CN205242407U - A cluster pipe, chute combination system for deep basal pit concrete placement - Google Patents

A cluster pipe, chute combination system for deep basal pit concrete placement Download PDF

Info

Publication number
CN205242407U
CN205242407U CN201521056339.XU CN201521056339U CN205242407U CN 205242407 U CN205242407 U CN 205242407U CN 201521056339 U CN201521056339 U CN 201521056339U CN 205242407 U CN205242407 U CN 205242407U
Authority
CN
China
Prior art keywords
chute
cell body
pipe
building
string pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521056339.XU
Other languages
Chinese (zh)
Inventor
曾运平
许立山
卢松
蒋凯
艾月华
周千帆
林絮
寇清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN201521056339.XU priority Critical patent/CN205242407U/en
Application granted granted Critical
Publication of CN205242407U publication Critical patent/CN205242407U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model provides a cluster pipe, chute combination system for deep basal pit concrete placement, the cluster pipe comprises steel pipe and reinforcement, and the steel pipe is followed the direction of height interval and is provided with 45 degrees elbow section to straight tube section welding 45 degrees elbow section tops has the reinforcement, and the steel pipe lower part has the vertical incision and forms cluster pipe discharge gate, and cluster pipe discharge gate is relative with chute starting point position, the chute includes chute cell body, chute support frame and pavement, the chute cell body is laid the iron sheet panel in by the flute profile plank sheathing and is constituted, chute cell body bottom and both sides by the flitch support on the chute support frame, set up on the chute support frame of chute cell body one side on the pavement. The utility model discloses a combination system that cluster pipe adds the chute can effectively have been solved the peripheral place of deep basal pit and narrow and small and can't set up the problem of chute, has improved the speed of building to practice thrift the time limit for a project, guarantee pouring in succession of bulky concrete, guaranteed the engineering quality.

Description

String pipe, the chute combined system of building for deep foundation ditch concrete
Technical field
The utility model relates to a kind of pipeline system of building for small space place ultra-deep foundation pit large volume underplate concrete.
Background technology
Along with the domestic Super High project executing is more and more, ultra-deep foundation pit large volume underplate concrete is built the heat subject that becomes research in industry. And Super High project construction place is positioned at Central commerce district, urban district mostly, traffic conditions complexity, many limiting factors such as foundation ditch periphery narrow field cause building of ultra-deep foundation pit large volume underplate concrete to become the heavy difficult point of construction.
Utility model content
The utility model provides a kind of string pipe of building for deep foundation ditch concrete, chute combined system, solve that surrounding deep foundation pit place is narrow cannot set up chute, and mass concrete is difficult to carry out the technical problem of continuous placing.
The utility model solves the technical scheme that its technical problem adopts:
This string pipe of building for deep foundation ditch concrete, chute combined system, described string pipe is made up of steel pipe and girth member, steel pipe is arranged at intervals with one eighth bend section along short transverse, and straight length above one eighth bend section is welded with girth member, steel pipe bottom forms string pipe discharging opening with vertical incision, and string pipe discharging opening is relative with chute start position;
Described chute comprises chute cell body, chute bracing frame and pavement, described chute cell body forms by laying iron sheet panel in flute profile plank sheathing, chute cell body bottom and both sides are supported on chute bracing frame by flitch, and described pavement is erected on the chute bracing frame of chute cell body one side.
Described girth member is steel plate or channel-section steel.
The gradient of described chute cell body is 1:2.5.
On the chute bracing frame of described chute cell body below, hang with safety net.
On the adjacent chute bracing frame in described pavement, hang with Dense mesh screen.
Described pavement is made up of the skirting board of the wooden springboard tiling and wooden springboard both sides.
Described pavement interval 300mm is furnished with tread plate.
Described chute also comprises the baffle plate that dams, described in the baffle plate that dams form with flitch, vertical baffle plate and detachable plank sheathing by damming, vertical baffle plate is connected with detachably plank sheathing is vertical in chute cell body, dams and is laterally connected in the vertical baffle plate back side with flitch.
The beneficial effects of the utility model are as follows:
It is curved that string pipe of the present utility model is established 45 degree every certain altitude, to ensure that concrete can not emanate because of freely falling body. String pipe has carried out Design of Reinforcement at the elbow position that is hit, and has improved string pipe service life.
Chute cell body of the present utility model adopts plank sheathing scene to be made by carpenter, is fixed on steel tube frame. Chute bracing frame arranges pavement, can ensure that workman observes the normal situation about using of chute in casting process, and keep in repair in the time that chute breaks down. When chute dams, can adopt the baffle plate that dams, the baffle arrangement that dams is simple, for convenience detach.
The combined system that string pipe of the present utility model adds chute efficiently solves surrounding deep foundation pit narrow field and cannot set up the problem of chute, has improved speed of perfusion, thereby saves the duration, ensures the continuous placing of mass concrete, has ensured construction quality.
Brief description of the drawings
Below in conjunction with drawings and Examples, the utility model is further illustrated.
Fig. 1 is the structural representation of string pipe.
Fig. 2 is the structural representation of chute.
Fig. 3 is the dam structural representation of baffle plate of chute.
Reference numeral: 1-steel pipe, 2-girth member, 3-45 degree elbow section, 4-vertical incision, 5-chute bracing frame, 6-flitch, 7-chute cell body, 8-wood springboard, 9-Dense mesh screen, 10-skirting board, 11-safety net, 12-dam with flitch, the vertical baffle plate of 13-, the detachable plank sheathing of 14-.
Detailed description of the invention
Embodiment is shown in Figure 1, this string pipe of building for deep foundation ditch concrete, chute combined system, and described string pipe is made up of steel pipe 1 and girth member 2. Steel pipe 1 can adopt the common pipe fitting of electromechanical speciality to process, and steel pipe 1 diameter determines according to grey speed under concrete tank. Steel pipe 1 is arranged at intervals with one eighth bend section 3 along short transverse, and straight length above one eighth bend section 3 is welded with girth member 2, and girth member 2 is steel plate or channel-section steel. Steel pipe 1 bottom forms string pipe discharging opening with vertical incision 4, and string pipe discharging opening is relative with chute start position.
Shown in Figure 2, described chute comprises chute cell body 7, chute bracing frame 5 and pavement. Described chute cell body 7 forms by laying iron sheet panel in flute profile plank sheathing, and the gradient of chute cell body 7 can be 1:2.5, needs to meet to build requirement. Chute cell body 7 bottoms and both sides are supported on chute bracing frame 5 by flitch 6. On the chute bracing frame 5 of chute cell body 7 belows, hang with safety net 11. Described pavement is erected on the chute bracing frame 5 of chute cell body 7 one sides. Pavement is made up of the skirting board 10 of the wooden springboard 8 tiling and wooden springboard both sides. Interval, pavement 300mm is furnished with tread plate. On the adjacent chute bracing frame 5 in pavement, hang with Dense mesh screen 9.
Chute bracing frame 5 facades can arrange horizontal bridging, limit portion and strengthen district, vertically strengthen district. When design, should take into full account resistance to capsizing, multiple tracks wall-connecting piece is set, throw support, also can cable wind rope be set according to actual conditions, ensure frame body safe.
Shown in Figure 3, described chute also comprises the baffle plate that dams, the described baffle plate that dams forms with flitch 12, vertical baffle plate 13 and detachable plank sheathing 14 by damming, vertical baffle plate 13 is connected with detachably plank sheathing 14 is vertical chute cell body 7 in, dams and is laterally connected in vertical baffle plate 13 back sides with flitch 12.
The course of work of the present utility model is as follows:
While using string pipe, chute system to build, concrete tank rests in string pipe feeding mouth place, and concrete trickles to chute start position from a high position by string pipe, then builds a little to specifying via chute trickling.

Claims (8)

1. string pipe, a chute combined system of building for deep foundation ditch concrete, is characterized in that:
Described string pipe is made up of steel pipe (1) and girth member (2), steel pipe (1) is arranged at intervals with one eighth bend section (3) along short transverse, and be welded with girth member (2) at the straight length of one eighth bend section (3) top, steel pipe (1) bottom forms string pipe discharging opening with vertical incision (4), and string pipe discharging opening is relative with chute start position;
Described chute comprises chute cell body (7), chute bracing frame (5) and pavement, described chute cell body (7) forms by laying iron sheet panel in flute profile plank sheathing, it is upper that chute cell body (7) bottom and both sides are supported on chute bracing frame (5) by flitch (6), and described pavement is erected on the chute bracing frame (5) of chute cell body (7) one sides.
2. string pipe of building for deep foundation ditch concrete according to claim 1, chute combined system, is characterized in that: described girth member (2) is steel plate or channel-section steel.
3. string pipe of building for deep foundation ditch concrete according to claim 1, chute combined system, is characterized in that: the gradient of described chute cell body (7) is 1:2.5.
4. string pipe of building for deep foundation ditch concrete according to claim 1, chute combined system, is characterized in that: on the chute bracing frame (5) of described chute cell body (7) below, hang with safety net (11).
5. string pipe of building for deep foundation ditch concrete according to claim 1, chute combined system, is characterized in that: on the adjacent chute bracing frame (5) in described pavement, hang with Dense mesh screen (9).
6. string pipe of building for deep foundation ditch concrete according to claim 1, chute combined system, is characterized in that: described pavement is made up of the skirting board (10) of the wooden springboard (8) tiling and wooden springboard both sides.
7. string pipe of building for deep foundation ditch concrete according to claim 1, chute combined system, is characterized in that: described pavement interval 300mm is furnished with tread plate.
8. string pipe of building for deep foundation ditch concrete according to claim 1, chute combined system, it is characterized in that: described chute also comprises the baffle plate that dams, the described baffle plate that dams is by damming by flitch (12), vertical baffle plate (13) and detachable plank sheathing (14) formation, vertical baffle plate (13) chute cell body (7) in detachable vertical connection of plank sheathing (14), dam and be laterally connected in vertical baffle plate (13) back side with flitch (12).
CN201521056339.XU 2015-12-17 2015-12-17 A cluster pipe, chute combination system for deep basal pit concrete placement Active CN205242407U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521056339.XU CN205242407U (en) 2015-12-17 2015-12-17 A cluster pipe, chute combination system for deep basal pit concrete placement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521056339.XU CN205242407U (en) 2015-12-17 2015-12-17 A cluster pipe, chute combination system for deep basal pit concrete placement

Publications (1)

Publication Number Publication Date
CN205242407U true CN205242407U (en) 2016-05-18

Family

ID=55941485

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521056339.XU Active CN205242407U (en) 2015-12-17 2015-12-17 A cluster pipe, chute combination system for deep basal pit concrete placement

Country Status (1)

Country Link
CN (1) CN205242407U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111119487A (en) * 2020-03-19 2020-05-08 中建一局集团建设发展有限公司 Double-layer chute concrete pouring system and construction method thereof
CN112832245A (en) * 2021-01-18 2021-05-25 中国建筑第二工程局有限公司 Small-angle overlong chute pouring raft foundation large-volume concrete construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111119487A (en) * 2020-03-19 2020-05-08 中建一局集团建设发展有限公司 Double-layer chute concrete pouring system and construction method thereof
CN111119487B (en) * 2020-03-19 2023-10-24 中建一局集团建设发展有限公司 Double-layer chute concrete pouring system and construction method thereof
CN112832245A (en) * 2021-01-18 2021-05-25 中国建筑第二工程局有限公司 Small-angle overlong chute pouring raft foundation large-volume concrete construction method

Similar Documents

Publication Publication Date Title
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
CN103470046B (en) The casting method of ultra-high steel tube concrete column tremie method concrete casting device
CN103882813B (en) For calf support platform and the building method thereof of bridge pier and straining beam synchronous construction
CN105239775B (en) A kind of reinforcement installation penetration quality dynamic control method for silo slip form construction
CN102587663A (en) Concrete construction process of steel tube columns of super-high-rise building
CN206625428U (en) Floor closed system is poured after a kind of pipe well
CN103993745B (en) A kind of conversion beam integral hoisting device for rapid and hanging method thereof
CN203547753U (en) Profile steel concrete shaft wall base
CN205242407U (en) A cluster pipe, chute combination system for deep basal pit concrete placement
CN103628575A (en) Large-altitude-difference variable-section concrete structure construction joint and construction method thereof
CN109812620A (en) Primary concreting large-diameter steel pipe concrete pack method
CN104314081A (en) Deep foundation pit driftway-free basement concrete pumping construction device
CN207775935U (en) City piping lane pre-buried channel flow mounting device
CN205975637U (en) A template reinforcing apparatus for concrete placement in circular well
CN203498850U (en) Raft foundation reinforcement support of super high-rising building
CN102747747A (en) Construction method for installing underground lattice column
CN104746521B (en) The application of oversized cross-section slope cushion layer constructing structure
CN201614740U (en) Layered concrete jacking device for steel column with box-shaped section
CN205296164U (en) Fill ability of swimming slip form construction device
CN202493033U (en) Cooling pipe network system for supporting multilayer reinforcing steel bars of building base plate
CN202925562U (en) Suspended scaffold passing overhead contact line equipment pole foundation
CN204021215U (en) A kind of job platform that is applicable to the excessive big vast tower of Tailings Dam
CN203530963U (en) Counter weight method cage floating prevention device
CN109778806B (en) Construction method for integrally sliding and lifting pier wall with connecting beam
CN207160052U (en) A kind of skewback for connecting arcuate bead steel construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant