CN206352262U - A kind of bearing support hydraulic system for cross-line bridge construction - Google Patents
A kind of bearing support hydraulic system for cross-line bridge construction Download PDFInfo
- Publication number
- CN206352262U CN206352262U CN201621408056.1U CN201621408056U CN206352262U CN 206352262 U CN206352262 U CN 206352262U CN 201621408056 U CN201621408056 U CN 201621408056U CN 206352262 U CN206352262 U CN 206352262U
- Authority
- CN
- China
- Prior art keywords
- side plate
- cross
- bridge
- hydraulic system
- bridge construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of bearing support hydraulic system for cross-line bridge construction, and it includes bogie and flexible bearing component;Bogie includes control room and car body;Flexible bearing component is arranged on the car body of bogie, and its flexible bearing component includes motor, the rotating shaft being connected with motor, the hydraulic elevating platform of motor both sides;Rotating shaft is flexibly connected support bar, and upper surface is welded and fixed with hanging plate;Hydraulic elevating platform is made up of telescopic folding arm;The beam slab upper surface of left and right two respectively supports and is connected respectively with the second side plate by buffer strip above the first side plate, its first side plate;Support column is provided with the second side plate, rotatable movable disk is connected on the support columns;The hanging plate being welded and fixed with support bar is supported by movable disk.The plant automation, intelligence degree are high, and construction quality is more easy to be protected, and can meet in city bridge construction and tear the rapid requirement of bridge open, the big highway overpass bridge of the magnitude of traffic flow also can greatly shorten construction period under, bridge nervous to the duration.
Description
Technical field
The utility model is related to equipment for bridge construction technical field, specially a kind of bearing support for cross-line bridge construction
Hydraulic system.
Background technology
With the development of the city, vehicle flowrate is growing day by day, and vehicular load also has the trend continued to increase, and Urban Bridge is carried
New higher requirement is gone out.Partial Bridges in operation, due to of the remote past, there are problems that itself needing to change.
Using the Full space support construction for leaving door opening more than conventional construction scheme, long construction period, vehicle must be another on construction period bridge
Building sidewalk outside could pass through, and vehicle also has falling object from high altitude equivalent risk below door opening.The field operation of full framing also can simultaneously
Noise, dust and pernicious gas are produced, bad influence is caused to urban environment.The congestion of traffic is even more that directly affects city
The life of the people.
The instructions such as prefabrication and assembly construction, rapid construction are proposed for this China's traffic part.To adapt to the form, this
Utility model patent proposes a kind of device for rapid construction bridges, and it can haul prefabricated whole girder to need more
At the bridge location changed, jack-up and rotation are realized, bearing is directly inserted into, therefore operating efficiency is high, reduces substantial amounts of work high above the ground,
Alleviate influence of the construction period to traffic on bridge, under bridge.The plant automation, intelligence degree are high, and construction quality is more easy to get
To guarantee, the requirement of rapid bridge construction in city can be met.The device can be used for the rapid original bridge of dismounting in city simultaneously
The big highway overpass bridge construction of the magnitude of traffic flow also can greatly shorten construction period under beam, bridge nervous to the duration.
Utility model content
The purpose of this utility model is that there is provided a kind of bearing support hydraulic pressure system for cross-line bridge construction for problem above
System, its operating efficiency is high, mobile convenient transportation, reduces substantial amounts of work high above the ground, alleviates construction period to being handed on bridge, under bridge
Logical influence.The plant automation, intelligence degree are high, and construction quality is more easy to be protected, and can meet in city bridge construction and tear open
The big highway overpass bridge of the magnitude of traffic flow also can greatly shorten construction period under the rapid requirement of bridge, bridge nervous to the duration.
To realize object above, the technical solution adopted in the utility model is:A kind of load-bearing support for cross-line bridge construction
Frame hydraulic system, it includes bogie(1)And flexible bearing component(3);The bogie(1)Including control room(101)And car
Body(102);The car body(102)Lower section is provided with several height-adjustable telescopic outriggers(2);The flexible bearing component
(3)It is movably arranged on three-dimensional mobile platform(4)On, its three-dimensional mobile platform(4)It is fixed on bogie(1)Car body(102)On,
Its flexible bearing component(3)Including motor(32)With motor(32)Connected rotating shaft(33), be arranged on motor(32)The liquid of both sides
Press hoistable platform(31);The rotating shaft(33)On be connected with support bar(34), its support bar(34)Section is T-shape, on
Surface and hanging plate(39)By being welded and fixed;The hydraulic elevating platform(31)It is made up of telescopic folding arm, passes through beam slab(314)
Stack;Two beam slabs in the left and right(314)Upper surface respectively supports the first side plate(35), two first side plate(35)Distinguish top
With the second side plate(36)Connected by buffer strip;In the second side plate(36)It is provided with support column(37), in support column(37)Upper company
Connect rotatable movable disk(38);In movable disk(38)On be supported by described and support bar(34)The hanging plate being welded and fixed(39).
Further, the hydraulic elevating platform(31)By hydraulic pump(311), hydraulic cylinder(312)And interior turntable(313)Group
Into the hydraulic elevating platform(31)At least provided with two.
Further, the movable disk(38)It is provided with the steel ball being inlaid with groove, groove for rolling.
Further, the telescopic outrigger(2)Be provided be used for judge bridge beam body placement location whether the pressure of centering
Sensor(201), pressure value is checked by Remote, to judge security.
Further, first side plate(35)With the second side plate(36)Between be provided with buffer strip(351).
Further, the hanging plate(39)It is carved with mesh antiskid lines in upper surface.
Further, the support bar(34)Upper part and the second side plate(36)Buffered from being formed when discharging bridge beam body
The free gap of effect.
Further, the flexible bearing component(3)Both sides are provided with the supporting station for being used for placing bridge beam body(5), it is described
Flexible bearing component(3)Postive stop baffle is provided with the corner location of bottom(6).
Further, the car body(102)Side buckles the lock of cable wire provided with several(1021), for cable wire binding
Bridge beam body.
Further, the car body(102)Side buckles the lock of cable wire provided with several(1021), for cable wire binding
Bridge beam body, during installation, is provided with the camera illuminated with LED on some positions of bridge plate(7).
The beneficial effects of the utility model:A kind of bearing support hydraulic system for cross-line bridge construction, its operation are provided
Efficiency high, mobile convenient transportation, reduces substantial amounts of work high above the ground, alleviates influence of the construction period to traffic on bridge, under bridge.
The plant automation, intelligence degree are high, and construction quality is more easy to be protected, and can meet in city bridge construction and to tear bridge open rapid
It is required that, the big highway overpass bridge of the magnitude of traffic flow also can greatly shorten construction period under, bridge nervous to the duration.
1. the utility model device uses hydraulic lifting folding platform, cast aside tradition and limited by opening angle, stress
More rationally, operating efficiency is substantially increased, in the vertical direction rises and also bridge sheet material can be played a protective role, prevents
Bridge sheet material collides with breakage during lifting, and for jack, its safety coefficient is higher, and stroke is bigger.
2. by provided with side plate and hanging plate, realization finish the problem of axle casing beam body is turned in lifting, be easily installed bridge
Beam girder.
3. being provided with buffer strip between biside plate, bridge main beam temporary impact in firm pressure can be buffered and acted on, protected
Hydraulic elevating platform and beam body.
4. part forms movable gap with the second side plate on support bar, side plate can be played when bridge is depressed
The effect of crossing, is also more convenient when beam body is rotated.
5. hydraulic elevating platform is mainly by the pressure actuation of hydraulic oil to realize the function of lifting, its scissor
Mechanical structure, makes lift raising have higher stability, roomy job platform and higher bearing capacity, makes work high above the ground
Scope is bigger.
6. car body side buckles the lock of cable wire provided with several, it is easy to the fixation to bridge beam body in transportation,
Prevent from coming off.
7. being provided with the display screen for being used for controlling bridge plate rotational angle in driver's cabin, three are adjusted by inputting numerical value
Mobile platform movement is tieed up, mobile range control realizes accurate quick positioning in 0 ~ 30cm or so.
Brief description of the drawings
Fig. 1 is the utility model positive structure schematic.
Fig. 2 is flexible bearing component positive structure schematic in Fig. 1.
Structure enlarged diagram in Fig. 3 Fig. 2 at A.
Fig. 4 is the dimensional structure diagram of movable disk.
Fig. 5 is the structural representation that bogie cable wire in transportation binds bridge beam body.
Fig. 6 is that bogie transports target point preparation steering top view.
Fig. 7 is the top view in bogie bridge beam body steering procedure.
Fig. 8 is three-dimensional mobile platform structural representation.
Label character is expressed as described in figure:1st, bogie;2nd, supporting leg;4th, three-dimensional mobile platform;5th, supporting station;6th, it is spacing
Baffle plate;7th, camera;31st, hydraulic elevating platform;32nd, motor;33rd, rotating shaft;34th, support bar;35th, the first side plate;36th, the second side
Plate;37th, support column;38th, movable disk;39th, hanging plate;101st, control room;102nd, car body;201st, pressure sensor;311st, hydraulic pump;
312nd, hydraulic cylinder;313rd, interior turntable;314th, beam slab;351st, buffer strip;1021st, latch.
Embodiment
In order that those skilled in the art more fully understand the technical solution of the utility model, below in conjunction with the accompanying drawings to this reality
Be described in detail with new, the description of this part be only it is exemplary and explanatory, should not be to protection domain of the present utility model
There is any restriction effect.
As Figure 1-Figure 8, concrete structure of the present utility model is:A kind of bearing support hydraulic pressure for cross-line bridge construction
System, it includes bogie 1 and flexible bearing component 3;The bogie 1 includes control room 101 and car body 102;The car body
102 lower sections are provided with several height-adjustable telescopic outriggers 2;The flexible bearing component 3 is movably arranged on three-dimensional movement
On platform 4, its three-dimensional mobile platform 4 is fixed on the car body 102 of bogie 1, its flexible bearing component 3 include motor 32, with
The connected rotating shaft 33 of motor 32, the hydraulic elevating platform 31 for being arranged on the both sides of motor 32;Branch is connected with the rotating shaft 33
Strut 34, its section of support bar 34 is T-shape, and upper surface is with hanging plate 39 by being welded and fixed;The hydraulic elevating platform 31 by
Telescopic folding arm is constituted, and is stacked by beam slab 314;Described two upper surfaces of beam slab 314 in left and right respectively support the first side plate 35, and it two
The individual top of first side plate 35 is connected with the second side plate 36 by buffer strip respectively;Support column 37 is provided with the second side plate 36,
Rotatable movable disk 38 is connected on support column 37;The hanging plate being welded and fixed with support bar 34 is supported by movable disk 38
39。
It is preferred that, the hydraulic elevating platform 31 is made up of hydraulic pump 311, hydraulic cylinder 312 and interior turntable 313, the liquid
Hoistable platform 31 is pressed at least provided with two.
It is preferred that, the movable disk 9 is provided with the steel ball being inlaid with groove, groove for rolling.
It is preferred that, the telescopic outrigger 2 be provided be used for judge bridge beam body placement location whether the pressure sensing of centering
Device 201, pressure value is checked by Remote, to judge security.
It is preferred that, buffer strip 351 is provided between the side plate 36 of the first side plate 35 and second.
It is preferred that, mesh antiskid lines is carved with the upper surface of hanging plate 39.
It is preferred that, cushioning effect from part is formed when discharging bridge beam body with the second side plate 36 on the support bar 34
Free gap.
It is preferred that, the flexible both sides of bearing component 3 be provided with and be used to place the supporting station 5 of bridge beam body, it is described flexible
Postive stop baffle 6 is provided with the corner location of the bottom of bearing component 3.
It is preferred that, the side of car body 102 buckles the lock 1021 of cable wire provided with several, and Bridge Beam is bound for cable wire
Body, during installation, is provided with the camera 7 illuminated with LED on some positions of bridge beam body.
A kind of course of work of bearing support hydraulic system for cross-line bridge construction of the utility model is as follows:
Prefabricated bridge main beam is hung on into hanging plate 39, fixed by spacing and cable wire, bogie 1 is driven into and specifies ground
Point, starts telescopic outrigger 2 and consolidates bogie 1, start control button and start hydraulic elevating platform 31, hydraulic lifting after being tentatively set to
Platform 31 drives hydraulic pump 311 to support the interior jacking of turntable 313 to design attitude by motor 32, it is ensured that after hanging plate 39 is stable, open
Dynamic motor 32 drives rotating shaft 33 slowly to rotate, and hanging plate 39 and support bar 37 are also rotated with;After specified angle is rotated to, fall beam
In place.Passed in construction by the pressure sensor 201 of some cameras 7 in bridge beam body and the lower section of telescopic outrigger 2
Numerical value is passed to ensure construction safety.If bogie 1 is slightly offset from specified location, it can suitably adjust three-dimensional mobile platform 4 and drive
Flexible bearing component 3 is moved, and bridge main beam position is met design requirement;Construction terminate after, workmen by control button,
By hydraulic elevating platform 31 and the return of telescopic outrigger 2.
It should be noted that herein, term " comprising ", "comprising" or its any other variant are intended to non-row
His property is included, so that process, method, article or equipment including a series of key elements not only include those key elements, and
And also including other key elements being not expressly set out, or also include for this process, method, article or equipment institute inherently
Key element.
Specific case used herein is set forth to principle of the present utility model and embodiment, above example
Illustrate that being only intended to help understands method of the present utility model and its core concept.Described above is only of the present utility model preferred
Embodiment, it is noted that due to the finiteness of literal expression, and objectively there is unlimited concrete structure, for this technology
For the those of ordinary skill in field, on the premise of the utility model principle is not departed from, some improvement, retouching can also be made
Or change, above-mentioned technical characteristic can also be by rights combined;These improve retouching, change or combined, or not
It is improved that the design of utility model and technical scheme are directly applied into other occasions, it is regarded as protection of the present utility model
Scope.
Claims (9)
1. a kind of bearing support hydraulic system for cross-line bridge construction, it is characterised in that it includes bogie(1)And flexible hold
Recombinate part(3);The bogie(1)Including control room(101)And car body(102);The car body(102)Lower section is provided with some
Individual height-adjustable telescopic outrigger(2);The flexible bearing component(3)It is movably arranged on three-dimensional mobile platform(4)On, thirdly
Tie up mobile platform(4)It is fixed on bogie(1)Car body(102)On, its flexible bearing component(3)Including motor(32)And electricity
Machine(32)Connected rotating shaft(33), be arranged on motor(32)The hydraulic elevating platform of both sides(31);The rotating shaft(33)Upper activity
It is connected with support bar(34), its support bar(34)Section is T-shape, upper surface and hanging plate(39)By being welded and fixed;The liquid
Press hoistable platform(31)It is made up of telescopic folding arm, passes through beam slab(314)Stack;Two beam slabs in the left and right(314)Upper surface
The first side plate of each support(35), two first side plate(35)Top respectively with the second side plate(36)Connected by buffer strip;
Second side plate(36)It is provided with support column(37), in support column(37)The upper rotatable movable disk of connection(38);In movable disk
(38)On be supported by described and support bar(34)The hanging plate being welded and fixed(39).
2. a kind of bearing support hydraulic system for cross-line bridge construction according to claim 1, it is characterised in that described
Hydraulic elevating platform(31)By hydraulic pump(311), hydraulic cylinder(312)And interior turntable(313)Composition, the hydraulic elevating platform
(31)At least provided with two.
3. a kind of bearing support hydraulic system for cross-line bridge construction according to claim 1, it is characterised in that described
Movable disk(38)It is provided with the steel ball being inlaid with groove, groove for rolling.
4. a kind of bearing support hydraulic system for cross-line bridge construction according to claim 1, it is characterised in that described
Telescopic outrigger(2)Be provided be used for judge bridge beam body placement location whether the pressure sensor of centering(201), by long-range distant
Pressure value is checked in control, to judge security.
5. a kind of bearing support hydraulic system for cross-line bridge construction according to claim 1, it is characterised in that described
First side plate(35)With the second side plate(36)Between be provided with buffer strip(351).
6. a kind of bearing support hydraulic system for cross-line bridge construction according to claim 1, it is characterised in that described
Hanging plate(39)It is carved with mesh antiskid lines in upper surface.
7. a kind of bearing support hydraulic system for cross-line bridge construction according to claim 1, it is characterised in that described
Support bar(34)Upper part and the second side plate(36)The free gap of cushioning effect from being formed when discharging bridge beam body.
8. a kind of bearing support hydraulic system for cross-line bridge construction according to claim 1, it is characterised in that described
Flexible bearing component(3)Both sides are provided with the supporting station for being used for placing bridge beam body(5), the flexible bearing component(3)Bottom
Postive stop baffle is provided with corner location(6).
