CN109469052A - A kind of miscellaneous fill and muddy terrain pile base construction method - Google Patents

A kind of miscellaneous fill and muddy terrain pile base construction method Download PDF

Info

Publication number
CN109469052A
CN109469052A CN201811070081.7A CN201811070081A CN109469052A CN 109469052 A CN109469052 A CN 109469052A CN 201811070081 A CN201811070081 A CN 201811070081A CN 109469052 A CN109469052 A CN 109469052A
Authority
CN
China
Prior art keywords
mud
drilling
pile
hole
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811070081.7A
Other languages
Chinese (zh)
Inventor
刘英红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Shekou Investment Harbor Engineering Co Ltd
Original Assignee
Shenzhen Shekou Investment Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Shekou Investment Harbor Engineering Co Ltd filed Critical Shenzhen Shekou Investment Harbor Engineering Co Ltd
Priority to CN201811070081.7A priority Critical patent/CN109469052A/en
Publication of CN109469052A publication Critical patent/CN109469052A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/385Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/06Placing concrete under water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/665Mould-pipes or other moulds for making piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/18Placing by vibrating
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention proposes a kind of miscellaneous fill and muddy terrain pile base construction methods, it is related to piling Technology field, it solves during being commonly in shallow sea muddy terrain and miscellaneous earthen backfill place progress pile foundation construction, drilling is easy to collapse, the problem of leading to useless hole or useless stake, its key points of the technical solution are that, including preparation of construction, stake position setting-out, the production of casing and embedded, configure mud, drilling construction, pore-forming inspection, borehole cleaning, fabrication of reinforcing cage and installation, conduit installation, secondary pile hole cleaning, pouring underwater concrete and Lumen catheter and steel pile casting, suitable for miscellaneous fill and the pile foundation construction of muddy terrain, reaching ensures pile foundation construction quality, improve the purpose of construction efficiency.

Description

A kind of miscellaneous fill and muddy terrain pile base construction method
Technical field
The present invention relates to piling Technology field, in particular to a kind of miscellaneous fill and muddy terrain pile base construction method.
Background technique
When shallow sea muddy terrain and miscellaneous earthen backfill place carry out pile foundation construction, since the soil is porous, drilling machine is being driven piles After point one-shot pore-forming extracts tup, mud can be gathered around rapidly in manhole, and collapse hole is caused.Tup can even be buried, be difficult to rush Hit pore-forming.Even if impact holing, collapse hole is also easily caused when secondary pile hole cleaning after steel reinforcement cage is installed, steel reinforcement cage can be buried, be caused Useless hole or useless stake, consequence is very serious, intrinsic to be modified.
Summary of the invention
The object of the present invention is to provide a kind of miscellaneous fill and muddy terrain pile base construction methods, can be in shallow sea muddy terrain Or the Soft Clays region such as miscellaneous earthen backfill place carries out pile foundation construction, it is ensured that pile foundation construction quality, the high advantage of construction efficiency.
Above-mentioned technical purpose of the invention has the technical scheme that a kind of miscellaneous
It bankets and muddy terrain pile base construction method, comprising the following steps:
P1: preparation of construction: before pile foundation construction, place geological condition is verified, it is miscellaneous to remove place
Object replaces the weak soil of upper layer 0.6-1.0m depth, mixes 15% lime and turns on the spot, backfills after uniform mix, use excavator Or road roller leveling compacting, sprinkling maintenance 7 days, roadbed paving plate formed the builder's road passed in and out for drilling machine and Construction traffic, cloth Set drilling place;
P2: the setting-out of stake position: stake position is released according to design drawing total station or theodolite are upper on construction ground, on stake position periphery Embedded cross fender pile;
P3: the production of casing and embedded: by thickness between 11-13mm, length is being greater than 5.0m and is being more than silt depth steel Board ends weld to form a round casing, with rotation drilling bucket by hole location in shield-tube embedment depth bounds miscellaneous fill or mud dig It removes, recycles rotary drilling rig to lift casing in place, squeeze into casing in hole followed by the vibration hammer of same diameter, form shield Wall, casing top are higher by construction ground 50cm or more, are filled up, tamped with clay on the outside of casing, prevent the surface water along on the outside of casing Wall penetrates into drilling;
P4: slurrying: selecting the high plastic clay 20% more containing sodium ion, adds 10% bentonite with cellulose, 0.5% ~0.65% industrial sodium hydroxide, 0.003% acrylamide (PHP), remaining group are divided into water, configure mud;And by mud Indices are controlled in density 1.20-1.35 g/cm3,18~22s of viscosity, sand factor≤6%, pH value 8-10;Wherein, enter The indices of mud are controlled in 1.30~1.35g/cm3 of density, 20~22s of viscosity after mud;The mud index control of borehole cleaning System exists: 1.20~1.25g/cm3 of density, 18~20s of viscosity;
P5: drilling construction: checking every preparation before drilling, loosely easily collapses since miscellaneous fill or muddy terrain belong to Stratum selects rotary drilling rig to carry out pile foundation construction, measures casing absolute altitude before drilling, and calculates practical hole depth, uses in drilling process Static mud protecting wall, drill bit gently presses slow-motion when aperture is constructed, and drill speed is not more than 10 revs/min, fully enters hole in drilling rod Gradually accelerate normal drilling after mouthful, when drill bit creeps into mud, the revolving speed and drilling rate, increase for reducing drill bit pour into mud Specific gravity and viscosity increase cleaning bottom of hole number when drilling, and bore operation, which is put into several classes, to be carried out continuously, and the moment pays attention to formation variation, fish out in time It samples slag to save, and checks geological condition, fill in drilling construction record;
P6: pore-forming inspection: when drilling depth reaches design requirement, checking hole location, aperture, hole depth and gradient etc., Drilled-hole inspecting is carried out using cage inspection hole device;
P7: mud balance borehole cleaning: is pressed between 1.20~1.25g/cm3,18~20s of viscosity to bottom hole with middling speed by drilling rod Mud, replace the mud in hole more than suspension boring mud, the mud index after borehole cleaning is tested by field test personnel, it is ensured that row hole in Mud hand out touches no 2-3mm particle, mud balance no more than 1.1 g/cm3, sand factor less than 2%, viscosity 17-20S, friction Stake holes bottom sediment thickness is not more than 20cm, and stanchion bottom hole sediment thickness is not more than 5cm;
P8: fabrication of reinforcing cage and installation: pile foundation steel bar cage is concentrated in reinforcing bar factory and is made, and steel reinforcement cage is equal along pile body surrounding every 2m Four chucking lug muscle of even arrangement are protruded into the pile crown reinforcing bar of cushion cap part and are packed using pearl cotton casing, in order to the later period into Row pile crown is cut, and steel reinforcement cage is transported to scene storage after processing is completed, uses bracket support pad below, is covered above with colour bar cloth, reinforcing bar Cage installation uses truck crane, lifts by crane steel reinforcement cage by shoulder pole girder, and transfer section by section, position admittedly in aperture after the completion of lower section It is fixed, it avoids that floating cage phenomenon occurs during concrete perfusion, it is ensured that steel reinforcement cage is overlapped with hole location center, hangs muscle length is accurate, The connection of sound detecting pipe is connected using threaded sleeve, carries out water filling inspection to every sound detecting pipe, and each 1m up and down at jointing Sound detecting pipe and steel reinforcement cage are carried out binding and fixing with iron wire by place, and centre is finely fixed with positioning ring with steel reinforcement cage, it is ensured that sound detecting pipe It installs straight, secured;
P9: conduit installation: using inner wall smooth, smoother, internal diameter is consistent, interface is tight, the conduit of diameter 30cm, using preceding to leading Pipe carries out examination spelling and pressure testing test, and conduit assembles posterior axis deviation between 0.5% to the 10% of drilling depth, and pressure testing power is bottom hole 1.5 times of hydrostatic pressure when conduit lifts entrance, rubber ring or Rubber washer are placed straight, tight, it is ensured that good seal;
P10: secondary pile hole cleaning: checking again for sediment thickness before pouring underwater concrete, is greater than when checking friction pile sediment thickness When 20cm or stanchion sediment thickness are greater than 2cm, carry out secondary pile hole cleaning using conduit, test the specific gravity of mud after borehole cleaning, sand factor, Viscosity is poured underwater concrete after borehole cleaning is qualified immediately;
P11: pouring underwater concrete: pile foundation concrete all uses concrete mixing station centralized mixing, and concrete tank car is transported to existing , scene is tested to be poured into the slump of pile foundation concrete, divergence, gassiness figureofmerit, and test result, which meets, to be set After meter requires, between conduit upper port installation funnel, hopper capacity 1.8-2.2t, guarantee impact energy when concrete falls Amount, mud can be discharged from concrete;
P12: after underwater gliders, remaining conduit and steel shield Lumen catheter and steel pile casting: are extracted at a slow speed by crane Cylinder, recycling.
By using above-mentioned technical proposal, before pile foundation construction, replaces upper layer weak soil and mixes 15% lime and turn on the spot, Backfill, leveling compacting, improve the bearing capacity of upper layer soil property, are convenient for Large Construction vehicles while passing place after uniform mix;Using Digging machine drilling is rotated, it can be to avoid occurring bit freezing in drilling process and the phenomenon that drill bit is fallen;Carrying out borehole cleaning twice can be effective Avoiding the problem that borehole cleaning is not thorough causes boring mud excessive and influences bearing capacity of pile foundation;Static mud protecting wall is used in drilling process, Drill bit gently presses slow-motion when aperture is constructed, and is adjusted at any time according to the ingredient for fishing for sample slag to the revolving speed and rate of penetration of drill bit, Specific gravity and viscosity that mud off uses mud are adjusted simultaneously, it is possible to prevente effectively from because drilling process hole wall collapses problem, it is ensured that Pile foundation construction quality;Hole location, aperture, hole depth and gradient etc. are checked using cage inspection hole device, it is possible to prevente effectively from The problem of hole scattering, it is ensured that hole quality;It is provided with mud circulating system, the slurry coat method in boring procedure can be followed Ring utilizes, saving of work and time, can effectively save material cost, reduces pollution of the mud to construction site;It makes rational planning for construction site And construction procedure, entire work progress orderly carry out, and improve pile foundation construction efficiency.
The further setting of the present invention, in step P1, rolled between the builder's road and construction site be trimmed to it is flat Along slope surface.
By using above-mentioned technical proposal, smooth slope surface smoothly passes in and out construction site convenient for drilling machine and Construction traffic.
The further setting of the present invention, in step P1, arrangement drilling place include on construction ground on clearly advise Draw mud pit, steel reinforcement cage, conduit, hopper and construction machinery placement position, the mud pit be arranged at builder's road it is big in To the left, the size of mud pit is 6m × 12m × 2.5m to Cheng Fang, carries out mud pit in time after digging well and goes along with sb. to guard him, mud pit is divided into heavy Shallow lake pond and pulp storage tank, outflow flows into sedimentation basin through mud ditch with the mud of boring mud from drilling, by sedimentation basin through preliminary sedimentation Pulp storage tank is flowed into afterwards to suck for slush pump, it is with change-can mixer that mud modulation is uniformly stand-by in mud pit.
By using above-mentioned technical proposal, the clearly planning of mud pit position and steel reinforcement cage, conduit, hopper and construction machinery Put as required, convenient for the orderly progress of pile foundation construction;The setting of mud pit facilitates mud off in the process directly to casing Interior extraction mud is also convenient for recycling for borehole cleaning outflow mud, reduces construction cost.
The further setting of the present invention, in step P2, the cross fender pile will be higher by casing top surface and with mortar and mixed Solidifying soil is fixed on the positioning, in case testing in drilling process to stake position, field technician checks at any time, guarantees shield Stake must not be displaced.
By using above-mentioned technical proposal, the setting of cross fender pile is convenient for guaranteeing drilling at any time testing to stake position In the process, cross fender pile mortar and concrete, which are fixed on the positioning, can greatly reduce the displacement that cross fender pile is loosened by soil property Amount guarantees the stability of stake bit trial result.
The further setting of the present invention, the diameter of the casing are greater than design aperture 20cm-30cm.
By using above-mentioned technical proposal, when the length that the diameter of casing is more than design aperture is less than 20cm, in drill bit The phenomenon that casing blocks drill bit is easy to appear in impact process;When the length that the diameter of casing is more than design aperture is greater than 30cm When, the earth volume for excavating shield-tube embedment depth bounds is larger, and construction cost is high, and is difficult to ensure the gradient of drilling.
The further setting of the present invention, the part that the casing is higher by construction ground are equipped with the excessive slurry of the cm of 40 cm × 40 Mouthful, the mud in the casing passes through at the excessive slurry mouth stream, and flows into sedimentation basin by mud ditch.
By using above-mentioned technical proposal, the mud in casing flows into sedimentation basin by overflow slurry mouth, mud ditch, reduces mud It is excessive everywhere and pollute construction ground, recycling for mud is also facilitated, construction cost is saved.
The further setting of the present invention, in step P4, under normal circumstances, sample slag takes once according to 2m, occurs in geology When variation, add and take once, when geology and different design conjunction, every 0.3-0.5m is taken once.
By using above-mentioned technical proposal, when using plus by the way of taking a sample slag and increasing sampling frequency, can improve and lead to The accuracy that sample slag testing result judges geologic structure is crossed, obtains more accurately geological condition information, and turn in time to drill bit It speed and rotates into rate and is adjusted, guarantee hole quality.
The further setting of the present invention, in step P10, the depth in the lower mouth Transducers Embedded in Concrete of the conduit is not less than 1m, is not more than 3m, and underwater gliders guarantee is carried out continuously.
By using above-mentioned technical proposal, when mouth length of embedment is greater than 3m under conduit, conduit inner concrete and conduit stud Concrete upper surface height difference in hole is small will lead to that filling concrete is unsmooth and the outer concrete climb of conduit it is excessive be mixed into it is miscellaneous Matter is more, relatively concentrates;When mouth length of embedment is less than 1m under conduit, during extracting conduit, there are shapes in concreting face At the danger of the disconnected section of pile body, in addition the outer small compactness that will lead to casting concrete structure of pressure difference is inadequate inside the Pass.
In conclusion the invention has the following advantages:
1, before pile foundation construction, the lime for replacing upper layer weak soil and incorporation 15% turns on the spot,
It backfilled after even mix, flatten compacting, improve the bearing capacity of upper layer soil property, be convenient for Large Construction vehicles while passing place;
It 2, can be to avoid occurring bit freezing in drilling process and the phenomenon that drill bit is fallen using rotation digging machine drilling;
3, borehole cleaning is carried out twice it is possible to prevente effectively from borehole cleaning is not thorough the problem of causing boring mud excessive and influencing bearing capacity of pile foundation;
4, static mud protecting wall is used in drilling process, drill bit gently presses slow-motion when aperture is constructed, according to the ingredient pair for fishing for sample slag The revolving speed and rate of penetration of drill bit are adjusted at any time, while adjusting specific gravity and viscosity that mud off uses mud, Ke Yiyou Effect avoids collapsing problem because of drilling process hole wall, it is ensured that pile foundation construction quality;
5, hole location, aperture, hole depth and gradient etc. are checked using cage inspection hole device, it is possible to prevente effectively from hole scattering Problem, it is ensured that hole quality;
6, it is provided with mud circulating system, the slurry coat method in boring procedure can be recycled, saving of work and time can be effective Material cost is saved, pollution of the mud to construction site is reduced;
7, it makes rational planning for construction site and construction procedure, entire work progress orderly carries out, and improves pile foundation construction efficiency.
Detailed description of the invention
Fig. 1 is the process flow chart of pile base construction method of the present invention.
Appended drawing reference: P1, preparation of construction;P2, the setting-out of stake position;P3, the production of casing and embedded;P4, slurrying;P5, Drilling construction;P6, pore-forming inspection;P7, borehole cleaning;8, fabrication of reinforcing cage and installation;P9, conduit installation;;10, secondary pile hole cleaning;11, Pouring underwater concrete;12, reverse irrigation and steel pile casting are pulled out.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
A kind of miscellaneous fill and muddy terrain pile base construction method, as shown in Figure 1, comprising the following steps:
P1: preparation of construction: before pile foundation construction, place geological condition is verified, it is miscellaneous to remove place
Object replaces the weak soil of upper layer 0.6-1.0m depth, mixes 15% lime and turns on the spot, backfills after uniform mix, use excavator Or road roller leveling compacting, sprinkling maintenance 7 days, roadbed paving plate formed builder's road, needed between builder's road and construction site It rolls and is trimmed to smooth slope surface, so that drilling machine and Construction traffic can be passed in and out successfully from builder's road.After the completion of builder's road, Carry out drilling place arrangement, drilling Ground arrangement include on construction ground on clearly plan mud pit, steel reinforcement cage, conduit, material The placement position of bucket and construction machinery, mud pit are arranged on the left of the big mileage direction of builder's road, and the size of mud pit is 6m × 12m × 2.5m carries out mud pit after digging well in time and goes along with sb. to guard him, and mud pit is divided into sedimentation basin and pulp storage tank, and band is flowed out from drilling There is the mud of boring mud to flow into sedimentation basin through mud ditch, flows into pulp storage tank after preliminary sedimentation by sedimentation basin and sucked for slush pump, It is with change-can mixer that mud modulation is uniformly stand-by in mud pit.
P2: the setting-out of stake position: stake position is released according to design drawing total station or theodolite are upper on construction ground, in stake position week Cross fender pile is buried on side, and cross fender pile is higher by casing top surface and carries out reinforcement protection with mortar or concrete, in case drilling process In test to stake position, field technician checks at any time, guarantee fender pile must not be displaced.
P3: the production of casing and embedded: in 12mm, length 6.0m and being more than that silt depth steel plate both ends are welded by thickness A round casing is formed, the part that casing is higher by construction ground is equipped with the excessive slurry mouth of the cm of 40 cm × 40, and the diameter of casing is greater than Designing aperture 24cm(, this numerical value can also be 20cm, 22cm, 26cm, 28cm, 30cm in other embodiments), this diameter Casing be both less prone to the phenomenon that casing blocks drill bit during drill bit impact, shield-tube embedment depth model can also be reduced to the greatest extent Interior excavation amount is enclosed, construction cost is lower, and the gradient of drilling is small;Casing is buried using mechanical excavation, first uses rotary drilling Bucket by hole location in shield-tube embedment depth bounds miscellaneous fill or mud excavate, recycle rotary drilling rig by casing lift in place, Followed by the vibration hammer of same diameter by casing press-in hole, it is higher by construction ground 50cm at the top of casing, checks the inclination of casing Spend deviation, it is ensured that in 1% range;Specific gravity is used to carry out retaining wall for the mud of 1.15 g/cm3 between stake holes inner wall and casing, Mud forms mudcake, closing and stable hole wall in hole wall, prevents hole wall collapse;It filled up with clay on the outside of casing, tamp and prevent ground Face water penetrates into drilling along casing lateral wall.
P4: slurrying: the selection high plastic clay 20% more containing sodium ion, 10% bentonite with cellulose of addition, 0.5%~0.65% industrial sodium hydroxide, 0.003% acrylamide (PHP), remaining group are divided into water, configure mud;And by mud The indices of slurry are controlled in density 1.20-1.35 g/cm3,18~22s of viscosity, sand factor≤6%, pH value 8-10;Wherein, The indices of mud are controlled in 1.30~1.35g/cm3 of density, 20~22s of viscosity after into mud;The mud of borehole cleaning refers to Mark control exists: 1.20~1.25g/cm3 of density, 18~20s of viscosity;
P5: it drilling construction: needs to report supervising engineer to check after survey crew's repetition measurement stake position is errorless before drilling machine is in place, then right Every preparation is checked before drilling, the inspection and maintenance including main mechanical, including the inclination of bit diameter, drilling rod Degree, pedestal and top ensure that steadily the position deviation of bit central and drill center controls within the scope of 2cm;Due to miscellaneous fill Or muddy terrain belongs to the stratum that loosely easily collapses, and rotary drilling rig is selected to carry out pile foundation construction, measures casing absolute altitude before drilling, and calculates real Border hole depth uses static mud protecting wall in drilling process, enters the hole common stratum of mud viscosity ratio and want bigger than normal, mud injection length control System was at 19-28 seconds, and mud is than control in 1.05-1.15 g/cm3, and sand factor is not more than 4%, and colloidity is not less than 95%, and pH value is big In 8, drill bit gently presses slow-motion when aperture is constructed, and drill speed is not more than 10 revs/min, gradually adds after drilling rod fully enters aperture Fast normal drilling when drill bit creeps into mud, reduces the revolving speed and drilling rate of drill bit, increases the specific gravity for pouring into mud and glutinous Degree increases cleaning bottom of hole number when drilling, and bore operation, which is put into several classes, to be carried out continuously, and the moment pays attention to formation variation, fishes for sample slag guarantor in time It deposits, and checks geological condition, fill in drilling construction record, under normal circumstances, sample slag takes once according to 2m, changes in geology When, add and take once, when geology and different design conjunction, every 0.3-0.5m is taken once, is improved the accuracy of sample slag testing result, is obtained It to the revolving speed of drill bit and rotates into rate to more accurate geological condition information, and in time and is adjusted, guarantee hole quality.
P6: pore-forming inspection: when drilling depth reaches design requirement, hole location, aperture, hole depth and gradient are examined It looks into, drilled-hole inspecting is carried out using cage inspection hole device, inspection hole device is made according to code requirement, and the outer diameter of inspection hole device is 1m, long Degree is 6m.
P7: borehole cleaning: by drilling rod with middling speed to bottom hole be pressed into mud balance 1.15 g/cm3, sand factor 0.2-0.4% it Between mud, replace the mud in hole more than suspension boring mud, the mud index after borehole cleaning is tested by field test personnel, it is ensured that in hole The mud hand of discharge touches no 2-3mm particle, mud balance and, less than 2%, viscosity 17-20S, rubs no more than 1.1 g/cm3, sand factor It wipes stake holes bottom sediment thickness and is not more than 20cm, stanchion bottom hole sediment thickness is not more than 5cm.
P8: fabrication of reinforcing cage and installation: pile foundation steel bar cage is concentrated in reinforcing bar factory and is made, and steel reinforcement cage is every 2m, along pile body four It is evenly arranged four chucking lug muscle week, the pile crown reinforcing bar for protruding into cushion cap part is packed using pearl cotton casing, in order to rear Phase carries out pile crown and cuts, and steel reinforcement cage is transported to scene storage after processing is completed, uses bracket support pad below, is covered above with colour bar cloth, Steel reinforcement cage installation uses truck crane, lifts by crane steel reinforcement cage by shoulder pole girder, and transfer section by section, is positioned after the completion of lower section in aperture It is fixed, it avoids that floating cage phenomenon occurs during concrete perfusion, it is ensured that steel reinforcement cage is overlapped with hole location center, hangs muscle length is quasi- Really, the connection of sound detecting pipe is connected using threaded sleeve, carries out water filling inspection to every sound detecting pipe, and each up and down at jointing Sound detecting pipe and steel reinforcement cage are subjected to binding and fixing with iron wire at 1m, centre is finely fixed with positioning ring with steel reinforcement cage, it is ensured that sounding Pipe installation is straight, secured;
P9: conduit installation: using inner wall smooth, smoother, internal diameter is consistent, interface is tight, the conduit of diameter 30cm, using preceding to leading Pipe carries out examination spelling and pressure testing test, and conduit assembles posterior axis deviation between 0.5% to the 10% of drilling depth, and pressure testing power is bottom hole 1.5 times of hydrostatic pressure (are calculated, pressure testing power is 0.735MPA, is calculated by 60m hole depth, and pressure testing power is by 50m hole depth 0.882MPA is calculated by 70m hole depth, and pressure testing power is 1.029MPA), when conduit lifts entrance, rubber ring or Rubber washer are placed It is straight, tight, it is ensured that good seal.
P10: secondary pile hole cleaning: checking again for sediment thickness before pouring underwater concrete, when checking friction pile sediment thickness When being greater than 2cm greater than 20cm or stanchion sediment thickness, secondary pile hole cleaning is carried out using conduit, the specific gravity of mud after borehole cleaning is tested, contains Sand coarse aggregate ratio, viscosity are poured underwater concrete after borehole cleaning is qualified immediately.
P11: pouring underwater concrete: pile foundation concrete all uses concrete mixing station centralized mixing, and concrete tank car transports To scene, scene is tested to be poured into the slump of pile foundation concrete, divergence, gassiness figureofmerit, and is made according to the rules Make standard curing member, every pile must not be less than 2 groups of test specimens, after test result meets design requirement, install and leak in conduit upper port It struggles against, between hopper capacity 1.8-2.2t, guarantees impact energy when concrete falls, mud can be discharged from concrete.It leads It manages depth in lower mouth Transducers Embedded in Concrete and is not less than 1m, be not more than 3m, when mouth length of embedment is greater than 3m under conduit, coagulation in conduit Soil and the concrete upper surface height difference in the outer stake holes of conduit is small will lead to that filling concrete is unsmooth and the outer concrete of conduit on lift From it is excessive be mixed into impurity it is more, relatively concentrate;When mouth length of embedment is less than 1m under conduit, during extracting conduit, coagulation Soil pours face and there is the danger for forming the disconnected section of pile body, in addition the outer small compactness that will lead to casting concrete structure of pressure difference inside the Pass Not enough.Underwater gliders guarantee is carried out continuously, and conduit controls the water between 2-6m in buried depth in concrete in filling process Lower concrete pours top surface by design of pile top elevation 1m control is higher by, to guarantee the quality of stake top concrete.
P12: Lumen catheter and steel pile casting: after underwater gliders, extracted at a slow speed by crane remaining conduit and Steel pile casting, recycling.
In conclusion the lime for replacing upper layer weak soil and incorporation 15% turns on the spot before pile foundation construction, returned after uniform mix It fills out, flatten compacting, improve the bearing capacity of upper layer soil property, be convenient for Large Construction vehicles while passing place;It is drilled using rotation digging machine, It can be to avoid occurring bit freezing in drilling process and the phenomenon that drill bit is fallen;Borehole cleaning is carried out twice it is possible to prevente effectively from borehole cleaning is not thorough The problem of causing boring mud excessive and influencing bearing capacity of pile foundation;Static mud protecting wall, drill bit when aperture is constructed are used in drilling process Light pressure slow-motion, is adjusted the revolving speed and rate of penetration of drill bit according to the ingredient for fishing for sample slag at any time, while adjusting mud shield Wall uses the specific gravity and viscosity of mud, it is possible to prevente effectively from because drilling process hole wall collapses problem, it is ensured that pile foundation construction quality; Hole location, aperture, hole depth and gradient etc. are checked using cage inspection hole device, it is possible to prevente effectively from the problem of hole scattering, Ensure hole quality;It is provided with mud circulating system, the slurry coat method in boring procedure can be recycled, saving of labor saves When, material cost can be effectively saved, pollution of the mud to construction site is reduced;It makes rational planning for construction site and construction procedure, it is whole A work progress orderly carries out, and improves pile foundation construction efficiency.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this All by the protection of Patent Law in the scope of the claims of invention.

Claims (8)

1. a kind of miscellaneous fill and muddy terrain pile base construction method, which is characterized in that including following
Step:
P1: preparation of construction: before pile foundation construction, place geological condition is verified, it is miscellaneous to remove place
Object replaces the weak soil of upper layer 0.6-1.0m depth, mixes 15% lime and turns on the spot, backfills after uniform mix, use excavator Or road roller leveling compacting, sprinkling maintenance 7 days, roadbed paving plate formed the builder's road passed in and out for drilling machine and Construction traffic, cloth Set drilling place;
P2: the setting-out of stake position: stake position is released according to design drawing total station or theodolite are upper on construction ground, on stake position periphery Embedded cross fender pile;
P3: the production of casing and embedded: by thickness between 11-13mm, length is being greater than 5.0m and is being more than silt depth steel Board ends weld to form a round casing, with rotation drilling bucket by hole location in shield-tube embedment depth bounds miscellaneous fill or mud dig It removes, recycles rotary drilling rig to lift casing in place, squeeze into casing in hole followed by the vibration hammer of same diameter, form shield Wall, casing top are higher by construction ground 50cm or more, are filled up, tamped with clay on the outside of casing, prevent the surface water along on the outside of casing Wall penetrates into drilling;
P4: slurrying: selecting the high plastic clay 20% more containing sodium ion, adds 10% bentonite with cellulose, 0.5% ~0.65% industrial sodium hydroxide, 0.003% acrylamide (PHP), remaining group are divided into water, configure mud;And by mud Indices are controlled in density 1.20-1.35 g/cm3,18~22s of viscosity, sand factor≤6%, pH value 8-10;Wherein, enter The indices of mud are controlled in 1.30~1.35g/cm3 of density, 20~22s of viscosity after mud;The mud index control of borehole cleaning System exists: 1.20~1.25g/cm3 of density, 18~20s of viscosity;
P5: drilling construction: checking every preparation before drilling, loosely easily collapses since miscellaneous fill or muddy terrain belong to Stratum selects rotary drilling rig to carry out pile foundation construction, measures casing absolute altitude before drilling, and calculates practical hole depth, uses in drilling process Static mud protecting wall, drill bit gently presses slow-motion when aperture is constructed, and drill speed is not more than 10 revs/min, fully enters hole in drilling rod Gradually accelerate normal drilling after mouthful, when drill bit creeps into mud, the revolving speed and drilling rate, increase for reducing drill bit pour into mud Specific gravity and viscosity increase cleaning bottom of hole number when drilling, and bore operation, which is put into several classes, to be carried out continuously, and the moment pays attention to formation variation, fish out in time It samples slag to save, and checks geological condition, fill in drilling construction record;
P6: pore-forming inspection: when drilling depth reaches design requirement, checking hole location, aperture, hole depth and gradient etc., Drilled-hole inspecting is carried out using cage inspection hole device;
P7: mud balance borehole cleaning: is pressed between 1.20~1.25g/cm3,18~20s of viscosity to bottom hole with middling speed by drilling rod Mud, replace the mud in hole more than suspension boring mud, the mud index after borehole cleaning is tested by field test personnel, it is ensured that row hole in Mud hand out touches no 2-3mm particle, mud balance no more than 1.1 g/cm3, sand factor less than 2%, viscosity 17-20S, friction Stake holes bottom sediment thickness is not more than 20cm, and stanchion bottom hole sediment thickness is not more than 5cm;
P8: fabrication of reinforcing cage and installation: pile foundation steel bar cage is concentrated in reinforcing bar factory and is made, and steel reinforcement cage is equal along pile body surrounding every 2m Four chucking lug muscle of even arrangement are protruded into the pile crown reinforcing bar of cushion cap part and are packed using pearl cotton casing, in order to the later period into Row pile crown is cut, and steel reinforcement cage is transported to scene storage after processing is completed, uses bracket support pad below, is covered above with colour bar cloth, reinforcing bar Cage installation uses truck crane, lifts by crane steel reinforcement cage by shoulder pole girder, and transfer section by section, position admittedly in aperture after the completion of lower section It is fixed, it avoids that floating cage phenomenon occurs during concrete perfusion, it is ensured that steel reinforcement cage is overlapped with hole location center, hangs muscle length is accurate, The connection of sound detecting pipe is connected using threaded sleeve, carries out water filling inspection to every sound detecting pipe, and each 1m up and down at jointing Sound detecting pipe and steel reinforcement cage are carried out binding and fixing with iron wire by place, and centre is finely fixed with positioning ring with steel reinforcement cage, it is ensured that sound detecting pipe It installs straight, secured;
P9: conduit installation: using inner wall smooth, smoother, internal diameter is consistent, interface is tight, the conduit of diameter 30cm, using preceding to leading Pipe carries out examination spelling and pressure testing test, and conduit assembles posterior axis deviation between 0.5% to the 10% of drilling depth, and pressure testing power is bottom hole 1.5 times of hydrostatic pressure when conduit lifts entrance, rubber ring or Rubber washer are placed straight, tight, it is ensured that good seal;
P10: secondary pile hole cleaning: checking again for sediment thickness before pouring underwater concrete, is greater than when checking friction pile sediment thickness When 20cm or stanchion sediment thickness are greater than 2cm, carry out secondary pile hole cleaning using conduit, test the specific gravity of mud after borehole cleaning, sand factor, Viscosity is poured underwater concrete after borehole cleaning is qualified immediately;
P11: pouring underwater concrete: pile foundation concrete all uses concrete mixing station centralized mixing, and concrete tank car is transported to existing , scene is tested to be poured into the slump of pile foundation concrete, divergence, gassiness figureofmerit, and test result, which meets, to be set After meter requires, between conduit upper port installation funnel, hopper capacity 1.8-2.2t, guarantee impact energy when concrete falls Amount, mud can be discharged from concrete;
P12: after underwater gliders, remaining conduit and steel shield Lumen catheter and steel pile casting: are extracted at a slow speed by crane Cylinder, recycling.
2. a kind of miscellaneous fill according to claim 1 and muddy terrain pile base construction method, which is characterized in that in step P1 In, it is rolled between the builder's road and construction site and is trimmed to smooth slope surface.
3. a kind of miscellaneous fill according to claim 1 and muddy terrain pile base construction method, which is characterized in that in step P1 In, arrangement drilling place include on construction ground on clearly plan mud pit, steel reinforcement cage, conduit, hopper and construction machinery Placement position, the mud pit is arranged on the left of the big mileage direction of builder's road, the size of mud pit be 6m × 12m × 2.5m carries out mud pit after digging well in time and goes along with sb. to guard him, and mud pit is divided into sedimentation basin and pulp storage tank, and outflow is with boring mud from drilling Mud flows into sedimentation basin through mud ditch, flows into pulp storage tank after preliminary sedimentation by sedimentation basin and sucks for slush pump, in mud pit It is with change-can mixer that mud modulation is uniformly stand-by.
4. a kind of miscellaneous fill according to claim 1 and muddy terrain pile base construction method, which is characterized in that in step P2 In, the cross fender pile will be higher by casing top surface and is fixed on the positioning with mortar and concrete, in case to stake in drilling process Position is tested, and field technician checks at any time, guarantees that fender pile must not be displaced.
5. a kind of miscellaneous fill according to claim 1 and muddy terrain pile base construction method, which is characterized in that the casing Diameter be greater than design aperture 20cm-30cm.
6. a kind of miscellaneous fill according to claim 1 and muddy terrain pile base construction method, which is characterized in that the casing The part for being higher by construction ground is equipped with the excessive slurry mouth of the cm of 40 cm × 40, and the mud in the casing passes through the excessive slurry mouth stream Place, and sedimentation basin is flowed by mud ditch.
7. a kind of miscellaneous fill according to claim 1 and muddy terrain pile base construction method, which is characterized in that in step P4 In, under normal circumstances, sample slag takes once according to 2m, when geology changes, adds and takes once, when geology and different design are closed When, every 0.3-0.5m takes once.
8. a kind of miscellaneous fill according to claim 1 and muddy terrain pile base construction method, which is characterized in that in step In P10, the depth in the lower mouth Transducers Embedded in Concrete of the conduit is not less than 1m, is not more than 3m, and underwater gliders guarantee to connect It is continuous to carry out.
CN201811070081.7A 2018-09-13 2018-09-13 A kind of miscellaneous fill and muddy terrain pile base construction method Pending CN109469052A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811070081.7A CN109469052A (en) 2018-09-13 2018-09-13 A kind of miscellaneous fill and muddy terrain pile base construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811070081.7A CN109469052A (en) 2018-09-13 2018-09-13 A kind of miscellaneous fill and muddy terrain pile base construction method

Publications (1)

Publication Number Publication Date
CN109469052A true CN109469052A (en) 2019-03-15

Family

ID=65664474

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811070081.7A Pending CN109469052A (en) 2018-09-13 2018-09-13 A kind of miscellaneous fill and muddy terrain pile base construction method

Country Status (1)

Country Link
CN (1) CN109469052A (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109944239A (en) * 2019-04-17 2019-06-28 广东中人岩土工程有限公司 A kind of rotary digging pile construction method
CN110055992A (en) * 2019-04-23 2019-07-26 谢定茂 The construction method of pile foundation
CN110080785A (en) * 2019-05-16 2019-08-02 中铁隧道局集团有限公司 Compound stratum super-large-diameter shield normal pressure warehouse entry reinforced construction method near water
CN110331736A (en) * 2019-07-24 2019-10-15 中铁四局集团有限公司 A kind of Slarry cycling apptss and corresponding construction for pile foundation in water construction
CN110424381A (en) * 2019-08-19 2019-11-08 首钢水城钢铁(集团)赛德建设有限公司 A kind of process for rotary digging drilling hole stake
CN110644467A (en) * 2019-09-04 2020-01-03 金鹏建筑产业有限公司 Construction method of building pile foundation
CN110894722A (en) * 2019-12-03 2020-03-20 湖北省路桥集团有限公司 Construction method of cast-in-situ bored pile
CN111005397A (en) * 2019-12-25 2020-04-14 惠州市新业建筑工程有限公司 Pile foundation construction method
CN111119169A (en) * 2019-12-23 2020-05-08 诚通凯胜生态建设有限公司 Construction method of drilled pile
CN111206576A (en) * 2020-01-19 2020-05-29 重庆渝能建筑安装工程有限公司 Cast-in-situ bored pile construction process
CN111733801A (en) * 2020-06-28 2020-10-02 中冶地集团西北岩土工程有限公司 Construction process of rotary drilling bored concrete pile in soft geology
CN111749233A (en) * 2020-07-20 2020-10-09 重庆华力建设有限公司 Extrusion pore-forming process of digging and drilling machine
CN112343057A (en) * 2020-10-16 2021-02-09 长江三峡集团福建能源投资有限公司 Construction method for offshore concrete pouring in offshore area
CN113235575A (en) * 2020-12-15 2021-08-10 陈汝连 Construction method of rotary excavated pile in bridge construction
CN113668527A (en) * 2021-08-04 2021-11-19 深圳宏业基岩土科技股份有限公司 Construction method for inserting long steel pile casing under rotary digging pile construction of deep rockfill silt stratum
CN113740244A (en) * 2021-09-22 2021-12-03 中国水利水电第四工程局有限公司 Testing method for forming mud skin to prevent seawater ion from corroding bridge pile foundation by utilizing modified marine mud
CN114164823A (en) * 2021-11-10 2022-03-11 中交第四航务工程局有限公司 Pile foundation construction method in high-fill foundation
CN114263156A (en) * 2021-12-29 2022-04-01 中铁十二局集团建筑安装工程有限公司 Construction method of deep-miscellaneous soil filling support pile
CN114703831A (en) * 2022-04-20 2022-07-05 山西四建集团有限公司 Construction method of reinforced concrete cast-in-place pile under complex geological condition
CN114808957A (en) * 2022-05-31 2022-07-29 中国十九冶集团有限公司 Construction method for forming holes in bridge pile foundation in karst area
CN114855781A (en) * 2022-05-18 2022-08-05 筑邦建设集团股份有限公司 Construction method of building pile foundation
CN115787627A (en) * 2022-12-21 2023-03-14 浙江广川工程咨询有限公司 Construction method for manually driving cast-in-place pile

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1016436C2 (en) * 2000-10-18 2002-04-22 Voorbij Groep Bv Method for producing concrete pile in ground involves use of boring unit to create tubular opening in ground and after its withdrawal volume of opening is filled with concrete
CN101487252A (en) * 2009-02-13 2009-07-22 中建八局第一建设有限公司 Construction process of cast-in-situ bored pile
CN104120716A (en) * 2013-04-28 2014-10-29 杨哲 Slurry wall protection construction method for bored pile
CN107165160A (en) * 2017-07-19 2017-09-15 上海宝冶集团有限公司 Electric drill bores construction filling pile construction engineering method with rotary digging relay

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1016436C2 (en) * 2000-10-18 2002-04-22 Voorbij Groep Bv Method for producing concrete pile in ground involves use of boring unit to create tubular opening in ground and after its withdrawal volume of opening is filled with concrete
CN101487252A (en) * 2009-02-13 2009-07-22 中建八局第一建设有限公司 Construction process of cast-in-situ bored pile
CN104120716A (en) * 2013-04-28 2014-10-29 杨哲 Slurry wall protection construction method for bored pile
CN107165160A (en) * 2017-07-19 2017-09-15 上海宝冶集团有限公司 Electric drill bores construction filling pile construction engineering method with rotary digging relay

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
中国水利水电第十一工程局有限公司: "《高速铁路工程项目手册》", 31 October 2012, 中国铁道出版社 *
张灿等: "淤泥地层中钻孔桩的施工方法", 《今日科苑》 *
李应文等: "《桥涵工程》", 31 October 2016, 中国铁道出版社 *

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109944239A (en) * 2019-04-17 2019-06-28 广东中人岩土工程有限公司 A kind of rotary digging pile construction method
CN110055992A (en) * 2019-04-23 2019-07-26 谢定茂 The construction method of pile foundation
CN110080785A (en) * 2019-05-16 2019-08-02 中铁隧道局集团有限公司 Compound stratum super-large-diameter shield normal pressure warehouse entry reinforced construction method near water
CN110331736A (en) * 2019-07-24 2019-10-15 中铁四局集团有限公司 A kind of Slarry cycling apptss and corresponding construction for pile foundation in water construction
CN110331736B (en) * 2019-07-24 2024-02-09 中铁四局集团有限公司 Slurry circulation device for construction of underwater pile foundation and corresponding construction method
CN110424381A (en) * 2019-08-19 2019-11-08 首钢水城钢铁(集团)赛德建设有限公司 A kind of process for rotary digging drilling hole stake
CN110644467A (en) * 2019-09-04 2020-01-03 金鹏建筑产业有限公司 Construction method of building pile foundation
CN110894722A (en) * 2019-12-03 2020-03-20 湖北省路桥集团有限公司 Construction method of cast-in-situ bored pile
CN110894722B (en) * 2019-12-03 2021-09-28 湖北省路桥集团有限公司 Construction method of cast-in-situ bored pile
CN111119169A (en) * 2019-12-23 2020-05-08 诚通凯胜生态建设有限公司 Construction method of drilled pile
CN111005397A (en) * 2019-12-25 2020-04-14 惠州市新业建筑工程有限公司 Pile foundation construction method
CN111206576A (en) * 2020-01-19 2020-05-29 重庆渝能建筑安装工程有限公司 Cast-in-situ bored pile construction process
CN111733801A (en) * 2020-06-28 2020-10-02 中冶地集团西北岩土工程有限公司 Construction process of rotary drilling bored concrete pile in soft geology
CN111749233A (en) * 2020-07-20 2020-10-09 重庆华力建设有限公司 Extrusion pore-forming process of digging and drilling machine
CN112343057A (en) * 2020-10-16 2021-02-09 长江三峡集团福建能源投资有限公司 Construction method for offshore concrete pouring in offshore area
CN113235575A (en) * 2020-12-15 2021-08-10 陈汝连 Construction method of rotary excavated pile in bridge construction
CN113668527A (en) * 2021-08-04 2021-11-19 深圳宏业基岩土科技股份有限公司 Construction method for inserting long steel pile casing under rotary digging pile construction of deep rockfill silt stratum
CN113740244A (en) * 2021-09-22 2021-12-03 中国水利水电第四工程局有限公司 Testing method for forming mud skin to prevent seawater ion from corroding bridge pile foundation by utilizing modified marine mud
CN113740244B (en) * 2021-09-22 2023-12-22 中国水利水电第四工程局有限公司 Testing method for sea mud modified sea water ion corrosion barrier bridge pile foundation
CN114164823A (en) * 2021-11-10 2022-03-11 中交第四航务工程局有限公司 Pile foundation construction method in high-fill foundation
CN114263156A (en) * 2021-12-29 2022-04-01 中铁十二局集团建筑安装工程有限公司 Construction method of deep-miscellaneous soil filling support pile
CN114703831A (en) * 2022-04-20 2022-07-05 山西四建集团有限公司 Construction method of reinforced concrete cast-in-place pile under complex geological condition
CN114855781A (en) * 2022-05-18 2022-08-05 筑邦建设集团股份有限公司 Construction method of building pile foundation
CN114855781B (en) * 2022-05-18 2024-03-22 筑邦建设集团股份有限公司 Construction method of building pile foundation
CN114808957A (en) * 2022-05-31 2022-07-29 中国十九冶集团有限公司 Construction method for forming holes in bridge pile foundation in karst area
CN115787627A (en) * 2022-12-21 2023-03-14 浙江广川工程咨询有限公司 Construction method for manually driving cast-in-place pile

Similar Documents

Publication Publication Date Title
CN109469052A (en) A kind of miscellaneous fill and muddy terrain pile base construction method
CN106284313B (en) Long spire based on circulating mud retaining wall is squeezed into rock filling pile construction method
CN107938676B (en) Pile foundation construction method for penetrating through full-filling karst cave
CN107524138B (en) Construction method of ultra-deep foundation pit underground diaphragm wall
CN106400782B (en) A kind of construction method for going along with sb. to guard him hole-drilling interlocking pile using rotary drilling rig construction foundation pit
CN107724383B (en) Rotary digging cast-in-place pile construction method
CN109488202A (en) A kind of gravel rock stratum pile foundation drilling construction engineering method containing gravel-boulder bed
CN109487807A (en) A kind of steel pipe pile cofferdam pilot hole altering fill method
CN106087997A (en) A kind of high latitude, high and cold Permafrost Area drilled pile construction engineering method
CN108301403A (en) Subway drilling cast-in-place pile construction method
CN108571000A (en) The construction method of underground water cutting when wearing existing railway under a kind of road of location along the river
CN112144514A (en) Simple method for forming hole and pile in sand and pebble stratum easy to collapse during rotary drilling machine
CN110258512A (en) It constructs in a kind of basement rock the method for diaphram wall
CN114232607A (en) Frozen soil section drilled pile construction process
CN113668564A (en) Construction method for supporting and reinforcing open-cut underground passage adjacent to subway station
CN113404042A (en) Bridge pile position construction method
CN211898541U (en) Guide wall structure for reinforced structure of air shaft initial end head
CN117107749A (en) Construction method of large-diameter punched bored pile under influence of sea water seepage in sea-filling land-building area
CN101713189A (en) Construction process of floral tube dry filling piles
CN217231642U (en) Coastline soft foundation solidified soil structure
CN115030146A (en) Solidified soil composite foundation technology for pile mud capable of being solidified in situ to form pile body material
CN108035357A (en) Filling pile construction scheme and its funnel
CN113373867A (en) Coastline soft foundation solidified soil structure and process
CN211171922U (en) Construction structure for improving stability of groove wall
CN113981958A (en) Method for plugging karst cave of mechanical pore-forming cast-in-place pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190315