CN103486330B - Either inside high-altitude pipeline mounting construction method - Google Patents

Either inside high-altitude pipeline mounting construction method Download PDF

Info

Publication number
CN103486330B
CN103486330B CN201310458447.9A CN201310458447A CN103486330B CN 103486330 B CN103486330 B CN 103486330B CN 201310458447 A CN201310458447 A CN 201310458447A CN 103486330 B CN103486330 B CN 103486330B
Authority
CN
China
Prior art keywords
pipeline
crane
run
frock
trolley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310458447.9A
Other languages
Chinese (zh)
Other versions
CN103486330A (en
Inventor
李义娥
梁新平
刘志强
魏东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201310458447.9A priority Critical patent/CN103486330B/en
Publication of CN103486330A publication Critical patent/CN103486330A/en
Application granted granted Critical
Publication of CN103486330B publication Critical patent/CN103486330B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/0243Laying or reclaiming pipes on land, e.g. above the ground above ground
    • F16L1/0246Laying or reclaiming pipes on land, e.g. above the ground above ground at a certain height off the ground
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances
    • B66D3/18Power-operated hoists
    • B66D3/20Power-operated hoists with driving motor, e.g. electric motor, and drum or barrel contained in a common housing

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明涉及一种冶金炼钢厂房车间内部高空管道安装施工方法,其步骤是:在天车小车上设立工装,包括承托管道的托座和用来吊装管道的抱杆;地面进行管道坡口加工及除锈、涂漆工序施工;利用厂房内天车检修电葫芦吊装管道,吊装高度超过天车高度;运行天车到天车检修电葫芦下面;运行小车,将管道放于工装上面,进行适当固定;运行天车,将管道运到安装位置;利用工装上栓挂的吊装用手拉葫芦将管道吊起;运行小车,将吊起的管道运到管道安装位置上方,然后将管道落在管道支座上安装就位。本发明利用了天车检修电葫芦安装位置高与天车可移动性的特点,将天车作为一个过渡载体,在操作安全可靠且大大节约成本的前提下完成了管道的安装。

The invention relates to a construction method for installing high-altitude pipelines in the workshop of a metallurgical steelmaking workshop. The steps are: setting up tooling on the trolley of the crane, including brackets for supporting the pipeline and holding poles for lifting the pipeline; beveling the pipeline on the ground Processing, rust removal, and painting process construction; use the crane in the workshop to inspect and repair the electric hoist to hoist the pipeline, and the hoisting height exceeds the height of the crane; run the crane to the bottom of the crane for inspection and repair of the electric hoist; run the trolley, put the pipe on the tooling, and carry out Properly fix; run the crane to transport the pipeline to the installation location; use the hoisting chain hoist bolted on the tooling to lift the pipeline; run the trolley to transport the hoisted pipeline above the installation location of the pipeline, and then drop the pipeline on the Installed in place on the pipe support. The invention utilizes the characteristics of high installation position of electric hoist for inspection and maintenance of the crane and the mobility of the crane, and uses the crane as a transitional carrier to complete the installation of the pipeline under the premise of safe and reliable operation and great cost savings.

Description

车间内部高空管道安装施工方法Construction method of high-altitude pipeline installation in the workshop

技术领域 technical field

本发明涉及管道位置在天车运行轨道上方的高空管道安装方法,具体是一种冶金炼钢厂房车间内部高空管道安装施工方法。 The invention relates to a high-altitude pipeline installation method in which the pipeline position is above the running track of a crane, in particular to a method for installing a high-altitude pipeline inside a workshop of a metallurgical steelmaking plant.

背景技术 Background technique

目前,为节省空间及生产需要和安全原因,冶金炼钢厂房车间内的工艺管道如煤气管道、液化石油气管道、丙烷气管道、氧气管道等,一般都设置在车间天车走台以上。工艺管道放置在高空位置,增加了安装难度。以往的管道安装施工采用汽车吊进行管道吊装,安装过程受地面现场条件制约较大,高空作业需要搭设安全脚手架,成本较高。 At present, in order to save space, production needs and safety reasons, process pipelines in metallurgical steelmaking workshops, such as gas pipelines, liquefied petroleum gas pipelines, propane gas pipelines, oxygen pipelines, etc., are generally set above the overhead traveling platform of the workshop. The process piping is placed at a high altitude, which increases the difficulty of installation. In the past, pipeline installation and construction used truck cranes for pipeline hoisting. The installation process was greatly restricted by the ground site conditions, and safety scaffolding was required for high-altitude operations, which was costly.

发明内容 Contents of the invention

本发明旨在解决现有高空管道安装方法存在的上述问题,而提供一种利用天车检修电葫芦安装位置高于天车的可移动性特点,将天车作为一个过渡载体,在操作安全可靠且大大节约成本的前提下,完成管道安装的车间内部高空管道安装施工方法。 The present invention aims to solve the above-mentioned problems existing in the existing high-altitude pipeline installation method, and provides a mobile hoist that utilizes the crane maintenance electric hoist installation position higher than the crane, and uses the crane as a transition carrier, which is safe and reliable in operation. And under the premise of greatly saving costs, the construction method of high-altitude pipeline installation inside the workshop that completes pipeline installation is completed.

本发明解决其技术问题采用的技术方案是: The technical scheme that the present invention solves its technical problem adopts is:

一种车间内部高空管道安装施工方法,按下述步骤进行: A construction method for installing high-altitude pipelines inside a workshop, which is carried out according to the following steps:

(1)在天车运行小车上设立工装:所述工装包括固定在天车运行小车承重梁上的两个支架,所述两个支架上分别固定有承托管道的托座和用来吊装管道的抱杆; (1) Set up tooling on the trolley running the crane: the tooling includes two brackets fixed on the load-bearing beam of the trolley running the crane, and the brackets are respectively fixed with brackets for supporting the pipes and used for hoisting pipelines. the pole;

(2)地面管道预制:根据管道安装尺寸,在地面进行坡口加工及除锈、涂漆工序施工; (2) Ground pipeline prefabrication: According to the installation size of the pipeline, the groove processing, rust removal and painting processes are carried out on the ground;

(3)管道吊装放于工装上面:利用厂房内天车检修电葫芦进行管道吊装,吊装高度超过天车高度;运行天车到天车检修电葫芦下面;运行小车,将管道放于工装上面,进行适当固定; (3) Pipe hoisting and placing on the tooling: use the crane inspection electric hoist in the workshop to hoist the pipeline, the hoisting height exceeds the height of the crane; run the crane to the bottom of the crane inspection electric hoist; run the trolley, put the pipeline on the tooling, be properly fixed;

(4)利用工装将管道安装就位:运行天车,将管道运到安装位置;利用工装抱杆上栓挂的吊装用手拉葫芦将管道吊起;运行小车,将吊起的管道运到管道安装位置上方,然后将管道落在管道支座上安装就位。 (4) Use the tooling to install the pipeline in place: run the crane to transport the pipeline to the installation location; use the hoisting bolt on the tooling pole to lift the pipeline with a hand chain hoist; run the trolley to transport the hoisted pipeline to Above the installation position of the pipe, then drop the pipe onto the pipe support and install it in place.

进一步地,所述工装由位于天车运行小车承重梁两端并与承重梁焊接固定的的两个门形支架、焊接固定在所述门形支架上的与被安装的管道管径相匹配的鞍式托座、焊接固定在所述门形支架上的并加设斜拉用来吊装管道的抱杆组成,两个门形支架上表面水平高度高于小车上设备高度,抱杆上部栓挂有吊装用手拉葫芦。 Further, the tooling is composed of two door-shaped brackets located at both ends of the load-bearing beam of the traveling trolley of the crane and welded and fixed to the load-bearing beam; It is composed of a saddle bracket, welding and fixing on the door-shaped bracket and adding a cable-stayed pole for hoisting the pipeline. The upper surface level of the two door-shaped brackets is higher than the height of the equipment on the trolley. There are chain hoists for hoisting.

与现有技术相比,采用上述技术方案的本发明,利用了天车检修电葫芦安装位置高与天车可移动性的特点,将天车作为一个过渡载体,在操作安全可靠且大大节约成本的前提下完成了管道的安装,其发明效果是: Compared with the prior art, the present invention adopts the above-mentioned technical solution, utilizes the characteristics of the high installation position of the electric hoist for the maintenance of the crane and the mobility of the crane, and uses the crane as a transition carrier, which is safe and reliable in operation and greatly saves costs Completed the installation of pipeline under the premise, its invention effect is:

管道安装过程不受任何地面现场条件限制,人员作业在天车平台上,提高了人员作业面的安全性;利用厂房现有资源进行施工,减少了施工机械吊装费用,降低了施工成本,缩短了施工工期,提高了施工效率;工装制作简单,材料可利用现场剩余废料制作,节约成本。 The pipeline installation process is not limited by any ground site conditions. The personnel work on the crane platform, which improves the safety of the personnel working surface; the existing resources of the plant are used for construction, which reduces the construction machinery hoisting cost, reduces the construction cost, and shortens the construction period. The construction period improves the construction efficiency; the tooling is simple to make, and the materials can be made from the remaining waste on site, saving costs.

附图说明 Description of drawings

图1为本发明实施例工装结构示意图。 Fig. 1 is a schematic diagram of the structure of the tooling of the embodiment of the present invention.

图2为天车检修电葫芦吊装管道示意图。 Figure 2 is a schematic diagram of the hoisting pipeline of the electric hoist for the maintenance of the crane.

图3为天车运行到天车检修电葫芦下面示意图。 Figure 3 is a schematic diagram of the crane running to the bottom of the electric hoist for crane maintenance.

图4为小车运行到天车检修电葫芦下面示意图。 Figure 4 is a schematic diagram of the trolley running to the bottom of the electric hoist for maintenance of the crane.

图5为管道放于工装上面示意图。 Figure 5 is a schematic diagram of the pipeline being placed on the tooling.

图6为倒链吊起的管道运到管道安装位置上方示意图。 Fig. 6 is a schematic diagram of transporting the pipeline hoisted by the chain to the top of the pipeline installation position.

图7为管道落在管道支座上安装就位示意图。 Fig. 7 is a schematic diagram of installation of the pipeline on the pipeline support.

图中:天车小车1,门形支架2,鞍式托座3,抱杆4,吊装用手拉葫芦5,天车6,天车检修电葫芦7,管道8,管道支座9。 In the figure: crane trolley 1, door-shaped support 2, saddle bracket 3, holding pole 4, hand chain block 5 for hoisting, crane 6, crane maintenance electric hoist 7, pipeline 8, pipeline support 9.

具体实施方式 Detailed ways

下面结合实施例对本发明作进一步说明,目的仅在于更好地理解本发明内容。因此,所举之例并不限制本发明的保护范围。 The present invention will be further described below in conjunction with the examples, and the purpose is only to better understand the content of the present invention. Therefore, the examples given do not limit the protection scope of the present invention.

本实施例是120吨转炉炼钢车间燃气管道的施工。具体管道安装过程如下: This embodiment is the construction of a gas pipeline in a 120-ton converter steelmaking workshop. The specific pipeline installation process is as follows:

1.参见图1,在天车运行小车上设立工装: 1. Referring to Figure 1, set up tooling on the running trolley of the crane:

(1)首先按照设计院图纸制作相应管径大小的管道鞍式托座3; (1) First make the saddle bracket 3 of the corresponding pipe diameter according to the drawings of the Design Institute;

(2)在天车小车1的承重梁(大梁)上焊接两个门形支架2,以保证门形支架2整体的稳定性,门形支架2上表面水平高度应高于天车小车1上设备高度,以便管道放到门形支架2上管道能水平放置,不受小车设备影响。 (2) Weld two door-shaped brackets 2 on the load-bearing beam (beam) of the crane trolley 1 to ensure the overall stability of the door-shaped bracket 2. The horizontal height of the upper surface of the door-shaped bracket 2 should be higher than that of the crane trolley 1 The height of the equipment is so that the pipeline can be placed horizontally on the door-shaped bracket 2 without being affected by the trolley equipment.

(3)将鞍式托座3焊接到门形支架2上,接触面应焊接牢固。 (3) Weld the saddle bracket 3 to the door bracket 2, and the contact surface should be welded firmly.

(4)在门形支架2上焊接吊装用的抱杆4,用来吊装管道,抱杆4加设斜拉,以保证抱杆4的稳定性,抱杆4上部栓挂有吊装用手拉葫芦5。 (4) Weld the hoisting pole 4 on the door-shaped bracket 2 to hoist the pipeline. The pole 4 is equipped with a cable stay to ensure the stability of the pole 4. The upper bolt of the pole 4 is hung with a hand pull for hoisting. Calabash 5.

