CN206669120U - A kind of flexible iron drain-pipe road suspension bracket - Google Patents
A kind of flexible iron drain-pipe road suspension bracket Download PDFInfo
- Publication number
- CN206669120U CN206669120U CN201720425077.2U CN201720425077U CN206669120U CN 206669120 U CN206669120 U CN 206669120U CN 201720425077 U CN201720425077 U CN 201720425077U CN 206669120 U CN206669120 U CN 206669120U
- Authority
- CN
- China
- Prior art keywords
- nut
- half annulus
- pipe road
- annulus
- screw rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
Description
技术领域technical field
本实用新型属于建筑给排水技术领域,具体涉及安装固定柔性铸铁排水管道的吊架结构技术领域。The utility model belongs to the technical field of building water supply and drainage, in particular to the technical field of hanger structures for installing and fixing flexible cast iron drainage pipes.
背景技术Background technique
随着城市建设的快速发展,工程项目品质的不断提升,对建筑给排水工程的技术要求也越来越高。在建筑给排水系统中安装柔性铸铁排水管道时,柔性铸铁排水管道吊架用量较大,但现有的柔性铸铁排水管道每个吊架制作尺寸需要根据现场管道安装位置才能确定吊架制作尺寸;吊架制作时需要投入大量角钢、电焊条及人工,费工费时。此外,在排水横干管上有管道接头的地方,所安装的吊架需要承受管道及接头处水的重量,现有的吊架结构存在受力不均匀的问题。With the rapid development of urban construction and the continuous improvement of project quality, the technical requirements for building water supply and drainage projects are also getting higher and higher. When installing flexible cast iron drainage pipes in building water supply and drainage systems, the amount of flexible cast iron drainage pipe hangers is relatively large, but the size of each hanger of the existing flexible cast iron drainage pipes needs to be determined according to the location of the pipeline on site to determine the size of the hanger; A large amount of angle steel, welding electrodes and labor need to be invested in the manufacture of the hanger, which is labor-intensive and time-consuming. In addition, where there are pipe joints on the horizontal drainage pipe, the installed hanger needs to bear the weight of the pipe and the water at the joint, and the existing hanger structure has the problem of uneven force.
发明内容Contents of the invention
本实用新型的目的在于解决上述现有技术存在的问题,提供一种可预先批量制做、在施工现场直接安装且安装简便的柔性铸铁排水管道吊架。The purpose of the utility model is to solve the above-mentioned problems in the prior art, and provide a flexible cast iron drainage pipe hanger that can be manufactured in batches in advance, and can be directly installed at the construction site and is easy to install.
实现本实用新型目的的技术方案如下:The technical scheme that realizes the utility model purpose is as follows:
一种柔性铸铁排水管道吊架,包括螺杆、可分别配装于螺杆上端和下端的上螺母和下螺母、焊接在下螺母底面的金属底板、焊接在上螺母顶面且两边带搭耳的下半圆环、配装于下半圆环上的两边带搭耳的上半圆环,下半圆环和上半圆环通过穿过两边搭耳的螺栓连接,围合成可卡装柔性铸铁排水管道的圆环,在金属底板两侧对称加工有安装孔。A flexible cast iron drainage pipe hanger, comprising a screw rod, an upper nut and a lower nut that can be fitted to the upper and lower ends of the screw rod respectively, a metal bottom plate welded to the bottom surface of the lower nut, and a lower half welded to the top surface of the upper nut with overlapping ears on both sides The ring, the upper half ring with ears on both sides fitted on the lower half ring, the lower half ring and the upper half ring are connected by bolts passing through the ears on both sides, forming a snap-on flexible cast iron drainage pipe There are mounting holes symmetrically processed on both sides of the metal base plate.
本实用新型可根据柔性铸铁排水管的外径尺寸预先进行批量化制作,节约大量角钢、电焊条及人工成本,每个吊架尺寸不需要根据现场管道安装位置来现场确定,安装时只需在楼板或梁上打两个孔,通过钢底板两侧的安装孔用膨胀螺栓将吊架整体安装在楼板或梁上,轻松完成支架的安装。通过调节螺杆长度就可以适应现场安装位置。下半圆环和上半圆环围合将柔性铸铁排水管道卡装后通过螺栓连接。本实用新型结构还可使安装在排水横干管上的吊架受力均匀。The utility model can be mass-produced in advance according to the outer diameter of the flexible cast iron drainage pipe, saving a lot of angle steel, welding rods and labor costs. The size of each hanger does not need to be determined on site according to the installation position of the pipeline on site. Drill two holes on the floor or beam, and install the hanger on the floor or beam as a whole through the installation holes on both sides of the steel base plate with expansion bolts, and easily complete the installation of the bracket. By adjusting the length of the screw rod, it can adapt to the site installation position. The lower semi-circular ring and the upper semi-circular ring enclose the flexible cast iron drainage pipe and then connect it by bolts. The structure of the utility model can also make the hanger installed on the drainage horizontal main pipe be stressed evenly.
本实用新型安装施工省时省力,施工效率高,安装后管道受力点均匀,排除了管道接头处需要承受管道及水的重量的情况。本实用新型整体结构强度较好,经久耐用,安装牢固,损坏率和返修率低。The utility model saves time and effort in installation and construction, and has high construction efficiency. After installation, the stress point of the pipeline is uniform, and the situation that the joint of the pipeline needs to bear the weight of the pipeline and water is eliminated. The utility model has good overall structural strength, durability, firm installation, and low damage rate and repair rate.
附图说明Description of drawings
图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;
图2为图1的A-A截面图;Fig. 2 is the A-A sectional view of Fig. 1;
图3为本实用新型将柔性铸铁排水管固定在顶板的示意图。Fig. 3 is a schematic diagram of fixing the flexible cast iron drainage pipe on the top plate of the utility model.
具体实施方式detailed description
如图1、图2、图3所示的柔性铸铁排水管道吊架,包括螺杆3、可分别配装于螺杆上端和下端的上螺母4和下螺母2、焊接在下螺母2底面的金属底板1、焊接在上螺母顶面且两边带搭耳的下半圆环5、配装于下半圆环上的两边带搭耳的上半圆环6,下半圆环和上半圆环通过穿过两边搭耳的螺栓7连接,围合成可卡装柔性铸铁排水管道的圆环,在金属底板两侧对称加工有安装孔1a。The flexible cast iron drainage pipe hanger shown in Fig. 1, Fig. 2 and Fig. 3 includes a screw rod 3, an upper nut 4 and a lower nut 2 which can be fitted on the upper and lower ends of the screw rod respectively, and a metal base plate 1 welded on the bottom surface of the lower nut 2 5. The lower semi-circular ring 5 with laps on both sides welded on the top surface of the upper nut. The upper semi-circular ring 6 with laps on both sides fitted on the lower semi-circular ring. The bolts 7 on both sides of the ears are connected to form a ring that can be snapped into a flexible cast iron drainage pipe, and mounting holes 1a are symmetrically processed on both sides of the metal base plate.
本实用新型的安装过程如下:The installation process of the present utility model is as follows:
(1)根据排水管道坐标及标高确定金属底板1的安装位置,用电锤在楼板或梁8上打两个孔,用螺栓穿过金属底板两侧的安装孔,将金属底板固定在楼板或梁上;(1) Determine the installation position of the metal base plate 1 according to the coordinates and elevation of the drainage pipe, punch two holes on the floor or beam 8 with an electric hammer, and use bolts to pass through the installation holes on both sides of the metal base plate to fix the metal base plate on the floor or beam 8 beam;
(2)根据排水管道标高确定螺杆3的长度,并用切割机将多余的螺杆长度切掉,将螺杆下端安装在下螺母2内;(2) Determine the length of the screw rod 3 according to the elevation of the drainage pipe, and cut off the redundant screw rod length with a cutting machine, and install the lower end of the screw rod in the lower nut 2;
(3)将顶部焊接有下半圆环5的上螺母4套装在螺杆3顶部;(3) The upper nut 4 with the lower semicircular ring 5 welded on the top is set on the top of the screw rod 3;
(4)将排水管道置放在下半圆环5和上半圆环6之间,将下半圆环5和上半圆环6两边搭耳处贴紧并用螺栓7连接固定即可。(4) Place the drainage pipe between the lower semi-circular ring 5 and the upper semi-circular ring 6, stick the ears on both sides of the lower semi-circular ring 5 and the upper semi-circular ring 6 tightly and connect and fix them with bolts 7.
本实用新型制作简单、结构牢固、易于安装、耐久性强、损坏率低,有利于成品保护,可大大降低施工期间损坏及后期维修的各种费用,降低成本,且有较强的可调性,可以根据现场情况任意调整吊架高度,成型后外观效果较好。The utility model has the advantages of simple manufacture, firm structure, easy installation, strong durability and low damage rate, which is beneficial to the protection of finished products, can greatly reduce various costs of damage during construction and maintenance in the later period, reduces costs, and has strong adjustability , the height of the hanger can be adjusted arbitrarily according to the site conditions, and the appearance effect is better after forming.
Claims (1)
- A kind of 1. flexible iron drain-pipe road suspension bracket, it is characterised in that including screw rod (3), can be fitted to respectively screw rod upper end and The top nut (4) of lower end and lower nut (2), it is welded on the metal base plate (1) of lower nut bottom surface, is welded on top nut top surface and two The upper half annulus (6) of the lower half annulus (5) of sideband ledge, two sideband ledges being fitted on lower half annulus, lower half annulus and upper Semicircular ring is connected by the bolt (7) through both sides ledge, encloses the annulus that can clamp flexible iron drain-pipe road;In metal Bottom plate both sides are symmetrily processed with mounting hole (1a).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720425077.2U CN206669120U (en) | 2017-04-21 | 2017-04-21 | A kind of flexible iron drain-pipe road suspension bracket |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720425077.2U CN206669120U (en) | 2017-04-21 | 2017-04-21 | A kind of flexible iron drain-pipe road suspension bracket |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206669120U true CN206669120U (en) | 2017-11-24 |
Family
ID=60375290
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720425077.2U Expired - Fee Related CN206669120U (en) | 2017-04-21 | 2017-04-21 | A kind of flexible iron drain-pipe road suspension bracket |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206669120U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113818351A (en) * | 2021-09-23 | 2021-12-21 | 中铁十二局集团有限公司 | Construction method of highway bridge drainage steel pipe |
-
2017
- 2017-04-21 CN CN201720425077.2U patent/CN206669120U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113818351A (en) * | 2021-09-23 | 2021-12-21 | 中铁十二局集团有限公司 | Construction method of highway bridge drainage steel pipe |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104695608B (en) | Floor construction between architecture pipe and construction method thereof | |
| CN203809870U (en) | Supporting and fixing tool for level pump pipe on concrete floor | |
| CN206669120U (en) | A kind of flexible iron drain-pipe road suspension bracket | |
| CN204647554U (en) | Steel structure concrete pump line supporting frame | |
| CN203547021U (en) | Novel steel column | |
| CN206458910U (en) | A kind of Rotatable hanging support | |
| CN103089010A (en) | Cradle construction device replacing reinforced concrete beam bottom protection layer and cradle construction method | |
| CN205329703U (en) | A foundation structure and full aluminium building frame structure for making perfect aluminium building | |
| CN205331594U (en) | Novel adjustable pipeline bracket | |
| CN204139600U (en) | Switchbox inner support mould | |
| CN209839352U (en) | Horizontal mounting bracket for heavy pipeline of steel structure building | |
| CN208668462U (en) | A kind of pipe gallery supporting structure | |
| CN203487548U (en) | Connecting structure of transformer substation steel bracket and concrete foundation joint | |
| CN201649400U (en) | Lifting devices for suspended ceiling machines | |
| CN202055146U (en) | Connecting structure for screed board accessories | |
| CN205173717U (en) | Feed pipe gallows | |
| CN206706828U (en) | A kind of corrugated steel pipe gallery variable bit support connection structure | |
| CN103184724B (en) | Adjustable damping device of external prestressing cable during bridge reinforcement | |
| CN204212393U (en) | One exempts from the universal wall-connecting piece of pre-buried scaffold | |
| CN216867741U (en) | Flexible ceiling support fixing device of PSP steel-plastic composite pipe | |
| CN202391114U (en) | Pipe passing floorslab sleeve pail | |
| CN206929429U (en) | Electromechanical pipeline no-welding hanger system below a kind of girder steel | |
| CN206016838U (en) | One kind pours mortar with being easy to adjusting type anchor pole support | |
| CN203672548U (en) | Movable device for fixing pressure box | |
| CN216201129U (en) | Supporting and hanging frame for installing pipeline on top plate of inclined ground warehouse |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171124 |