CN206680995U - A kind of constructing device of screw rod pile pile cover - Google Patents

A kind of constructing device of screw rod pile pile cover Download PDF

Info

Publication number
CN206680995U
CN206680995U CN201720260171.7U CN201720260171U CN206680995U CN 206680995 U CN206680995 U CN 206680995U CN 201720260171 U CN201720260171 U CN 201720260171U CN 206680995 U CN206680995 U CN 206680995U
Authority
CN
China
Prior art keywords
pile
pile cover
screw rod
bucket
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201720260171.7U
Other languages
Chinese (zh)
Inventor
陶美祥
刘涛
王宪国
谢贵山
卫康
刘晓星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority to CN201720260171.7U priority Critical patent/CN206680995U/en
Application granted granted Critical
Publication of CN206680995U publication Critical patent/CN206680995U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model belongs to a kind of constructing device of screw rod pile pile cover.Wherein pile cover cheats rotary drilling device by mounting flange, protective case, tend to act motor, rotary digging bucket and spiral dig wing and formed, the upper center of protective case is connected as a single entity with mounting flange, pile cover hole rotary drilling device is fixed as one by mounting flange and the fixed flange of extending arm front end, motor of tending to act is provided with protective case, motor shaft of tending to act is connected through protective case with the rotary digging bucket upper end center sections of housing lower end, the periphery wall of rotary digging bucket is provided with spiral and digs wing, spiral digs wing by the bucket bottom spiral on periphery wall to bucket top, the neck hole with motor shaft clamping is provided with the middle part of the upper surface of rotary digging bucket.The advantages of the utility model releases the device supporting with the construction technology of screw rod pile pile cover " preceding section of method ", can effectively accelerate pile cover construction speed, saves construction cost, and time saving and energy saving, construction cost is low, and construction quality is good, and security is good and using effect is good.

Description

A kind of constructing device of screw rod pile pile cover
Technical field
The utility model belongs to a kind of constructing device of screw rod pile pile cover.
Background technology
Foundation pile of the screw grout pile (abbreviation screw rod pile) as building, has been widely used.Generally, the stake footpath of screw rod pile Straight bar section uses 0.4m, thread segment stake core diameter 0.299m, straight bar section it is long not less than total stake 1/3rd and be not less than 5m, top Portion is pile cover, and pile cover is diameter 110cm cylinder, high 30cm.
The pile cover of existing screw rod pile that is, after the completion of screw rod pile perfusion, removes each screw rod using the construction technology of " cutting method afterwards " Soil arrives pile cover bottom absolute altitude among between stake, then cuts off the unnecessary pile crown of screw rod pile, all cheek boards of installation composition pile cover, pours Build pile cover concrete and cut off the screw rod pile cast solid structure of pile crown, form pile cover, when pile cover concrete reaches design by force After degree, the middle soil between each screw rod pile, grinding compacting are backfilled.The technique of " the cutting method afterwards " needs first will be big between each screw rod pile Measure inter-pile soil to remove, then amputate unnecessary pile crown again, then all cheek boards of composition pile cover, construction casting pile cover concrete-pile are installed After cap, through health, then inter-pile soil is backfilled, inter-pile soil be present and first remove the waste technique backfilled again, waste time and energy, speed of application Slowly, amputation pile crown cost is big, and efficiency is low.
The content of the invention
The purpose of this utility model is to design a kind of constructing device of screw rod pile pile cover, is released and " preceding section of screw rod pile pile cover The supporting device of the construction technology of method ", can effectively accelerate pile cover construction speed, save construction cost, time saving and energy saving, construction cost The advantages of low, construction quality is good, and security is good and using effect is good.
Formed therefore, the utility model includes excavator, pile cover hole rotary drilling device and pile cover locating template, wherein:
Excavator, excavator are used for pile cover hole rotary drilling device of tending to act, and the front end of the extending arm of excavator is provided with mounting flange Disk;
Pile cover cheats rotary drilling device, is cheated for rotary digging pile cover, and pile cover cheats rotary drilling device by mounting flange, protective case, electricity of tending to act Machine, rotary digging bucket and spiral dig wing and formed, and upper center and the mounting flange of protective case are connected as a single entity, and pile cover hole rotary drilling device is led to Cross mounting flange and the fixed flange of extending arm front end is fixed as one, motor of tending to act, motor shaft of tending to act are provided with protective case It is connected through protective case with the rotary digging bucket upper end center sections of housing lower end, the periphery wall of rotary digging bucket is provided with spiral and digs wing, and spiral is dug For wing by the bucket bottom spiral on periphery wall to bucket top, the lower end of rotary digging bucket is openend, is provided with and electricity in the middle part of the upper surface of rotary digging bucket The neck hole of arbor clamping, the upper surface of the rotary digging bucket on neck hole periphery are provided with scum hole;
Pile cover locating template, for positioning the upper end absolute altitude of casting concrete in pile cover hole, pile cover locating template is disk Type, the diameter 40cm of pile cover locating template, it is process using the thick steel plates of 1cm, the top surface welding 2 of pile cover locating template is put down The capable aluminium alloy plate set in spacing distance, the center line of twice aluminium alloy plate are provided with tag line, are in interval on aluminium alloy plate Distance is provided with fixing hole.
The openend internal diameter of described rotary digging bucket is 1.1~1.3: 1 with screw rod pile upper surface diameter ratio.Described rotary digging bucket Diameter and with diameter line spiral dig wing width sum be equal to pile cover upper surface diameter.Between being on described aluminium alloy plate Gauge is from provided with stay hook.The diameter of described pile cover locating template is less than pile cover hole interior diameter.
Said apparatus has reached the purpose of this utility model.
The utility model releases the device supporting with the construction technology of screw rod pile pile cover " preceding section of method ", can effectively accelerate pile cover Construction speed, construction cost is saved, time saving and energy saving, construction cost is low, and construction quality is good, and it is excellent that security is good and using effect is good Point.
Screw rod pile " the preceding section of method " construction technology, is characterized in:In screw rod pile filling process, pass through laser level Elevation control, screw rod pile stake top absolute altitude is controlled, and any excess concrete of perfusion in stake holes is removed with iron spoon, and used and vibrate Rod vibrates pile crown concrete, then excavates pile cover foundation ditch using homemade pile cover hole rotary drilling device, pours pile cover.
The construction technology of the utility model more existing " cutting method afterwards " is compared, and eliminates the centre removed between each screw rod pile The process that soil arrives pile cover bottom absolute altitude, the process for cutting off the unnecessary pile crown of screw rod pile, the process of all cheek boards of installation composition pile cover, return The process that the middle soil filled out between each screw rod pile arrives pile cover bottom absolute altitude.
With the utility model ratio conventional method and structure construction time contracting square 80%, construction material 90%, construction are saved Cost reduces by 70%;Construction quality is good, and effects of energy conservation and environmental protection is good.
Brief description of the drawings
Fig. 1 is that pile cover of the present utility model cheats rotary drilling device schematic diagram.
Fig. 2 is the polycrystalline substance schematic diagram of rotary digging bucket of the present utility model.
Fig. 3 is that pile cover of the present utility model cheats structural representation.
Embodiment
As shown in Figure 1 to Figure 3, a kind of constructing device of screw rod pile pile cover, including excavator, pile cover hole rotary drilling device and stake Cap locating template is formed, wherein:
Excavator, excavator are used for pile cover hole rotary drilling device of tending to act.The front end 1 of the extending arm of excavator is provided with mounting flange Disk 101.Excavator is traditional excavator, need to only remove the bucket of the front end of extending arm, installs fixed flange.
Pile cover cheats rotary drilling device, for rotary digging pile cover hole 11.Pile cover cheat rotary drilling device by mounting flange 2, protective case 5, become Dynamic motor 4, rotary digging bucket 6 and spiral dig wing 7 and formed.The upper center of protective case is connected as a single entity with mounting flange.The rotation of pile cover hole Dig device to be fixed as one by mounting flange and the fixed flange of extending arm front end, both can be bolted as one Body.Motor of tending to act is provided with protective case.Motor shaft of tending to act is connected through protective case with the rotary digging bucket upper end center sections of housing lower end.Rotary digging The periphery wall of bucket is provided with spiral and digs wing, and spiral digs wing by the bucket bottom spiral on periphery wall to bucket top.The lower end of rotary digging bucket is to open Mouth end, the upper surface middle part of rotary digging bucket are provided with the neck hole 9 with motor shaft clamping, and motor shaft of tending to act sequentially passes through protective case and hole clipping After groove, it is connected with bolt pin and rotary digging bucket upper end center sections.
The upper surface of the rotary digging bucket on neck hole periphery is provided with scum hole 8, to facilitate the digging slag in discharge or removing rotary digging bucket. The side wall of protective case is provided with through hole 3, to facilitate connecting wire, controls the operation panel of tend to act motor speed and keying to be located at excavator In driver's cabin.
The openend internal diameter of described rotary digging bucket is 1.1~1.3: 1 with the upper surface diameter ratio of screw rod pile 10.
Described rotary digging bucket diameter and dig wing width sum with the spiral on diameter line and be equal to pile cover upper surface diameter. Pile cover upper surface diameter is identical with the upper end diameter in pile cover hole 11.
In use, the extending arm completion risen or fallen by excavator of rotary digging bucket, spiral shell is directed at by the center of rotary digging bucket The pile crown center of bar stake, start tend to act motor driven rotary digging bucket and spiral and dig the pile cover hole that wing starts lower digging stake position periphery, to stake Cap hole designed elevation after, it is upper lift excavator extending arm, by pile cover cheat in soil zone go out, and by excavate soil be transported to Dumping Sites. Native (i.e. inter-pile soil) 12 is not removed then among between pile cover hole.
Pile cover locating template, for positioning the upper end absolute altitude of casting concrete in pile cover hole, pile cover locating template is disk Type, the diameter 40cm of pile cover locating template, it is process using the thick steel plates of 1cm, the top surface welding 2 of pile cover locating template is put down The capable aluminium alloy plate set in spacing distance, the center line of twice aluminium alloy plate are provided with tag line, are in interval on aluminium alloy plate Distance is provided with fixing hole.
On described aluminium alloy plate stay hook is provided with spacing distance.The diameter of described pile cover locating template is less than pile cover Cheat interior diameter.
The construction technology of " preceding section of method ", comprises the following steps:
(1) pile cover hole rotary drilling device is prepared.The preparation of repacking and pile cover locating template including excavator.
(2) screw rod pile treatment of soft foundation paragraph is segmented according to designed elevation, ground carried out according to design requirement clear Table is to design altitude.
(3) by neighbouring control bench mark, temporary bench mark is introduced on this section of ground side, and measure temporary bench mark Height value H.
(4) in screw drill installed in front laser level, and level is adjusted to level by tripod bolt.
(5) laser level is used, levelling rod is stood on temporary bench mark, reading h1 is read, calculates laser level Horizontal elevation H1, H1=H+h1.
(6) root includes the design of pile top absolute altitude H2 of screw rod pile, calculates reading h2, the h2=H1-H2 of levelling rod, and in level Identified on chi with red symbol pen.
(7) screw rod pile rig is in place, spuds in, and carries brill, and to drill-pouring concrete, the concrete of perfusion approaches in drilling When at original ground, levelling rod is stood in the concrete top of perfusion in drilling, the concrete top for the interior perfusion that drills is screw rod pile stake top Absolute altitude.Read the difference D of laser level horizontal line and tag line on levelling rod.
If (a) D is less than zero, laser level horizontal line is less than levelling rod tag line, and screw rod pile stake top absolute altitude is higher than design Value, then the concrete spoon of more perfusions in drilling is gone out using iron spoon.
If (b) D is more than zero, laser level horizontal line is higher than levelling rod tag line, and screw rod pile stake top absolute altitude is less than design Value, then the concrete of perfusion is supplemented into drilling again.
(8) (a) (b) step is repeated, until screw rod pile stake top absolute altitude meets design requirement.
(9) it should soon insert and carry slowly using the concrete for perfusion of being vibrated in vibrating spear insertion stake holes, vibrating spear, smash shake repeatedly, it is deep In the stake holes for entering lower 2 meters of stake top, ensure pile crown concrete quality.
(10) after the completion of vibrating, in the pile crown upper berth plastic cloth health handled well, pile crown is protected.
(11) after the concrete setting phase for treating screw rod pile.Pile cover construction is carried out, screw rod pile rig is first being bored into stake holes mistake The spoir complete liquidation that periphery is left in journey finishes, then is flattened using land leveller, and with 18~20 tons of road roller static pressure 2 times.
(12) surveying and locating, recover stake position, and mark is carried out with bamboo stick.
(13) with pile cover hole rotary drilling device alignment pile crown, starter starts the pile cover hole on lower digging stake position periphery, to pile cover The designed elevation in hole, and it is transported to Dumping Sites by soil is excavated.
(14) remaining dregs in manual cleaning pile cover hole, and it is trimmed to designed elevation.
(15) absolute altitude and outward appearance of the screw rod pile stake top in each pile cover hole are checked, using laser level and levelling rod, Judge whether stake top absolute altitude meets design requirement, the pile crown to being higher by design requirement and surface irregularity, carry out manual amendment.
(16) screw rod pile is detected according to design requirement, after qualified, carries out pile cover construction.
(17) concreting is carried out to the pile cover in pile cover hole, including:
(a) to control the line style of the roof fall absolute altitude of pile cover and exposed face, in the downward 5cm installations pile cover positioning of pile cover roof fall Template, pile cover locating template diameter 40cm, it is process using the thick steel plates of 1cm, and 2 is welded in the top surface of pile cover locating template The parallel aluminium alloy plate set in spacing distance in road, and the center line of twice aluminium alloy plate is identified, used for Template Location.
(b) screw rod pile central point is found out using cross hairs, and identified, then pile cover locating template is installed to and opened Upper end end in the pile cover hole dug.
(c) using laser level and the absolute altitude of levelling rod adjustment pile cover locating template, locating template is adjusted by plumb bob It is whole in place, pile cover locating template is being fixed by aluminium alloy plate and timber wedge.
(d) casting concrete up to pile cover locating template, the concrete that vibrating spear vibration compacting pours, is scraped in pile cover hole Flat receipts face.
(e) using covering geotextiles watering health, positioning template is finally removed.
The diameter in described pile cover hole is identical with the pile cover hole diameter designed.The process of described step (7) is to spiral shell Synchronously carried out during placing concrete in bar stake.Flattened in described step (11) using land leveller, and with 18~20 Dun Ya roads Machine static pressure 2 times is smooth to the ground basal plane on each screw rod pile periphery and the road roller with 18~20 tons is to the ground on each screw rod pile periphery Face static pressure 2 times.
In a word, the utility model releases the device supporting with the construction technology of screw rod pile pile cover " preceding section of method ", can effectively add Fast pile cover construction speed, saves construction cost, and time saving and energy saving, construction cost is low, and construction quality is good, and security is good and using effect The advantages of good.

Claims (5)

1. a kind of constructing device of screw rod pile pile cover, including excavator, pile cover hole rotary drilling device and pile cover locating template are formed, Wherein:
Excavator, excavator are used for pile cover hole rotary drilling device of tending to act, and the front end of the extending arm of excavator is provided with fixed flange;
Pile cover cheats rotary drilling device, is cheated for rotary digging pile cover, and pile cover cheats rotary drilling device by mounting flange, protective case, motor of tending to act, rotation Dig bucket and spiral digs wing and formed, upper center and the mounting flange of protective case are connected as a single entity, and pile cover hole rotary drilling device passes through company Acting flange disk and the fixed flange of extending arm front end are fixed as one, and motor of tending to act is provided with protective case, and motor shaft of tending to act passes through Protective case is connected with the rotary digging bucket upper end center sections of housing lower end, and the periphery wall of rotary digging bucket is provided with spiral and digs wing, spiral dig wing by Bucket bottom spiral on periphery wall is to bucket top, and the lower end of rotary digging bucket is openend, and the upper surface middle part of rotary digging bucket is provided with and motor shaft The neck hole of clamping, the upper surface of the rotary digging bucket on neck hole periphery are provided with scum hole;
Pile cover locating template, for positioning the upper end absolute altitude of casting concrete in pile cover hole, pile cover locating template is collar plate shape, stake The diameter 40cm of cap locating template, it is process using the thick steel plates of 1cm, the top surface welding 2 of pile cover locating template is parallel The aluminium alloy plate set in spacing distance, the center line of twice aluminium alloy plate is provided with tag line, is in spacing distance on aluminium alloy plate Provided with fixing hole.
A kind of 2. constructing device of screw rod pile pile cover as described in claim 1, it is characterised in that:The opening of described rotary digging bucket It is 1.1~1.3: 1 to hold internal diameter and screw rod pile upper surface diameter ratio.
A kind of 3. constructing device of screw rod pile pile cover as described in claim 1, it is characterised in that:Described rotary digging bucket diameter and Wing width sum, which is dug, with the spiral on diameter line is equal to pile cover upper surface diameter.
A kind of 4. constructing device of screw rod pile pile cover as described in claim 1, it is characterised in that:It is on described aluminium alloy plate Spacing distance is provided with stay hook.
A kind of 5. constructing device of screw rod pile pile cover as described in claim 1, it is characterised in that:Described pile cover locating template Diameter be less than pile cover hole interior diameter.
CN201720260171.7U 2017-03-17 2017-03-17 A kind of constructing device of screw rod pile pile cover Withdrawn - After Issue CN206680995U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720260171.7U CN206680995U (en) 2017-03-17 2017-03-17 A kind of constructing device of screw rod pile pile cover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720260171.7U CN206680995U (en) 2017-03-17 2017-03-17 A kind of constructing device of screw rod pile pile cover

Publications (1)

Publication Number Publication Date
CN206680995U true CN206680995U (en) 2017-11-28

Family

ID=60393245

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720260171.7U Withdrawn - After Issue CN206680995U (en) 2017-03-17 2017-03-17 A kind of constructing device of screw rod pile pile cover

Country Status (1)

Country Link
CN (1) CN206680995U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106703021A (en) * 2017-03-17 2017-05-24 中交公局第工程有限公司 Construction method for pile cap of screw pile, and device thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106703021A (en) * 2017-03-17 2017-05-24 中交公局第工程有限公司 Construction method for pile cap of screw pile, and device thereof
CN106703021B (en) * 2017-03-17 2018-11-02 中交一公局第一工程有限公司 A kind of construction method and its device of screw rod pile pile cover

Similar Documents

Publication Publication Date Title
CN104153352B (en) Karst geology rotary-drilling bored concrete pile hole forming process
CN106400782B (en) A kind of construction method for going along with sb. to guard him hole-drilling interlocking pile using rotary drilling rig construction foundation pit
CN109469052A (en) A kind of miscellaneous fill and muddy terrain pile base construction method
CN109488202A (en) A kind of gravel rock stratum pile foundation drilling construction engineering method containing gravel-boulder bed
CN106193042B (en) Obstacle pile sweep-out method at ground wall is gone along with sb. to guard him close in underground structure sandy soil layer
CN107938656A (en) Complexity rebuilds base pit engineering pile base construction method
CN110468833A (en) Drilled grouting piles under water constructing device and its application method for cruiseway
CN102720186B (en) Underwater once pouring method for variable cross-section bored cast-in-place pile
CN206308569U (en) It is a kind of to reinforce the road structure for punishing the solution cavity that underlies
CN103938512A (en) Reverse construction method of newly built road with existing expressway in underneath penetrating manner
CN106930277A (en) A kind of construction of manual-excavation cast-in-place pile method
CN104074199A (en) Underwater bearing platform construction method
CN106481278A (en) A kind of rotary digging drill bit
CN107724383A (en) Rotary digging cast-in-place pile construction method
CN102912806B (en) A kind of construction method of dewatering well
CN107246242A (en) Dual-purpose drill bit and its application method for holing with slurry wall protection filling pile construction
CN111894450A (en) Combined construction method for percussion drill and rotary drill in thick sand gravel layer
CN108240180A (en) A kind of reverse circulation preventing sticking three wings drag bit assemblies
CN106284311B (en) A kind of dry efficient construction technology of pore-forming cast-in-place concrete pile of rotary drilling rig
CN106703021B (en) A kind of construction method and its device of screw rod pile pile cover
CN107964977A (en) The composite foundation and its construction method of a kind of karst landform
CN205382483U (en) Drilling bored concrete pile drilling equipment in deep water sand boulder bed riverbed
CN206680995U (en) A kind of constructing device of screw rod pile pile cover
CN108222843B (en) A kind of construction method preventing cast-in-situ bored pile bit freezing
CN100523389C (en) Ballastless track steel reinforced concrete pile-net construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20171128

Effective date of abandoning: 20181102

AV01 Patent right actively abandoned