CN106193042B - Obstacle pile sweep-out method at ground wall is gone along with sb. to guard him close in underground structure sandy soil layer - Google Patents

Obstacle pile sweep-out method at ground wall is gone along with sb. to guard him close in underground structure sandy soil layer Download PDF

Info

Publication number
CN106193042B
CN106193042B CN201610577029.5A CN201610577029A CN106193042B CN 106193042 B CN106193042 B CN 106193042B CN 201610577029 A CN201610577029 A CN 201610577029A CN 106193042 B CN106193042 B CN 106193042B
Authority
CN
China
Prior art keywords
steel sleeve
pile
soil
cement
backfill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610577029.5A
Other languages
Chinese (zh)
Other versions
CN106193042A (en
Inventor
姜舟
李书信
李文明
刘亚松
全有维
沈兴东
王鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN201610577029.5A priority Critical patent/CN106193042B/en
Publication of CN106193042A publication Critical patent/CN106193042A/en
Application granted granted Critical
Publication of CN106193042B publication Critical patent/CN106193042B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • E02D9/02Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses one kind close to going along with sb. to guard him obstacle pile sweep-out method at ground wall in underground structure sandy soil layer, including:Preparation of construction, measurement and positioning, rig be in place and steel sleeve drilling, pile body are pulled out, stake holes water filling, backfill and steel sleeve rise and pulled out and the step such as low-dosage three axes agitating pile construction.The obstacle pile sweep-out method can effectively protect neighbouring underground structure, it is not produced sedimentation deformation equivalent risk, and then ensure that being smoothed out for pile pulling construction.

