CN106381925A - Prefabricated reinforced concrete column and column splice joint with sleeves - Google Patents
Prefabricated reinforced concrete column and column splice joint with sleeves Download PDFInfo
- Publication number
- CN106381925A CN106381925A CN201610960482.4A CN201610960482A CN106381925A CN 106381925 A CN106381925 A CN 106381925A CN 201610960482 A CN201610960482 A CN 201610960482A CN 106381925 A CN106381925 A CN 106381925A
- Authority
- CN
- China
- Prior art keywords
- column
- reinforced concrete
- post
- buried
- concrete column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/20—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
- E04B1/21—Connections specially adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/20—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
- E04B1/21—Connections specially adapted therefor
- E04B1/215—Connections specially adapted therefor comprising metallic plates or parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
- E04C5/162—Connectors or means for connecting parts for reinforcements
- E04C5/163—Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
- E04C5/165—Coaxial connection by means of sleeves
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention discloses a prefabricated reinforced concrete column and column splice joint adopting connection of embedded corrugated sleeves and high-strength reinforcement. The splice joint mainly comprises a prefabricated reinforced concrete upper column, a prefabricated reinforced concrete lower column, steel sleeves, the embedded corrugated sleeves and the high-strength reinforcement. An installation method of the splice joint comprises the following steps: in a factory, realizing the embedded high-strength reinforcement by a method of firstly pouring non-shrinkage self-compacting high-strength concrete into the embedded corrugated sleeves of the prefabricated reinforced concrete upper column and then inserting the high-strength reinforcement; and at the construction site, grouting the corrugated sleeves of the reinforced concrete lower column, inserting the embedded high-strength reinforcement of the upper column in the corrugated sleeves of the lower column and simultaneously welding the steel sleeve joint parts on the outer surfaces of the columns, thus realizing prefabricated reinforced concrete column and column splicing. The splice joint has the beneficial effects that all the used components are assembled and connected on the site, thus reducing reinforcement assembling and formwork supporting on the site, improving the building industrial assembly efficiency and reflecting the novel building concepts of environment friendliness and energy saving of building components.
Description
Technical field
The invention belongs to engineering structure technical field, it is particularly applicable to armored concrete in many high level assembled arthitecutral structures
Splicing field of operation in scene between post and post.
Background technology
, mainly based on site operation, this traditional mode of production industrialization degree is not high, design for China's construction
Build that more extensive, building products quality is unstable, construction efficiency is low, amount of labour demanded is big, spillage of material and building waste
Amount is big, resource is larger with energy resource consumption it is impossible to meet the Sustainable Development Construction about energy-conserving and environment-protective for national " 13 " planning
Require.
With the quickening of China's " building industrialization, housing industrialization " process, the trend day of housing industry industrialization gets brighter
Aobvious, architecture production mode is also carrying out a revolution, gradually expands the construction of novel fabricated building, novel fabricated
The application of reinforced concrete structure becomes one of current research focus again.Prefabricated reinforced concrete column has product quality can
Control, environmental protection, obvious economic, greatly shorten duration and easy construction.In consideration of it, seeking that a kind of construction speed is fast, building
Build the structural system that the novel reinforced concrete post of material recoverable is connected with post, play the advantage of fabricated construction, with
Meet building industrialization and the problem of energy-conserving and environment-protective demand is also more and more prominent.Inventor is to reinforced column and post splicing section
Point has made intensive studies, and then has this case to produce.
Content of the invention
The invention provides a kind of install convenient efficiently, simple structure, the assembled steel reinforced concrete column of energy-conserving and environment-protective with
The splicing node of post.
The present invention is achieved by the following technical solutions:
The invention provides a kind of assembled steel reinforced concrete column using pre-buried corrugated bushing and high tensile reinforcement and post
Splicing node.Main inclusion prefabricated reinforced concrete upper prop, lower prop, steel thimble, pre-buried corrugated bushing and pre-buried high tensile reinforcement, its
It is characterised by indulging in armored concrete upper prop down cross-sectional and passes through the pre-buried high tensile reinforcement of corrugated bushing in the range of muscle, and mix in reinforcing bar
Solidifying soil lower prop cross section indulges pre-buried corrugated bushing in the range of muscle, and, with reserving hole, scene pours in the pre-buried corrugated bushing of lower prop
After mortar, pre-buried for upper prop high tensile reinforcement is inserted in lower prop corrugated bushing to realize splicing.Meanwhile, in upper prop and lower prop stitching section
The outer surface of position puts steel thimble, is welded to connect upper and lower steel thimble after grouting insertion high tensile reinforcement.
Further, pre-buried high tensile reinforcement and corrugated bushing should be arranged on upper lower prop same position indulge identical in the range of muscle
Position, to ensure that indulging muscle up and down does not misplace, and is easy to scene grouting insertion.
Further, in order to the shear-carrying capacity ensureing high tensile reinforcement can play one's part to the full, perpendicular to mast axis side
To the spacing of pre-buried corrugated bushing should meet related specifications and detailing requiments.
Further, pour into ungauged regions self-compacting high-strength concrete in the pre-buried corrugated bushing of armored concrete lower prop,
Pre-buried for upper prop high tensile reinforcement is inserted in lower prop corrugated bushing.Described ungauged regions self-compacting high-strength concrete, its strength grade is not
Strength grade of concrete less than prefabricated reinforced concrete column.
Further, the steel thimble up and down splicing position outer surface in reinforced column carries out groove welding and realizes connecting,
The intensity of weld seam is not less than the intensity of steel thimble.
Further, steel tie is set in the steel thimble of post splicing position, steel tie quality and intensity should meet phase
Close specification and detailing requiments.
Described assembled steel reinforced concrete column is fast with the achievable construction speed of the splicing node of post, the recyclable profit of construction material
Function.
Compared with prior art, the invention has the beneficial effects as follows:
1st, the present invention realizes reinforced column and post using pre-buried corrugated bushing, pre-buried high tensile reinforcement and styletable steel thimble
Connection.The effect of styletable steel thimble is the anti-bending strength that local concrete is strengthened, constrained corrugated bushing and increase post, steel thimble
Interior setting steel tie effect is the fastening strength strengthening steel thimble.
2nd, all components are all prefabricated in the factory and complete, and transport to construction site, can assembly connection at the construction field (site), reduce
Live assembling reinforcement and formwork work it is ensured that site operation quality, improve building industrialization efficiency of assembling.
3rd, pre-buried for armored concrete upper prop high tensile reinforcement insertion lower prop is filled in the corrugated bushing of mortar by the present invention, to post
Steel thimble carries out groove welding, makes armored concrete upper prop and lower prop form common stress after an entirety so as to energy dissipation capacity
More superior with ductility, even if it is repaired and replacing cost also can be less after rarely occurred earthquake.
The present invention is further elaborated below in conjunction with the accompanying drawings.
Brief description
Fig. 1 is the pre-buried high tensile reinforcement of reinforced column of the present invention and corrugated bushing;
Fig. 2 is to pour into ungauged regions self-compacting high-strength concrete in lower prop corrugated bushing of the present invention;
Fig. 3 is inserted in lower prop corrugated bushing for the pre-buried high tensile reinforcement of upper prop of the present invention;
Fig. 4 carries out groove welding for steel thimble of the present invention;
Fig. 5 is the perspective view of steel thimble of the present invention;
Fig. 6 is the perspective view of armored concrete upper prop of the present invention;
Fig. 7 is the perspective view of armored concrete lower prop of the present invention.
In in figure:
The pre-buried high tensile reinforcement of 1-, 2- steel thimble, the pre-buried corrugated bushing of 3-,
4- prefabricated reinforced concrete upper prop, 5- prefabricated reinforced concrete lower prop, 6- indulges muscle,
7- pours into ungauged regions self-compacting high-strength concrete, 8- groove, 9- groove weld,
10- steel tie.
Specific embodiment
Technical solution of the present invention is specifically, provide the splicing of a kind of assembled steel reinforced concrete column that can quickly assemble and post
Node, structural system main member includes high tensile reinforcement 1, steel thimble 2, pre-buried corrugated bushing 3, prefabricated reinforced concrete upper prop 4
With lower prop 5.The installation method of present configuration is:
1st, except scene need in armored concrete lower prop 5 corrugated bushing 3 grouting 7 insertion armored concrete upper props 4 high-strength
Reinforcing bar 1 and carry out outside groove welding 9 to steel thimble 2 connecting portion groove 8, all composition components are all prefabricated in the factory and complete, wherein
Pre-buried high tensile reinforcement 1 and corrugated bushing 3 should meet specification and detailing requiments.Pre-buried corrugated bushing 3 is in pouring reinforcement concrete
Before post, fix good position together with vertical muscle 6 in advance;Pre-buried high tensile reinforcement 1 is the corrugated bushing to armored concrete upper prop 4
3 grouting, high tensile reinforcement 1 are inserted into realization in the corrugated bushing 3 of upper prop 4, pre-buried high tensile reinforcement 1 should be with pre-buried corrugated bushing
3 corresponding and supporting (shown in Fig. 1);
2nd, the pre-buried corrugated bushing 3 of armored concrete lower prop 5 is carried out being in the milk with 7, the mortar pouring into is ungauged regions self-compaction
High-strength concrete, the pre-buried high tensile reinforcement 1 of armored concrete upper prop 4 is inserted (Fig. 2 and Fig. 3 institute in the corrugated bushing 3 of lower prop 5
Show);
3rd, the steel bushing pipe bevel 8 splicing position to precast concrete column and post carries out groove welding 9 so that on armored concrete
Post 4 and lower prop 5 are integrally formed (shown in Fig. 4).Meanwhile, setting steel tie 10 in steel thimble, effect is to strengthen steel thimble to add
Tenacity (shown in Fig. 5).
The product form of above-described embodiment and diagram non-limiting patent of the present invention and style, any art
Suitable change or modification that those of ordinary skill is done to it, all should be regarded as the patent category without departing from patent of the present invention.
Claims (6)
1. a kind of assembled steel reinforced concrete column using pre-buried corrugated bushing and high tensile reinforcement and the splicing node of post, mainly wrap
Include prefabricated reinforced concrete column, steel thimble, pre-buried high tensile reinforcement and corrugated bushing it is characterised in that to reinforced column and post
Splicing realize can assembling;Wherein, pre-buried high tensile reinforcement and corrugated bushing should be arranged on lower prop same position and indulge muscle scope
Interior same position, to ensure that indulging muscle up and down does not misplace, and is easy to scene grouting insertion.
2. the splicing node of a kind of assembled steel reinforced concrete column according to claim 1 and post is it is characterised in that described
Steel thimble and reinforced column are prefabricated in the factory as integrated member, and its bonding strength is not less than intensity of reinforced column etc.
Level.
3. the splicing node of a kind of assembled steel reinforced concrete column according to claim 1 and post is it is characterised in that described
Pour into ungauged regions self-compacting high-strength concrete in pre-buried corrugated bushing, its strength grade is not less than concrete of concrete column etc.
Level.
4. the splicing node of a kind of assembled steel reinforced concrete column according to claim 1 and post is it is characterised in that described
Groove welding is carried out to steel thimble connecting portion, weldquality should meet related specifications and detailing requiments.
5. the splicing node of a kind of assembled steel reinforced concrete column according to claim 1 and post is it is characterised in that described
Steel thimble inside is carried out with reinforcing bar drawknot, steel tie quality and intensity should meet related specifications and detailing requiments.
6. according to claim 1 in order to the shear-carrying capacity ensureing pre-buried high tensile reinforcement can play one's part to the full, vertical
In mast axis direction, the spacing of pre-buried corrugated bushing and high tensile reinforcement and depth should meet related specifications and detailing requiments.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610960482.4A CN106381925A (en) | 2016-10-28 | 2016-10-28 | Prefabricated reinforced concrete column and column splice joint with sleeves |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610960482.4A CN106381925A (en) | 2016-10-28 | 2016-10-28 | Prefabricated reinforced concrete column and column splice joint with sleeves |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106381925A true CN106381925A (en) | 2017-02-08 |
Family
ID=57957218
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610960482.4A Pending CN106381925A (en) | 2016-10-28 | 2016-10-28 | Prefabricated reinforced concrete column and column splice joint with sleeves |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106381925A (en) |
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106865387A (en) * | 2017-03-09 | 2017-06-20 | 广东易佳梯科技有限公司 | A kind of elevator hoistways prefabricated component |
CN107060081A (en) * | 2017-04-21 | 2017-08-18 | 福州市川普建筑产业化有限公司 | Precast prestressed concrete column system and its application method |
CN107254884A (en) * | 2017-07-28 | 2017-10-17 | 湖南大学 | A kind of detachable prefabricated assembled concrete-filled steel square tubular column pin node |
CN107386434A (en) * | 2017-09-12 | 2017-11-24 | 南京清骐筑宇建筑科技有限公司 | A kind of novel fabricated attachment structure of concrete column and concrete column |
CN107419803A (en) * | 2017-06-27 | 2017-12-01 | 湖南大学 | A kind of assembled architecture ultra-high performance concrete post component and its construction method |
CN107460994A (en) * | 2017-08-30 | 2017-12-12 | 河北建筑工程学院 | Assembled steel tube high-strength concrete column and its construction method |
CN107795011A (en) * | 2017-10-30 | 2018-03-13 | 河北地质大学 | A kind of prefabricated assembled RC posts inflection point contraposition connection method |
CN107806109A (en) * | 2017-09-28 | 2018-03-16 | 中交第公路勘察设计研究院有限公司 | Precast assembly bridge pier attachment means and its construction method |
CN107816128A (en) * | 2017-10-30 | 2018-03-20 | 河北地质大学 | A kind of prefabricated assembled RC posts inflection point contraposition attachment means |
CN107859248A (en) * | 2017-11-02 | 2018-03-30 | 湖南大学 | A kind of prefabricated concrete structure jointing and connection method |
CN108189221A (en) * | 2018-01-25 | 2018-06-22 | 华北水利水电大学 | Enhancement Method and the mold of the test block is made in regenerative pervious concrete test block |
CN109083275A (en) * | 2018-09-10 | 2018-12-25 | 西北民族大学 | Prefabricated post and integral preform beam slab assembly node and its construction method |
CN109098352A (en) * | 2018-10-24 | 2018-12-28 | 张云天 | A kind of prefabricated assembled steel core concrete column connected structure part and its construction method |
CN110468681A (en) * | 2019-08-21 | 2019-11-19 | 无锡市锡山三建实业有限公司 | A kind of unit construction bridge girder construction and construction method |
CN110565813A (en) * | 2019-08-29 | 2019-12-13 | 郑州大学 | Wood structure building column plate connecting structure |
CN112575896A (en) * | 2020-12-29 | 2021-03-30 | 中铁三局集团建筑安装工程有限公司 | Complex steel reinforced concrete composite structure and construction method |
CN112922233A (en) * | 2021-01-27 | 2021-06-08 | 海南大学 | Reinforced concrete prefabricated column and construction method thereof |
CN113152669A (en) * | 2021-03-22 | 2021-07-23 | 河北工业大学 | Assembly type reinforced concrete column and column splicing structure and method |
CN113216397A (en) * | 2021-05-19 | 2021-08-06 | 西华大学 | Novel splicing mode of assembled GFRP (glass fiber reinforced plastic) pipe concrete column |
CN114457957A (en) * | 2020-11-10 | 2022-05-10 | 内蒙古中朵远大建筑工业有限公司 | Prefabricated frame post and prefabricated building |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003268878A (en) * | 2002-03-18 | 2003-09-25 | Kajima Corp | Beam-column joint structure |
CN103938800A (en) * | 2014-04-12 | 2014-07-23 | 北京工业大学 | Reinforced concrete column with different unbonded end lengths |
CN104775516A (en) * | 2015-02-16 | 2015-07-15 | 清华大学 | Field connecting method among prefabricated reinforced concrete columns |
CN205000554U (en) * | 2015-09-25 | 2016-01-27 | 赵洪波 | A concrete column for assembling overall structure |
CN205476074U (en) * | 2016-01-11 | 2016-08-17 | 华侨大学 | Assembled steel pipe concrete combination column |
-
2016
- 2016-10-28 CN CN201610960482.4A patent/CN106381925A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003268878A (en) * | 2002-03-18 | 2003-09-25 | Kajima Corp | Beam-column joint structure |
CN103938800A (en) * | 2014-04-12 | 2014-07-23 | 北京工业大学 | Reinforced concrete column with different unbonded end lengths |
CN104775516A (en) * | 2015-02-16 | 2015-07-15 | 清华大学 | Field connecting method among prefabricated reinforced concrete columns |
CN205000554U (en) * | 2015-09-25 | 2016-01-27 | 赵洪波 | A concrete column for assembling overall structure |
CN205476074U (en) * | 2016-01-11 | 2016-08-17 | 华侨大学 | Assembled steel pipe concrete combination column |
Cited By (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106865387A (en) * | 2017-03-09 | 2017-06-20 | 广东易佳梯科技有限公司 | A kind of elevator hoistways prefabricated component |
CN107060081A (en) * | 2017-04-21 | 2017-08-18 | 福州市川普建筑产业化有限公司 | Precast prestressed concrete column system and its application method |
CN107419803A (en) * | 2017-06-27 | 2017-12-01 | 湖南大学 | A kind of assembled architecture ultra-high performance concrete post component and its construction method |
CN107254884A (en) * | 2017-07-28 | 2017-10-17 | 湖南大学 | A kind of detachable prefabricated assembled concrete-filled steel square tubular column pin node |
CN107460994A (en) * | 2017-08-30 | 2017-12-12 | 河北建筑工程学院 | Assembled steel tube high-strength concrete column and its construction method |
CN107386434A (en) * | 2017-09-12 | 2017-11-24 | 南京清骐筑宇建筑科技有限公司 | A kind of novel fabricated attachment structure of concrete column and concrete column |
CN107806109A (en) * | 2017-09-28 | 2018-03-16 | 中交第公路勘察设计研究院有限公司 | Precast assembly bridge pier attachment means and its construction method |
CN107795011A (en) * | 2017-10-30 | 2018-03-13 | 河北地质大学 | A kind of prefabricated assembled RC posts inflection point contraposition connection method |
CN107816128A (en) * | 2017-10-30 | 2018-03-20 | 河北地质大学 | A kind of prefabricated assembled RC posts inflection point contraposition attachment means |
CN107859248A (en) * | 2017-11-02 | 2018-03-30 | 湖南大学 | A kind of prefabricated concrete structure jointing and connection method |
CN108189221A (en) * | 2018-01-25 | 2018-06-22 | 华北水利水电大学 | Enhancement Method and the mold of the test block is made in regenerative pervious concrete test block |
CN109083275A (en) * | 2018-09-10 | 2018-12-25 | 西北民族大学 | Prefabricated post and integral preform beam slab assembly node and its construction method |
CN109098352A (en) * | 2018-10-24 | 2018-12-28 | 张云天 | A kind of prefabricated assembled steel core concrete column connected structure part and its construction method |
CN109098352B (en) * | 2018-10-24 | 2024-02-23 | 张云天 | Prefabricated assembled steel pipe concrete column splicing structural member and construction method thereof |
CN110468681A (en) * | 2019-08-21 | 2019-11-19 | 无锡市锡山三建实业有限公司 | A kind of unit construction bridge girder construction and construction method |
CN110565813A (en) * | 2019-08-29 | 2019-12-13 | 郑州大学 | Wood structure building column plate connecting structure |
CN114457957A (en) * | 2020-11-10 | 2022-05-10 | 内蒙古中朵远大建筑工业有限公司 | Prefabricated frame post and prefabricated building |
CN112575896A (en) * | 2020-12-29 | 2021-03-30 | 中铁三局集团建筑安装工程有限公司 | Complex steel reinforced concrete composite structure and construction method |
CN112575896B (en) * | 2020-12-29 | 2022-03-29 | 中铁三局集团建筑安装工程有限公司 | Complex steel reinforced concrete composite structure and construction method |
CN112922233A (en) * | 2021-01-27 | 2021-06-08 | 海南大学 | Reinforced concrete prefabricated column and construction method thereof |
CN113152669A (en) * | 2021-03-22 | 2021-07-23 | 河北工业大学 | Assembly type reinforced concrete column and column splicing structure and method |
CN113216397A (en) * | 2021-05-19 | 2021-08-06 | 西华大学 | Novel splicing mode of assembled GFRP (glass fiber reinforced plastic) pipe concrete column |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106381925A (en) | Prefabricated reinforced concrete column and column splice joint with sleeves | |
CN108049498B (en) | The prefabricated post and Prefabricated beam connection structure and method of assembled architecture frame structure | |
CN107299683B (en) | Compound concrete-filled tubular column assembled docks node and connection method | |
CN104712089B (en) | Open the compound shear attachment structure of net | |
CN107254884A (en) | A kind of detachable prefabricated assembled concrete-filled steel square tubular column pin node | |
CN205777098U (en) | A kind of detachable assembling type concrete-filled circular steel tube column | |
CN108301561A (en) | A kind of connection structure of assembly concrete-filled steel tube shaft | |
CN105133791A (en) | Construction method for prefabricated thick plate steel rib concrete column variable cross-section transformation node structure | |
CN204781368U (en) | Novel girder steel - concrete column steel node and prefab | |
CN205529905U (en) | Take prefabricated decking connection structure of U type muscle | |
CN204849569U (en) | Steel pipe concrete stem stem prefabricated unit construction bridge pier stud of putting more energy into | |
CN108487453B (en) | Connecting structure and connecting method for steel tube concrete column and reinforced concrete beam | |
CN106760054B (en) | Prefabricated reinforced concrete shear wall | |
CN107023076A (en) | A kind of assembly concrete pole steel beam connecting node and preparation method thereof | |
CN105863167A (en) | Dismountable assembly type circular steel tube concrete column | |
CN106400982A (en) | Stirrup-densified splicing joint for fabricated reinforced concrete columns | |
CN206144032U (en) | Mosaic structure of assembled steel core concrete column and post | |
CN105735466A (en) | Prefabricated wall column one-segment type steel rib connection structure and method | |
CN205046677U (en) | Assembled concrete frame nodal connection structure | |
CN106437032A (en) | Assembled concrete filled steel tubular column splicing structure and method | |
CN206844316U (en) | A kind of assembled steel reinforced concrete column with well and post splicing node | |
CN205063961U (en) | Push pipe tube coupling structure | |
CN207211366U (en) | The attachment structure of prefabricated beam column | |
CN206752693U (en) | A kind of assembled steel reinforced concrete column of stirrup encryption and post splicing node | |
CN210767266U (en) | Prefabricated assembled type stiffening concrete column member node connecting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170208 |