CN206346520U - A kind of concurrent plant layout structure - Google Patents
A kind of concurrent plant layout structure Download PDFInfo
- Publication number
- CN206346520U CN206346520U CN201621155952.1U CN201621155952U CN206346520U CN 206346520 U CN206346520 U CN 206346520U CN 201621155952 U CN201621155952 U CN 201621155952U CN 206346520 U CN206346520 U CN 206346520U
- Authority
- CN
- China
- Prior art keywords
- area
- truss
- transmission line
- skeleton
- preparation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000005540 biological transmission Effects 0.000 claims abstract description 40
- 238000002360 preparation method Methods 0.000 claims abstract description 21
- 238000004519 manufacturing process Methods 0.000 claims abstract description 18
- 238000004080 punching Methods 0.000 claims abstract description 17
- 238000003756 stirring Methods 0.000 claims abstract description 7
- 238000005119 centrifugation Methods 0.000 claims abstract description 6
- 238000012546 transfer Methods 0.000 claims abstract description 6
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 238000003466 welding Methods 0.000 claims description 4
- 241000196324 Embryophyta Species 0.000 description 5
- 238000000034 method Methods 0.000 description 2
- 239000008267 milk Substances 0.000 description 2
- 210000004080 milk Anatomy 0.000 description 2
- 235000013336 milk Nutrition 0.000 description 2
- 239000004570 mortar (masonry) Substances 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 210000000988 bone and bone Anatomy 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model provides a kind of concurrent plant layout structure, the first truss and the second truss extended parallel along X-direction including two transmission lines, also include setting gradually along X-axis negative sense and crossing over the first truss and the mould area in preparation of the transmission line of the second truss, feeding zone, production district, rod area and skeleton area in preparation, provided with conveying trough, the punching block transfer cart in conveying trough, the drawing-in device and draw-gear for being respectively arranged on conveying trough two ends extended along Y direction in feeding zone, conveying trough crosses over the transmission line of the first truss and the second truss;Provided with electric pole transport vehicle and the conveying track extended along Y direction in rod area, conveying track crosses over the transmission line of the first truss and the second truss;Production district includes demoulding area, Skeleton assembly area, curing pool and centrifugation pond;Also include boiler room, stirring area, sandstone pile and electric pole pile.The utility model make it that factory building layout is more flexible, reduces factory site requirement;And production efficiency can be improved.
Description
Technical field
The utility model is related to hydroelectric facility field, more particularly to a kind of factory building layout knot for being used to produce concurrent
Structure.
Background technology
Electric pole is the visual plant in electric power transport, typically with wooden electric pole, concurrent and steel electric pole, wherein
Concurrent is because its cost is low, intensity is high, long lifespan and be most widely used.Concurrent is first to make bone when producing
Framework of steel reinforcement, is then placed in steel mould for electric pole and the penetration concrete mortar in punching block by frame and concrete mortar, then by punching block
It is placed on centrifugal device and is centrifuged, conserve and be stripped finally by high-temperature vapour, you can the concurrent being molded.It is existing
The factory for having concurrent is continuous-flow type design, i.e., by carcasing, mix the work such as slurry, grouting, centrifugation and the demoulding
Area is arranged on the transmission line of same truss, and its shortcoming is:The layout structure of this factory building generally linear pattern, thus it is right
The requirement in place is higher, is not suitable for mountain region area.
Utility model content
For the deficiency in the presence of prior art, the utility model provides a kind of concurrent factory building and is laid out knot
Structure, some production districts are distributed on a plurality of truss transmission line by it by setting a plurality of truss transmission line according to circulating layout,
So that each workplace layout is more flexible, to adapt to build factory building in mountain region area.
To achieve the above object, the utility model employs following technical scheme:
A kind of concurrent plant layout structure, including the first purlin that two transmission lines extend parallel along X-direction
Frame and the second truss and the mould area in preparation set gradually along X-axis negative sense, feeding zone, production district, rod area and skeleton prepare
Area, the mould area in preparation, feeding zone, production district, rod area and skeleton area in preparation are across the first truss and the second truss
Be provided with some conveying troughs extended along Y direction in transmission line, the feeding zone, the conveying trough across the first truss and
Punching block transfer cart is equipped with the transmission line of second truss, each conveying trough, the two ends of each conveying trough are set respectively
It is equipped with drawing-in device and draw-gear;Be provided with electric pole transport vehicle and conveying track in the rod area, the conveying track across
The more transmission line of the first truss and the second truss;
The production district includes being arranged on the first truss transmission line and the demoulding area set gradually along X-axis forward direction and skeleton
Assembly section, the production district also include being arranged on the curing pool that sets gradually on the second truss transmission line and along X-axis forward direction and from
Heart pond;
Further, in addition to close to the boiler room of curing pool, close to the stirring area of drawing-in device, the sand close to stirring area
Clitter code field and the electric pole pile close to rod area, the conveying track are extended in electric pole pile.
Further, the mould area in preparation includes the mould laydown area being arranged on the first truss transmission line and is arranged on
Mould servicing area on second truss transmission line.
Further, the skeleton area in preparation include being successively set on seam welder weld zone on the first truss transmission line and
Skeleton laydown area and the steel laydown area being arranged on the second truss transmission line and manual welding area.
Compared to prior art, the utility model has the advantages that:The utility model is by setting two along X-axis
Truss transmission line and the feeding zone arranged parallel along Y direction and rod area are arranged in direction parallel so that concurrent
Feeding, centrifugation, maintenance, the demoulding and Skeleton assembly process are located in an annular so that the plane figure of factory building is more flexible, because
And the length requirement to plant address can be greatly reduced, it is adapted to Mountainous Regions;Simultaneously because set two it is parallel
Truss transmission line, can effectively improve production efficiency.
Brief description of the drawings
Fig. 1 is planar layout structure figure of the present utility model.
Embodiment
Below in conjunction with the accompanying drawings and embodiment is further illustrated to the technical scheme in the utility model.
As illustrated, the utility model proposes a kind of concurrent plant layout structure, including two transmission lines are equal
The first truss 1 and the second truss 2 that extend parallel along X-direction and the mould area in preparation 3 set gradually along X-axis negative sense, feed
Expect area 4, production district 5, rod area 6 and skeleton area in preparation 7, the mould area in preparation 3, feeding zone 4, production district 5, the and of rod area 6
Skeleton area in preparation 7 is crossed in the transmission line of the first truss 1 and the second truss 2, the feeding zone 4 and is provided with some along Y-axis
The conveying trough 41 of direction extension, the conveying trough 41 is across the first truss 1 and the transmission line of the second truss 2, and described each is transported
Punching block transfer cart 42 is equipped with defeated groove 41, the two ends of each conveying trough 41 are respectively arranged with drawing-in device 43 and draw-gear
44;Electric pole transport vehicle 61 and conveying track 62 are provided with the rod area 6, the conveying track 62 crosses over the He of the first truss 1
The transmission line of second truss 2;
The production district 5 includes the He of demoulding area 51 for being arranged on the transmission line of the first truss 1 and being set gradually along X-axis forward direction
Skeleton assembly area 52, the production district 5 also includes being arranged on the transmission line of the second truss 2 and along supporting that X-axis forward direction is set gradually
Protect pond 53 and centrifugation pond 54;
Also include close to the boiler room 81 of curing pool 53, close to the stirring area 82 of drawing-in device 43, close to stirring area 82
Sandstone pile 83 and the electric pole pile 84 close to rod area 6, the conveying track 62 are extended in electric pole pile 84, with
The finished product electric pole transportation obtained in area will be stripped by electric pole transport vehicle 61 to be stacked to electric pole pile 84;
The mould area in preparation 3 includes the mould laydown area 31 being arranged on the transmission line of the first truss 1 and is arranged on second
Mould servicing area 32 on the transmission line of truss 2;
The skeleton area in preparation 7 includes the seam welder weld zone 71 and skeleton being successively set on the transmission line of the first truss 1
Laydown area 72 and the steel laydown area 73 being arranged on the transmission line of the second truss 2 and manual welding area 74.
Skeleton area in preparation is used to stack the raw material of skeleton and carries out being welded for skeleton, wherein being existed respectively according to the specification of skeleton
Welder area and manual welding area are welded, and the skeleton being welded is placed in skeleton laydown area;Mould area in preparation is used to stack
Punching block used, and the punching block of flexural deformation or damage is repaired as needed.
Electric pole production procedure of the present utility model is:After punching block loads skeleton in Skeleton assembly area, punching block is by first
Truss is lifted into the punching block transfer cart of rolling feeding zone, is then in the milk by drawing-in device, punching block transfer cart will be in the milk
Complete punching block is transported onto the supply line of the second truss, and punching block is lifted into centrifugation pond successively by the second truss and curing pool enters
Row processing, conserves the punching block finished and is transported to by electric pole transport vehicle on the transmission line of the first truss, then hung by the first truss
It is attached to demoulding area to be stripped, the punching block after the demoulding is lifted to Skeleton assembly area, then one circulation of punching block completion by the first truss,
And the demoulding obtains electric pole and is then lifted on electric pole transport vehicle and transported into electric pole pile.
Finally illustrate, above example is only unrestricted to illustrate the technical solution of the utility model, although ginseng
The utility model is described in detail according to preferred embodiment, it will be understood by those within the art that, can be to this
The technical scheme of utility model is modified or equivalent substitution, without departing from the objective and model of technical solutions of the utility model
Enclose, it all should cover among right of the present utility model.
Claims (4)
1. a kind of concurrent plant layout structure, it is characterised in that including:
The first truss and the second truss that two transmission lines extend parallel along X-direction;
Mould area in preparation, feeding zone, production district, rod area and the skeleton area in preparation set gradually along X-axis negative sense, the mould is accurate
The transmission line of the first truss and the second truss is crossed in preparation area, feeding zone, production district, rod area and skeleton area in preparation, wherein,
It is provided with some conveying troughs extended along Y direction in the feeding zone, the conveying trough is across the first truss and the
Punching block transfer cart is equipped with the transmission line of two truss, each conveying trough, the two ends of each conveying trough are set respectively
There are drawing-in device and draw-gear;
Electric pole transport vehicle and conveying track are provided with the rod area, the conveying track crosses over the first truss and the second truss
Transmission line;
The production district includes being arranged on the first truss transmission line and the demoulding area set gradually along X-axis forward direction and Skeleton assembly
Area, curing pool and centrifugation pond that the production district also includes being arranged on the second truss transmission line and set gradually along X-axis forward direction.
2. a kind of concurrent plant layout structure as claimed in claim 1, it is characterised in that:Also include close to curing pool
Boiler room, the sandstone pile close to the stirring area of drawing-in device, close to stirring area and the electric pole pile close to rod area,
The conveying track is extended in electric pole pile.
3. a kind of concurrent plant layout structure as claimed in claim 1, it is characterised in that:The mould area in preparation bag
Include the mould laydown area being arranged on the first truss transmission line and the mould servicing area being arranged on the second truss transmission line.
4. a kind of concurrent plant layout structure as claimed in claim 1, it is characterised in that:The skeleton area in preparation bag
Include the seam welder weld zone being successively set on the first truss transmission line and skeleton laydown area and be arranged on the transmission of the second truss
Steel laydown area and manual welding area on line.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621155952.1U CN206346520U (en) | 2016-10-31 | 2016-10-31 | A kind of concurrent plant layout structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621155952.1U CN206346520U (en) | 2016-10-31 | 2016-10-31 | A kind of concurrent plant layout structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206346520U true CN206346520U (en) | 2017-07-21 |
Family
ID=59321015
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621155952.1U Expired - Fee Related CN206346520U (en) | 2016-10-31 | 2016-10-31 | A kind of concurrent plant layout structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206346520U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108789809A (en) * | 2018-07-10 | 2018-11-13 | 俞向阳 | A kind of centrifugal concrete pile production line |
CN109227920A (en) * | 2018-07-10 | 2019-01-18 | 俞向阳 | Centrifugal concrete pile production line |
-
2016
- 2016-10-31 CN CN201621155952.1U patent/CN206346520U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108789809A (en) * | 2018-07-10 | 2018-11-13 | 俞向阳 | A kind of centrifugal concrete pile production line |
CN109227920A (en) * | 2018-07-10 | 2019-01-18 | 俞向阳 | Centrifugal concrete pile production line |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2005259161B2 (en) | Facility used for the production and/or assembly of goods | |
CN203919320U (en) | A kind of concrete equating plucking all-in-one | |
CN203143572U (en) | Solar greenhouse internally suspended type electric rail transportation device | |
CN104710155A (en) | Production technology of precast reinforced concrete piles | |
CN206346520U (en) | A kind of concurrent plant layout structure | |
CN202480217U (en) | Whole mouldboard of combined box girder | |
CN102398305B (en) | Method for producing precast concrete piles | |
CN204524120U (en) | The vertical loopful of large diameter pile foundation steel reinforcement cage is to location moulding bed device | |
CN103272963B (en) | Preformed pile reinforcement cage pile tip bending device | |
CN209381044U (en) | Modularization movable multi-layer piles up steam-cured PC component production system | |
CN106351429B (en) | A kind of Process for Heavy Support system and its construction method | |
CN102322138A (en) | The modular sliding formwork | |
CN204747826U (en) | Planer -type net piece welded platform | |
CN202805405U (en) | Automatic production line of centrifugal pile | |
CN207597263U (en) | A kind of concrete bridge deck automatic spray health preserving equipment | |
CN205727473U (en) | One rotates planting unit of following spot | |
CN204725632U (en) | A kind of rotary shaft high ferro case beam outboard template | |
CN108748643A (en) | A kind of intelligent production line of novel fabricated construction material | |
CN107116676A (en) | Superelevation blower fan prestressed concrete tower tube construction method | |
CN203961415U (en) | Safety moving formula communication base station | |
CN103590591B (en) | Construct to face and build save land section steel platform and construction method thereof | |
CN202805399U (en) | Production line of centrifugal pile | |
CN207469280U (en) | A kind of green light steel integrated housing basis rapid construction device | |
CN209190980U (en) | A kind of intelligent production line of novel fabricated construction material | |
CN206644133U (en) | A kind of three-dimensional production of intelligent change system of prefabricated components |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170721 |