Description

Obstacle pile sweep-out method at ground wall is gone along with sb. to guard him close in underground structure sandy soil layer
Technical field
It is especially a kind of to be used to close in underground structure sandy soil layer enclose the present invention relates to a kind of obstacle pile sweep-out method Obstacle pile sweep-out method at shield ground wall.
Background technology
Obstacle pile pulls out construction and typically uses full-rotating drill, and full circle swinging drive device clamps steel sleeve and carries out 360 ° of revolutions Drilling, steel sleeve push underground layer in the collective effect of pressure and moment of torsion.Then acted on using the retaining wall of steel sleeve, in steel sleeve Interior progress pile pulling is removed obstacles.
Head section steel sleeve band alloy cutter heads, can cut it compared with sound-hard obstacle if met while drilling, cut Implementation barrier stake and the separation of surrounding soil afterwards, the frictional force of obstacle pile and the soil body, and then pulling force during reduction pile pulling are reduced, Inside steel sleeve using wedge type hammer (also known as:Drill rod, grip force rod, inverted triangle hammer) concrete-pile in sleeve pipe is crushed, Twist off, then grabbed bucket with punching and remove the soil body and pile body residue in steel sleeve, until removing to design requirement depth.Finally in time to set Backfill soil cement in pipe, pulls out steel sleeve while backfill section by section.
But when obstacle pile is close to underground structure and when being in sandy soil layer, because underground bearing water oozes in sandy soil layer Permeability is preferable, so after obstacle pile is pulled out, the water and soil around steel sleeve can pour in steel sleeve, under finally easily causing neighboringly Structure sedimentation, displacement etc. adversely affect.
The content of the invention
Goal of the invention:There is provided it is a kind of can protect neighbouring underground structure, it is not produced sedimentation deformation equivalent risk Obstacle pile sweep-out method.
Technical scheme:Obstacle pile removing side at ground wall is gone along with sb. to guard him in the sandy soil layer of the present invention close to underground structure Method, comprise the following steps:
Step 1, preparation of construction, the 1.5~2m position below common trench side built-in slip casting pipe to underground structure bottom Place is put, and measures the sedimentation deformation of common trench in real time;
Step 2, measurement and positioning, pile crown coordinate is collected using total powerstation, recycles the coordinate of collection to determine pile pulling Stake position, and be marked;
Step 3, rig is in place and steel sleeve is crept into, and adjusts the levelness of drilling equipment and the perpendicularity of steel sleeve, The perpendicularity of steel sleeve is monitored during rig drilling operation in real time, and ensures that every section steel sleeve anglec of rotation is more than 360 °, while profit With the cutter tooth cutting soil or barrier of steel bushing tube end, then by steel sleeve press-in soil;
Step 4, pile body is pulled out, and steel sleeve is first pierced to 13~15m depth, then cleans out stake top soil, is hammered into shape by wedge type Pile body is twisted into two parts, and broken pile is hung out into stake holes, it is ensured that often pull out stake holes bottom and steel bushing bottom of the tube after a section stake have more than 3m away from From repetition said process is until pile top is taken out;
Step 5, stake holes water filling, backfill and steel sleeve rise and pulled out, and the water filling in steel sleeve immediately, is filled to after pile top is pulled out Artesian head height, the balance of water level inside and outside steel sleeve is kept, the backfill soil cement after water filling immediately using live mixing is carried out Backfill, tamped simultaneously with block stamp in backfill, after backfill cement soil stabilization is closely knit, started to pull out steel sleeve, and keep steel sleeve Interior soil plug thickness is not less than 3m, circulates above-mentioned water filling, backfill and acts process of pulling out until extracting final section steel sleeve, final backfill To terrace absolute altitude;
Step 6, low-dosage three axes agitating pile is constructed, and three axes agitating pile is carried out using reinforced cementitious soil to pile pulling backfill position Reinforce.
During creeping into and rising and pull out in steel sleeve, because in steel sleeve press-in soil as deep as possible, and steel bushing bottom of the tube All the time more than 3m soil or stake is left, serves the effect of cut-off artesian water, neighbouring underground structure is protected well, makes to pull out Stake everything goes well with your work carry out;Pull out and finish in obstacle pile, during steel sleeve pulls out, because first employing the water filling in steel sleeve Method, the balance of water level and the outer underground pressure water head of pipe in steel sleeve is ensure that, water and soil around is avoided and pours in pipe, it is ensured that Close to the safety of underground structure.
As the further limits scheme of the present invention, the backfill soil cement of Site includes soil, cement and powder in step 5 Coal ash, and the quality proportioning of soil, cement and flyash is:10 parts of 100 parts of soil, 7 parts of cement and flyash.Due to pile pulling Position will construct diaphram wall, so the selection of backfilling material is crucial, the conventional plain concrete for backfilling inferior grade or Mortar may cause follow-up continuous wall trench underground difficult, while backfill and expect also to need possess certain compactness.Backfill uses The undisturbed soil caught, mixes cement and flyash, cement mixing content 7%, doping quantity of fly ash 10%, the soil cement later stage possess necessarily Intensity, scene mixes in advance, it is ensured that grabs and native can be backfilled in time to during bottom hole.
As the further limits scheme of the present invention, steel sleeve acts that to pull out speed be 0.5m/min in step 5.Using 0.5m/ The rising of min pulls out speed and is able to ensure that steel sleeve acts the stability pulled out.
As the further limits scheme of the present invention, in step 5 rise pull out steel sleeve while left-right rotation steel sleeve.Using Left-right rotation steel sleeve can improve the backfill soil compactness in steel bushing, while reduce steel sleeve and act the frictional resistance pulled out.
As the further limits scheme of the present invention, reinforced cementitious soil includes soil and cement, and soil and cement in step 6 Quality proportioning be:7 parts of 100 parts of soil and cement.Rise and pull out into steel sleeve, after equipment removes, the backfill position uses The three axes agitating pile that cement mixing content is 7% is reinforced, so as to construction of diaphragm wall.
As the further limits scheme of the present invention, at least provided with two excretions connected with inside in the side wall of steel sleeve Screwed hole, closure screw is combined with excretion screwed hole.Can be when needing draining using excretion screwed hole and closure screw Muddy water specification in steel sleeve is discharged, prevents from polluting from spilling suitable for reading.
As the further limits scheme of the present invention, in step 5 when backfill cement earthen backfill, by a section of the top The closure screw of corresponding position screws off on steel sleeve, and the installation excretion steel pipe on excretion screwed hole, in the another of excretion steel pipe One end connects plastic flexible pipe.Using plastic flexible pipe slime water specification in steel sleeve can be facilitated to discharge, preventing from being spilled over to will outside pipe Full-rotating drill and surrounding contaminated sites.
Compared with prior art, its advantage is the present invention:(1) during due to creeping into and rising and pulling out in steel sleeve, because In steel sleeve press-in soil as deep as possible, and steel bushing bottom of the tube leaves more than 3m soil or stake all the time, serves cut-off artesian water Effect, protect neighbouring underground structure well, make pile pulling everything goes well with your work to carry out;(2) pull out and finish in obstacle pile, steel bushing Manage during pulling out, the method because first employing the water filling in steel sleeve, ensure that water level and the outer underground of pipe are held in steel sleeve The balance of water level is pressed, water and soil around is avoided and pours in pipe, it is ensured that close to the safety of underground structure.
Brief description of the drawings
Fig. 1 is flow chart of the method for the present invention;
Fig. 2 is the steel bushing bottom of the tube and stake holes bottom position schematic diagram of the present invention;
Fig. 3 is that water level balances schematic diagram with managing outer pressure water head in the steel sleeve of the present invention;
Fig. 4 is that water level constantly rises schematic diagram with the backfill of soil cement in the steel sleeve of the present invention.
Embodiment
Technical solution of the present invention is described in detail below in conjunction with the accompanying drawings, but protection scope of the present invention is not limited to The embodiment.
Embodiment 1:
As Figure 1-4, obstacle pile sweep-out method at ground wall is gone along with sb. to guard him in the sandy soil layer of the invention close to underground structure, Comprise the following steps:
Step 1, preparation of construction, after the completion of plant equipment of marching into the arena assembly, according to actual conditions reasonable arrangement place planar cloth Put, ensure that construction is smoothed out, by on-site actual situations reasonable Arrangement hydraulic power station location, crawler crane stand, steel bushing Pipe stowed location, excavator track route, cement stack place, soil cement mix place, cement silo stowed location and note Pulp grinder putting position etc., setting area is used for stacking the pile body pulled out at the scene in addition, is uniformly carried out after pile body is broken at outward transport Reason, and before obstacle pile pulls out construction, the 2m below common trench side built-in slip casting pipe to underground structure bottom, measurement in real time The sedimentation deformation of common trench, if common trench sedimentation deformation is excessive, stop constructing and carrying out grouting and reinforcing soil body processing immediately;
Step 2, measurement and positioning, it is all unified to dig out pile foundation support table with excavator, and abolish cushion cap exposure stake with pick machine At the top of base, pile crown coordinate is collected using total powerstation, then back-filling in layers is carried out to it and tamped, finally with the point position collected A position is released and determines pile pulling stake position by coordinate, and makes mark;
Step 3, rig is in place and steel sleeve is crept into, first smooth to the progress of pile pulling place, spreads base board, then rig is used Crawler crane is hung on base board, and the levelness of equipment is adjusted after rig is in place, and observes and control hanging down for steel sleeve at any time Straight degree is allowed to be not less than pile foundation construction requirement 1/100, and crawler crane props up reaction frame so that rig crept into pull out during keep It is stable, after rig is in place, the embedded and drilling operation of steel sleeve is proceeded by, the precision of sleeve pipe press-in is often saved in work progress The construction quality of drilling will be all directly affected, steel sleeve (standard 6.5m/ sections) is often saved and is put into clamping device, shrink clamp hydraulic pressure Cylinder, in the range of the vertical precision of steel sleeve is adjusted into requirement using rig and guide deviation-correcting device, in drilling process at any time The level monitoring system test steel sleeve perpendicularity carried using equipment, and two vertical direction per hole whole process in sleeve pipe are set up Instrument carries out perpendicularity review control, and after often section steel sleeve connects and checks perpendicularity, the revolution for passing through full-rotating drill fills Putting makes sleeve pipe carry out the rotation not less than 360 °, to reduce the frictional resistance of sleeve pipe and the soil body, and utilizes steel bushing tube end immediately Cutter tooth cutting soil or barrier, press-in soil in;
Step 4, pile body is pulled out, and steel sleeve first is pierced into 15m depth for the first time, first grabbed stake top soil totally, so with grab bucket Wedge type hammer is placed afterwards to twist into two parts pile body, is typically broken and is usually no more than 10m, Ran Houfang in drill bit above 3m~5m positions, broken pile Enter grab bucket and broken pile hung out into stake holes, it is ensured that often pulling out stake holes bottom and steel bushing bottom of the tube after a section stake there are more than 3m distances, and broken pile pulls out Rig, which coordinates, during removing rotates steel sleeve, to reduce the resistance of the soil body, repeats drilling sleeve pipe afterwards, twists stake, catches broken pile, directly Taken out to by pile top, pile pulling mitigates the influence to underground structure using the sequence of construction for pulling out a jump one;
Step 5, stake holes water filling, backfill and steel sleeve are risen and pulled out, and because pressure-bearing water permeability is stronger in sandy soil layer, pile top is pulled out The water filling in steel sleeve immediately afterwards, artesian head height is filled to, keeps the balance of water level inside and outside steel sleeve, prevent that steel sleeve is all Enclose water and soil to extrude into steel sleeve, cause the sedimentation of surrounding soil, underground structure, use mixing for live mixing after water filling immediately The backfill soil cement of 7% cement and 10% flyash is backfilled, and (quality of soil, cement and flyash is matched somebody with somebody in backfill soil cement Than for:10 parts of 100 parts of soil, 7 parts of cement and flyash), tamped in backfill with block stamp, it is ensured that backfill quality, prevent pair Later three axial troughs wall is reinforced and ground-connecting-wall construction impacts, and after waiting backfill soil stabilization closely knit, has been started to pull out steel sleeve, has been kept steel Soil plug thickness be not less than 3m in sleeve pipe, rises and pulls out speed control in 0.5m/min, progresss is circulated with this, up to extraction final section steel Sleeve pipe, be finally backfilled to terrace absolute altitude, rise pull out during need control the speed for pulling out steel sleeve, protect soil layer construction steady It is fixed, and steel sleeve is turned left and right while rising and pulling out steel sleeve, the backfill soil compactness in steel bushing is improved, while reduce The frictional resistance pulled out, because injecting a large amount of water in steel sleeve, mud outflow is had during backfill, arranges digging machine to carry out mud drainage Intensive work, prevent mud stream from entering town road, adversely affect;
Step 6, low-dosage three axes agitating pile is constructed, and the pile pulling backfill position between the reinforcing of both sides cell wall is mixed using cement Measure and reinforced for 7% three axes agitating pile, so as to construction of diaphragm wall.
The quality proportioning of soil, cement and flyash is in the backfill soil cement of the live mixing of the present invention:100 parts of soil, 10 parts of 7 parts of cement and flyash are the preferred schemes by experiment, and the conventional plain concrete for backfilling inferior grade or mortar may Cause follow-up continuous wall trench underground difficult, while backfill material also to need possess certain compactness.The backfill soil cement of the present invention Using the undisturbed soil caught, cement and flyash are mixed, cement mixing content 7%, doping quantity of fly ash 10%, the backfill soil cement is rear Phase possesses certain intensity, provides safeguard for follow-up construction of diaphragm wall, mixes in advance at the scene, it is ensured that grabs soil to bottom hole When can be backfilled in time.
In order to facilitate muddy water to drain when being pulled out on steel sleeve, the present invention in the side wall of steel sleeve at least provided with two with it is interior The excretion screwed hole of portion's connection, is combined with closure screw on excretion screwed hole, and multiple excretion screwed holes are located at steel pipe socket not At height and position;When backfill cement earthen backfill, by the closure spiral shell of corresponding position on a section steel sleeve of the top Silk is screwed off, and the installation excretion steel pipe on excretion screwed hole, and plastic flexible pipe is connected in the other end of excretion steel pipe.
As described above, although the present invention has been represented and described with reference to specific preferred embodiment, but it must not be explained For to the limitation of itself of the invention., can be right under the premise of the spirit and scope of the present invention that appended claims define are not departed from Various changes can be made in the form and details for it.

Claims (7)

1. obstacle pile sweep-out method at ground wall is gone along with sb. to guard him close in underground structure sandy soil layer, it is characterised in that including following step Suddenly:
Step 1, preparation of construction, the 1.5~2m opening position below common trench side built-in slip casting pipe to underground structure bottom, And the sedimentation deformation of common trench is measured in real time;
Step 2, measurement and positioning, pile crown coordinate is collected using total powerstation, recycles the coordinate of collection to determine pile pulling stake position, And it is marked;
Step 3, rig is in place and steel sleeve is crept into, and the levelness of drilling equipment and the perpendicularity of steel sleeve is adjusted, in rig The perpendicularity of steel sleeve is monitored during drilling operation in real time, and ensures that every section steel sleeve anglec of rotation is more than 360 °, while utilizes steel The cutter tooth cutting soil or barrier of cannula tip, then by steel sleeve press-in soil;
Step 4, pile body is pulled out, and steel sleeve is first pierced to 13~15m depth, then cleans out stake top soil, is hammered into shape by wedge type by stake Body is twisted into two parts, and broken pile is hung out into stake holes, it is ensured that often pulling out stake holes bottom and steel bushing bottom of the tube after a section stake has distance more than 3m, weight Multiple said process is until pile top is taken out;
Step 5, stake holes water filling, backfill and steel sleeve rise and pulled out, and the water filling in steel sleeve immediately, is filled to pressure-bearing after pile top is pulled out Head height, the balance of water level inside and outside steel sleeve being kept, the backfill soil cement after water filling immediately using live mixing is backfilled, Tamped simultaneously with block stamp in backfill, after backfill cement soil stabilization is closely knit, started to pull out steel sleeve, and keep soil plug in steel sleeve Thickness is not less than 3m, circulates above-mentioned water filling, backfill and acts process of pulling out until extracting final section steel sleeve, is finally backfilled to terrace Absolute altitude;
Step 6, low-dosage three axes agitating pile is constructed, and carrying out three axes agitating pile using reinforced cementitious soil to pile pulling backfill position adds Gu.
2. obstacle pile sweep-out method at ground wall is gone along with sb. to guard him in the sandy soil layer according to claim 1 close to underground structure, its It is characterised by, the backfill soil cement of Site includes soil, cement and flyash, and soil, cement and flyash in step 5 Quality proportioning be:10 parts of 100 parts of soil, 7 parts of cement and flyash.
3. obstacle pile sweep-out method at ground wall is gone along with sb. to guard him in the sandy soil layer according to claim 1 or 2 close to underground structure, Characterized in that, steel sleeve acts that to pull out speed be 0.5m/min in step 5.
4. obstacle pile sweep-out method at ground wall is gone along with sb. to guard him in the sandy soil layer according to claim 1 or 2 close to underground structure, Characterized in that, in step 5 rise pull out steel sleeve while left-right rotation steel sleeve.
5. obstacle pile sweep-out method at ground wall is gone along with sb. to guard him in the sandy soil layer according to claim 1 or 2 close to underground structure, Characterized in that, reinforced cementitious soil includes soil and cement in step 6, and the quality proportioning of soil and cement is:100 parts of soil And 7 parts of cement.
6. obstacle pile sweep-out method at ground wall is gone along with sb. to guard him in the sandy soil layer according to claim 1 or 2 close to underground structure, Characterized in that, at least provided with two excretion screwed holes connected with inside in the side wall of steel sleeve, on excretion screwed hole It is combined with closure screw.
7. obstacle pile sweep-out method at ground wall is gone along with sb. to guard him in the sandy soil layer according to claim 6 close to underground structure, its It is characterised by, in step 5 when backfill cement earthen backfill, by the closure of corresponding position on a section steel sleeve of the top Screw is screwed off, and the installation excretion steel pipe on excretion screwed hole, and plastic flexible pipe is connected in the other end of excretion steel pipe.
CN201610577029.5A 2016-07-20 2016-07-20 Obstacle pile sweep-out method at ground wall is gone along with sb. to guard him close in underground structure sandy soil layer Active CN106193042B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610577029.5A CN106193042B (en) 2016-07-20 2016-07-20 Obstacle pile sweep-out method at ground wall is gone along with sb. to guard him close in underground structure sandy soil layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610577029.5A CN106193042B (en) 2016-07-20 2016-07-20 Obstacle pile sweep-out method at ground wall is gone along with sb. to guard him close in underground structure sandy soil layer

Publications (2)

Publication Number Publication Date
CN106193042A CN106193042A (en) 2016-12-07
CN106193042B true CN106193042B (en) 2018-02-13

Family

ID=57491886

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610577029.5A Active CN106193042B (en) 2016-07-20 2016-07-20 Obstacle pile sweep-out method at ground wall is gone along with sb. to guard him close in underground structure sandy soil layer

Country Status (1)

Country Link
CN (1) CN106193042B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106978807A (en) * 2017-03-10 2017-07-25 浙江大学城市学院 Existing bridge pile pulling device and construction method are passed through by a kind of weak soil shield driving area
CN110258562B (en) * 2019-06-28 2020-06-23 甘肃九州岩土工程有限公司 Accessible cleaning device for waste piles
CN110805307A (en) * 2019-10-31 2020-02-18 中铁二局集团有限公司 Underground continuous wall removing method
CN111339584B (en) * 2020-01-21 2024-02-06 中铁二局集团有限公司 Torque calculation method of underground reinforced concrete continuous wall cleaning device
CN112324441A (en) * 2020-10-27 2021-02-05 深圳宏业基岩土科技股份有限公司 Construction method for removing underground shield segments by full-slewing drilling machine
CN112343037B (en) * 2020-11-16 2022-03-18 安徽华盛国际建筑设计工程咨询有限公司 Construction method of composite foundation
CN112593548A (en) * 2020-12-22 2021-04-02 中建一局集团建设发展有限公司 Intensive obstacle pile group engineering cast-in-place pile configuration structure and construction method
CN113653052A (en) * 2021-09-02 2021-11-16 上海建工四建集团有限公司 Obstacle clearing construction method for large-diameter underground steel-concrete composite structure
CN114215474B (en) * 2021-11-03 2023-09-15 江苏无锡二建建设集团有限公司 Barrier removing construction process of full rotary drilling machine
CN114753381A (en) * 2022-05-23 2022-07-15 中铁七局集团郑州工程有限公司 Method for clearing underground obstacles in non-excavation construction path range in limited space

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1482309A (en) * 2003-06-12 2004-03-17 上海隧道工程股份有限公司 A drill hole grout pile drag reduction extraction process
CN103911996A (en) * 2014-04-01 2014-07-09 中铁六局集团有限公司 Construction method for pulling out steel sheet piles close to existing buildings
CN104746519A (en) * 2015-02-04 2015-07-01 邵阳学院 Obstacle clearing construction method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10168879A (en) * 1996-12-10 1998-06-23 Taisei Corp Pulling method for steel sheet pile

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1482309A (en) * 2003-06-12 2004-03-17 上海隧道工程股份有限公司 A drill hole grout pile drag reduction extraction process
CN103911996A (en) * 2014-04-01 2014-07-09 中铁六局集团有限公司 Construction method for pulling out steel sheet piles close to existing buildings
CN104746519A (en) * 2015-02-04 2015-07-01 邵阳学院 Obstacle clearing construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
地下障碍桩处理技术体系探讨;张冠洲等;《江苏建筑》;20100131(第1期);第66-67页 *
地铁盾构区间障碍桩拔除施工技术;王远;《建筑》;20141031(第10期);第54-56页 *

Also Published As

Publication number Publication date
CN106193042A (en) 2016-12-07

Similar Documents

Publication Publication Date Title
CN106193042B (en) Obstacle pile sweep-out method at ground wall is gone along with sb. to guard him close in underground structure sandy soil layer
CN104153352B (en) Karst geology rotary-drilling bored concrete pile hole forming process
CN104563098B (en) A kind of super-large diameter all steel casing does operation pore-creating filling pile construction method
CN101761083B (en) Underground continuous wall obstacle clearing construction method for traversing ultra-thick obstacle
CN107524138A (en) A kind of ultra-deep foundation pit construction method of underground continuous wall
CN107938656A (en) Complexity rebuilds base pit engineering pile base construction method
CN101343868B (en) Underground continuous wall construction method of city-across pipeline
CN106978807A (en) Existing bridge pile pulling device and construction method are passed through by a kind of weak soil shield driving area
CN105780763A (en) Construction method of medium-hole vibrating casing wall protection type long spiral cast-in-situ bored pile
CN108589707A (en) A kind of full-sleeve long screw auger and churning driven combined type construction
CN204199335U (en) A kind of pressure release well reducing PHC tube pile construction soil compaction effect
CN111395330B (en) Construction method for concrete cast-in-situ bored pile complete steel casing penetrating through underground gallery
CN105442532A (en) Construction method for pile-head-expanded bored pile
CN110629747A (en) Full-casing full-rotation construction process for pile foundation under complex geological conditions
CN107653889A (en) A kind of shaped steel pressure is poured water the construction method of soil curtain support pile
CN108571000A (en) The construction method of underground water cutting when wearing existing railway under a kind of road of location along the river
CN112627172A (en) Pile forming system and construction method for large-diameter cast-in-situ bored pile in karst area
CN209958343U (en) Connecting joint for connecting reinforced concrete cast-in-place piles
CN107653878A (en) Cast-in-situ bored pile is reusable to be longitudinally separated formula steel pile casting construction
CN107587502A (en) A kind of spiral-digging pore pressure pour water soil occlusion curtain pile construction method
CN106284311A (en) A kind of rotary drilling rig dry pore-forming efficient construction technology of cast-in-place concrete pile
CN106050239A (en) Construction method for retaining structure of deep and large vertical shaft in water-abundant upper-soft lower-hard stratum
CN101481913A (en) Construction method of rock-socketed underground continuous wall punching slot section
JP5543628B2 (en) Cement milk solidification strength judgment method, foundation pile construction method, cement milk column construction method, sampling device
CN105155421B (en) Complete embedding circular construction method in a kind of single pile Single column pier river course shallow water

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant