CN107988915B - Self-elevating water platform for bridge construction - Google Patents

Self-elevating water platform for bridge construction Download PDF

Info

Publication number
CN107988915B
CN107988915B CN201711473580.6A CN201711473580A CN107988915B CN 107988915 B CN107988915 B CN 107988915B CN 201711473580 A CN201711473580 A CN 201711473580A CN 107988915 B CN107988915 B CN 107988915B
Authority
CN
China
Prior art keywords
fixedly connected
positioning
sides
supporting
seats
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711473580.6A
Other languages
Chinese (zh)
Other versions
CN107988915A (en
Inventor
尹华军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoxing Yinchuang Machinery Technology Co ltd
Original Assignee
Shaoxing Yinchuang Machinery Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoxing Yinchuang Machinery Technology Co ltd filed Critical Shaoxing Yinchuang Machinery Technology Co ltd
Priority to CN201711473580.6A priority Critical patent/CN107988915B/en
Publication of CN107988915A publication Critical patent/CN107988915A/en
Application granted granted Critical
Publication of CN107988915B publication Critical patent/CN107988915B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to the technical field of bridge processing equipment, and discloses a self-elevating water platform for bridge construction, which comprises a base, wherein the top of the base is fixedly connected with a limiting table, two sides of the top of the limiting table are fixedly connected with electric push rods, the tops of the two electric push rods are fixedly connected with stand columns, the tops of the two stand columns are respectively and fixedly connected with two sides of the bottom of a positioning device, the top of the positioning device is fixedly connected with a supporting device, and two sides of the top of the limiting table, which are far away from the limiting frame, are fixedly connected with reset devices. This bridge construction is with jack-up formula water platform, the user is when constructing, can drive the reciprocates of stand through starting electric putter to can drive positioner and strutting arrangement's reciprocates, can let the user more convenient when using, through reset device, fixing base, reset spring, holding down plate, atmospheric pressure seat and atmospheric pressure post's cooperation use moreover, can guarantee the stability of positioner and strutting arrangement when using.

Description

Self-elevating water platform for bridge construction
Technical Field
The invention relates to the technical field of bridge reinforcement equipment, in particular to a self-elevating water platform for bridge construction.
Background
The bridge construction is a process of constructing a bridge according to design content; the bridge mainly refers to the contents of bridge construction technology, construction organization, construction management, construction quality and the like, and generally refers to a structure which is erected on rivers, lakes and seas to enable vehicles, pedestrians and the like to pass smoothly. In order to adapt to the traffic industry of modern high-speed development, bridges are also spreading to span mountain stream, poor geology or buildings which are erected to meet other traffic needs and enable the traffic to be more convenient. The bridge is generally composed of an upper structure, a lower structure, a support and an accessory structure, wherein the upper structure is also called a bridge span structure and is a main structure for crossing obstacles; the lower structure comprises a bridge abutment, a bridge pier and a foundation; the support is a force transmission device arranged at the supporting position of the bridge span structure and the bridge pier or the bridge abutment; the auxiliary structure is bridge end butt strap, cone slope protection, bank protection, diversion engineering, etc.
At present, the water platform is used for building the bridge when the bridge is constructed in the market, but the existing water platform does not have a self-lifting function in the use process, so that great trouble can be brought to workers when the water platform is used, meanwhile, stability cannot be guaranteed, the safety performance is reduced, and the problem is solved by the self-lifting water platform for bridge construction.
Disclosure of Invention
(one) solving the technical problems
Aiming at the defects of the prior art, the invention provides the self-elevating water platform for bridge construction, which has the self-elevating function, can ensure that workers can more conveniently process the platform, can ensure the stability during use, improves the safety performance and the like, and solves the problems that the safety performance is reduced because the platform does not have the self-elevating function, so that great trouble is brought to the workers during use, the stability cannot be ensured, and the safety performance is reduced.
(II) technical scheme
In order to realize the self-lifting function, the processing of workers can be more convenient, meanwhile, the invention can ensure the stability during use and improve the safety performance, and the invention provides the following technical scheme: the utility model provides a bridge construction is with jack-up formula water platform, includes the base, the top fixedly connected with spacing platform of base, the equal fixedly connected with electric putter in both sides at spacing platform top, two the equal fixedly connected with stand in top of electric putter, and the top of two stands respectively with positioner bottom's both sides fixedly connected with strutting arrangement, positioner's top fixedly connected with strutting arrangement, the middle part fixedly connected with spacing at spacing platform top, the top fixedly connected with connecting plate of spacing, and the bottom of connecting plate and positioner bottom's middle part fixedly connected with.
The limiting table top is kept away from the equal fixedly connected with resetting means in both sides of locating rack, and the equal fixedly connected with fixing base in the inboard bottom of two resetting means, two equal fixedly connected with reset spring in the middle part at fixing base top, and the equal fixedly connected with holding down plate in top of two reset springs, two the equal fixedly connected with atmospheric pressure seat in top of holding down plate, and the both sides fixed connection of two atmospheric pressure seats bottom all through the barometric leg with positioner.
Preferably, both sides of positioner inner wall are all fixedly connected with positioning seat, and the equal fixedly connected with locating plate in the outside of two positioning seats, two through cassette fixed connection between the locating plate, the inner chamber joint of cassette has the cardboard, the surface cover of cassette is equipped with the location sleeve plate, the equal fixedly connected with locating piece in both sides of location sleeve plate surface, and the outside of locating piece passes through the inner wall fixed connection of stabilizing seat and positioner.
Preferably, the inner cavity of the supporting device is connected with a supporting plate in a penetrating manner, the outer surface of the supporting device is fixedly connected with a baffle frame, the middle part of the inner side of the baffle frame is fixedly connected with a supporting column, one end of the supporting column penetrates through the supporting plate and extends to the inner side of the supporting device to be fixedly connected with the outer side of a supporting seat, and the other side of the supporting seat is fixedly connected with the outer surface of a protective fence.
Preferably, the inner cavity of the positioning sleeve plate is provided with a clamping hole, and the position of the clamping hole corresponds to the position of the supporting device.
Preferably, the joint of the support column and the support plate is sleeved with a support sleeve plate, and the inner cavity of the support sleeve plate is provided with a through hole matched with the support column in size.
Preferably, the inner cavity of the joint of the supporting seat and the protective fence is connected with a positioning bolt in a penetrating way, and the inner cavity of the protective fence is provided with a thread groove matched with the positioning bolt in size.
Preferably, the outer surfaces of the two fixing seats are respectively sleeved with a fixing sleeve plate, and two sides of the fixing sleeve plates are respectively and fixedly connected with two sides of the inner wall of the resetting device.
Preferably, the inner side of the fixing seat is provided with a through groove which is matched with the reset spring and the lower pressing plate in size.
Preferably, both sides of the inner wall of the limiting frame are fixedly connected with hinge seats, the hinge seats are fixedly connected through hinge frames, the middle part of the inner cavity of each hinge frame is connected with a bearing plate in a penetrating manner, and the top of each bearing plate is fixedly connected with the bottom of each connecting plate.
(III) beneficial effects
Compared with the prior art, the invention provides a self-elevating water platform for bridge construction, which has the following beneficial effects:
1. this bridge construction is with jack-up formula water platform, the user is when constructing, can drive the reciprocates of stand through starting electric putter to can drive positioner and strutting arrangement's reciprocates, can let the user more convenient when using, through reset device, fixing base, reset spring, holding down plate, atmospheric pressure seat and atmospheric pressure post's cooperation use moreover, not only can play the effect of unloading power and buffering, also can guarantee the stability of positioner and strutting arrangement when using simultaneously, improve the security performance when constructing, can be more convenient and safe when using.
2. This self-elevating water platform for bridge construction uses through the cooperation of positioning seat, locating plate, cassette and cardboard, can be in the same place with strutting arrangement joint, guarantees strutting arrangement's stability, then uses through the cooperation of locating sleeve plate, locating piece and steady seat, can play the effect of stability and spacing strutting arrangement, improves strutting arrangement's stability in the use to improve the security performance, let the workman can be more convenient and stable when using height-adjusting.
3. This self-elevating water platform for bridge construction uses through the cooperation of keeping off frame, backup pad, support column and supporting seat, can play the effect of location protective fence, improves protective fence's protection effect, prevents when receiving effort during the construction, and the workman does not have the measure of protection, leads to dropping the condition that causes the potential safety hazard, has improved security performance greatly, also can play the effect of support and spacing support column and strutting arrangement through supporting the cover board moreover, guarantees strutting arrangement stability when using, lets the workman can be safer during the construction.
4. This bridge construction is with jack-up formula water platform uses through the cooperation of locating rack, articulated seat, articulated frame and loading board, can play the effect of supporting and stable positioner, when positioner receives external effort too big simultaneously, can play the effect of unloading power and buffering through loading board, articulated frame and articulated seat, greatly reduced the effort that the locating rack received to guarantee holistic stability, can be more stable when letting the workman construct, can effectively improve the efficiency of workman's construction.
Drawings
FIG. 1 is a schematic diagram of a self-elevating water platform for bridge construction according to the present invention;
FIG. 2 is a schematic view of a partial enlarged structure of the portion A of FIG. 1 according to the present invention;
FIG. 3 is a schematic top view of a positioning device according to the present invention;
FIG. 4 is a schematic top view of a supporting device according to the present invention;
fig. 5 is a schematic view of a partial enlarged structure of fig. 4 according to the present invention.
In the figure: 1 base, 2 spacing platform, 3 electric putter, 4 stand, 5 positioner, 51 positioning seat, 52 locating plate, 53 cassette, 54 cardboard, 55 location sleeve plate, 56 locating piece, 57 steady seat, 58 draw-in hole, 6 strutting arrangement, 61 keep off the frame, 62 backup pad, 63 support column, 64 support sleeve plate, 65 supporting seat, 66 protective fence, 67 positioning bolt, 7 spacing, 8 articulated seat, 9 articulated frame, 10 loading board, 11 connecting plate, 12 resetting means, 121 fixing base, 122 fixed sleeve plate, 123 reset spring, 124 holding down plate, 125 atmospheric pressure seat, 126 barometric leg.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Referring to fig. 1-5, a self-elevating water platform for bridge construction comprises a base 1, wherein the top of the base 1 is fixedly connected with a limiting table 2, both sides of the top of the limiting table 2 are fixedly connected with electric push rods 3, when a user performs construction, the electric push rods 3 can drive a stand column 4 to move up and down, so that the positioning device 5 and a supporting device 6 can be driven to move up and down, the user can use more conveniently, and the cooperation of a reset device 12, a fixed seat 121, a reset spring 123, a lower pressure plate 124, an air pressure seat 125 and an air pressure column 126 can play roles of unloading and buffering, meanwhile, the stability of the positioning device 5 and the supporting device 6 during use can be ensured, the safety performance during construction is improved, the tops of the two electric push rods 3 are fixedly connected with the stand column 4 during use, the tops of the two upright posts 4 are fixedly connected with two sides of the bottom of the positioning device 5 respectively, two sides of the inner wall of the positioning device 5 are fixedly connected with positioning seats 51, the outer sides of the two positioning seats 51 are fixedly connected with positioning plates 52, the two positioning seats 52 are fixedly connected with each other through the matching of the positioning seats 51, the positioning plates 52, clamping seats 53 and clamping plates 54, the two positioning seats can be clamped with the supporting device 6 together to ensure the stability of the supporting device 6, then the positioning sleeve plates 55, the positioning blocks 56 and the stabilizing seats 57 are matched for use, the functions of stabilizing and limiting the supporting device 6 can be achieved, the stability of the supporting device 6 in the use process is improved, the safety performance is improved, workers can be more convenient and stable when using the height-adjusting device, the two positioning plates 52 are fixedly connected with each other through the clamping seats 53, the clamping plates 54 are clamped in the inner cavities of the clamping seats 53, the positioning sleeve plates 55 are sleeved on the outer surfaces of the clamping seats 53, the inner cavity of the positioning sleeve plate 55 is provided with the clamping holes 58, the positions of the clamping holes 58 correspond to the positions of the supporting devices 6, the two sides of the outer surface of the positioning sleeve plate 55 are fixedly connected with the positioning blocks 56, the outer sides of the positioning blocks 56 are fixedly connected with the inner wall of the positioning device 5 through the stabilizing seat 57, the top of the positioning device 5 is fixedly connected with the supporting devices 6, the inner cavity of the supporting devices 6 is connected with the supporting plates 62 in a penetrating manner, the functions of positioning the protective barriers 66 can be achieved through the matched use of the baffle frame 61, the supporting plates 62, the supporting columns 63 and the supporting seats 65, the protective effect of the protective barriers 66 is improved, the situation that potential safety hazards are caused by falling due to no protective measures of workers during construction is prevented, the safety performance is greatly improved, the supporting and limiting of the supporting columns 63 and the supporting devices 6 can be also achieved through the supporting sleeve plate 64, the worker can be safer during construction, the baffle frame 61 is fixedly connected with the outer surface of the supporting device 6, the middle part of the inner side of the baffle frame 61 is fixedly connected with the supporting column 63, the joint of the supporting column 63 and the supporting plate 62 is sleeved with the supporting sleeve plate 64, the inner cavity of the supporting sleeve plate 64 is provided with a through hole matched with the size of the supporting column 63, one end of the supporting column 63 penetrates through the supporting plate 62 and extends to the inner side of the supporting device 6 to be fixedly connected with the outer side of the supporting seat 65, the inner cavity of the joint of the supporting seat 65 and the protective fence 66 is fixedly connected with the positioning bolt 67, the inner cavity of the protective fence 66 is provided with a thread groove matched with the size of the positioning bolt 67, the other side of the supporting seat 65 is fixedly connected with the outer surface of the protective fence 66, the middle part of the top of the limiting table 2 is fixedly connected with the limiting frame 7, the two sides of the inner wall of the limiting frame 7 are fixedly connected with the hinging seat 8, and through articulated frame 9 fixed connection between the articulated seat 8, the middle part in articulated frame 9 inner chamber through-connection has loading board 10, and the top of loading board 10 and the bottom fixed connection of connecting plate 11, through spacing 7, articulated seat 8, the cooperation of articulated frame 9 and loading board 10 is used, can play the effect of supporting and stable positioner 5, simultaneously when positioner 5 receives external effort too big, can play the effect of unloading and buffering through loading board 10, articulated frame 9 and articulated seat 8, the effort that the spacing 7 received is greatly reduced, thereby guarantee holistic stability, let the workman can be more stable when constructing, can effectively improve the efficiency of workman's construction, the top fixedly connected with connecting plate 11 of spacing 7, and the bottom of connecting plate 11 and the middle part fixed connection of positioner 5 bottom.
The both sides that spacing frame 7 was kept away from at spacing bench 2 top are all fixedly connected with resetting means 12, and the equal fixedly connected with fixing base 121 of the inboard bottom of two resetting means 12, the logical groove with reset spring 123 and holding down plate 124 size looks adaptation has been seted up to the inboard of fixing base 121, the surface of two fixing bases 121 all is equipped with fixed sleeve plate 122, and the both sides of fixed sleeve plate 122 respectively with the both sides fixed connection of resetting means 12 inner wall, the equal fixedly connected with reset spring 123 in middle part at two fixing base 121 tops, and the equal fixedly connected with holding down plate 124 at the top of two reset spring 123, the equal fixedly connected with barometric leg 125 at the top of two holding down plates 124, and the both sides fixed connection of two barometric leg 125 bottom all through barometric leg 126 and positioner 5.
The electrical components are all connected with an external main controller and 220V mains supply, and the main controller can be conventional known equipment for controlling a computer and the like.
In summary, the self-elevating water platform for bridge construction can drive the upright post 4 to move up and down by starting the electric push rod 3 when a user performs construction, so that the positioning device 5 and the supporting device 6 can be driven to move up and down, the user can more conveniently use the self-elevating water platform, the force unloading and buffering effects can be achieved by the cooperation of the resetting device 12, the fixing seat 121, the resetting spring 123, the lower pressing plate 124, the air pressure seat 125 and the air pressure column 126, the stability of the positioning device 5 and the supporting device 6 during use can be ensured, the safety performance during construction is improved, the safety performance during use can be more convenient and safe, the self-elevating water platform can be clamped with the supporting device 6 through the cooperation of the positioning seat 51, the positioning plate 52, the clamping seat 53 and the clamping plate 54, the stability of the supporting device 6 is ensured, then through the cooperation of the positioning sleeve plate 55, the positioning block 56 and the stabilizing seat 57, the function of stabilizing and limiting the supporting device 6 can be achieved, the stability of the supporting device 6 in the use process is improved, thereby the safety performance is improved, workers can more conveniently and stably adjust the height in use, the function of positioning the protective fence 66 can be achieved through the cooperation of the baffle frame 61, the support plate 62, the support column 63 and the support seat 65, the protective effect of the protective fence 66 is improved, the situation that the worker does not have protective measures when the worker receives acting force during construction, the situation that the falling causes potential safety hazard is caused is avoided, the safety performance is greatly improved, the function of supporting and limiting the support column 63 and the supporting device 6 can be achieved through the support sleeve plate 64, the stability of the supporting device 6 in use is ensured, the workers can be safer during construction, the problem that the safety protection function is not provided is solved, therefore, great trouble is brought to workers when the safety protection device is used, stability cannot be guaranteed, and the safety performance is reduced.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a bridge construction is with jack-up formula water platform, includes base (1), its characterized in that: the device comprises a base (1), wherein a limiting table (2) is fixedly connected to the top of the base (1), electric push rods (3) are fixedly connected to two sides of the top of the limiting table (2), upright posts (4) are fixedly connected to the tops of the two electric push rods (3), the tops of the two upright posts (4) are respectively fixedly connected to two sides of the bottom of a positioning device (5), a supporting device (6) is fixedly connected to the top of the positioning device (5), a limiting frame (7) is fixedly connected to the middle of the top of the limiting table (2), a connecting plate (11) is fixedly connected to the top of the limiting frame (7), and the bottom of the connecting plate (11) is fixedly connected with the middle of the bottom of the positioning device (5);
the two sides of the top of the limiting table (2) far away from the limiting frame (7) are fixedly connected with reset devices (12), the bottoms of the inner sides of the two reset devices (12) are fixedly connected with fixing seats (121), the middle parts of the tops of the two fixing seats (121) are fixedly connected with reset springs (123), the tops of the two reset springs (123) are fixedly connected with a lower pressing plate (124), the tops of the two lower pressing plates (124) are fixedly connected with air pressure seats (125), and the tops of the two air pressure seats (125) are fixedly connected with the two sides of the bottom of the positioning device (5) through air pressure columns (126);
the two sides of the inner wall of the positioning device (5) are fixedly connected with positioning seats (51), the outer sides of the two positioning seats (51) are fixedly connected with positioning plates (52), the two positioning plates (52) are fixedly connected through clamping seats (53), clamping plates (54) are clamped in the inner cavities of the clamping seats (53), positioning sleeve plates (55) are sleeved on the outer surfaces of the clamping seats (53), positioning blocks (56) are fixedly connected to the two sides of the outer surfaces of the positioning sleeve plates (55), and the outer sides of the positioning blocks (56) are fixedly connected with the inner wall of the positioning device (5) through stabilizing seats (57);
the inner cavity of the supporting device (6) is connected with a supporting plate (62) in a penetrating manner, the outer surface of the supporting device (6) is fixedly connected with a baffle frame (61), the middle part of the inner side of the baffle frame (61) is fixedly connected with a supporting column (63), one end of the supporting column (63) penetrates through the supporting plate (62) and extends to the inner side of the supporting device (6) to be fixedly connected with the outer side of a supporting seat (65), and the other side of the supporting seat (65) is fixedly connected with the outer surface of a protective fence (66);
the outer surfaces of the two fixed seats (121) are sleeved with fixed sleeve plates (122), and two sides of the fixed sleeve plates (122) are fixedly connected with two sides of the inner wall of the resetting device (12) respectively;
the inner side of the fixed seat (121) is provided with a through groove which is matched with the reset spring (123) and the lower pressing plate (124).
2. The self-elevating water platform for bridge construction as set forth in claim 1, wherein: the inner cavity of the positioning sleeve plate (55) is provided with a clamping hole (58), and the position of the clamping hole (58) corresponds to the position of the supporting device (6).
3. The self-elevating water platform for bridge construction as set forth in claim 1, wherein: the support sleeve plate (64) is sleeved at the joint of the support column (63) and the support plate (62), and a through hole matched with the support column (63) in size is formed in the inner cavity of the support sleeve plate (64).
4. The self-elevating water platform for bridge construction as set forth in claim 1, wherein: the inner cavity of the joint of the supporting seat (65) and the protective fence (66) is connected with a positioning bolt (67) in a penetrating way, and the inner cavity of the protective fence (66) is provided with a thread groove matched with the positioning bolt (67) in size.
5. The self-elevating water platform for bridge construction as set forth in claim 1, wherein: both sides of locating rack (7) inner wall are all fixedly connected with articulated seat (8), and pass through articulated frame (9) fixed connection between articulated seat (8), the middle part in articulated frame (9) inner chamber through-connection has loading board (10), and the bottom fixed connection of top and connecting plate (11) of loading board (10).
CN201711473580.6A 2017-12-29 2017-12-29 Self-elevating water platform for bridge construction Active CN107988915B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711473580.6A CN107988915B (en) 2017-12-29 2017-12-29 Self-elevating water platform for bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711473580.6A CN107988915B (en) 2017-12-29 2017-12-29 Self-elevating water platform for bridge construction

