CN206721683U - A kind of concrete Simple T-Girders tensioning jack hanger - Google Patents
A kind of concrete Simple T-Girders tensioning jack hanger Download PDFInfo
- Publication number
- CN206721683U CN206721683U CN201720314439.0U CN201720314439U CN206721683U CN 206721683 U CN206721683 U CN 206721683U CN 201720314439 U CN201720314439 U CN 201720314439U CN 206721683 U CN206721683 U CN 206721683U
- Authority
- CN
- China
- Prior art keywords
- crossbeam
- jack
- girders
- movable pulley
- annulus
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
A kind of concrete Simple T-Girders tensioning jack hanger.It includes crossbeam, two pieces of baffle plates, combination movable pulley, two supporting legs, annulus and steel wire rope;Wherein two supporting legs are set in splayed, and upper end is connected to the on both sides of the middle position of crossbeam;Combination movable pulley is arranged on the crossbeam of supporting leg junction side in a sliding manner, for connecting jack by jack;Annulus is fixed on crossbeam on the end bottom surface of supporting leg junction opposite side;Two pieces of baffle plates are separately fixed at the both ends of crossbeam, for preventing that combining movable pulley outwards skids off crossbeam;Annulus is applied in the middle part of steel wire rope, both ends are separately fixed on bridge floor exposed B1 reinforcing bars and T-steel.Concrete Simple T-Girders tensioning provided by the utility model jack hanger, which has, to be made simple, is installed, is dismantled easy to use, and production cost is low, can reuse, it is environmentally friendly the advantages that, therefore be easy to promote the use of.
Description
Technical field
The utility model belongs to bridge construction technical field of auxiliary equipment, more particularly to a kind of concrete Simple T-Girders
Drawing jack hanger.
Background technology
Pre-stressed concrete simple-support T-sectional girder is widely used in China railways engineering field.Prestressing stretching technique is
The critical process of precast beam production.During tensioning construction, it is that loading machine coordinates that traditional jack, which hangs shifting method,
Tripod directly coordinates completion with straddle truck, but this method in operation is easy to that beam body and steel strand wires are caused to damage,
Potential safety hazard is bigger, and needs when moving to take substantial amounts of mechanical one-shift, human resources, therefore the pole not side that constructs
Just, while also it is unfavorable for the saving of the energy.
The content of the invention
In order to solve the above problems, the purpose of this utility model is to provide a kind of light, safe and can repeat profit
With being moved easily the concrete Simple T-Girders tensioning jack hanger of operation.
In order to achieve the above object, concrete Simple T-Girders tensioning provided by the utility model includes horizontal stroke with jack hanger
Beam, two pieces of baffle plates, combination movable pulley, two supporting legs, annulus and steel wire rope;Wherein two supporting legs are set in splayed, upper end point
The on both sides of the middle position of crossbeam is not connected to;Combination movable pulley is arranged in the horizontal stroke of supporting leg junction side in a sliding manner
Liang Shang, for connecting jack by jack;Annulus is fixed on crossbeam on the end bottom surface of supporting leg junction opposite side;
Two pieces of baffle plates are separately fixed at the both ends of crossbeam, for preventing that combining movable pulley outwards skids off crossbeam;The middle part of steel wire rope is run through
In annulus, both ends are separately fixed on bridge floor exposed B1 reinforcing bars and T-steel.
Described combination movable pulley includes U-shaped frame and two rollers, wherein U-shaped frame surround the two sides that are arranged on crossbeam and
Outer side bottom surface, two rollers are arranged on the opening of U-shaped frame, and the outer circumference surface of roller is in contact with the top surface of crossbeam.
Described crossbeam uses 120*74*5mm I-steel;Supporting leg uses 100*48*5.3mm channel-section steels.
Concrete Simple T-Girders tensioning provided by the utility model jack hanger, which has, to be made simply, and installation, dismounting make
With convenient, production cost is low, can reuse, it is environmentally friendly the advantages that, therefore be easy to promote the use of.
Brief description of the drawings
Fig. 1 is concrete Simple T-Girders tensioning jack hanger front view provided by the utility model.
Fig. 2 is concrete Simple T-Girders tensioning jack hanger top view provided by the utility model.
Fig. 3 is concrete Simple T-Girders tensioning jack hanger side view provided by the utility model.
Embodiment
Concrete Simple T-Girders tensioning provided by the utility model is hung with jack with specific embodiment below in conjunction with the accompanying drawings
Frame is described in detail.
As shown in Fig. 1-Fig. 3, concrete Simple T-Girders tensioning provided by the utility model includes crossbeam with jack hanger
1st, two pieces of baffle plates 2,3, two supporting legs 4 of combination movable pulley, annulus 5 and steel wire rope 6;Wherein two supporting legs 4 are set in splayed, on
End is connected to the on both sides of the middle position of crossbeam 1;Combination movable pulley 3 is arranged in the junction of supporting leg 4 in a sliding manner
On the crossbeam 1 of side, for connecting jack by jack;Annulus 5, which is fixed on crossbeam 1, is located at the junction opposite side of supporting leg 4
End bottom surface on;Two pieces of baffle plates 2 are separately fixed at the both ends of crossbeam 1, for preventing that combining movable pulley 3 outwards skids off crossbeam 1;
The middle part of steel wire rope 6 is applied in annulus 5, and both ends are separately fixed on bridge floor exposed B1 reinforcing bars and T-steel.
Described combination movable pulley 3 includes U-shaped frame 7 and two rollers 8, and wherein U-shaped frame 7 surrounds and is arranged on the two of crossbeam 1
Side and outer side bottom surface, two rollers 8 are arranged on the opening of U-shaped frame 7, and the top surface of the outer circumference surface of roller 8 and crossbeam 1
It is in contact.
Described crossbeam 1 uses 120*74*5mm I-steel.
Described supporting leg 4 uses 100*48*5.3mm channel-section steels.
Now concrete Simple T-Girders tensioning provided by the utility model is illustrated such as with jack hanger installation and application method
Under:Concrete Simple T-Girders tensioning provided by the utility model is placed on bridge floor with jack hanger by operating personnel first, and
Supporting leg 4 is stood in the position for being more than 200mm away from beam-ends, then the both ends of steel wire rope 6 are locked in bridge floor respectively with snap ring exposed
On B1 reinforcing bars and T-steel, until steel wire rope 6 is in tensioned state, now crossbeam 1, afterwards will combination just at horizontal level
Movable pulley 3 moves to the close position of baffle plate 2 in the outer end of crossbeam 1, is connected finally by jack by movable pulley 3 is combined with stretch-draw jack
Connect, you can complete installation process.
Application method is:Will with jack hanger using jack and concrete Simple T-Girders tensioning provided by the utility model
Stretch-draw jack is promoted to duct horizontal level to be tensioned, i.e. tension steel strand beam position, the erector successively on steel wire bundle
Make anchorage, work clip sheet, limiting plate and gasket ring, mobile combination movable pulley 3, be installed in place stretch-draw jack and be close to gasket ring,
Installation tool anchorage, tool clamping piece are then proceeded to, finally adjustment combination movable pulley 3 and jack, make in anchorage center, jack
The heart, duct center point-blank, urgent work clip sheet, you can carry out tensioning operation.After the completion of tensioning operation, by opposite
Order is dismantled, and then moves to next duct, and constructed according to the method described above.
Claims (3)
- A kind of 1. concrete Simple T-Girders tensioning jack hanger, it is characterised in that:Described jack hanger includes crossbeam (1), two pieces of baffle plates (2), combination movable pulley (3), two supporting legs (4), annulus (5) and steel wire rope (6);Wherein two supporting legs (4) Set in splayed, upper end is connected to the on both sides of the middle position of crossbeam (1);Combination movable pulley (3) is set in a sliding manner Put on the crossbeam (1) positioned at supporting leg (4) junction side, for connecting jack by jack;Annulus (5) is fixed on crossbeam (1) on the end bottom surface of supporting leg (4) junction opposite side;Two pieces of baffle plates (2) are separately fixed at the both ends of crossbeam (1), For preventing that combining movable pulley (3) outwards skids off crossbeam (1);It is applied in the middle part of steel wire rope (6) in annulus (5), both ends difference It is fixed on bridge floor exposed B1 reinforcing bars and T-steel.
- 2. concrete Simple T-Girders tensioning jack hanger according to claim 1, it is characterised in that:Described combination Movable pulley (3) includes U-shaped frame (7) and two rollers (8), and wherein U-shaped frame (7) surrounds the two sides and bottom for being arranged on crossbeam (1) On the outside of face, two rollers (8) are arranged on the opening of U-shaped frame (7), and the top surface of the outer circumference surface of roller (8) and crossbeam (1) It is in contact.
- 3. concrete Simple T-Girders tensioning jack hanger according to claim 1, it is characterised in that:Described crossbeam (1) 120*74*5mm I-steel is used;Supporting leg (4) uses 100*48*5.3mm channel-section steels.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720314439.0U CN206721683U (en) | 2017-03-28 | 2017-03-28 | A kind of concrete Simple T-Girders tensioning jack hanger |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720314439.0U CN206721683U (en) | 2017-03-28 | 2017-03-28 | A kind of concrete Simple T-Girders tensioning jack hanger |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206721683U true CN206721683U (en) | 2017-12-08 |
Family
ID=60502798
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720314439.0U Expired - Fee Related CN206721683U (en) | 2017-03-28 | 2017-03-28 | A kind of concrete Simple T-Girders tensioning jack hanger |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206721683U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108868160A (en) * | 2018-09-13 | 2018-11-23 | 奥来国信(北京)检测技术有限责任公司 | A kind of steel strand prestress tensioning equipment and steel strand prestress construction method |
-
2017
- 2017-03-28 CN CN201720314439.0U patent/CN206721683U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108868160A (en) * | 2018-09-13 | 2018-11-23 | 奥来国信(北京)检测技术有限责任公司 | A kind of steel strand prestress tensioning equipment and steel strand prestress construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204199721U (en) | A kind of erecting device for factory building construction high and medium structure | |
CN102733314B (en) | Walking mechanism for moving hanging basket by front clamp type jack and construction method of walking mechanism | |
CN203392766U (en) | Lightweight lifting bracket arranged on roof | |
CN109881590A (en) | Bridge steel box girder high altitude operation operating platform and building method | |
CN104179342A (en) | Hanging cage and construction method thereof for mounting profiled steel sheets on steel structural workshop wall surface | |
CN206721683U (en) | A kind of concrete Simple T-Girders tensioning jack hanger | |
CN205578009U (en) | Two lined steel bones RACK in tunnel equipment of being under construction | |
CN202193564U (en) | Simple and convenient bridge crane | |
CN203795311U (en) | Multi-leg high pier and slip form construction device | |
CN212599995U (en) | Welding installation equipment for hot-melt welded pipe | |
CN209353734U (en) | For installing the double-track device of curtain wall | |
CN106150105A (en) | A kind of stiffened column installation method | |
CN208732486U (en) | Roofing monorail crane | |
CN103486330B (en) | Either inside high-altitude pipeline mounting construction method | |
CN103375029B (en) | Prestressed dome lifting cantilever crane | |
CN204954201U (en) | Blast furnace stove outer covering outer wall welding platform | |
CN204225503U (en) | Large span steel truss high altitude bulk conversion beam moulding bed | |
CN211473342U (en) | Overhanging scaffold upright rod with anti-skid device | |
CN202688889U (en) | Walking mechanism for moving hanging basket by using front clamped type jack | |
CN103669219B (en) | Many limbs height pier is with sliding construction equipment | |
CN111042538A (en) | Hoisting and mounting method of buckling restrained brace | |
CN202578008U (en) | Prestress dome jack-up cantilever crane | |
CN105108396B (en) | A kind of last furnace shell outer wall jig and its erection method | |
CN104652833A (en) | Manufacturing method for fixing device for pulleys for installation and lifting of purlines of steel structure factory building | |
CN214570577U (en) | Hexagonal block installation and transportation integrated machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171208 |
|