CN206428719U - Equipment Foundations on dismountable bridge - Google Patents
Equipment Foundations on dismountable bridge Download PDFInfo
- Publication number
- CN206428719U CN206428719U CN201720061806.0U CN201720061806U CN206428719U CN 206428719 U CN206428719 U CN 206428719U CN 201720061806 U CN201720061806 U CN 201720061806U CN 206428719 U CN206428719 U CN 206428719U
- Authority
- CN
- China
- Prior art keywords
- sole plate
- saddle
- branch pipe
- bridge
- plant stem
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model is specially Equipment Foundations on a kind of dismountable bridge, solve on existing bridge Equipment Foundations exist coordinate it is difficult, easily omit, have deviation and the problem of the later stage makes up difficulty.Equipment Foundations on dismountable bridge, including saddle sole plate and supervisor's support, threading supervisor is provided with branch pipe holder, plant stem is provided with above saddle sole plate, the bottom of plant stem is provided with adpting flange, and the side wall of plant stem is provided with threading branch pipe, and saddle sole plate upper end is fixed with bolt of lower base, it is provided with the right side of saddle sole plate on branch pipe fixed cover, saddle sole plate and is installed with standing screw.The utility model has prevented to omit the generation of phenomenon, and the problem of will not produce deviation, while structure is effectively guaranteed the quick and convenient of later stage and remedied during dismounting, has the advantages that simple in construction, easy to operate and cost is low.
Description
Technical field
The utility model is related to equipment installation servicing unit on bridge, Equipment Foundations on specially a kind of dismountable bridge.
Background technology
It is supporting in road construction attached to set with the quickening of China's road construction paces and continuing to develop for transport science and techonologies
Apply, such as street lamp, video camera quantity is more and more.In physical device installation, due to installation site, many equipment are needed
Basis is set to be arranged on bridge on bridge.
General traditional method is that affiliated facility design department proposes fundamental importance, and reserved base is carried out by Bridge Design department
Plinth.But appurtenant work designing unit does not belong to same department typically with Bridge Design unit, coordinate relatively difficult.Even if passing through association
Adjust, equipment reserved into basic engineering in Bridge Design file, also often because construction reason cause reserved basis omit or
It is unqualified, it is impossible to meet use requirement, cause the affiliated facility later stage can not install or installation difficulty.
The content of the invention
Equipment Foundations presence coordination is difficult, easily omit, have deviation and the later stage makes up in order to solve on existing bridge for the utility model
Difficult the problem of, there is provided Equipment Foundations on a kind of dismountable bridge.
The utility model adopts the following technical scheme that realization:Equipment Foundations on dismountable bridge, including it is enclosed on coagulation
The saddle sole plate on native barricade top and the master for being arranged on concrete guard wall side wall and being located at below saddle sole plate
It is provided with pipe holder, branch pipe holder above threading supervisor, saddle sole plate and is provided with plant stem, the bottom of plant stem is set
Adpting flange is equipped with, the side wall of plant stem is provided with threading branch pipe, and saddle sole plate upper end is fixed with some and connection method
The bolt of lower base of orchid connection, threading branch pipe is provided with the right side of saddle sole plate and wears branch pipe fixed cover in the inner, saddle
Some distributions up and down are installed with sole plate and the standing screw of concrete guard wall is passed through.
Each part is made prefabricated component by structure design specification as needed, can be needed according to erecting bed to installation site
It is adjusted, and saddle sole plate is connected with concrete guard wall perfection, while standing screw can be with bridge concrete
Barricade is effectively fixed, and is more uniformly stressed, overcome on existing bridge Equipment Foundations exist coordinate it is difficult, easily omit, have deviation and after
The problem of phase makes up difficulty.
The utility model reasonable in design is reliable, and the setting of affiliated facility need not be coordinated with bridge civil engineering unit, without
Communication and coordination, have prevented to omit the generation of phenomenon, and the construction together of saddle sole plate, adpting flange and plant stem,
The problem of deviation will not being produced, while structure is effectively guaranteed the quick and convenient of later stage and remedied during dismounting, with it is simple in construction,
The low advantage of easy to operate and cost.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
In figure:1- concrete guard walls, 2- saddle sole plates, 3- supervisor's supports, 4- threading supervisor, 5- plant stems, 6-
Adpting flange, 7- threading branch pipes, 8- bolts of lower base, 9- branch pipe fixed covers, 10- standing screws.
Embodiment
Equipment Foundations on dismountable bridge, including be enclosed on the saddle sole plate 2 on the top of concrete guard wall 1 and be arranged on
Threading supervisor is provided with the side wall of concrete guard wall 1 and supervisor's support 3 below saddle sole plate 2, branch pipe holder 3
4, the top of saddle sole plate 2 is provided with plant stem 5, and the bottom of plant stem 5 is provided with adpting flange 6, the side wall of plant stem 5
Threading branch pipe 7 is provided with, the upper end of saddle sole plate 2 is fixed with some bolts of lower base 8 being connected with adpting flange 6, saddle
The right side of shape sole plate 2 be provided with threading branch pipe 7 wear be installed with branch pipe fixed cover 9 in the inner, saddle sole plate 2 it is some
It is distributed and passes through up and down the standing screw 10 of concrete guard wall 1.
In specific implementation process, the surface of saddle sole plate 2 is provided with galvanizing anticorrosive coat, can effective anti-corrosion.
During processing, according to the size of bridge concrete barricade 1, saddle basis is processed into using certain thickness high strength steel plate
Base 2, welds bolt of lower base 8, spacing, specification are corresponding with adpting flange 6 in the top relevant position of saddle sole plate 2;Will
The saddle sole plate 2 produced is transported to job site, should be fixed saddle sole plate 2 in transportation, is prevented
Control in transportation and mutually collide, damage zinc coat;According to equipment installation site in design drawing and the saddle base produced
The specification of plinth base 2, on bridge concrete barricade 1 after correspondence position drilling, bridge coagulation is arranged on by saddle sole plate 2
On native barricade 1, and fixed with standing screw 10;By plant stem 5 be arranged on adpting flange 6 on, and make supporting threading pipeline,
Equipment, cable are installed.
Claims (1)
1. Equipment Foundations on a kind of dismountable bridge, it is characterised in that:Including being enclosed on concrete guard wall(1)The saddle base on top
Plinth base(2)Be arranged on concrete guard wall(1)Side wall and positioned at saddle sole plate(2)Supervisor's support of lower section(3), branch
Pipe holder(3)On be provided with threading supervisor(4), saddle sole plate(2)Top is provided with plant stem(5), plant stem(5)'s
Bottom is provided with adpting flange(6), plant stem(5)Side wall be provided with threading branch pipe(7), saddle sole plate(2)Upper end
It is fixed with some and adpting flange(6)The bolt of lower base of connection(8), saddle sole plate(2)Right side is provided with threading branch pipe
(7)Wear branch pipe fixed cover in the inner(9), saddle sole plate(2)On be installed with it is some up and down be distributed and through concrete gear
Wall(1)Standing screw(10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720061806.0U CN206428719U (en) | 2017-01-19 | 2017-01-19 | Equipment Foundations on dismountable bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720061806.0U CN206428719U (en) | 2017-01-19 | 2017-01-19 | Equipment Foundations on dismountable bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206428719U true CN206428719U (en) | 2017-08-22 |
Family
ID=59582609
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720061806.0U Active CN206428719U (en) | 2017-01-19 | 2017-01-19 | Equipment Foundations on dismountable bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206428719U (en) |
-
2017
- 2017-01-19 CN CN201720061806.0U patent/CN206428719U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9091372B2 (en) | Pipe hanger assembly | |
CN206458918U (en) | A kind of adjustable subway suspension and support | |
CN103061504A (en) | Concrete board pipeline installation reserved hole construction mould and construction method | |
CN209604683U (en) | Multi-pipeline fixes bracket | |
CN103089010B (en) | The suspension bracket construction equipment of topping at the bottom of a kind of alternative reinforced concrete beam and method | |
CN208056594U (en) | Novel overhanging type scaffold device | |
CN204780972U (en) | Bayonet column base mounting adjustment device of steel column rim of a cup | |
CN206428719U (en) | Equipment Foundations on dismountable bridge | |
CN205025089U (en) | Pre -buried one shot forming construction structures of cast -in -place concrete floor steel casing pipe | |
CN207018627U (en) | A kind of suspension and support pre-embedded device | |
CN205617732U (en) | Job site pipeline formula floor rubbish clearance system | |
CN104153451A (en) | Construction method for installing concrete pipeline through prefabricated supporting block | |
CN206233264U (en) | For the rear-mounted adjustable support of piping lane | |
CN205954678U (en) | Prefabricated utility tunnel hoisting point structure of assembled | |
CN208152575U (en) | A kind of multipurpose positioning fixture | |
CN203346950U (en) | Hidden laying structure for temporary water supply pipes of high-rise building | |
CN204754225U (en) | Can have enough to meet need a support | |
CN104878926A (en) | Suspended template system construction method and turnover brackets | |
CN206000173U (en) | A kind of multiple steel sleeve pipe arrangement apparatus in a row in template | |
CN207526109U (en) | Hole device is blocked up around through the erect riser of floor | |
CN207048163U (en) | Large space steel skeleton grid suspended ceiling converting support structure | |
CN206669120U (en) | A kind of flexible iron drain-pipe road suspension bracket | |
CN202265801U (en) | Exhaust system for joint grouting of induced joints of rolled concrete dam | |
CN205976407U (en) | Smart flat installation work rack of hanging of concrete built -in fitting | |
CN206752207U (en) | The extensible bolting system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 030032 Shanxi Transportation Science and Technology Park, 27 Wuluo Street, Xiaodian District, Taiyuan City, Shanxi Province Patentee after: Shanxi Transportation Planning Survey and Design Institute Co., Ltd. Address before: 030012 Shanxi Province, Taiyuan city and State Road No. 69 Patentee before: Shanxi Traffic Planning Survey Design Institute |
|
CP03 | Change of name, title or address |