CN205954678U - Prefabricated utility tunnel hoisting point structure of assembled - Google Patents
Prefabricated utility tunnel hoisting point structure of assembled Download PDFInfo
- Publication number
- CN205954678U CN205954678U CN201620117414.7U CN201620117414U CN205954678U CN 205954678 U CN205954678 U CN 205954678U CN 201620117414 U CN201620117414 U CN 201620117414U CN 205954678 U CN205954678 U CN 205954678U
- Authority
- CN
- China
- Prior art keywords
- plate
- steel pipe
- embedded part
- prefabricated
- vertical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
本实用新型涉及了一种装配式预制综合管廊吊点结构,包括每个管节的两侧板及立式分仓板的内外侧、槽型底板上面设有一定数量的钢管预埋件,左侧板以及立式分仓板的内侧、槽型底板钢管预埋件上镶嵌左右拉伸丝调节杆,右侧板及槽型底板钢管预埋件上镶嵌右拉伸丝调节杆,本实用新型提供了一种在装配式管廊的所有侧板、立式分仓板及底板设置左右拉伸丝调节杆的方法,通过旋转左右调节丝调整并校正两侧板及立式分仓板的垂直度,不仅解决了因立板不垂直而造成的施工工期延长,而且钢管预埋件可作为预制工厂到安装现场和装配时的吊钩点、固定左右拉伸丝调节杆的固定点,以及每片管廊之间的沉降变形约束点,便于管廊的装配,降低了生产成本。
The utility model relates to a hanging point structure of an assembled prefabricated comprehensive pipe gallery, which includes a certain number of steel pipe embedded parts on the side plates of each pipe joint, the inner and outer sides of the vertical sub-warehouse plate, and the groove bottom plate. The left side plate and the inner side of the vertical sub-warehouse plate and the embedded parts of the grooved floor steel pipe are inlaid with the left and right drawing wire adjusting rods, and the right side plate and the embedded parts of the grooved floor steel pipe are inlaid with the right drawing wire adjusting rod. The new model provides a method for setting left and right stretching wire adjustment rods on all side panels, vertical compartment panels and bottom panels of the assembled pipe gallery, and adjusts and corrects the position of the two side panels and the vertical compartment panels by rotating the left and right adjustment wires. Verticality, not only solves the extension of the construction period caused by the non-vertical vertical plate, but also the steel pipe embedded parts can be used as the hook point from the prefabricated factory to the installation site and during assembly, the fixed point for fixing the left and right drawing wire adjustment rods, and The settlement and deformation constraint points between each pipe rack facilitate the assembly of the pipe rack and reduce the production cost.
Description
技术领域technical field
本实用新型涉及一种预制管廊,具体涉及一种装配式预制综合管廊吊点结构。The utility model relates to a prefabricated pipe gallery, in particular to a hanging point structure of an assembled prefabricated comprehensive pipe gallery.
背景技术Background technique
综合管廊在市政道路下建造一个地下管廊,将排水、热力、燃气、电力、通信、广电等市政管线汇聚并集中铺设纳入其中,并设置专门的检修口、投料口等设施,统一建设管理,省去管线自身独立的构筑物和土方开挖,可以有效集约化的利用空间资源。其优点为:一次开挖,集中施工,避免了同一路段重复开挖;极大方便了电力、通信、燃气、供排水等市政设施的维护和检修,降低了路面多次翻修的费用和工程管线的维修费用,保持了路面的完整性和各类管线的耐久性;减少了道路的杆柱及各种管线的检查井、室等,优美了城市的景观;综合管廊内管线布置紧凑合理,有效利用了道路下的空间,节约了城市用地。2014年国务院办公厅发布《关于加强城市地下管线建设管理的指导意见》(国办发〔2014〕27号),明确提出稳步推进城市地下综合管廊建设,在36个大中城市开展地下综合管廊试点工程。The comprehensive pipe gallery builds an underground pipe gallery under the municipal road, and integrates municipal pipelines such as drainage, heat, gas, electricity, communication, radio and television, etc. and lays them in a concentrated manner, and sets up special inspection ports, feeding ports and other facilities for unified construction management , eliminating the need for independent structures and earthwork excavation of the pipeline itself, which can effectively and intensively use space resources. Its advantages are: one-time excavation, centralized construction, avoiding repeated excavation of the same road section; it greatly facilitates the maintenance and repair of municipal facilities such as electricity, communication, gas, water supply and drainage, and reduces the cost of multiple road surface renovations and engineering pipelines The maintenance cost of the road is reduced, and the integrity of the road surface and the durability of various pipelines are maintained; the poles of the road and the inspection wells and rooms of various pipelines are reduced, and the urban landscape is beautiful; the layout of the pipelines in the comprehensive pipeline gallery is compact and reasonable, The space under the road is effectively used and the urban land is saved. In 2014, the General Office of the State Council issued the "Guiding Opinions on Strengthening the Construction and Management of Urban Underground Pipelines" (Guobanfa [2014] No. 27), clearly proposing to steadily promote the construction of urban underground comprehensive pipeline corridors, and to carry out underground comprehensive management in 36 large and medium-sized cities. Corridor pilot project.
不同形式的地下综合管廊,其断面形式、容纳管线种类、造价、维修及管理均有所不同。目前,已建成或正建设部分地下综合管廊,绝大部分采用现浇式和在工厂里采用离心或振捣浇筑成一个整体运送到施工现场。这两种方法都存在很大的不足:现场浇筑箱涵施工周期长、劳动强度大、效率低,受天气、现场条件影响大,对周围环境产生巨大的污染、施工质量也不稳定,成本高,同时对土壤造成污染;工厂化生产的整体箱涵,管廊成型时间长,工艺步骤繁琐,施工成本高,运输、吊装困难,尤其是大型的箱涵,生产设备和吊装设备投入巨大,而超大规格的箱涵难有生产设备也无法制造。Different forms of underground comprehensive utility corridors have different cross-sectional forms, types of pipelines accommodated, cost, maintenance and management. At present, part of the underground comprehensive pipe gallery has been built or is being built, most of which are cast-in-place and centrifugally or vibrated in the factory to form a whole and transported to the construction site. These two methods have great disadvantages: cast-in-place box culverts have a long construction period, high labor intensity, low efficiency, are greatly affected by weather and site conditions, cause huge pollution to the surrounding environment, unstable construction quality, and high cost , and pollute the soil at the same time; the overall box culvert produced in the factory takes a long time to form the pipe gallery, the process steps are cumbersome, the construction cost is high, and the transportation and hoisting are difficult. Especially for large box culverts, the production equipment and hoisting equipment are huge. It is difficult to have production equipment and cannot manufacture super-sized box culverts.
现有片状装配式管廊施工优点是:工厂化生产,制造简单,质量可控,片状构件运输,吊装方便,综合成本低,相对于混凝土板状构件组装施工周期可大大提前,且基本不影响道路通行,适用范围广,经济环保。由于采用装配式结构,箱涵的规格尺寸可以制造到超大尺寸,不再受限于制造和运输等外部条件,解决了现有现浇、整体预制技术中存在的问题,但由于片状安装,进行装配侧板与立式分仓板时不能保证侧板与立式分仓板的垂直度而影响顶板的准确装配,从而影响施工工期和管廊的使用功能。The advantages of the existing sheet-like assembly pipe gallery construction are: factory production, simple manufacturing, controllable quality, sheet-like component transportation, convenient hoisting, low overall cost, and the construction period can be greatly advanced compared with concrete plate-like component assembly, and basically It does not affect road traffic, has a wide range of applications, and is economical and environmentally friendly. Due to the prefabricated structure, the specification and size of the box culvert can be manufactured to a super large size, and it is no longer limited by external conditions such as manufacturing and transportation. When assembling the side panels and the vertical compartment panels, the verticality of the side panels and the vertical compartment panels cannot be guaranteed, which will affect the accurate assembly of the top panel, thereby affecting the construction period and the use function of the pipe gallery.
实用新型内容Utility model content
本实用新型的目的在于弥补现有技术不能保证装配式管廊中的所有侧板及立式分仓板的垂直度问题,提供了一种在装配式管廊的所有侧板、立式分仓板及底板设置左右拉伸丝调节杆的方法,通过旋转左右调节丝调整并校正两侧板及立式分仓板的垂直度,不仅解决了因立 板不垂直而造成的施工工期延长,而且钢管预埋件可作为预制工厂到安装现场和装配时的吊钩点、每片管廊之间的沉降变形约束点以及固定左右拉伸丝调节杆的固定点,便于管廊的装配,降低了生产成本。The purpose of this utility model is to make up for the problem that the existing technology cannot guarantee the verticality of all side panels and vertical compartment panels in the assembled pipe gallery, and provides a The method of setting the left and right stretching wire adjustment rods on the board and the bottom board, adjusts and corrects the verticality of the two side boards and the vertical sub-warehouse board by rotating the left and right adjustment wires, which not only solves the extension of the construction period caused by the non-vertical vertical board, but also The steel pipe embedded parts can be used as the hook point from the prefabrication factory to the installation site and during assembly, the settlement deformation constraint point between each pipe gallery, and the fixed point for fixing the left and right drawing wire adjustment rods, which is convenient for the assembly of the pipe gallery and reduces the Cost of production.
本实用新型为解决上述技术问题所采用的技术方案是:The technical scheme that the utility model adopts for solving the problems of the technologies described above is:
一种装配式预制综合管廊吊点结构,包括每个管节的两侧板及立式分仓板的内外侧、槽型底板上面设有一定数量的钢管预埋件,槽型底板上的钢管预埋件位于安装左侧板及立式分仓板的中间位置和立式分仓板的右侧位置,两侧板及立式分仓板上的钢管预埋件位于板的同一高度上,上述钢管预埋件可作为搬运、安装时的吊钩点。An assembled prefabricated comprehensive pipe gallery lifting point structure, including the two side plates of each pipe joint and the inner and outer sides of the vertical sub-warehouse plate, and a certain number of steel pipe embedded parts on the groove bottom plate, and the groove bottom plate The steel pipe embedded parts are located in the middle of the installation of the left side plate and the vertical compartment plate and the right side of the vertical compartment plate, and the steel pipe embedded parts on the two side plates and the vertical compartment plate are located at the same height of the plate , the above-mentioned steel pipe embedded parts can be used as the hook point during handling and installation.
其中所述的槽型底板上的钢管预埋件可作为综合管廊底部垫层和槽型底板间缝隙注浆填充加固防沉降的注浆孔。The steel pipe embedded parts on the trough bottom plate can be used as the grouting hole between the bottom cushion of the comprehensive pipe gallery and the trough bottom plate to fill and reinforce the anti-settling grouting hole.
其中所述的槽型底板、两侧板及立式分仓板设置的钢管预埋件可用于左右拉伸丝调节杆、右拉伸丝调节杆的螺栓或者双头螺柱、丝杆穿过的连接孔及便于装配螺母、垫圈的工艺槽。The steel pipe embedded parts set on the grooved bottom plate, the two side plates and the vertical compartment plate can be used for the bolts of the left and right drawing wire adjusting rods, the right drawing wire adjusting rods or the double-ended studs and screw rods to pass through. The connection hole and the process groove for easy assembly of nuts and washers.
其中所述的所述的左右拉伸丝调节杆,一端连接并固定在左侧板或立式分仓板的钢管预埋件上,另一端固定在槽型底板上部的钢管预埋件上。The left and right drawing wire adjustment rods described therein have one end connected and fixed on the steel pipe embedded part of the left side plate or the vertical compartment plate, and the other end is fixed on the steel pipe embedded part on the top of the grooved bottom plate.
其中所述的右拉伸丝调节杆,一端连接并固定在右侧板的钢管预埋件上,另一端固定在槽型底板上部的钢管预埋件上。Wherein said right drawing wire adjusting rod, one end is connected and fixed on the steel pipe embedded part of the right side plate, and the other end is fixed on the steel pipe embedded part on the top of the trough bottom plate.
其中所述的钢管预埋件为镀锌焊管,在预制管廊各片板制作前与各片钢筋笼焊接在一起。The steel pipe embedded parts mentioned above are galvanized welded pipes, which are welded together with each piece of steel cage before each plate of the prefabricated pipe gallery is fabricated.
其中所述的钢管预埋件可作为预制工厂到安装现场和装配时的吊钩点、管廊之间沉降变形的约束点以及固定左右拉伸丝调节杆的固定点。The steel pipe embedded parts described therein can be used as the hook point from the prefabrication factory to the installation site and during assembly, the constraint point for settlement deformation between the pipe racks, and the fixed point for fixing the left and right drawing wire adjustment rods.
附图说明Description of drawings
图1为本实用新型的主视结构示意图。Fig. 1 is a front structural schematic diagram of the utility model.
图2为图1中A部的放大结构示意图。FIG. 2 is an enlarged structural schematic diagram of part A in FIG. 1 .
图3为钢管预埋件位置示意图。Figure 3 is a schematic diagram of the position of the steel pipe embedded parts.
图中,1、槽型底板,2、侧板,3、立式分仓板,4、右拉伸丝调节杆,5、钢管预埋件,6、左拉伸丝调节杆。Among the figure, 1. grooved bottom plate, 2. side plate, 3. vertical compartment plate, 4. right drawing wire adjusting rod, 5. steel pipe embedded part, 6. left drawing wire adjusting rod.
具体实施方式detailed description
为了能清楚说明本方案的技术特点,下面通过具体实施方式,并结合其附图,对本实用新型进行详细阐述。In order to clearly illustrate the technical features of this solution, the utility model will be described in detail below through specific implementation methods and in conjunction with the accompanying drawings.
如图1-2所示,一种装配式预制综合管廊吊点结构,侧板2以及立式分仓板3的内外侧、槽型底板1上面设有一定数量的钢管预埋件5,侧板2以及立式分仓板3的内侧、槽型底板1 上的钢管预埋件5镶嵌有包含右拉伸丝调节杆4和左拉伸丝调节杆6,且通过旋转左右调节丝调整校正两侧板2或者立式分仓板3的垂直度。槽型底板1、侧板2、分仓立板3都设有钢管预埋件5。钢管预埋件5可以作为预制工厂到安装现场的吊钩点使用,装配时的吊钩点,固定右拉伸丝调节杆4和左拉伸丝调节杆6的固定点。As shown in Figure 1-2, a prefabricated integrated pipe gallery hanging point structure, the side plate 2 and the inner and outer sides of the vertical compartment plate 3, and the grooved bottom plate 1 are provided with a certain number of steel pipe embedded parts 5, The inner side of the side plate 2 and the vertical compartment plate 3, and the steel pipe embedded part 5 on the grooved bottom plate 1 are inlaid with a right drawing wire adjusting rod 4 and a left drawing wire adjusting rod 6, and can be adjusted by rotating the left and right adjusting wires. Correct the verticality of the side panels 2 or the vertical compartment panels 3. The trough bottom plate 1, the side plate 2, and the compartment vertical plate 3 are all provided with steel pipe embedded parts 5. The steel pipe embedded part 5 can be used as the hook point from the prefabricated factory to the installation site, the hook point during assembly, the fixed point of fixing the right drawing wire adjusting rod 4 and the left drawing wire adjusting rod 6.
上述具体实施方式不能作为对本实用新型保护范围的限制,对于本技术领域的技术人员来说,对本实用新型实施方式所做出的任何替代改进或变换均落在本实用新型的保护范围内。The above-mentioned specific implementation manners cannot be regarded as limitations on the protection scope of the present utility model. For those skilled in the art, any alternative improvements or transformations made to the embodiments of the present utility model fall within the protection scope of the present utility model.
本实用新型未详述之处,均为本技术领域技术人员的公知技术。The parts of the utility model that are not described in detail are the known techniques of those skilled in the art.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620117414.7U CN205954678U (en) | 2016-02-05 | 2016-02-05 | Prefabricated utility tunnel hoisting point structure of assembled |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620117414.7U CN205954678U (en) | 2016-02-05 | 2016-02-05 | Prefabricated utility tunnel hoisting point structure of assembled |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205954678U true CN205954678U (en) | 2017-02-15 |
Family
ID=57966431
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620117414.7U Expired - Lifetime CN205954678U (en) | 2016-02-05 | 2016-02-05 | Prefabricated utility tunnel hoisting point structure of assembled |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205954678U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108560587A (en) * | 2018-06-01 | 2018-09-21 | 西安交通大学 | A kind of cave type prefabrication and assembly construction pipe gallery and installation method |
| CN109440819A (en) * | 2018-12-25 | 2019-03-08 | 上海公路桥梁(集团)有限公司 | Prefabricated pipe gallery |
| CN112977571A (en) * | 2021-02-23 | 2021-06-18 | 中建八局轨道交通建设有限公司 | Large-volume embedded part carrying and installing equipment in narrow space of pipe gallery |
-
2016
- 2016-02-05 CN CN201620117414.7U patent/CN205954678U/en not_active Expired - Lifetime
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108560587A (en) * | 2018-06-01 | 2018-09-21 | 西安交通大学 | A kind of cave type prefabrication and assembly construction pipe gallery and installation method |
| CN109440819A (en) * | 2018-12-25 | 2019-03-08 | 上海公路桥梁(集团)有限公司 | Prefabricated pipe gallery |
| CN112977571A (en) * | 2021-02-23 | 2021-06-18 | 中建八局轨道交通建设有限公司 | Large-volume embedded part carrying and installing equipment in narrow space of pipe gallery |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205242427U (en) | Novel iron tower basis | |
| CN106381885B (en) | A kind of Underground Steel pipe gallery with skeleton | |
| CN105756087A (en) | Assembling-type anchoring structure for adjacent plates of prefabricated comprehensive pipe rack | |
| CN105544605A (en) | Modular assembly type comprehensive pipe gallery | |
| CN106801436A (en) | A kind of construction method for overlapping assembled underground pipe gallery | |
| CN207633357U (en) | Assembled foundation of charging station | |
| CN205776342U (en) | A kind of prefabricated pipe gallery tube coupling attachment structure | |
| CN105625466A (en) | Assembled prefabricated comprehensive pipe gallery | |
| CN105569075A (en) | Assembled prefabricated comprehensive pipe rack guide positioning device | |
| CN105735353A (en) | Prefabricated comprehensive pipe gallery | |
| CN104455889A (en) | Integrated underground pipe gallery with compensation device | |
| CN212028738U (en) | Suspension device for socket type reinforced concrete drain pipe | |
| CN204676533U (en) | A kind of soil-nail wall support system based on the recyclable technique of assembling | |
| CN203284801U (en) | Assembled inspection well | |
| CN207211800U (en) | Assembled architecture outer wall plate construction edge protection device | |
| CN205857240U (en) | A kind of prefabricated pipe gallery | |
| CN210134455U (en) | Integral utility tunnel of environment-friendly prefabricated assembly | |
| CN210134453U (en) | Integral utility tunnel of environment-friendly prefabricated assembly | |
| CN212427206U (en) | Assembled underground pipe gallery | |
| CN203113362U (en) | Steel structure factory building prefabricated foundation structure | |
| CN202989788U (en) | Inner supporting member for steel corrugated culvert | |
| CN209686449U (en) | A sheet-bolted prefabricated integrated pipe gallery and its pipe gallery unit | |
| CN223399403U (en) | Assembled pipeline excavation strutting arrangement | |
| CN106759475B (en) | steel structure comprehensive pipe gallery | |
| CN207392235U (en) | Construction template of circular pipe culvert in urban underground comprehensive pipe gallery |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20210705 Address after: 266600 west of Yanqing 1st grade road, Jiangshan Industrial Park, Jiangshan Town, Laixi City, Qingdao City, Shandong Province Patentee after: QINGDAO ZHONGKE KUNTAI ASSEMBLY CONSTRUCTION TECHNOLOGY Co.,Ltd. Address before: 266000 No. 168 Zhuzhou Road, Laoshan District, Qingdao, Shandong. Patentee before: QINGDAO RUNGUO SCIENCE AND TECHNOLOGY DEVELOPMENT Co.,Ltd. |
|
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20170215 |