described first support body and the second support body; Described half space extends the other end of described pedestal in the projection of pedestal place plane.
8. the suspension scaffold choosing the construction of sky position for building interior according to claim 4, it is characterized in that, support frame as described above comprises:
First support body, described first support body is fixed on described pedestal;
Second support body, described second support body is fixed on described pedestal, and parallel with described first support body;
Described half space while be fixedly connected on described first support body and the second support body; Described half space extends the other end of described pedestal in the projection of pedestal place plane.
9. the suspension scaffold choosing the construction of sky position for building interior according to any one of claim 1,2,3,6 or 8, it is characterized in that, described mass comprises article putting groove and sandstone; Described sandstone is contained in described article putting groove.
10. the suspension scaffold choosing the construction of sky position for building interior according to claim 7, it is characterized in that, described mass comprises article putting groove and sandstone; Described sandstone is contained in described article putting groove.
CN201520621255.XU 2015-08-18 2015-08-18 Cantilever frame for construction of hollow part inside building Expired - Fee Related CN205036062U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520621255.XU CN205036062U (en) 2015-08-18 2015-08-18 Cantilever frame for construction of hollow part inside building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520621255.XU CN205036062U (en) 2015-08-18 2015-08-18 Cantilever frame for construction of hollow part inside building

Publications (1)

Publication Number Publication Date
CN205036062U true CN205036062U (en) 2016-02-17

Family

ID=55294972

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520621255.XU Expired - Fee Related CN205036062U (en) 2015-08-18 2015-08-18 Cantilever frame for construction of hollow part inside building

Country Status (1)

Country Link
CN (1) CN205036062U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105696782A (en) * 2016-04-06 2016-06-22 中国建筑局(集团)有限公司 Novel mobile operation platform
CN109356375A (en) * 2018-10-23 2019-02-19 中建四局第六建筑工程有限公司 A kind of attachment type raise scaffold support construction for high Stilt layer structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105696782A (en) * 2016-04-06 2016-06-22 中国建筑局(集团)有限公司 Novel mobile operation platform
CN109356375A (en) * 2018-10-23 2019-02-19 中建四局第六建筑工程有限公司 A kind of attachment type raise scaffold support construction for high Stilt layer structure

Similar Documents

Publication Publication Date Title
CN205036063U (en) A operation platform that encorbelments for building inside is encorbelmented position and is under construction
CN205036062U (en) Cantilever frame for construction of hollow part inside building
CN203487803U (en) Safety protection structure for elevator shaft construction
CN102493671A (en) Additional concrete protection structure for ancient dwelling and construction method thereof
CN204626252U (en) Hanging basket device of movable assembly vehicle for bridge guardrail
CN103967332B (en) The construction method of a kind of building site enclosing
CN104120649A (en) End-girder-free V-shaped rigid-frame bridge with bridgehead anti-thrust protection wall
CN206762048U (en) A kind of escape device for board house
CN205531268U (en) A moving platform guide rail strutting arrangement for daylighting top construction
CN110748140A (en) Track beam hanging basket special for stepped curtain wall
CN208545955U (en) A kind of load-bearing mounting seat for building scaffold equipment
CN205777591U (en) A kind of simple electric drill perforating lengthens holder device
CN208396449U (en) A kind of Fast Installation prefabricated components enclosure of concrete
CN208501722U (en) A kind of stone structure Gu decorated archway base isolation system
CN204662957U (en) New take-off position aluminum alloy pattern plate
CN203938968U (en) The auxiliary hanging basket of installation of continuous beam arch suspension rod bottom anchored end
CN206110163U (en) Steel frame quick -mounting tower structure
CN206842841U (en) A kind of outdoor case unit framework balancing pole hoisting structure
CN206957349U (en) Encorbelment protection advertisement enclosure wall
CN211949469U (en) Reinforced supporting structure for constructional engineering
CN206705575U (en) A kind of building tower crane with safety hanging cradle
CN202450655U (en) Integral precast-concrete outer wall board
CN205935188U (en) Combination formula building structure based on stone steel matter
CN221461775U (en) Building engineering is with climbing frame
CN201722708U (en) High-strength steel fiber gully cover

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160217

Termination date: 20160818