CN207526109U - Hole device is blocked up around through the erect riser of floor - Google Patents
Hole device is blocked up around through the erect riser of floor Download PDFInfo
- Publication number
- CN207526109U CN207526109U CN201721425271.7U CN201721425271U CN207526109U CN 207526109 U CN207526109 U CN 207526109U CN 201721425271 U CN201721425271 U CN 201721425271U CN 207526109 U CN207526109 U CN 207526109U
- Authority
- CN
- China
- Prior art keywords
- supporting plate
- floor
- pipe collar
- blocked
- around
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Hole device is blocked up around a kind of erect riser through floor, is spliced by two halves mold by bolt.Include pipe collar, supporting plate, fixed pad and cushion per half mold, supporting plate connect with pipe collar right angle and is fixed on pipeline by pipe collar, supporting plate is tightly attached to Bars In Poured Concrete Slab in the following, fixed pad is placed between pipe collar and pipeline, and splint upper surface is equipped with a cushion and links into an integrated entity with supporting plate;Cushion is equipped between two halves mold bolt fixed plate.The utility model has the advantages that:1st, it combines closely between floor, is not easy to run mould, spillage.2nd, it is easy to operate, convenient for disassembly and assembly, construction efficiency is high, cost of labor is low.3rd, supporting plate rigidity is big, can tamp concrete, ensures Surface Quality of Concrete.
Description
Technical field
The utility model belongs to technical field of building construction, is blocked up more particularly to around a kind of erect riser through floor
Hole device.
Background technology
The hoisting die construction in tradition through stifled hole around the erect riser of floor is spliced using plank sheathing, passes through iron wire
It is fixed on and has poured on floor, operation must bring following inconvenience by upper and lower two people coordinative construction to construction:
1st, hole template is hung with plank sheathing splicing, splicing does not be easy to cause the problems such as running mould, spillage tightly.
2nd, it is fixed on above floor with iron wire when fixed, it is necessary to by two people in upper and lower floor coordinative construction, low construction efficiency.
3rd, it is fixed with iron wire, be easy to cause and fix loosely, casting concrete template is sunk, and influences Surface Quality of Concrete.
Invention content
The purpose of this utility model, which is to provide around a kind of erect riser through floor, blocks up hole device, the apparatus structure
It is tightly combined between reasonable design, component, is safe and reliable, cost of manufacture is relatively low, easy for installation.
As above conceive, the technical solution of the utility model is:Hole device is blocked up around a kind of erect riser through floor,
It is characterized in that:It is spliced by two halves mold by bolt;Include pipe collar, supporting plate, fixed pad and cushion, supporting plate per half mold
It connect with pipe collar right angle and is fixed on pipeline by pipe collar, supporting plate is tightly attached to Bars In Poured Concrete Slab in the following, fixed pad is placed in pipe collar and pipe
Between road, splint upper surface is equipped with a cushion and links into an integrated entity with supporting plate;Cushion is equipped between two halves mold bolt fixed plate.
Above-mentioned supporting plate is circular, annular width 100mm.
Above-mentioned supporting plate bottom is equipped with ribbed stiffener.
Above-mentioned pipe collar height is 50mm.
Above-mentioned fixed pad links into an integrated entity and is tightly attached on pipeline outer wall with pipe collar madial wall.
Above-mentioned fixed pad and cushion thickness are 5mm.
The beneficial effects of the utility model are:
1st, the supporting plate of the utility model is fixed on by pipe collar on pipeline, and supporting plate is close to Bars In Poured Concrete Slab lower surface, can be effectively
Pea gravel concreten when support pipeline blocks up hole.
2nd, the fixed pad of the utility model links into an integrated entity and is tightly attached on pipeline outer wall with pipe collar madial wall, therefore can profit
Make pipe collar and pipeline elastic connection with its elasticity, prevent from damaging pipeline due to tightening pipe collar bolt, and prevent pea gravel concreten
Side leakage.