2.地面管道预制: 2. Ground pipe prefabrication:

根据管道安装尺寸,在地面进行坡口加工及除锈、涂漆等工序施工。 According to the installation size of the pipeline, the groove processing, rust removal, painting and other processes are carried out on the ground.

3.管道吊装放于工装上面: 3. The pipe is hoisted and placed on the tooling:

参见图2,利用厂房内天车检修电葫芦7进行管道8的吊装,吊装高度超过天车6的高度; Referring to Fig. 2, the hoisting of the pipeline 8 is carried out by using the electric hoist 7 for maintenance of the crane in the factory building, and the hoisting height exceeds the height of the crane 6;

参见图3,将天车6运行到天车检修电葫芦7下面; Referring to Fig. 3, run the crane 6 under the electric hoist 7 for crane maintenance;

参见图4,将天车小车1运行到天车检修电葫芦7下面,通过天车检修电葫芦7将管道8放于工装的鞍式托座3上面,并进行适当固定。 Referring to Fig. 4, run the crane trolley 1 under the crane maintenance electric hoist 7, put the pipeline 8 on the saddle bracket 3 of the tooling through the crane maintenance electric hoist 7, and fix it properly.

4.利用工装将管道就位: 4. Use the tooling to put the pipe in place:

参见图5,运行天车6,将承载管道8的天车小车1送到管道8的安装位置旁边; Referring to Fig. 5, run the crane 6, and send the crane trolley 1 carrying the pipeline 8 to the side where the pipeline 8 is installed;

参见图6,利用工装上栓挂的吊装用手拉葫芦5将管道8吊起,提升至管道8安装标高,再将天车小车1运行到管道8安装位置上方; Referring to Fig. 6, the pipeline 8 is hoisted by the hoisting hand chain hoist 5 bolted on the tooling, lifted to the installation elevation of the pipeline 8, and then the crane trolley 1 is run above the installation position of the pipeline 8;

参见图7,通过吊装用手拉葫芦5将管道8落在管道支座9上安装就位。 Referring to Fig. 7, the pipeline 8 is dropped on the pipeline support 9 by hoisting with a hand chain hoist 5 and installed in place.

Claims (2)

1. an either inside high-altitude pipeline mounting construction method, is characterized in that, carries out in the steps below:
(1) on overhead traveling crane running trolley, set up frock: described frock comprises two portal trestles be fixed on overhead traveling crane running trolley machine supporting beams, described two portal trestles be fixed with respectively the bracket of support pipeline and be used for lifting the pole of pipeline;
(2) surface duct is prefabricated: according to Pipe installing size, carries out retaining wall on slope and rust cleaning, painting process construction on ground;
(3) lifting pipeline is put in above frock: utilize vehicle overhauling electric hoist in sky in factory building to carry out lifting pipeline, hoisting height exceedes a day height; Run below overhead traveling crane to sky vehicle overhauling electric hoist; Running trolley, is put in pipeline above frock, suitably fixes;
(4) utilize frock that Pipe installing is in place: to run overhead traveling crane, pipeline is transported to mounting point; The lifting chain block that on frock pole, bolt is hung is utilized to be sling by pipeline; Running trolley, transports to the pipeline sling above Pipe installing position, then pipeline is dropped on installation in position on pipe support.
2. either inside high-altitude according to claim 1 pipeline mounting construction method, it is characterized in that, described frock is by being positioned at overhead traveling crane running trolley machine supporting beams two ends and two portal trestles be welded and fixed with machine supporting beams, the saddle bracket matched with mounted pipe diameter be weldingly fixed on described portal trestle, being weldingly fixed on described portal trestle and adding the pole that oblique pull is used for lifting pipeline and form, two portal trestle upper surface level heights are higher than device height on dolly, and pole top bolt hangs with lifting chain block.
CN201310458447.9A 2013-10-02 2013-10-02 Either inside high-altitude pipeline mounting construction method Active CN103486330B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310458447.9A CN103486330B (en) 2013-10-02 2013-10-02 Either inside high-altitude pipeline mounting construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310458447.9A CN103486330B (en) 2013-10-02 2013-10-02 Either inside high-altitude pipeline mounting construction method

Publications (2)

Publication Number Publication Date
CN103486330A CN103486330A (en) 2014-01-01
CN103486330B true CN103486330B (en) 2015-11-11

Family

ID=49826800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310458447.9A Active CN103486330B (en) 2013-10-02 2013-10-02 Either inside high-altitude pipeline mounting construction method

Country Status (1)

Country Link
CN (1) CN103486330B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107416685B (en) * 2017-08-29 2019-11-05 株洲新奥燃气有限公司 Installation of gas pipeline construction method and its supporting structure on the downside of a kind of bridge
CN108706503B (en) * 2018-05-31 2020-03-27 广船国际有限公司 Hanging weight installation method
CN110282557A (en) * 2019-05-28 2019-09-27 中国华冶科工集团有限公司 Assist mounting platform and the method with high vacant duct in bridge crane installation workshop
CN115724351A (en) * 2022-11-30 2023-03-03 中国二十二冶集团有限公司 Construction method for installing pipeline by using double-beam bridge crane

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6179523B1 (en) * 1995-12-29 2001-01-30 Shell Oil Company Method for pipeline installation
CN101264845A (en) * 2008-05-06 2008-09-17 首钢总公司 Integral Suspension Transposition Construction Method for High-altitude Crane
CN201793331U (en) * 2010-07-30 2011-04-13 合肥紫金制管有限公司 Translational crane for steel pipes
CN201980883U (en) * 2011-03-01 2011-09-21 四川华英化工有限责任公司 Hoisting tool
CN202186848U (en) * 2011-07-21 2012-04-11 舟山蓝天气体有限公司 Universal movable maintenance gantry crane
CN202946764U (en) * 2012-12-20 2013-05-22 甬港现代工程有限公司 Pipe installation machine

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1121086A (en) * 1997-07-07 1999-01-26 Yukiya Iimura Traveling hoist mechanism

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6179523B1 (en) * 1995-12-29 2001-01-30 Shell Oil Company Method for pipeline installation
CN101264845A (en) * 2008-05-06 2008-09-17 首钢总公司 Integral Suspension Transposition Construction Method for High-altitude Crane
CN201793331U (en) * 2010-07-30 2011-04-13 合肥紫金制管有限公司 Translational crane for steel pipes
CN201980883U (en) * 2011-03-01 2011-09-21 四川华英化工有限责任公司 Hoisting tool
CN202186848U (en) * 2011-07-21 2012-04-11 舟山蓝天气体有限公司 Universal movable maintenance gantry crane
CN202946764U (en) * 2012-12-20 2013-05-22 甬港现代工程有限公司 Pipe installation machine

Also Published As

Publication number Publication date
CN103486330A (en) 2014-01-01

Similar Documents

Publication Publication Date Title
CN204917742U (en) Portable portal crane is used in piping erection
CN201660380U (en) Novel hoisting transportation vehicle
CN202358849U (en) Small-size suspension crane
CN106121234B (en) A kind of mounting tool and installation method of roof large span large-diameter pipeline
CN203269442U (en) Auxiliary suspension device for electric hoist
CN102102344B (en) Method for quickly assembling assembled corrugated culvert
CN110127530A (en) For hanging apparatus and its application method in restricted clearance workshop
CN103486330B (en) Either inside high-altitude pipeline mounting construction method
CN203654702U (en) Operating platform for construction of reinforced concrete chimney
CN105398953A (en) Horizontal conveying construction method for underground pipe gallery and pipeline
CN104016260B (en) Little lattice funnel slide installation method and slippage installing mechanism
CN104195948A (en) Bridge hanging pipeline pushing installation and construction method
CN103791156A (en) Superaltitude quick installation method of large-diameter glass fiber reinforced plastic pipes
CN108343783B (en) The installation method and hanging apparatus of high-altitude large-diameter pipeline under complex environment
CN212251443U (en) Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device
CN103982046A (en) Lifting and installation method of buckling restrained braces
CN108275579B (en) Quick dismantling device for pipeline in tunnel
CN110159057A (en) Technological transformation workshop chimney construction method of installation
CN104418240B (en) The lifting of a kind of flue and group are to method
CN212599995U (en) Welding installation equipment for hot-melt welded pipe
CN100366832C (en) Construction technique for hoisting steel made coal hopper on-site
CN103470057B (en) A kind of high-altitude component hoisting construction method
CN216889772U (en) Three-dimensional lifting equipment in limited space
CN204224123U (en) A kind of suspension hoisting device installing base husband Saite stove
CN203402879U (en) Rotatable and portable elevator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant