CN106381925A - Prefabricated reinforced concrete column and column splice joint with sleeves - Google Patents
Prefabricated reinforced concrete column and column splice joint with sleeves Download PDFInfo
- Publication number
- CN106381925A CN106381925A CN201610960482.4A CN201610960482A CN106381925A CN 106381925 A CN106381925 A CN 106381925A CN 201610960482 A CN201610960482 A CN 201610960482A CN 106381925 A CN106381925 A CN 106381925A
- Authority
- CN
- China
- Prior art keywords
- column
- reinforced concrete
- embedded
- corrugated
- steel bars
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000011150 reinforced concrete Substances 0.000 title claims abstract description 42
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 55
- 239000010959 steel Substances 0.000 claims abstract description 55
- 239000011372 high-strength concrete Substances 0.000 claims abstract description 7
- 230000002787 reinforcement Effects 0.000 claims description 11
- 238000003466 welding Methods 0.000 claims description 5
- 239000004567 concrete Substances 0.000 claims description 4
- 238000003780 insertion Methods 0.000 claims description 3
- 230000037431 insertion Effects 0.000 claims description 3
- 210000003205 muscle Anatomy 0.000 claims 2
- 230000003014 reinforcing effect Effects 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 20
- 230000007613 environmental effect Effects 0.000 abstract description 5
- 238000000034 method Methods 0.000 description 3
- 239000004570 mortar (masonry) Substances 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 239000004566 building material Substances 0.000 description 2
- 238000004134 energy conservation Methods 0.000 description 2
- 239000011440 grout Substances 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000011160 research Methods 0.000 description 2
- 230000001133 acceleration Effects 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000021715 photosynthesis, light harvesting Effects 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/20—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
- E04B1/21—Connections specially adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/20—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
- E04B1/21—Connections specially adapted therefor
- E04B1/215—Connections specially adapted therefor comprising metallic plates or parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
- E04C5/162—Connectors or means for connecting parts for reinforcements
- E04C5/163—Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
- E04C5/165—Coaxial connection by means of sleeves
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
本发明公开了一种采用预埋波纹套管和高强钢筋连接的装配式钢筋混凝土柱与柱的拼接节点,主要包括预制钢筋混凝土上柱、下柱、钢套管、预埋波纹套管和高强钢筋。其中在工厂,先在钢筋混凝土上柱的预埋波纹套管中灌入无收缩自密实高强混凝土后插入高强钢筋的方法实现预埋高强钢筋,而在钢筋混凝土下柱预埋波纹套管。在施工现场,对钢筋混凝土下柱的波纹套管灌浆,将上柱预埋高强钢筋插入到下柱波纹套管中,同时将柱外表面的钢套管连接部位焊接,实现预制钢筋混凝土柱与柱之间的拼接。本发明使用的所有构件均采用现场装配连接,减少了现场绑扎钢筋和支模工作,提高了建筑工业化装配效率,体现了建筑构件环保节能的新型建筑理念。
The invention discloses an assembled reinforced concrete column-to-column splicing node connected by pre-embedded corrugated sleeves and high-strength steel bars, mainly including prefabricated reinforced concrete upper columns, lower columns, steel sleeves, pre-embedded corrugated sleeves and high-strength steel bars. rebar. Among them, in the factory, the pre-embedded high-strength steel bars are realized by pouring non-shrinkage self-compacting high-strength concrete into the pre-embedded corrugated sleeves of the upper reinforced concrete columns, and then inserting high-strength steel bars, while the corrugated sleeves are pre-embedded in the lower reinforced concrete columns. At the construction site, the corrugated casing of the reinforced concrete lower column is grouted, and the pre-embedded high-strength steel bars of the upper column are inserted into the corrugated casing of the lower column. Splicing between columns. All components used in the present invention are assembled and connected on site, which reduces the work of binding steel bars and setting up forms on site, improves the efficiency of building industrial assembly, and embodies the new architectural concept of environmental protection and energy saving of building components.
Description
技术领域technical field
本发明属于工程结构技术领域,具体适用于多高层装配式建筑结构中钢筋混凝土柱与柱之间现场拼接作业领域。The invention belongs to the technical field of engineering structures, and is particularly applicable to the field of on-site splicing operations between reinforced concrete columns in multi-high-rise assembled building structures.
背景技术Background technique
我国建筑施工主要以现场施工为主,这种传统的生产方式工业化程度不高、设计建造比较粗放、建筑产品质量不稳定、建设效率低、劳动力需求量大、材料损耗和建筑垃圾量大、资源和能源消耗较大,不能满足国家“十三五”规划有关节能环保的可持续发展建设要求。my country's building construction is mainly based on on-site construction. This traditional production method is not highly industrialized, the design and construction are relatively extensive, the quality of construction products is unstable, the construction efficiency is low, the demand for labor is large, the loss of materials and the amount of construction waste And energy consumption is relatively large, which cannot meet the sustainable development construction requirements of the national "Thirteenth Five-Year Plan" for energy conservation and environmental protection.
随着我国“建筑工业化、住宅产业化”进程的加快,住宅工业产业化的趋势日渐明显,建筑生产方式也正在进行着一场革命,即逐渐扩大新型装配式建筑的建设,新型装配式钢筋混凝土结构的应用重新成为当前研究热点之一。预制钢筋混凝土柱具有产品质量可控、绿色环保、经济效果显著、大大缩短工期和施工方便。鉴于此,寻求一种建设速度快、建筑材料可回收利用的新型钢筋混凝土柱与柱连接的结构体系,发挥装配式结构的优势,以满足建筑工业化和节能环保需求的问题也越来越突出。发明人对钢筋混凝土柱与柱拼接节点进行了深入研究,遂有本案产生。With the acceleration of the process of "construction industrialization and housing industrialization" in my country, the trend of housing industrialization is becoming more and more obvious, and the construction production method is also undergoing a revolution, that is, gradually expanding the construction of new prefabricated buildings, new prefabricated reinforced concrete The application of structures has become one of the current research hotspots again. The prefabricated reinforced concrete column has the advantages of controllable product quality, green environmental protection, remarkable economic effect, greatly shortened construction period and convenient construction. In view of this, it is becoming more and more prominent to seek a new type of reinforced concrete column-to-column connection structure system with fast construction speed and recyclable building materials, and to take advantage of the prefabricated structure to meet the needs of building industrialization, energy conservation and environmental protection. The inventor has carried out in-depth research on reinforced concrete columns and column splicing joints, so this case is produced.
发明内容Contents of the invention
本发明提供了一种安装便捷高效、构造简单、节能环保的装配式钢筋混凝土柱与柱的拼接节点。The invention provides an assembled reinforced concrete column and column splicing node with convenient and efficient installation, simple structure, energy saving and environmental protection.
本发明是通过以下技术方案实现的:The present invention is achieved through the following technical solutions:
本发明提供了一种采用预埋波纹套管和高强钢筋的装配式钢筋混凝土柱与柱的拼接节点。主要包括预制钢筋混凝土上柱、下柱、钢套管、预埋波纹套管和预埋高强钢筋,其特征在于在钢筋混凝土上柱下横截面纵筋范围内通过波纹套管预埋高强钢筋,而在钢筋混凝土下柱上横截面纵筋范围内预埋波纹套管以预留孔洞,现场在下柱预埋波纹套管内灌入砂浆后,将上柱预埋高强钢筋插入下柱波纹套管中以实现拼接。同时,在上柱和下柱拼接部位的外表面套上钢套管,待灌浆插入高强钢筋后将上下钢套管焊接连接。The invention provides a splicing node between assembled reinforced concrete columns and columns using pre-embedded corrugated sleeves and high-strength steel bars. It mainly includes prefabricated reinforced concrete upper column, lower column, steel casing, pre-embedded corrugated casing and pre-embedded high-strength steel bars, and is characterized in that high-strength steel bars are pre-embedded through corrugated casings within the range of longitudinal bars in the lower cross-section of reinforced concrete upper columns, However, the corrugated casing is pre-embedded within the range of the longitudinal reinforcement of the upper cross-section of the reinforced concrete lower column to reserve holes. After the mortar is poured into the pre-embedded corrugated casing of the lower column on site, the pre-embedded high-strength steel bars of the upper column are inserted into the corrugated casing of the lower column. to achieve splicing. At the same time, a steel casing is placed on the outer surface of the splicing part of the upper column and the lower column, and the upper and lower steel casings are welded and connected after the high-strength steel bars are inserted into the grout.
进一步地,预埋高强钢筋和波纹套管应设置在上下柱同一位置纵筋范围内的相同位置,以保证上下纵筋不错位,且便于现场灌浆插入。Furthermore, the pre-embedded high-strength steel bars and corrugated casings should be set at the same position within the range of the longitudinal bars at the same position of the upper and lower columns, so as to ensure that the upper and lower longitudinal bars are not misaligned, and to facilitate on-site grouting insertion.
进一步地,为了保证高强钢筋的抗剪承载力能充分发挥作用,在垂直于柱轴线方向,预埋波纹套管的间距应满足相关规范和构造要求。Furthermore, in order to ensure that the shear bearing capacity of the high-strength steel bars can fully play its role, the spacing of the pre-embedded corrugated sleeves in the direction perpendicular to the column axis should meet the relevant specifications and construction requirements.
进一步地,在钢筋混凝土下柱的预埋波纹套管中灌入无收缩自密实高强混凝土,将上柱预埋高强钢筋插入下柱波纹套管中。所述无收缩自密实高强混凝土,其强度等级不低于预制钢筋混凝土柱的混凝土强度等级。Further, non-shrinkage self-compacting high-strength concrete is poured into the pre-embedded corrugated casing of the lower reinforced concrete column, and the pre-embedded high-strength steel bars of the upper column are inserted into the corrugated casing of the lower column. The strength grade of the non-shrinkage self-compacting high-strength concrete is not lower than the concrete strength grade of the prefabricated reinforced concrete column.
进一步地,在钢筋混凝土柱拼接部位外表面的上下钢套管进行坡口焊实现连接,焊缝的强度不低于钢套管的强度。Further, groove welding is performed on the upper and lower steel sleeves on the outer surface of the reinforced concrete column joint to realize the connection, and the strength of the weld is not lower than that of the steel sleeve.
进一步地,对柱拼接部位钢套管内设置拉结钢筋,拉结钢筋质量和强度应满足相关规范和构造要求。Furthermore, tie reinforcements are set in the steel sleeves at the joints of the columns, and the quality and strength of the tie reinforcements should meet the relevant specifications and construction requirements.
所述装配式钢筋混凝土柱与柱的拼接节点可实现建设速度快、建筑材料可回收利用的功能。The assembled reinforced concrete column and the splicing node of the column can realize the functions of fast construction speed and recyclable building materials.
与现有技术相比,本发明的有益效果是:Compared with prior art, the beneficial effect of the present invention is:
1、本发明采用预埋波纹套管、预埋高强钢筋和柱端钢套管实现钢筋混凝土柱与柱的连接。柱端钢套管的作用是局部混凝土加强、约束波纹套管和增加柱的抗弯性能,钢套管内设置拉结钢筋作用是增强钢套管的加固强度。1. The present invention uses pre-embedded corrugated sleeves, pre-embedded high-strength steel bars and column-end steel sleeves to realize the connection between reinforced concrete columns and columns. The role of the steel sleeve at the end of the column is to strengthen the local concrete, restrain the corrugated sleeve and increase the bending resistance of the column.
2、所有构件均在工厂预制完成,运输至施工工地后,可在施工现场装配连接,减少了现场绑扎钢筋和支模工作,保证了现场施工质量,提高了建筑工业化装配效率。2. All components are prefabricated in the factory. After transported to the construction site, they can be assembled and connected at the construction site, which reduces the work of binding steel bars and formwork on site, ensures the quality of site construction, and improves the efficiency of building industrial assembly.
3、本发明将钢筋混凝土上柱预埋高强钢筋插入下柱灌满砂浆的波纹套管中,对柱钢套管进行坡口焊接,使钢筋混凝土上柱和下柱形成一个整体后共同受力,使其耗能能力和延性更加优越,即使在罕遇地震后其修复和更换代价也会较小。3. In the present invention, the pre-embedded high-strength steel bars of the reinforced concrete upper column are inserted into the corrugated casing filled with mortar in the lower column, and the steel casing of the column is groove-welded, so that the reinforced concrete upper column and the lower column form a whole and then bear the force together , so that its energy dissipation capacity and ductility are superior, and its repair and replacement costs will be relatively small even after rare earthquakes.
下面结合附图对本发明作进一步阐述。The present invention will be further elaborated below in conjunction with the accompanying drawings.
附图说明Description of drawings
图1为本发明钢筋混凝土柱预埋高强钢筋和波纹套管;Fig. 1 is the pre-embedded high-strength steel bar and corrugated casing of reinforced concrete column of the present invention;
图2为本发明下柱波纹套管中灌入无收缩自密实高强混凝土;Fig. 2 shows that the non-shrinkage self-compacting high-strength concrete is poured into the corrugated casing of the lower column of the present invention;
图3为本发明上柱预埋高强钢筋插入到下柱波纹套管中;Fig. 3 shows that the pre-embedded high-strength steel bar of the upper column of the present invention is inserted into the corrugated casing of the lower column;
图4为本发明钢套管进行坡口焊接;Fig. 4 carries out groove welding for steel casing of the present invention;
图5为本发明钢套管的透视图;Fig. 5 is the perspective view of steel casing of the present invention;
图6为本发明钢筋混凝土上柱的透视图;Fig. 6 is the perspective view of reinforced concrete column of the present invention;
图7为本发明钢筋混凝土下柱的透视图。Fig. 7 is a perspective view of the reinforced concrete lower column of the present invention.
在图中:In the picture:
1-预埋高强钢筋,2-钢套管,3-预埋波纹套管,1-Pre-embedded high-strength steel bars, 2-Steel casing, 3-Pre-embedded corrugated casing,
4-预制钢筋混凝土上柱,5-预制钢筋混凝土下柱,6-纵筋,4- prefabricated reinforced concrete upper column, 5- prefabricated reinforced concrete lower column, 6- longitudinal bar,
7-灌入无收缩自密实高强混凝土,8-坡口,9-坡口焊缝,7-Pour non-shrinkage self-compacting high-strength concrete, 8-groove, 9-groove weld,
10-拉结钢筋。10- tie reinforcement.
具体实施方式detailed description
本发明技术方案具体为,提供一种可快速组装的装配式钢筋混凝土柱与柱的拼接节点,结构体系主要构件包括高强钢筋1、钢套管2、预埋波纹套管3、预制钢筋混凝土上柱4和下柱5。本发明结构的安装方法为:Specifically, the technical solution of the present invention is to provide a splicing joint between a prefabricated reinforced concrete column and a column that can be quickly assembled. The main components of the structural system include high-strength steel bars 1, steel sleeves 2, pre-embedded Column 4 and lower column 5. The installation method of structure of the present invention is:
1、除现场需要对钢筋混凝土下柱5内波纹套管3灌浆7插入钢筋混凝土上柱4高强钢筋1和对钢套管2连接部位坡口8进行坡口焊9外,所有组成构件均在工厂预制完成,其中预埋高强钢筋1和波纹套管3应满足规范和构造要求。预埋波纹套管3是在浇筑钢筋混凝土柱之前,和纵筋6一起提前固定好位置的;预埋高强钢筋1是对钢筋混凝土上柱4的波纹套管3灌浆,将高强钢筋1插入到上柱4的波纹套管3中实现的,预埋高强钢筋1应和预埋波纹套管3相对应和配套(图1所示);1. In addition to the grouting 7 of the inner corrugated casing 3 of the reinforced concrete lower column 5, the insertion of the high-strength steel bar 1 of the reinforced concrete upper column 4 and the groove welding 9 of the groove 8 of the connection part of the steel casing 2, all components are in the Factory prefabrication is completed, among which the pre-embedded high-strength steel bars 1 and corrugated casing 3 should meet the specifications and construction requirements. The pre-embedded corrugated sleeve 3 is fixed in place together with the longitudinal reinforcement 6 before pouring the reinforced concrete column; the pre-embedded high-strength steel bar 1 is grouted to the corrugated sleeve 3 of the reinforced concrete upper column 4, and the high-strength steel bar 1 is inserted into the Realized in the corrugated sleeve 3 of the upper column 4, the pre-embedded high-strength steel bar 1 should correspond to and match with the pre-embedded corrugated sleeve 3 (as shown in Figure 1);
2、对钢筋混凝土下柱5的预埋波纹套管3进行灌浆7,灌入的砂浆为无收缩自密实高强混凝土,将钢筋混凝土上柱4的预埋高强钢筋1插入下柱5的波纹套管3中(图2和图3所示);2. Grout 7 the pre-embedded corrugated casing 3 of the reinforced concrete lower column 5, the poured mortar is non-shrinkage self-compacting high-strength concrete, insert the pre-embedded high-strength steel bar 1 of the reinforced concrete upper column 4 into the corrugated sleeve of the lower column 5 In the tube 3 (shown in Figure 2 and Figure 3);
3、对预制混凝土柱与柱拼接部位的钢套管坡口8进行坡口焊9,使得钢筋混凝土上柱4和下柱5成为整体(图4所示)。同时,钢套管内设置拉结钢筋10,作用是增强钢套管的加固强度(图5所示)。3. Groove welding 9 is performed on the groove 8 of the steel casing at the splicing part of the precast concrete column and the column, so that the reinforced concrete upper column 4 and the lower column 5 are integrated (as shown in FIG. 4 ). At the same time, the steel casing is provided with tie bars 10 to enhance the reinforcement strength of the steel casing (as shown in FIG. 5 ).
上述实施例和图示并非限定本发明专利的产品形态和式样,任何所属技术领域的普通技术人员对其所做的适当变化或修饰,皆应视为不脱离本发明专利的专利范畴。The above-mentioned embodiments and diagrams do not limit the product form and style of the patent of the present invention, and any appropriate changes or modifications made by those skilled in the art shall be deemed as not departing from the scope of the patent of the present invention.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610960482.4A CN106381925A (en) | 2016-10-28 | 2016-10-28 | Prefabricated reinforced concrete column and column splice joint with sleeves |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610960482.4A CN106381925A (en) | 2016-10-28 | 2016-10-28 | Prefabricated reinforced concrete column and column splice joint with sleeves |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN106381925A true CN106381925A (en) | 2017-02-08 |
Family
ID=57957218
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610960482.4A Pending CN106381925A (en) | 2016-10-28 | 2016-10-28 | Prefabricated reinforced concrete column and column splice joint with sleeves |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106381925A (en) |
Cited By (24)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106865387A (en) * | 2017-03-09 | 2017-06-20 | 广东易佳梯科技有限公司 | A prefabricated elevator shaft |
| CN107060081A (en) * | 2017-04-21 | 2017-08-18 | 福州市川普建筑产业化有限公司 | Precast prestressed concrete column system and its application method |
| CN107254884A (en) * | 2017-07-28 | 2017-10-17 | 湖南大学 | A kind of detachable prefabricated assembled concrete-filled steel square tubular column pin node |
| CN107386434A (en) * | 2017-09-12 | 2017-11-24 | 南京清骐筑宇建筑科技有限公司 | A kind of novel fabricated attachment structure of concrete column and concrete column |
| CN107419803A (en) * | 2017-06-27 | 2017-12-01 | 湖南大学 | A kind of assembled architecture ultra-high performance concrete post component and its construction method |
| CN107460994A (en) * | 2017-08-30 | 2017-12-12 | 河北建筑工程学院 | Assembled steel tube high-strength concrete column and its construction method |
| CN107795011A (en) * | 2017-10-30 | 2018-03-13 | 河北地质大学 | A kind of prefabricated assembled RC posts inflection point contraposition connection method |
| CN107806109A (en) * | 2017-09-28 | 2018-03-16 | 中交第公路勘察设计研究院有限公司 | Precast assembly bridge pier attachment means and its construction method |
| CN107816128A (en) * | 2017-10-30 | 2018-03-20 | 河北地质大学 | A kind of prefabricated assembled RC posts inflection point contraposition attachment means |
| CN107859248A (en) * | 2017-11-02 | 2018-03-30 | 湖南大学 | A kind of prefabricated concrete structure jointing and connection method |
| CN108189221A (en) * | 2018-01-25 | 2018-06-22 | 华北水利水电大学 | Enhancement Method and the mold of the test block is made in regenerative pervious concrete test block |
| CN109083275A (en) * | 2018-09-10 | 2018-12-25 | 西北民族大学 | Prefabricated post and integral preform beam slab assembly node and its construction method |
| CN109098352A (en) * | 2018-10-24 | 2018-12-28 | 张云天 | A kind of prefabricated assembled steel core concrete column connected structure part and its construction method |
| CN110468681A (en) * | 2019-08-21 | 2019-11-19 | 无锡市锡山三建实业有限公司 | A kind of unit construction bridge girder construction and construction method |
| CN110565813A (en) * | 2019-08-29 | 2019-12-13 | 郑州大学 | Wood structure building column plate connecting structure |
| CN112575896A (en) * | 2020-12-29 | 2021-03-30 | 中铁三局集团建筑安装工程有限公司 | Complex steel reinforced concrete composite structure and construction method |
| CN112922233A (en) * | 2021-01-27 | 2021-06-08 | 海南大学 | Reinforced concrete prefabricated column and construction method thereof |
| CN113152669A (en) * | 2021-03-22 | 2021-07-23 | 河北工业大学 | Assembly type reinforced concrete column and column splicing structure and method |
| CN113216397A (en) * | 2021-05-19 | 2021-08-06 | 西华大学 | Novel splicing mode of assembled GFRP (glass fiber reinforced plastic) pipe concrete column |
| CN114457957A (en) * | 2020-11-10 | 2022-05-10 | 内蒙古中朵远大建筑工业有限公司 | Prefabricated frame post and prefabricated building |
| CN117051968A (en) * | 2023-07-04 | 2023-11-14 | 华中科技大学 | Construction method of assembly joints in prefabricated reinforced concrete frame columns |
| CN118207961A (en) * | 2024-04-23 | 2024-06-18 | 淮阴工学院 | A prefabricated concrete beam-column joint |
| US12234633B2 (en) * | 2022-11-10 | 2025-02-25 | Hainan University | Prefabricated reinforced concrete beam-column connecting structure and construction method thereof |
| CN119778178A (en) * | 2025-01-24 | 2025-04-08 | 同济大学 | Concrete tower segment joint reinforcement device and construction method |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2003268878A (en) * | 2002-03-18 | 2003-09-25 | Kajima Corp | Beam-column joint structure |
| CN103938800A (en) * | 2014-04-12 | 2014-07-23 | 北京工业大学 | Reinforced concrete column with different unbonded end lengths |
| CN104775516A (en) * | 2015-02-16 | 2015-07-15 | 清华大学 | Field connecting method among prefabricated reinforced concrete columns |
| CN205000554U (en) * | 2015-09-25 | 2016-01-27 | 赵洪波 | A concrete column for assembling overall structure |
| CN205476074U (en) * | 2016-01-11 | 2016-08-17 | 华侨大学 | Assembled steel pipe concrete combination column |
-
2016
- 2016-10-28 CN CN201610960482.4A patent/CN106381925A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2003268878A (en) * | 2002-03-18 | 2003-09-25 | Kajima Corp | Beam-column joint structure |
| CN103938800A (en) * | 2014-04-12 | 2014-07-23 | 北京工业大学 | Reinforced concrete column with different unbonded end lengths |
| CN104775516A (en) * | 2015-02-16 | 2015-07-15 | 清华大学 | Field connecting method among prefabricated reinforced concrete columns |
| CN205000554U (en) * | 2015-09-25 | 2016-01-27 | 赵洪波 | A concrete column for assembling overall structure |
| CN205476074U (en) * | 2016-01-11 | 2016-08-17 | 华侨大学 | Assembled steel pipe concrete combination column |
Cited By (26)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106865387A (en) * | 2017-03-09 | 2017-06-20 | 广东易佳梯科技有限公司 | A prefabricated elevator shaft |
| CN107060081A (en) * | 2017-04-21 | 2017-08-18 | 福州市川普建筑产业化有限公司 | Precast prestressed concrete column system and its application method |
| CN107419803A (en) * | 2017-06-27 | 2017-12-01 | 湖南大学 | A kind of assembled architecture ultra-high performance concrete post component and its construction method |
| CN107254884A (en) * | 2017-07-28 | 2017-10-17 | 湖南大学 | A kind of detachable prefabricated assembled concrete-filled steel square tubular column pin node |
| CN107460994A (en) * | 2017-08-30 | 2017-12-12 | 河北建筑工程学院 | Assembled steel tube high-strength concrete column and its construction method |
| CN107386434A (en) * | 2017-09-12 | 2017-11-24 | 南京清骐筑宇建筑科技有限公司 | A kind of novel fabricated attachment structure of concrete column and concrete column |
| CN107806109A (en) * | 2017-09-28 | 2018-03-16 | 中交第公路勘察设计研究院有限公司 | Precast assembly bridge pier attachment means and its construction method |
| CN107795011A (en) * | 2017-10-30 | 2018-03-13 | 河北地质大学 | A kind of prefabricated assembled RC posts inflection point contraposition connection method |
| CN107816128A (en) * | 2017-10-30 | 2018-03-20 | 河北地质大学 | A kind of prefabricated assembled RC posts inflection point contraposition attachment means |
| CN107859248A (en) * | 2017-11-02 | 2018-03-30 | 湖南大学 | A kind of prefabricated concrete structure jointing and connection method |
| CN108189221A (en) * | 2018-01-25 | 2018-06-22 | 华北水利水电大学 | Enhancement Method and the mold of the test block is made in regenerative pervious concrete test block |
| CN109083275A (en) * | 2018-09-10 | 2018-12-25 | 西北民族大学 | Prefabricated post and integral preform beam slab assembly node and its construction method |
| CN109098352A (en) * | 2018-10-24 | 2018-12-28 | 张云天 | A kind of prefabricated assembled steel core concrete column connected structure part and its construction method |
| CN109098352B (en) * | 2018-10-24 | 2024-02-23 | 张云天 | Prefabricated assembled steel pipe concrete column splicing structural member and construction method thereof |
| CN110468681A (en) * | 2019-08-21 | 2019-11-19 | 无锡市锡山三建实业有限公司 | A kind of unit construction bridge girder construction and construction method |
| CN110565813A (en) * | 2019-08-29 | 2019-12-13 | 郑州大学 | Wood structure building column plate connecting structure |
| CN114457957A (en) * | 2020-11-10 | 2022-05-10 | 内蒙古中朵远大建筑工业有限公司 | Prefabricated frame post and prefabricated building |
| CN112575896B (en) * | 2020-12-29 | 2022-03-29 | 中铁三局集团建筑安装工程有限公司 | Complex steel reinforced concrete composite structure and construction method |
| CN112575896A (en) * | 2020-12-29 | 2021-03-30 | 中铁三局集团建筑安装工程有限公司 | Complex steel reinforced concrete composite structure and construction method |
| CN112922233A (en) * | 2021-01-27 | 2021-06-08 | 海南大学 | Reinforced concrete prefabricated column and construction method thereof |
| CN113152669A (en) * | 2021-03-22 | 2021-07-23 | 河北工业大学 | Assembly type reinforced concrete column and column splicing structure and method |
| CN113216397A (en) * | 2021-05-19 | 2021-08-06 | 西华大学 | Novel splicing mode of assembled GFRP (glass fiber reinforced plastic) pipe concrete column |
| US12234633B2 (en) * | 2022-11-10 | 2025-02-25 | Hainan University | Prefabricated reinforced concrete beam-column connecting structure and construction method thereof |
| CN117051968A (en) * | 2023-07-04 | 2023-11-14 | 华中科技大学 | Construction method of assembly joints in prefabricated reinforced concrete frame columns |
| CN118207961A (en) * | 2024-04-23 | 2024-06-18 | 淮阴工学院 | A prefabricated concrete beam-column joint |
| CN119778178A (en) * | 2025-01-24 | 2025-04-08 | 同济大学 | Concrete tower segment joint reinforcement device and construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108049498B (en) | Prefabricated column and prefabricated beam connection structure and method of prefabricated building frame structure | |
| CN107299683B (en) | Duplex concrete-filled steel tubular column assembled butt joint and connection method | |
| CN106968360A (en) | A kind of prefabricated hollow formula opens perps concrete shear force wall | |
| CN208486364U (en) | Frame structure system | |
| CN207063153U (en) | A sleeve-grouting reinforced concrete prefabricated beam-column joint | |
| CN103924710B (en) | Low layer assembled combined wall house Plate Welding node structure | |
| CN206144032U (en) | Mosaic structure of assembled steel core concrete column and post | |
| CN104481031B (en) | Assembly connection structure and method of coupling beams of shear walls of assembly concrete frame shear structure | |
| CN106400982A (en) | Stirrup-densified splicing joint for fabricated reinforced concrete columns | |
| CN108951952A (en) | Concrete filled steel tube precast shear wall plate perps connecting node and assembly method | |
| CN108487453B (en) | A kind of connection structure of steel tube concrete column and reinforced concrete beam and its connection method | |
| CN204850069U (en) | Prefabricated beam column connected node among assembled concrete building | |
| CN106760054B (en) | Prefabricated reinforced concrete shear walls | |
| CN113719029A (en) | Assembly type beam-column connecting joint based on hidden corbels and construction method thereof | |
| CN104775555B (en) | A kind of T-shaped composite plate shear wall edge member and attaching method thereof | |
| CN209260897U (en) | Combined connection node of fabricated concrete beam-column sleeve | |
| CN206844316U (en) | A kind of assembled steel reinforced concrete column with well and post splicing node | |
| CN205046677U (en) | Assembled concrete frame nodal connection structure | |
| CN106437032A (en) | Assembled concrete filled steel tubular column splicing structure and method | |
| CN103711232B (en) | L-shaped frame component and lightweight concrete wall prefabricated type shear wall and connection construction method | |
| CN202466890U (en) | Prefabricated concrete-filled steel tube lateral frame shear wall | |
| CN207063226U (en) | Precast reinforced concrete shear wall | |
| CN209958493U (en) | A C-shaped thin-walled steel connection node of an assembled shear wall | |
| CN206752693U (en) | A kind of assembled steel reinforced concrete column of stirrup encryption and post splicing node | |
| CN104948202B (en) | The rapid-result assembled prefabricated components of a kind of tunnel mid-board |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170208 |
|
| WD01 | Invention patent application deemed withdrawn after publication |