9. a kind of bearing support hydraulic system for cross-line bridge construction according to claim 1, it is characterised in that described
Car body(102)Side buckles the lock of cable wire provided with several(1021), bridge beam body, during installation, bridge are bound for cable wire
The camera illuminated with LED is provided with some positions of beam body(7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621408056.1U CN206352262U (en) | 2016-12-21 | 2016-12-21 | A kind of bearing support hydraulic system for cross-line bridge construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621408056.1U CN206352262U (en) | 2016-12-21 | 2016-12-21 | A kind of bearing support hydraulic system for cross-line bridge construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206352262U true CN206352262U (en) | 2017-07-25 |
Family
ID=59348118
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621408056.1U Expired - Fee Related CN206352262U (en) | 2016-12-21 | 2016-12-21 | A kind of bearing support hydraulic system for cross-line bridge construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206352262U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107700364A (en) * | 2017-10-18 | 2018-02-16 | 中铁机械装备研究设计院(成都)有限公司 | A kind of quick transition carrying frame for mobile formwork |
CN107988915A (en) * | 2017-12-29 | 2018-05-04 | 绍兴尹创机械科技有限公司 | A kind of bridge construction jack up pier |
CN110144808A (en) * | 2019-05-09 | 2019-08-20 | 福建侨龙应急装备有限公司 | A kind of collapsible Option of Piping across Bridge |
CN112482245A (en) * | 2020-11-23 | 2021-03-12 | 温州方舵建筑有限公司 | Detachable bridge combination support of turning |
CN113173114A (en) * | 2021-05-10 | 2021-07-27 | 山东交通学院 | Material transfer device for bridge construction |
-
2016
- 2016-12-21 CN CN201621408056.1U patent/CN206352262U/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107700364A (en) * | 2017-10-18 | 2018-02-16 | 中铁机械装备研究设计院(成都)有限公司 | A kind of quick transition carrying frame for mobile formwork |
CN107700364B (en) * | 2017-10-18 | 2023-04-07 | 中铁宝桥集团有限公司 | Rapid transition carrying frame for movable mould frame |
CN107988915A (en) * | 2017-12-29 | 2018-05-04 | 绍兴尹创机械科技有限公司 | A kind of bridge construction jack up pier |
CN107988915B (en) * | 2017-12-29 | 2023-12-26 | 绍兴尹创机械科技有限公司 | Self-elevating water platform for bridge construction |
CN110144808A (en) * | 2019-05-09 | 2019-08-20 | 福建侨龙应急装备有限公司 | A kind of collapsible Option of Piping across Bridge |
CN112482245A (en) * | 2020-11-23 | 2021-03-12 | 温州方舵建筑有限公司 | Detachable bridge combination support of turning |
CN113173114A (en) * | 2021-05-10 | 2021-07-27 | 山东交通学院 | Material transfer device for bridge construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206352262U (en) | A kind of bearing support hydraulic system for cross-line bridge construction | |
CN106968179B (en) | A kind of constructing device that Cast-in-situ Beam is carried out using self-propelled entirety falsework method | |
CN104695337B (en) | Self-lifting sliding and turnover construction system and construction method | |
CN203412327U (en) | Rotary lift type stereo garage | |
CN206591862U (en) | A kind of subway overhead station construction protecting platform car | |
CN206886602U (en) | A kind of highway bridge construction drilling platform | |
CN105401525B (en) | Cast-in-situ construction method of beam flange plates of acoustic barriers through movable mold base vehicles | |
CN205857026U (en) | A kind of movable type bridge anticollision barrier construction operation chassis | |
CN106012824A (en) | Movable bridge anti-collision guardrail construction operation trolley | |
CN203271136U (en) | Construction vehicle and operating platform safety fence thereof | |
CN111926691A (en) | Pier top rotating structure with power arranged on side pier and construction method | |
WO2023070257A1 (en) | Intelligent hoisting robot | |
CN102425100A (en) | Wide-bodied pedestrian overpass erected among buildings | |
CN206634946U (en) | Panorama type gantry crane | |
CN206554746U (en) | The anti-Hongmen Gate of subway | |
CN206319257U (en) | A kind of scalable mechanical bearing support for cross-line bridge construction | |
CN201309802Y (en) | Walking assembly-type gantry hoisting apparatus | |
CN203174511U (en) | Steel truss overhanging bracket | |
CN113417671A (en) | Construction method for quickly assembling prefabricated parts in shield tunnel | |
CN113135502A (en) | Method and device for high-rise building construction by adopting hydraulic jacking assembly | |
CN206092006U (en) | Self -propelled landing stage | |
CN206486811U (en) | Template expanding unit for bridge concrete guardrail slding form operation | |
CN206940276U (en) | A kind of special cantilever simple crane of high-speed railway shield | |
CN207761241U (en) | A kind of suspension type elevator shaft structure | |
CN206917297U (en) | A kind of large-span steel girder upper air installing system in place |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170725 Termination date: 20201221 |
|
CF01 | Termination of patent right due to non-payment of annual fee |