CN107806109A - Precast assembly bridge pier attachment means and its construction method - Google Patents

Precast assembly bridge pier attachment means and its construction method Download PDF

Info

Publication number
CN107806109A
CN107806109A CN201710896095.3A CN201710896095A CN107806109A CN 107806109 A CN107806109 A CN 107806109A CN 201710896095 A CN201710896095 A CN 201710896095A CN 107806109 A CN107806109 A CN 107806109A
Authority
CN
China
Prior art keywords
pier
precast
steel plate
cushion cap
attachment means
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710896095.3A
Other languages
Chinese (zh)
Inventor
姚晓飞
梁智涛
李刚
杨敏
来猛刚
刘浩
朱谊彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Consultants Co Ltd
Original Assignee
CCCC First Highway Consultants Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Consultants Co Ltd filed Critical CCCC First Highway Consultants Co Ltd
Priority to CN201710896095.3A priority Critical patent/CN107806109A/en
Publication of CN107806109A publication Critical patent/CN107806109A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a kind of precast assembly bridge pier attachment means and its construction method, pier bottom attachment means including precast pier bottom connected with the cushion cap at the top of cast-in-place cushion cap pre-embedded device, precast pier and cast-in-place cushion cap connected by pier bottom attachment means with cushion cap pre-embedded device cooperation up and down installation realization be connected.The present invention uses the precast assembly bridge pier of steel plate outsourcing+U ribs+fining twisted steel type of attachment, and construction technology is simply, conveniently.Compared with other forms, on-site construction processes are few, greatly improve efficiency of construction, and construction quality has been obtained maximally effective guarantee;Security reliability is high, is applicable to earthquake intensity area higher;Connecting structure has certain Anti-bumping protection function to bridge pier main body, can be widely popularized in Urban Bridge.

Description

Precast assembly bridge pier attachment means and its construction method
Technical field
The present invention relates to bridge's design technical field of construction, and in particular to a kind of precast assembly bridge pier attachment means and Its construction method.
Background technology
With the fast development of the fast development of traffic, particularly municipal works, to efficiency of construction, speed of application and drop The influence that low construction is passed through to existing line proposes higher and higher requirement.Precast assembly bridge pier is as a kind of Bridge Pier Construction shape Formula, Bridge Pier Construction efficiency can be greatly promoted, the maximized influence for reducing substructure construction to traffic.Precast assembly bridge pier More and more it is applied, is widely recognized in engineering, this technology is still evolving with perfect, and wherein section connects Connection device is one of its technological core.
The shortcomings that following aspect be present in the form and attachment means of precast assembly bridge pier existing at present:1st, attachment means are applied Work technics comparing is complicated;2nd, device is attached using prestressing force, need to be avoided during prestressed strand tensioning, and material be present Waste;3rd, using fining twisted steel pattern attachment means, have that joint is more, form is complicated, and only bonded by storeroom strong Spend to realize the connection between segmentation, reliability is relatively weak;4th, other diversified forms, site operation quantities is big, complex process; 5th, attachment means pair and bridge structure safe are without other auxiliary sexual functions.
The content of the invention
It is an object of the invention to provide a kind of precast assembly bridge pier attachment means and its construction method, construction technology are simpler Just, construction quality easily ensures folk prescription, and has collision prevention function.
The technical solution adopted in the present invention is:
Precast assembly bridge pier attachment means, it is characterised in that:
Pier bottom attachment means including precast pier bottom connect pre-embedded device with the cushion cap at the top of cast-in-place cushion cap, precast pier and The installation realization of cooperation up and down that cast-in-place cushion cap connects pre-embedded device by pier bottom attachment means with cushion cap is connected.
Pier bottom attachment means include encased steel plate, upper pressure-bearing steel plate, U-shaped ribbed stiffener and pier bottom steel plate;
Encased steel plate is arranged at precast pier bottom periphery, is welded in U-shaped gilled rings week of putting more energy on the outside of encased steel plate and is formed vertically Duct;Upper pressure-bearing steel plate is set at the top of U-shaped ribbed stiffener, and bottom sets pier bottom steel plate.
It is welded with vertical perforated panel in encased steel plate side ring week, horizontal pass through is provided through between the perforate of perforated panel Wear reinforcing bar.
Cushion cap connection pre-embedded device includes upper fixing steel plate, vertical finish rolling deformed bar, sleeve pipe and lower anchor plate;
Vertical finish rolling deformed bar defaults in inside cast-in-place cushion cap and reserved section of stretching out, is arranged in sleeve pipe, position correspondence is in pier U-shaped ribbed stiffener in the attachment means of bottom;Cannula tip welding is positioned at fixing steel plate, and bottom welding is positioned at lower anchoring steel Plate.
Lower anchor plate bottom surface is provided with vertical anchor bar.
Vertical finish rolling deformed bar bottom is fixed through the preformed hole of lower anchor plate by anchoring piece;
Vertical finish rolling deformed bar vertically passes through U-shaped ribbed stiffener, and top is consolidated through the preformed hole of upper pressure-bearing steel plate by anchoring piece It is fixed.
Precast pier bottom is provided with pier bottom and reserves tongue-and-groove, is provided with the top of cast-in-place cushion cap and reserves tongue and groove fit with pier bottom Cushion cap reserves tenon.
Sagging precast pier preformed groove is provided with the top of cast-in-place cushion cap, precast pier bottom is placed in precast pier and reserved surely Interior, being poured in precast pier preformed groove has ungauged regions self-compaction slightly expanded concrete.
The construction method of precast assembly bridge pier attachment means, it is characterised in that:
Comprise the following steps:
Step 1:The processing of precast pier and pier bottom attachment means:
Vertical perforated panel is welded in side ring week in encased steel plate and runs through reinforcing bar through setting level;
The duct that U-shaped ribbed stiffener forms vertical line is welded in side ring week outside encased steel plate, upper pressure-bearing steel is welded at the top of U-shaped ribbed stiffener Plate, bottom welding pier bottom steel plate;
When bridge pier is prefabricated, pier shaft vertical reinforcement, with after-pouring pier shaft coagulation, completes precast pier work with being attached through reinforcing bar Factory processes;
Step 2:The processing of cast-in-place cushion cap and cushion cap connection pre-embedded device:
The locating framework being welded to form by lower anchor plate, upper fixing steel plate and sleeve pipe vertical therebetween, lower anchor plate Bottom sets anchor bar;Penetrated in sleeve pipe and complete vertical finish rolling deformed bar, after the completion of lashing and anchoring, poured cushion cap and mix Solidifying soil, completes the cast in situs of cushion cap;
Step 3:Pier bottom attachment means connect the connection of pre-embedded device with cushion cap:
Precast pier lifting is in place, and vertical finish rolling deformed bar is vertically passed through to the preformed hole of U-shaped ribbed stiffener and upper pressure-bearing steel plate, And fastened in upper pressure-bearing steel plate top surface by anchoring piece;
Step 4:Preservative treatment:
After the completion of precast pier assembly, the perfusion that tapping carries out anti-corrosion grouting material is reserved in U-shaped ribbed stiffener bottom;Attachment means After derusting, require to carry out anticorrosive coating according to anti-collision alarm and landscape.
Precast pier bottom is provided with pier bottom and reserves tongue-and-groove, is provided with the top of cast-in-place cushion cap and reserves tongue and groove fit with pier bottom Cushion cap reserves tenon;
Sagging precast pier preformed groove is provided with the top of cast-in-place cushion cap, precast pier bottom is placed in precast pier preformed groove, After the completion of precast pier assembly, precast pier preformed groove domestic demand pours ungauged regions self-compaction slightly expanded concrete.
The present invention has advantages below:
The present invention uses the precast assembly bridge pier of steel plate outsourcing+U ribs+fining twisted steel type of attachment, and construction technology is simple, side Just, and on-site construction processes are few, greatly improve efficiency of construction, and construction quality has been obtained maximally effective guarantee.With other Form compares, and saves material and connecting structure has certain Anti-bumping protection function to bridge pier main body, can be in Urban Bridge It is widely popularized.
Brief description of the drawings
Fig. 1 is elevation of the present invention.
Fig. 2 is plan of the present invention.
Fig. 3 is pier shaft facade structural map.
Fig. 4 is pier bottom planar configuration figure.
In figure, 1- precast piers, the cast-in-place cushion caps of 2-, 3- pier bottoms reserve tongue-and-groove, and 4- cushion caps reserve tenon, 5- encased steel plates, 6-U type ribbed stiffeners, the vertical finish rolling deformed bars of 7-, 8- sleeve pipes, anchor plate under 9-, the upper fixing steel plates of 10-, 11- pier bottom steel plates, The upper pressure-bearing steel plates of 12-, 13- anchor bars, 14- anchoring pieces, 15- ungauged regions self-compaction slightly expanded concretes, 16- perforated panels, 17- Through reinforcing bar.
Embodiment
With reference to embodiment, the present invention will be described in detail.
Precast assembly bridge pier attachment means of the present invention, it is a kind of encased steel plate+U ribs+fining twisted steel connection shape The precast assembly bridge pier building technology of formula, including the cushion cap at the pier bottom attachment means of the bottom of precast pier 1 and the top of cast-in-place cushion cap 2 Pre-embedded device is connected, precast pier 1 connects the cooperation up and down of pre-embedded device with cast-in-place cushion cap 2 by pier bottom attachment means with cushion cap Installation realization is connected.
Pier bottom attachment means include encased steel plate 5, upper pressure-bearing steel plate 12, U-shaped ribbed stiffener 6 and pier bottom steel plate 11.Covered with Angles Plate 5 is arranged at the bottom periphery of precast pier 1, is welded to the outside of encased steel plate 5 the U-shaped ring week of ribbed stiffener 6 and forms vertical duct;U The top of type ribbed stiffener 6 sets upper pressure-bearing steel plate 12, and bottom is welded on pier bottom steel plate 11.Side ring week is welded with encased steel plate 5 Vertical perforated panel 16, it is provided through horizontal running through reinforcing bar 17 between the perforate of perforated panel 16.The vertical cage bar of pier shaft is with passing through Wear reinforcing bar colligation connection.
Cushion cap connection pre-embedded device includes upper fixing steel plate 10, vertical finish rolling deformed bar 7, sleeve pipe 8 and lower anchor plate 9.Vertical finish rolling deformed bar 7 defaults in the cast-in-place inside of cushion cap 2 and reserved section of stretching out, is arranged in sleeve pipe 8, position correspondence is in pier U-shaped ribbed stiffener 6 in the attachment means of bottom;The top of sleeve pipe 8 is welded in the bottom surface of fixing steel plate 10, and bottom is welded in lower anchor plate 9 top surfaces.The lower bottom surface of anchor plate 9 is provided with vertical anchor bar 13.The vertical bottom of finish rolling deformed bar 7 passes through lower anchoring steel The preformed hole of plate 9 is fixed by anchoring piece 14.
When coordinating installation up and down, vertical finish rolling deformed bar 7 vertically passes through U-shaped ribbed stiffener 6, and top passes through upper pressure-bearing steel plate 12 preformed hole is fixed by anchoring piece 14.
The bottom of precast pier 1 is provided with pier bottom and reserves tongue-and-groove 3, and the top of cast-in-place cushion cap 2, which is provided with, to be reserved tongue-and-groove 3 with pier bottom and match somebody with somebody The cushion cap of conjunction reserves tenon 4.The cast-in-place top of cushion cap 2 is provided with sagging precast pier preformed groove, and the bottom of precast pier 1 is placed in pre- Being poured in bridge pier preformed groove processed, in precast pier preformed groove has ungauged regions self-compaction slightly expanded concrete 15.
The construction procedure of precast assembly bridge pier attachment means of the present invention is:
Step 1:The processing of precast pier 1 and pier bottom attachment means:
Vertical perforated panel 16 is welded in side ring week in encased steel plate 5 and runs through reinforcing bar 17 through setting level;
The duct that U-shaped ribbed stiffener 6 forms vertical line, the upper pressure-bearing of the U-shaped top of ribbed stiffener 6 welding are welded in 5 outer side ring of encased steel plate week Steel plate 12, bottom welding pier bottom steel plate 11;
When bridge pier is prefabricated, pier shaft vertical reinforcement, with after-pouring pier shaft coagulation, completes precast pier with being attached through reinforcing bar 17 Factory process;
Step 2:The processing of cast-in-place cushion cap 2 and cushion cap connection pre-embedded device:
The locating framework being welded to form by lower anchor plate 9, upper fixing steel plate 10 and sleeve pipe 8 vertical therebetween, lower anchoring The bottom of steel plate 9 sets anchor bar 13;Penetrated in sleeve pipe 8 and complete vertical finish rolling deformed bar 7, after the completion of lashing and anchoring, Cushion cap concrete is poured, completes the cast in situs of cushion cap;
Step 3:Pier bottom attachment means connect the connection of pre-embedded device with cushion cap:
Precast pier 1 lifts in place, by vertical finish rolling deformed bar 7 vertically through the pre- of U-shaped ribbed stiffener 6 and upper pressure-bearing steel plate 12 Box out, and fastened in the upper top surface of pressure-bearing steel plate 12 by anchoring piece 14;
Step 4:Preservative treatment:
After the completion of the assembly of precast pier 1, the perfusion that tapping carries out anti-corrosion grouting material is reserved in the U-shaped bottom of ribbed stiffener 6;Connection dress After putting derusting, require to carry out anticorrosive coating according to anti-collision alarm and landscape.
The bottom of precast pier 1 is provided with pier bottom and reserves tongue-and-groove 3, and there is provided reserve tongue-and-groove 3 with pier bottom to match somebody with somebody at the cast-in-place top of cushion cap 2 The cushion cap of conjunction reserves tenon 4.The cast-in-place top of cushion cap 2 is provided with sagging precast pier preformed groove, and the bottom of precast pier 1 is placed in pre- In bridge pier preformed groove processed, after the completion of the assembly of precast pier 1, precast pier preformed groove domestic demand is poured ungauged regions self-compaction microdilatancy and mixed Solidifying soil 15.
The present invention is applied to the bridge pier of different section size, and the processing and fabricating of attachment means can be according to the spirit of bridge pier cross dimensions Processing living is selected.Had concurrently after attachment means installation and prevent hitting landscape function, its exposed surface can be as requested from difference Color carries out anticorrosive coating.
(1)The design of the pre-buried fining twisted steel tendons skeleton of cushion cap
The pre-buried fining twisted steel of cushion cap is embedded into cushion cap and carried out by upper and lower fixing steel plate and metal sleeve connection composition skeleton Positioning;Finish rolling deformed bar is fixed in bottom by flat anchorage(As fixing end), adopted by and according to bridge pier form With different intensity grades, the finish rolling deformed bar of specification.
(2)The welding design of steel plate, steel plate and U ribs
Steel plate and U ribs are designed using weathering steel, during practice of construction, need to select matching welding rod;Weld shape Formula is according to actual conditions using Type of Welding such as penetration weld, groove welding, fillet welds.
(3)Position Design
This part includes pre-embedded steel slab above and below inside cushion cap, finish rolling deformed bar, U ribs, pier bottom steel plate and passes through hole and upper pressure-bearing steel The Position Design of plate position of opening.Each component for being participated in is pre-buried or installation before, need to be in factory to its package unit system Preassembling is carried out, to ensure to agree between a full set of system and the degree of deviation is in the permissible range of design;The reinforcing bar of the pre-buried part of cushion cap Skeleton should determine its flat orientation when pre-buried according to pier location, and strictly control its levelness and finish rolling deformed bar Vertical degree.
(4)Post jacking designs
By respectively opening aperture at one in U ribs top/bottom part, then pressure injects grouting material, to ensure U ribs inside and fining twisted steel Muscle is not by the corrosion of steam etc., so as to ensure the safety durable of structure.
(5)Anticorrosive coating designs
The external environmental conditions such as air, the hydrology according to residing for bridge, matching anticorrosive coating system is selected, and use band There is the application color of alarming effect, while steel plate antiseptic effect is reached, take into account the anticollision effect of bridge pier.
The present invention use steel plate outsourcing+U ribs+fining twisted steel type of attachment precast assembly bridge pier, by outside steel plate+ U ribs+finish rolling deformed bar undertakes superstructure and load is transmitted in earthquake:It is i.e. internal by welding perforated panel in encased steel plate + the mode for running through reinforcing bar forms PBL shear connectors, reaches internal cage bar and transmits load to the purpose of encased steel plate;Outside is by outer Common stress between steel plated, U ribs and finish rolling deformed bar, pier shaft load is transmitted to cushion cap, the stress of guarantee precast assembly bridge pier Performance meets design requirement;Finish rolling deformed bar is embedded in inside cushion cap, while precast pier pier bottom(Containing encased steel plate and U ribs) It is embedded to inside cushion cap, pier shaft is formed overall guarantee reliability with cushion cap.U ribs are using weather-proof steel and internal grouting, to ensure The durability of finish rolling deformed bar and steel plate;U ribs and exposed steel plate use the anticorrosive coating with warning mark, while U ribs are certainly Body may also function as the effect for absorbing Impact energy, to play a part of anticollision device, collision-prevention device.
Present disclosure is not limited to cited by embodiment, and those of ordinary skill in the art are by reading description of the invention And any equivalent conversion taken technical solution of the present invention, it is that claim of the invention is covered.

Claims (10)

1. precast assembly bridge pier attachment means, it is characterised in that:
Including precast pier(1)The pier bottom attachment means of bottom and cast-in-place cushion cap(2)The cushion cap connection pre-embedded device at top, it is prefabricated Bridge pier(1)With cast-in-place cushion cap(2)Connection is realized in the installation of cooperation up and down for connecting pre-embedded device with cushion cap by pier bottom attachment means It is fixed.
2. precast assembly bridge pier attachment means according to claim 1, it is characterised in that:
Pier bottom attachment means include encased steel plate(5), upper pressure-bearing steel plate(12), U-shaped ribbed stiffener(6)With pier bottom steel plate(11);
Encased steel plate(5)It is arranged at precast pier(1)Bottom periphery, U-shaped ribbed stiffener(6)Ring week is welded to encased steel plate(5)Outside Side forms vertical duct;U-shaped ribbed stiffener(6)Top sets upper pressure-bearing steel plate(12), bottom sets pier bottom steel plate(11).
3. precast assembly bridge pier attachment means according to claim 2, it is characterised in that:
Encased steel plate(5)Interior side ring week is welded with vertical perforated panel(16), perforated panel(16)Perforate between be provided through Horizontal runs through reinforcing bar(17).
4. precast assembly bridge pier attachment means according to claim 1, it is characterised in that:
Cushion cap connection pre-embedded device includes upper fixing steel plate(10), vertical finish rolling deformed bar(7), sleeve pipe(8)With lower anchoring steel Plate(9);
Vertical finish rolling deformed bar(7)Default in cast-in-place cushion cap(2)Internal and reserved section of stretching out, is arranged at sleeve pipe(8)It is interior, position Corresponding to the U-shaped ribbed stiffener in pier bottom attachment means(6);Sleeve pipe(8)Top welding is positioned at fixing steel plate(10), bottom weldering Connect and be positioned at lower anchor plate(9).
5. precast assembly bridge pier attachment means according to claim 4, it is characterised in that:
Lower anchor plate(9)Bottom surface is provided with vertical anchor bar(13).
6. precast assembly bridge pier attachment means according to claim 4, it is characterised in that:
Vertical finish rolling deformed bar(7)Bottom passes through lower anchor plate(9)Preformed hole pass through anchoring piece(14)It is fixed;
Vertical finish rolling deformed bar(7)Vertically pass through U-shaped ribbed stiffener(6), top passes through upper pressure-bearing steel plate(12)Preformed hole lead to Cross anchoring piece(14)It is fixed.
7. precast assembly bridge pier attachment means according to claim 1, it is characterised in that:
Precast pier(1)Bottom is provided with pier bottom and reserves tongue-and-groove(3), cast-in-place cushion cap(2)Top is provided with reserves tongue-and-groove with pier bottom (3)The cushion cap of cooperation reserves tenon(4).
8. precast assembly bridge pier attachment means according to claim 1, it is characterised in that:
Cast-in-place cushion cap(2)Top is provided with sagging precast pier preformed groove, precast pier(1)It is surely pre- that bottom is placed in precast pier Being poured in staying, in precast pier preformed groove has ungauged regions self-compaction slightly expanded concrete(15).
9. the construction method of precast assembly bridge pier attachment means, it is characterised in that:
Comprise the following steps:
Step 1:Precast pier(1)And the processing of pier bottom attachment means:
In encased steel plate(5)Interior side ring week welds vertical perforated panel(16)And run through reinforcing bar through setting level(17);
In encased steel plate(5)Outer side ring week welds U-shaped ribbed stiffener(6)Form the duct of vertical line, U-shaped ribbed stiffener(6)Weld at top Upper pressure-bearing steel plate(12), bottom welding pier bottom steel plate(11);
When bridge pier is prefabricated, pier shaft vertical reinforcement is with running through reinforcing bar(17)It is attached, with after-pouring pier shaft coagulation, completes prefabricated bridge Pier factory process;
Step 2:Cast-in-place cushion cap(2)And the processing of cushion cap connection pre-embedded device:
By lower anchor plate(9), upper fixing steel plate(10)Therebetween vertical sleeve pipe(8)The locating framework being welded to form, Lower anchor plate(9)Bottom sets anchor bar(13);In sleeve pipe(8)Inside penetrate and complete vertical finish rolling deformed bar(7), lashing And after the completion of anchoring, cushion cap concrete is poured, completes the cast in situs of cushion cap;
Step 3:Pier bottom attachment means connect the connection of pre-embedded device with cushion cap:
Precast pier(1)Lifting is in place, by vertical finish rolling deformed bar(7)Vertically pass through U-shaped ribbed stiffener(6)And upper pressure-bearing steel plate (12)Preformed hole, and in upper pressure-bearing steel plate(12)Top surface passes through anchoring piece(14)Fastened;
Step 4:Preservative treatment:
Precast pier(1)After the completion of assembly, in U-shaped ribbed stiffener(6)Reserve the perfusion that tapping carries out anti-corrosion grouting material in bottom;Even After connection device derusting, require to carry out anticorrosive coating according to anti-collision alarm and landscape.
10. the construction method of precast assembly bridge pier attachment means according to claim 9, it is characterised in that:
Precast pier(1)Bottom is provided with pier bottom and reserves tongue-and-groove(3), cast-in-place cushion cap(2)Top is provided with reserves tongue-and-groove with pier bottom (3)The cushion cap of cooperation reserves tenon(4);
Cast-in-place cushion cap(2)Top is provided with sagging precast pier preformed groove, precast pier(1)Bottom is placed in precast pier and reserved In groove, precast pier(1)After the completion of assembly, precast pier preformed groove domestic demand pours ungauged regions self-compaction slightly expanded concrete (15).
CN201710896095.3A 2017-09-28 2017-09-28 Precast assembly bridge pier attachment means and its construction method Withdrawn CN107806109A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710896095.3A CN107806109A (en) 2017-09-28 2017-09-28 Precast assembly bridge pier attachment means and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710896095.3A CN107806109A (en) 2017-09-28 2017-09-28 Precast assembly bridge pier attachment means and its construction method

Publications (1)

Publication Number Publication Date
CN107806109A true CN107806109A (en) 2018-03-16

Family

ID=61592599

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710896095.3A Withdrawn CN107806109A (en) 2017-09-28 2017-09-28 Precast assembly bridge pier attachment means and its construction method

Country Status (1)

Country Link
CN (1) CN107806109A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108396641A (en) * 2018-04-28 2018-08-14 上海市城市建设设计研究总院(集团)有限公司 Precast assembly bridge pier joint structure
CN108442235A (en) * 2018-04-03 2018-08-24 中国建筑第五工程局有限公司 Connecting structure between assembled bridge pier and cushion cap and construction method
CN108457172A (en) * 2018-04-03 2018-08-28 中国建筑第五工程局有限公司 Assembling type girder bridge and construction method
CN108547216A (en) * 2018-06-12 2018-09-18 北京市市政工程设计研究总院有限公司 Bridge prefabrication performance of concrete column confined and bridge foundation alligator bell and spigot frame and construction method
CN109024249A (en) * 2018-08-16 2018-12-18 福建工程学院 A kind of connector uses the spigot-and-socket construction precast assembly bridge pier of cast-in-place UHPC material
CN109162197A (en) * 2018-09-29 2019-01-08 中国建筑第八工程局有限公司 Bridge pier structure and its construction method
CN109403213A (en) * 2018-11-08 2019-03-01 中交第二航务工程局有限公司 Bridge prefabrication pier shaft installs locating guide device and its construction method
CN110306425A (en) * 2019-06-05 2019-10-08 中铁二院工程集团有限责任公司 The pier bottom construction for bearing the squat pier rigid frame bridge of moment of flexure can significantly be reduced
CN111705630A (en) * 2020-06-01 2020-09-25 上海市城市建设设计研究总院(集团)有限公司 Prefabricated hollow pier with unconnected inner steel bars
CN112112180A (en) * 2020-08-26 2020-12-22 绍兴文理学院 Connecting system of assembled combined pier and bearing platform and construction method thereof
CN112176886A (en) * 2020-11-16 2021-01-05 山东高速建设管理集团有限公司 Double-steel sleeve socket connection structure of prefabricated bridge pier and construction method thereof
CN112211045A (en) * 2020-10-19 2021-01-12 中建八局广西建设有限公司 Base plate embedded structure of straddle type monorail traffic and construction method
CN113668388A (en) * 2021-07-14 2021-11-19 武汉二航路桥特种工程有限责任公司 Pier-beam cooperative integral rapid installation and removal method based on vehicle-mounted equipment

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6709200B1 (en) * 2002-11-01 2004-03-23 Milton Reynolds Method of constructing the foundation and support structure for elevated transportation systems
CN101413250A (en) * 2008-11-20 2009-04-22 中铁大桥勘测设计院有限公司 Rabbet type connecting method of cross-sea bridge prefabricated bridge pier and platform
KR20100054889A (en) * 2008-11-15 2010-05-26 고려대학교 산학협력단 Development of fabricated internally confined hollow concrete filled tube using corrugated tube
CN201730336U (en) * 2010-03-17 2011-02-02 李明芳 Split bolt sleeve
CN103147391A (en) * 2013-03-29 2013-06-12 东南大学 Corrosion-resistant self-centering bridge pier structure easy for seismic rehabilitation
CN104294753A (en) * 2014-09-06 2015-01-21 安徽省交通建设有限责任公司 Bridge prefabricated hollow pier stud connecting structure and construction method thereof
CN104532740A (en) * 2015-01-21 2015-04-22 宁波大学 Energy-consuming rebar-attached unbonded post-tensioning prestressed concrete filled double-wall steel tube prefabricated assembly bridge pier
CN106049493A (en) * 2016-07-28 2016-10-26 广东省建科建筑设计院有限公司 Anti-corrosion prefabricated grouting anchor rod for highly corrosive environment
CN106381925A (en) * 2016-10-28 2017-02-08 湖南大学 Prefabricated reinforced concrete column and column splice joint with sleeves
CN106592440A (en) * 2016-12-30 2017-04-26 河南省交通规划设计研究院股份有限公司 Construction method of prefabricated segment type pier
CN206521694U (en) * 2017-02-15 2017-09-26 重庆交通大学 A kind of precast pier structure
CN207277176U (en) * 2017-09-28 2018-04-27 中交第一公路勘察设计研究院有限公司 A kind of precast assembly bridge pier attachment device

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6709200B1 (en) * 2002-11-01 2004-03-23 Milton Reynolds Method of constructing the foundation and support structure for elevated transportation systems
KR20100054889A (en) * 2008-11-15 2010-05-26 고려대학교 산학협력단 Development of fabricated internally confined hollow concrete filled tube using corrugated tube
CN101413250A (en) * 2008-11-20 2009-04-22 中铁大桥勘测设计院有限公司 Rabbet type connecting method of cross-sea bridge prefabricated bridge pier and platform
CN201730336U (en) * 2010-03-17 2011-02-02 李明芳 Split bolt sleeve
CN103147391A (en) * 2013-03-29 2013-06-12 东南大学 Corrosion-resistant self-centering bridge pier structure easy for seismic rehabilitation
CN104294753A (en) * 2014-09-06 2015-01-21 安徽省交通建设有限责任公司 Bridge prefabricated hollow pier stud connecting structure and construction method thereof
CN104532740A (en) * 2015-01-21 2015-04-22 宁波大学 Energy-consuming rebar-attached unbonded post-tensioning prestressed concrete filled double-wall steel tube prefabricated assembly bridge pier
CN106049493A (en) * 2016-07-28 2016-10-26 广东省建科建筑设计院有限公司 Anti-corrosion prefabricated grouting anchor rod for highly corrosive environment
CN106381925A (en) * 2016-10-28 2017-02-08 湖南大学 Prefabricated reinforced concrete column and column splice joint with sleeves
CN106592440A (en) * 2016-12-30 2017-04-26 河南省交通规划设计研究院股份有限公司 Construction method of prefabricated segment type pier
CN206521694U (en) * 2017-02-15 2017-09-26 重庆交通大学 A kind of precast pier structure
CN207277176U (en) * 2017-09-28 2018-04-27 中交第一公路勘察设计研究院有限公司 A kind of precast assembly bridge pier attachment device

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442235A (en) * 2018-04-03 2018-08-24 中国建筑第五工程局有限公司 Connecting structure between assembled bridge pier and cushion cap and construction method
CN108457172A (en) * 2018-04-03 2018-08-28 中国建筑第五工程局有限公司 Assembling type girder bridge and construction method
CN108396641A (en) * 2018-04-28 2018-08-14 上海市城市建设设计研究总院(集团)有限公司 Precast assembly bridge pier joint structure
CN108547216B (en) * 2018-06-12 2023-07-11 北京市市政工程设计研究总院有限公司 Bridge precast concrete pier column and bridge foundation tooth key socket structure and construction method
CN108547216A (en) * 2018-06-12 2018-09-18 北京市市政工程设计研究总院有限公司 Bridge prefabrication performance of concrete column confined and bridge foundation alligator bell and spigot frame and construction method
CN109024249A (en) * 2018-08-16 2018-12-18 福建工程学院 A kind of connector uses the spigot-and-socket construction precast assembly bridge pier of cast-in-place UHPC material
CN109024249B (en) * 2018-08-16 2023-10-24 福建工程学院 Socket type structure prefabricated assembly pier with joint made of cast-in-situ UHPC material
CN109162197A (en) * 2018-09-29 2019-01-08 中国建筑第八工程局有限公司 Bridge pier structure and its construction method
CN109403213B (en) * 2018-11-08 2023-09-22 中交第二航务工程局有限公司 Bridge prefabrication pier body installation, positioning and guiding device and construction method thereof
CN109403213A (en) * 2018-11-08 2019-03-01 中交第二航务工程局有限公司 Bridge prefabrication pier shaft installs locating guide device and its construction method
CN110306425A (en) * 2019-06-05 2019-10-08 中铁二院工程集团有限责任公司 The pier bottom construction for bearing the squat pier rigid frame bridge of moment of flexure can significantly be reduced
CN110306425B (en) * 2019-06-05 2024-03-22 中铁二院工程集团有限责任公司 Pier bottom structure of short pier rigid frame bridge capable of greatly reducing bearing bending moment
CN111705630A (en) * 2020-06-01 2020-09-25 上海市城市建设设计研究总院(集团)有限公司 Prefabricated hollow pier with unconnected inner steel bars
CN111705630B (en) * 2020-06-01 2021-09-10 上海市城市建设设计研究总院(集团)有限公司 Prefabricated hollow pier with unconnected inner steel bars
CN112112180A (en) * 2020-08-26 2020-12-22 绍兴文理学院 Connecting system of assembled combined pier and bearing platform and construction method thereof
CN112211045A (en) * 2020-10-19 2021-01-12 中建八局广西建设有限公司 Base plate embedded structure of straddle type monorail traffic and construction method
CN112176886A (en) * 2020-11-16 2021-01-05 山东高速建设管理集团有限公司 Double-steel sleeve socket connection structure of prefabricated bridge pier and construction method thereof
CN112176886B (en) * 2020-11-16 2022-03-22 山东高速建设管理集团有限公司 Double-steel sleeve socket connection structure of prefabricated bridge pier and construction method thereof
CN113668388A (en) * 2021-07-14 2021-11-19 武汉二航路桥特种工程有限责任公司 Pier-beam cooperative integral rapid installation and removal method based on vehicle-mounted equipment
CN113668388B (en) * 2021-07-14 2023-12-19 中交特种工程有限公司 Pier-beam collaborative integral rapid installation and removal method based on vehicle-mounted equipment

Similar Documents

Publication Publication Date Title
CN107806109A (en) Precast assembly bridge pier attachment means and its construction method
CN207277176U (en) A kind of precast assembly bridge pier attachment device
CN109469202A (en) Prestressed assembly integral concrete frame structure system and construction method thereof
CN105735112B (en) Bolt connection-based rapid assembling precast rectangular concrete filled steel tube bridge pier
CN101914952A (en) Connecting joint between hollow steel tube concrete column and steel girder and construction method thereof
CN107476476A (en) One kind is greatly across steel bar truss floor support plate and reinforced beam combination constructing method thereof
CN108412125A (en) A kind of strengthening concrete composite structure frame beam column construction
CN101831875A (en) Precast assembly process of prestressed concrete cylindrical hollow pier
CN103374881A (en) Prefabricated segment assembling pier structure system and construction method thereof
CN205954921U (en) Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area
CN106567458B (en) Assembled steel-is mixed to combine Beam-post Frame Structure system
CN205894313U (en) Prefabricated assembled steel pipe retrains frame node entirely
CN208917657U (en) Prefabricated assembled ultra-high performance concrete prestressing force i-shaped beams
CN106049691A (en) Fully-prefabricated assembling type steel tube constraint frame node
CN106703416A (en) Lifting method of steel structure roof truss pulling bar in narrow space
CN107245953B (en) A kind of crossed construction method of multilayer bridge structure
CN104652242B (en) Derrick connecting structure used for reinforcing PSC (Pre-stressed Concrete) continuous box girder bridge and construction method
CN205712590U (en) A kind of fabricated shear wall and the attachment structure of Prefabricated concrete-filled steel tube post
CN109057148A (en) Ultra-high performance concrete is without regular reinforcement Prestressed U type beam and its construction method
CN108775084B (en) Steel-concrete combined precast beam and precast column connecting structure and construction method
CN110397148A (en) A kind of prefabricated assembled catch pit structure and construction method
CN207062745U (en) A kind of bridge prefabricated abutment pier abutment component entirely
CN109809277A (en) Existing building uses the additional elevator structure of assembled and its construction method
CN113005926A (en) Construction method of mountain area abrupt slope pier reinforcing device
CN108951847A (en) A kind of Precast Concrete Frame system and its construction method based on UHPC

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180316

WW01 Invention patent application withdrawn after publication