Publications (2)

Publication Number Publication Date
CN107988915A CN107988915A (en) 2018-05-04
CN107988915B true CN107988915B (en) 2023-12-26

Family

ID=62043287

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711473580.6A Active CN107988915B (en) 2017-12-29 2017-12-29 Self-elevating water platform for bridge construction

Country Status (1)

Country Link
CN (1) CN107988915B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108644547A (en) * 2018-05-31 2018-10-12 朱本涛 A kind of fixing device that building engineering construction equipment damping performance is good
CN109440655B (en) * 2018-12-18 2020-11-17 中铁二十三局集团第一工程有限公司 Active drainage pressure release bridge construction platform on water

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3913531A1 (en) * 1989-04-25 1990-10-31 Carstensen Peter H Pneumatically operated lifting platform - is attached by struts to beam actuated by two pneumatic cylinders
CN201881367U (en) * 2010-12-10 2011-06-29 济南轨道交通装备有限责任公司 Manual fine adjustment lifting platform
CN106224431A (en) * 2016-08-26 2016-12-14 无锡市恒达矿山机械有限公司 A kind of mining machinery damping base
CN206144123U (en) * 2016-10-26 2017-05-03 甘肃建筑职业技术学院 Lifting and drop rotating formula interior decoration platform for building
CN206352262U (en) * 2016-12-21 2017-07-25 岳阳市公路桥梁基建总公司 A kind of bearing support hydraulic system for cross-line bridge construction
CN206529705U (en) * 2017-02-13 2017-09-29 王贵美 bridge column construction operation platform
CN107511808A (en) * 2017-09-05 2017-12-26 江苏宁泰模具有限公司 A kind of height-adjustable mould production storage rack
CN209353228U (en) * 2017-12-29 2019-09-06 绍兴尹创机械科技有限公司 A kind of bridge construction jack up pier

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN207032906U (en) * 2017-05-23 2018-02-23 深圳南利装饰集团股份公司 A kind of construction platform safety device
CN107838885A (en) * 2017-10-31 2018-03-27 楼浩伟 It is a kind of to use stable valve processing workbench
CN107914153A (en) * 2017-12-29 2018-04-17 绍兴市柯桥区欧祥机械有限公司 A kind of machine components machine table

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3913531A1 (en) * 1989-04-25 1990-10-31 Carstensen Peter H Pneumatically operated lifting platform - is attached by struts to beam actuated by two pneumatic cylinders
CN201881367U (en) * 2010-12-10 2011-06-29 济南轨道交通装备有限责任公司 Manual fine adjustment lifting platform
CN106224431A (en) * 2016-08-26 2016-12-14 无锡市恒达矿山机械有限公司 A kind of mining machinery damping base
CN206144123U (en) * 2016-10-26 2017-05-03 甘肃建筑职业技术学院 Lifting and drop rotating formula interior decoration platform for building
CN206352262U (en) * 2016-12-21 2017-07-25 岳阳市公路桥梁基建总公司 A kind of bearing support hydraulic system for cross-line bridge construction
CN206529705U (en) * 2017-02-13 2017-09-29 王贵美 bridge column construction operation platform
CN107511808A (en) * 2017-09-05 2017-12-26 江苏宁泰模具有限公司 A kind of height-adjustable mould production storage rack
CN209353228U (en) * 2017-12-29 2019-09-06 绍兴尹创机械科技有限公司 A kind of bridge construction jack up pier

Also Published As

Publication number Publication date
CN107988915A (en) 2018-05-04

Similar Documents

Publication Publication Date Title
CN107988915B (en) Self-elevating water platform for bridge construction
CN110700538A (en) Building scaffold convenient to dismouting
CN211341658U (en) Portable secondary construction telescopic stool
CN212583181U (en) Inclined lever type movable cantilever platform
CN205532502U (en) Operating platform
CN212802437U (en) Scaffold with prevent empting function
CN214943104U (en) Highway engineering construction rail guard device
CN210460176U (en) Protector for construction
CN211949476U (en) Safety platform for building construction
CN210887997U (en) Building scaffold with adjustable height
CN210439974U (en) Small-sized engineering drilling machine support
CN208950270U (en) A kind of steel structure support frame structure
CN203808487U (en) Construction wall-attached scaffold cantilever device
CN210439644U (en) Detachable convenient construction frame
CN216406093U (en) Support base with cross-platform flue convenient to replace
CN214144878U (en) Building municipal works is with protection canopy
CN216947874U (en) Bridge faces limit protection fixed foot rest
CN203977834U (en) A kind of construction of lift well protective platform
CN205558259U (en) A adjustable bearing structure for frame template
CN221001873U (en) Folding scaffold for building construction
CN216766856U (en) Protective device used during architectural decoration construction
CN212078623U (en) High elevating platform is used in construction of security
CN212613600U (en) Scaffold for building engineering
CN219315701U (en) A connection structure that is used for steel bushing case to promote removable stand in station
CN214303204U (en) Site isolating device for construction of exhibition hall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant