CN206521694U - A kind of precast pier structure - Google Patents
A kind of precast pier structure Download PDFInfo
- Publication number
- CN206521694U CN206521694U CN201720137260.2U CN201720137260U CN206521694U CN 206521694 U CN206521694 U CN 206521694U CN 201720137260 U CN201720137260 U CN 201720137260U CN 206521694 U CN206521694 U CN 206521694U
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- stand column
- hole
- cushion cap
- reinforcing bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The mounting hole for being used for installing prefabricated stand column is provided with the utility model discloses a kind of precast pier structure, including prefabricated cushion cap and prefabricated stand column, at the top of prefabricated cushion cap, trapezoidal positioning convex is in the convex longitudinal section that is formed with the mounting hole bottom;Prefabricated stand column bottom has the positioning hole coordinated with positioning convex, and the height of positioning convex is more than the height of positioning hole;The injected hole for Pumping concrete is offered at the top of the prefabricated cushion cap, injected hole is connected with the bottom of mounting hole by intercommunicating pore;Prefabricated stand column bottom, which is fixed with the first U-shaped reinforcing bar, prefabricated cushion cap, is fixed with the second U-shaped reinforcing bar;First U-shaped reinforcing bar and the second U-shaped reinforcing bar are provided with overlay segment in mounting hole.The utility model can prevent that bubble occur when being sealed between prefabricated cushion cap and prefabricated stand column causes unbalanced, and add the steadiness and anti-shear performance of precast pier, and there is provided a kind of prefabricated stand column be easy to assemble and transported.
Description
Technical field
The utility model belongs to building field, more particularly to a kind of precast pier structure.
Background technology
Bridge pier structure generally includes cushion cap and column, and former way is typically that the mode of cast in situs builds bridge pier, but
It is so to have construction-time long, delays traffic, the shortcomings of work progress is easily influenceed by weather and noise disturbs residents in work progress.
Therefore people are gradually built using prefabricated bridge pier component.A kind of such as disclosed in patent 201420741735.5 bridge pier,
Bridge pier can be formed by simply being set up by bearing hole on prefabricated tubular pile, precast pier and precast pier.But in actually building,
Prefabricated tubular pile and precast pier are the rigid structures that concrete is built up, so gap is had between bearing hole and prefabricated tubular pile,
So as to cause bridge pier unstable.If filling concrete into gap, it can only add from up to down, it is easy to by gap bottom
Air is blocked so that bottom produces space, causes bridge pier not enough to consolidate.In addition do not have between said structure pile tube and precast pier
Reinforcing bar fixed connection structure, causes its anti-shear ability not enough, and connection is not enough consolidated.Finally, existing column is one-piece casting
Form, make, use and transport inconvenience.
Utility model content
To solve the above problems, the utility model provides a kind of precast pier structure.The utility model can prevent pre-
Occur bubble when being sealed between cushion cap and prefabricated stand column processed and cause unbalanced, and add the steadiness of precast pier and anti-shearing
Performance, and there is provided a kind of prefabricated stand column be easy to assemble and transported.
To reach above-mentioned technique effect, the technical solution of the utility model is:
Being provided with the top of a kind of precast pier structure, including prefabricated cushion cap and prefabricated stand column, prefabricated cushion cap is used to install prefabricated
The mounting hole of column, trapezoidal positioning convex is in the convex longitudinal section that is formed with the mounting hole bottom;Prefabricated stand column bottom
There is the positioning hole coordinated with positioning convex, the height of positioning convex is more than the height of positioning hole;Opened up at the top of the prefabricated cushion cap
There is the injected hole for Pumping concrete, injected hole is connected with the bottom of mounting hole by intercommunicating pore;Prefabricated stand column bottom is fixed
Have and the second U-shaped reinforcing bar is fixed with the first U-shaped reinforcing bar, prefabricated cushion cap;First U-shaped reinforcing bar and the second U-shaped reinforcing bar are in mounting hole
Provided with overlay segment;Prefabricated stand column bottom surrounding is formed with chamfering;The bottom of prefabricated stand column is formed with annular projection and annular recess.
Further to improve, the prefabricated stand column includes some short columns and the foundation being connected with prefabricated cushion cap;The short column
Through hole between the through hole and short column and foundation that are provided between some through holes, short column is corresponded, inserted with reinforcing bar in through hole
And it is perfused with concrete.
Further to improve, the positioning convex is circular cone shape.
Further to improve, the section of the annular projection is arc.
Further to improve, the section of the annular recess is arc.
Brief description of the drawings
Fig. 1 is assembly structure diagram of the present utility model;
Fig. 2 is the overlooking the structure diagram of short column.
Embodiment
The technical solution of the utility model is illustrated below by way of embodiment and with reference to accompanying drawing.
Embodiment 1
A kind of precast pier structure as shown in Figure 1, including prefabricated cushion cap 1 and prefabricated stand column 2, the prefabricated top of cushion cap 1 are set
There is the mounting hole 3 for installing prefabricated stand column 2, trapezoidal positioning convex is in the convex longitudinal section that is formed with the bottom of mounting hole 3
4;The bottom of prefabricated stand column 2 has the positioning hole 5 coordinated with positioning convex 4, and the height of positioning convex 4 is more than the height of positioning hole 5
Degree;The top of prefabricated cushion cap 1 offers the injected hole 6 for Pumping concrete, and the bottom of injected hole 6 and mounting hole 3 passes through
Intercommunicating pore 7 is connected;The bottom of prefabricated stand column 2 is fixed with the first U-shaped reinforcing bar 8, prefabricated cushion cap 1 and is fixed with the second U-shaped reinforcing bar 9;The
One U-shaped reinforcing bar 8 and the second U-shaped reinforcing bar 9 are provided with overlay segment 10 in mounting hole 3;The bottom surrounding of prefabricated stand column 2 is formed with chamfering
11;The bottom of prefabricated stand column 2 is formed with annular projection 12 and annular recess 13.Positioning convex 4 is preferably circular cone shape, or
Wedge shape.The section of annular projection 12 and annular recess 13 is preferably arc.
The utility model inserts prefabricated stand column 2 on the positioning convex 4 of mounting hole 3, then injects coagulation by injected hole 6
Soil, the space between filling prefabricated stand column 2 and prefabricated cushion cap 1.Because concrete is gradually filled from bottom to top in mounting hole 3,
Therefore it can say that air is fully driven away, without sealing air in gap.Connect to increase prefabricated stand column 2 with prefabricated cushion cap 1
The tight type and anti-shearing shape connect, there is provided the first U-shaped reinforcing bar 8 and the second U-shaped reinforcing bar 9.Annular projection 12 and annular recess 13
The stroke up and down of prefabricated stand column 2 is limited, good against shock effect can be played.
As shown in Fig. 2 making transport for convenience, prefabricated stand column 2 includes some short columns 14 and is connected with prefabricated cushion cap 1
Foundation 15;Short column 14 is provided with the through hole 16 between the through hole 16 between some through holes 16, short column 14 and short column 14 and foundation 15
Correspond, inserted with reinforcing bar 17 and be perfused with concrete 18 in through hole 16.Short column 14 and foundation 15 are first so transported into building site,
Then by its through hole to it, reinforcing bar 17 is inserted into, concrete perfusion 18 is sealed, that is, prefabricated stand column 2 is made, it is processed need not
Oversized making apparatus, and transport is quick, assembling is flexible.
Above are only one of the present utility model it is specific be oriented to embodiment, but design concept of the present utility model not office
It is limited to this, all changes for carrying out unsubstantiality to the utility model using this design all should belong to infringement guarantor of the present utility model
Protect the behavior of scope.
Claims (5)
1. being provided with the top of a kind of precast pier structure, including prefabricated cushion cap (1) and prefabricated stand column (2), prefabricated cushion cap (1) is used to pacify
Fill the mounting hole (3) of prefabricated stand column (2), it is characterised in that the convex longitudinal section that is formed with mounting hole (3) bottom is trapezoidal
Positioning convex (4);Prefabricated stand column (2) bottom has the positioning hole (5) coordinated with positioning convex (4), the height of positioning convex (4)
Height of the degree more than positioning hole (5);The injected hole (6) for Pumping concrete, slip casting are offered at the top of the prefabricated cushion cap (1)
Hole (6) is connected with the bottom of mounting hole (3) by intercommunicating pore (7);Prefabricated stand column (2) bottom is fixed with the first U-shaped reinforcing bar (8),
The second U-shaped reinforcing bar (9) is fixed with prefabricated cushion cap (1);First U-shaped reinforcing bar (8) is with the second U-shaped reinforcing bar (9) in mounting hole (3)
Provided with overlay segment (10);Prefabricated stand column (2) bottom surrounding is formed with chamfering (11);The bottom of prefabricated stand column (2) is formed with ring-type
Raised (12) and annular recess (13).
2. precast pier structure as claimed in claim 1, it is characterised in that the prefabricated stand column (2) includes some short columns
(14) foundation (15) and with prefabricated cushion cap (1) being connected;The short column (14) is provided between some through holes (16), short column (14)
Through hole (16) and short column (14) and foundation (15) between through hole (16) correspond, inserted with reinforcing bar (17) in through hole (16)
And it is perfused with concrete (18).
3. precast pier structure as claimed in claim 1, it is characterised in that the positioning convex (4) is circular cone shape.
4. precast pier structure as claimed in claim 1, it is characterised in that the section of the annular projection (12) is arc.
5. precast pier structure as claimed in claim 1, it is characterised in that the section of the annular recess (13) is arc.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720137260.2U CN206521694U (en) | 2017-02-15 | 2017-02-15 | A kind of precast pier structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720137260.2U CN206521694U (en) | 2017-02-15 | 2017-02-15 | A kind of precast pier structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206521694U true CN206521694U (en) | 2017-09-26 |
Family
ID=59891447
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720137260.2U Expired - Fee Related CN206521694U (en) | 2017-02-15 | 2017-02-15 | A kind of precast pier structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206521694U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107806109A (en) * | 2017-09-28 | 2018-03-16 | 中交第公路勘察设计研究院有限公司 | Precast assembly bridge pier attachment means and its construction method |
CN107859248A (en) * | 2017-11-02 | 2018-03-30 | 湖南大学 | A kind of prefabricated concrete structure jointing and connection method |
CN109518593A (en) * | 2018-11-14 | 2019-03-26 | 安徽省交通规划设计研究总院股份有限公司 | Assembly concrete-filled steel tube lattice pier |
CN109898540A (en) * | 2019-04-16 | 2019-06-18 | 福州市规划设计研究院 | Wet-make connection structure and its construction technology between bridge pier, cushion cap and pile foundation |
CN113373798A (en) * | 2021-05-14 | 2021-09-10 | 同济大学 | Prefabricated assembled pier and connecting method thereof |
-
2017
- 2017-02-15 CN CN201720137260.2U patent/CN206521694U/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107806109A (en) * | 2017-09-28 | 2018-03-16 | 中交第公路勘察设计研究院有限公司 | Precast assembly bridge pier attachment means and its construction method |
CN107859248A (en) * | 2017-11-02 | 2018-03-30 | 湖南大学 | A kind of prefabricated concrete structure jointing and connection method |
CN109518593A (en) * | 2018-11-14 | 2019-03-26 | 安徽省交通规划设计研究总院股份有限公司 | Assembly concrete-filled steel tube lattice pier |
CN109898540A (en) * | 2019-04-16 | 2019-06-18 | 福州市规划设计研究院 | Wet-make connection structure and its construction technology between bridge pier, cushion cap and pile foundation |
CN109898540B (en) * | 2019-04-16 | 2023-12-15 | 福州市规划设计研究院集团有限公司 | Wet joint structure among bridge pier, bearing platform and pile foundation and construction process thereof |
CN113373798A (en) * | 2021-05-14 | 2021-09-10 | 同济大学 | Prefabricated assembled pier and connecting method thereof |
CN113373798B (en) * | 2021-05-14 | 2022-09-20 | 同济大学 | Prefabricated assembled pier and connecting method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206521694U (en) | A kind of precast pier structure | |
CN108374489B (en) | Assembled concrete column foot joint structure and construction method thereof | |
CN207003652U (en) | A kind of compound concrete-filled tubular column and steel tube concrete beam composite frame structure | |
CN104453015A (en) | Reinforcing bar splicing connection component comprising thin-wall sleeves constrained by spiral bars | |
CN206941608U (en) | A kind of diaphram wall foundation pit supporting construction | |
KR101247201B1 (en) | Reinforcement member for preventing punching shear and construction method using the same | |
CN109811782A (en) | A kind of soft soil foundation reinforcing method and its ruggedized construction | |
CN208844417U (en) | A kind of outer precast construction for pier column and its outer prefabricated interior cast-in-place pier column | |
CN206829148U (en) | A kind of combined type shaped steel, concrete square pile bearing diagonal foundation pit enclosure structure | |
CN204112525U (en) | Band perps precast shear wall structure in strong concrete precast frame | |
CN206289873U (en) | Spacing oblique grout outlet type semi-connection grouting sleeve | |
CN103122642A (en) | Construction method of vertical post support change | |
CN204282370U (en) | A kind of rigidity is unearthed platform internal support of foundation pit structure | |
CN207277379U (en) | Adapt to the anti-settling inspection shaft of the road surface vertically and horizontally gradient | |
CN209412846U (en) | A kind of drainage mechanism of basement bottom board | |
CN204252119U (en) | The special-shaped supporting pile structure of X | |
CN113174986B (en) | Base structure of steel structure building | |
CN202500146U (en) | Steel-structure assembly type bearing platform tubular pile foundation | |
CN201865118U (en) | Grouting spiral anchor base | |
CN205475207U (en) | A construction equipment is pour to exposed basement rock or shallow overburden basement rock | |
CN101979777A (en) | Cast-in-place hollow square pile and combined underground continuous wallboard and construction method thereof | |
CN209723230U (en) | The connecting node of steel plate combined shear wall and not equal higher baselines | |
CN211256953U (en) | Reinforcing pile structure for improving foundation stress | |
CN209779636U (en) | Building foundation pit supporting structure | |
CN102061695A (en) | Treatment method of drainage pipe pile composite foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170926 Termination date: 20180215 |