3rd, a cushion of the utility model is placed in splint upper surface and links into an integrated entity with supporting plate, and top plate is close in operation
Lower surface can be effectively prevented concrete leakage.
4th, the utility model makes two halves mold close by a cushion between two halves mold bolt fixed plate using its elasticity
With reference to.
Description of the drawings
Fig. 1 is the bottom view of the utility model when mounted;
Fig. 2 is the scheme of installation of the utility model;
Fig. 3 is the 1-1 sectional views of Fig. 1;
Fig. 4 is the 2-2 sectional views of Fig. 1.
In figure:1. supporting plate, 2. pipe collars, 3. ribbed stiffeners, 4. cushions 1,5. fix pad, 6. cushions 2,7. bolt fixed plates, 8.
Bolt, 9. Bars In Poured Concrete Slabs, 10. pipelines, the filling of 11. pea gravel concretens.
Specific embodiment
Below by specific embodiment, the utility model is described in further detail, following embodiment be it is descriptive, no
It is limited, it is impossible to which the scope of protection of the utility model is limited with this.
Hole device is blocked up around a kind of erect riser through floor, is spliced by two halves mold by bolt.Per half
Mold includes pipe collar, supporting plate, fixed pad and cushion.Supporting plate connect with pipe collar right angle and is fixed on pipeline by pipe collar, supporting plate
Bars In Poured Concrete Slab is tightly attached in the following, so as to pea gravel concreten when support pipeline blocks up hole.Fixed pad is placed between pipe collar and pipeline, fixed pad
It links into an integrated entity with pipe collar madial wall, is tightly attached on pipeline outer wall in operation, make pipe collar and pipeline elastic connection using its elasticity,
It prevents from damaging pipeline due to tightening pipe collar bolt, and prevents pea gravel concreten side leakage (see Fig. 2).Splint upper surface is equipped with cushion
It 1 and links into an integrated entity with supporting plate, top plate lower surface is close in operation, preventing concrete leakage, cushion 2 is set on two halves (see Fig. 2)
Between diebolt fixed plate, two halves mold is made to combine closely using its elasticity.
Bolt is after two halves mold is spliced into an entirety, is then tightened fixed (see Fig. 1).
The supporting plate is circular, annular width 100mm, is strengthened below supporting plate equipped with ribbed stiffener, ensures supporting plate
Rigidity.The pipe collar height is 50mm.The fixed pad and cushion thickness are 5mm.
It operates in implementation process at the scene, two halves device, which is spliced into an entirety and is stuck in, first needs the pipeline for hanging mould
It is upper then to tighten the fixing bolt of wherein side (see Fig. 2), it adjusts and hangs mold device position, be allowed to be close to floor plate top, it is seamless
Gap is best.Next tightens other side bolt, makes pipe collar and pipeline elastic connection using fixed pad elasticity, is cut not when twisting bolt
Can be too tight, prevent from destroying pipeline, with pour pea gravel concreten plug and pound do not run mould can be (see Fig. 3,4).It can be poured after installation is complete
Pea gravel concreten is built, and is plugged and pounded, makes to pour tight.The i.e. collapsible die after the pea gravel concreten condensation poured, striking time
Can not be too early, prevent because concrete coagulation loosely due to come off.
The utility model has the advantages that:1st, it combines closely between floor, is not easy to run mould, spillage.2nd, easy to operate, dismounting
Convenient, construction efficiency height, cost of labor are low.3rd, supporting plate rigidity is big, can tamp concrete, ensures Surface Quality of Concrete.
Claims (6)
1. hole device is blocked up around a kind of erect riser through floor, it is characterised in that:Spliced by two halves mold by bolt
It forms;Include pipe collar, supporting plate, fixed pad and cushion, supporting plate per half mold to connect with pipe collar right angle and be fixed on pipe by pipe collar
On road, supporting plate is tightly attached to Bars In Poured Concrete Slab in the following, fixed pad is placed between pipe collar and pipeline, splint upper surface be equipped with a cushion and with support
Plate links into an integrated entity;Cushion is equipped between two halves mold bolt fixed plate.
2. hole device is blocked up around the erect riser according to claim 1 through floor, it is characterised in that:Above-mentioned supporting plate
For annular shape, annular width 100mm.
3. hole device is blocked up around the erect riser according to claim 1 through floor, it is characterised in that:Above-mentioned supporting plate
Bottom is equipped with ribbed stiffener.
4. hole device is blocked up around the erect riser according to claim 1 through floor, it is characterised in that:Above-mentioned pipe collar
Highly it is 50mm.
5. hole device is blocked up around the erect riser according to claim 1 through floor, it is characterised in that:Above-mentioned fixation
Pad links into an integrated entity and is tightly attached on pipeline outer wall with pipe collar madial wall.
6. hole device is blocked up around the erect riser according to claim 1 through floor, it is characterised in that:Above-mentioned fixation
Pad and cushion thickness are 5mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721425271.7U CN207526109U (en) | 2017-10-31 | 2017-10-31 | Hole device is blocked up around through the erect riser of floor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721425271.7U CN207526109U (en) | 2017-10-31 | 2017-10-31 | Hole device is blocked up around through the erect riser of floor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207526109U true CN207526109U (en) | 2018-06-22 |
Family
ID=62571706
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721425271.7U Active CN207526109U (en) | 2017-10-31 | 2017-10-31 | Hole device is blocked up around through the erect riser of floor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207526109U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107675878A (en) * | 2017-10-31 | 2018-02-09 | 中冶天工集团有限公司 | Hole device is blocked up around through the erect riser of floor |
-
2017
- 2017-10-31 CN CN201721425271.7U patent/CN207526109U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107675878A (en) * | 2017-10-31 | 2018-02-09 | 中冶天工集团有限公司 | Hole device is blocked up around through the erect riser of floor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100510280C (en) | Method for the earthwork of a foundation sunk for a wind energy facility | |
CN203878615U (en) | Light combined type set-shaped steel formwork for inspection well | |
CN206625428U (en) | Floor closed system is poured after a kind of pipe well | |
WO2021232479A1 (en) | Underwater repairing method for large-diameter hdpe pipeline | |
CN207469307U (en) | A kind of gang form structure of the inspection shaft cast-in-place construction of town road pipeline | |
CN207063522U (en) | A kind of frame column high-supported formwork | |
CN207526109U (en) | Hole device is blocked up around through the erect riser of floor | |
CN208121808U (en) | Die body system is hung in bottom plate and side wall one-time-concreting molding pond | |
CN207177286U (en) | Add region mould after fabricated shear wall is reserved | |
CN207245727U (en) | A kind of flexible positioning fixture for controlling the short abutment wall cover to reinforcement of tunnel inverted arch | |
CN107989069A (en) | Pre-embedded bolt, the pre-buried prefabricated piping lane and method for prefabricating for hanging nail | |
CN210858069U (en) | Concrete curing device for ultrahigh independent structure column | |
CN110541567A (en) | Plugging die for pipeline hanging hole gap and construction method | |
CN208830444U (en) | Inspection shaft steel combined template | |
CN107675878A (en) | Hole device is blocked up around through the erect riser of floor | |
CN206158192U (en) | Concrete pump pipe's simple easily fixable device on concrete face | |
CN206267520U (en) | A kind of self-supporting post-cast strip is poured with hanging mould | |
CN210266210U (en) | Can absorb exempting from to tear open mould pipe joint of deformation | |
CN206376518U (en) | Overhanging type steel waterproof hinged bolt anchor | |
CN202416347U (en) | Foundation structure for tower crane | |
CN212745338U (en) | Vertical pump pipe fixer | |
CN205242407U (en) | A cluster pipe, chute combination system for deep basal pit concrete placement | |
CN207714372U (en) | Pre-embedded bolt, the pre-buried prefabricated piping lane for hanging nail | |
CN104847090B (en) | A kind of small cross-sectional size ventilation shaft construction method | |
CN205502058U (en) | Pin -connected panel tower crane foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |