CN207469280U - A kind of green light steel integrated housing basis rapid construction device - Google Patents

A kind of green light steel integrated housing basis rapid construction device Download PDF

Info

Publication number
CN207469280U
CN207469280U CN201721402049.5U CN201721402049U CN207469280U CN 207469280 U CN207469280 U CN 207469280U CN 201721402049 U CN201721402049 U CN 201721402049U CN 207469280 U CN207469280 U CN 207469280U
Authority
CN
China
Prior art keywords
integrated
bletillae
green light
steel joist
lightgage steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721402049.5U
Other languages
Chinese (zh)
Inventor
赵大选
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Tian Xun Park Technology Co Ltd
Original Assignee
Chongqing Tian Xun Park Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Tian Xun Park Technology Co Ltd filed Critical Chongqing Tian Xun Park Technology Co Ltd
Priority to CN201721402049.5U priority Critical patent/CN207469280U/en
Application granted granted Critical
Publication of CN207469280U publication Critical patent/CN207469280U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model belongs to technical field of buildings, disclose a kind of green light steel integrated housing basis rapid construction device, Pseudobulbus Bletillae (Rhizoma Bletillae) is implanted into underground using machine, it is connect at the top of integrated lightgage steel joist frame and the Pseudobulbus Bletillae (Rhizoma Bletillae), plug-in steel mesh is connect using dedicated hanging part with lightgage steel joist frame, the ground collar tie beam of the integrated lightgage steel joist frame is cast in using the spray of modified gypsum machine after the completion of connection, in the space needed for floor.The utility model reduces industrial discharge pollution environment;Pseudobulbus Bletillae (Rhizoma Bletillae) is added to construct using integrated lightgage steel joist skeleton and steel net structure, quick construction;Work progress is using intelligent, digitlization, factorial praluction, live Fast Installation;A large amount of resource is saved, substantially increases labor productivity;Construction site is conducive to preserve the ecological environment without any waste discharge;Total quality is very light, and saving transport reduces energy consumption.Green is completed, low-carbon, environmental protection is energy saving, safety, and the indexs such as efficient bring high Social benefit and economic benefit.

Description

A kind of green light steel integrated housing basis rapid construction device
Technical field
The utility model belongs to technical field of buildings more particularly to a kind of green light steel integrated housing basis rapid construction dress It puts.
Background technology
At present, house foundation construction needs, using numerous raw materials of industry, to be also easy to produce trade waste etc., pollutes environment;It is general Logical construction method, construction are slow;In-site installation is constructed, and needs to expend the resources such as a large amount of water, electricity, and total quality weight Greatly, transportation cost is high.Green is extremely difficult to, low-carbon, environmental protection is energy saving, the indexs such as safety, and bringing high society to the mankind imitates Benefit and economic benefit.
In conclusion problem of the existing technology is:Existing construction technology waste discharge is more, pollutes environment, applies Between working hour slowly, consuming energy is more.
Invention content
In view of the problems of the existing technology, the utility model provides a kind of green light steel integrated housing basis and quickly applies Tooling is put, green, low-carbon, and fast, safe, quality is secure.
The utility model is realized in this way a kind of green light steel integrated housing basis rapid construction device, the green Rapid construction device in light steel integrated housing basis is provided with:
Integrated lightgage steel joist frame;
The integrated lightgage steel joist frame is connect with Pseudobulbus Bletillae (Rhizoma Bletillae);
Steel mesh is connect using dedicated hanging part with integrated lightgage steel joist frame;
The spray of modified gypsum machine is cast in the integrated lightgage steel joist frame appearance.
Further, the Pseudobulbus Bletillae (Rhizoma Bletillae) is implanted into underground using machine.
Further, the Pseudobulbus Bletillae (Rhizoma Bletillae) uses a diameter of 120mm, and the Pseudobulbus Bletillae (Rhizoma Bletillae) connect with the integrated lightgage steel joist frame and adopts It is connected with riveting technology.
Further, the modified gypsum is constructed using high pressure painting method.
The advantages of the utility model and good effect are:
The utility model through chemical synthesis, reduces industrial discharge pollution environment using trade waste (gypsum);Utilize collection Pseudobulbus Bletillae (Rhizoma Bletillae) is added to construct into lightgage steel joist skeleton and steel net structure, quick construction;It using intelligence, is factory produced, scene Installation saves the resources such as a large amount of water, electricity, substantially increases labor productivity;It is arranged without any waste construction site It puts, is conducive to preserve the ecological environment;Total quality is very light, and saving transport reduces energy consumption.Complete green, low-carbon, environmental protection, section Can, the indexs such as safety bring high Social benefit and economic benefit to the mankind.
Description of the drawings
Fig. 1 is the integrated lightgage steel joist foundation structure schematic diagram that the utility model embodiment provides;
In figure:1st, modified gypsum;2nd, lightgage steel joist frame is integrated;3rd, Pseudobulbus Bletillae (Rhizoma Bletillae);4th, steel wire
Specific embodiment
For that can further appreciate that the invention, features and effects of the utility model, the following examples are hereby given, and coordinates Detailed description are as follows for attached drawing.
The structure of the utility model is explained in detail below in conjunction with the accompanying drawings.
As shown in Figure 1, the green light steel integrated housing basis rapid construction device that the utility model embodiment provides includes: Modified gypsum 1, integrated lightgage steel joist frame 2, Pseudobulbus Bletillae (Rhizoma Bletillae) 3, steel wire 4.
Pseudobulbus Bletillae (Rhizoma Bletillae) 3 is implanted into underground using machine, and integrated lightgage steel joist frame 2 is connect with Pseudobulbus Bletillae (Rhizoma Bletillae) 3, and steel mesh 4 uses Special hanging Part is connect with lightgage steel joist frame 2, and the spray of 1 machine of modified gypsum is cast in integrated 2 appearance of lightgage steel joist frame.
Further, Pseudobulbus Bletillae (Rhizoma Bletillae) 3 uses a diameter of 120mm, and Pseudobulbus Bletillae (Rhizoma Bletillae) 3 is connect with integrated lightgage steel joist frame 2 using riveting skill Art connects.
Further, modified gypsum 1 is using the construction of high pressure painting method.
In-site measurement first when the utility model is constructed calculates design Pseudobulbus Bletillae (Rhizoma Bletillae) by load requirement, determines light steel dragon Bone carries stress scheme.Factory process later, all material are intelligent plant produced.Finished product is implanted by construction drawing design requirement Pseudobulbus Bletillae (Rhizoma Bletillae), arrangement installation lightgage steel joist frame, by the good steel wire of construction drawing requirement cloth, pours into a mould finished product modified gypsum, and finally cleaning is applied Work scene.
The above is only the preferred embodiment to the utility model, and not the utility model is made in any form Limitation, it is every according to the technical essence of the utility model it is made to the above embodiment it is any it is simple modification, equivalent variations with Modification, belongs in the range of technical solutions of the utility model.

Claims (4)

  1. A kind of 1. green light steel integrated housing basis rapid construction device, which is characterized in that the green light steel integrated housing base Plinth rapid construction device is provided with:
    Integrated lightgage steel joist frame;
    The integrated lightgage steel joist frame is connect with Pseudobulbus Bletillae (Rhizoma Bletillae);
    Steel mesh is connect using dedicated hanging part with integrated lightgage steel joist frame;
    The spray of modified gypsum machine is cast in the integrated lightgage steel joist frame appearance.
  2. 2. green light steel integrated housing basis rapid construction device as described in claim 1, which is characterized in that the Pseudobulbus Bletillae (Rhizoma Bletillae) Underground is implanted into using machine.
  3. 3. green light steel integrated housing basis rapid construction device as described in claim 1, which is characterized in that the Pseudobulbus Bletillae (Rhizoma Bletillae) Using a diameter of 120mm, the Pseudobulbus Bletillae (Rhizoma Bletillae) is connect with the integrated lightgage steel joist frame to be connected using riveting technology.
  4. 4. green light steel integrated housing basis rapid construction device as described in claim 1, which is characterized in that the modified stone Cream is constructed using high pressure painting method.
CN201721402049.5U 2017-10-27 2017-10-27 A kind of green light steel integrated housing basis rapid construction device Expired - Fee Related CN207469280U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721402049.5U CN207469280U (en) 2017-10-27 2017-10-27 A kind of green light steel integrated housing basis rapid construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721402049.5U CN207469280U (en) 2017-10-27 2017-10-27 A kind of green light steel integrated housing basis rapid construction device

Publications (1)

Publication Number Publication Date
CN207469280U true CN207469280U (en) 2018-06-08

Family

ID=62265338

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721402049.5U Expired - Fee Related CN207469280U (en) 2017-10-27 2017-10-27 A kind of green light steel integrated housing basis rapid construction device

Country Status (1)

Country Link
CN (1) CN207469280U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107604934A (en) * 2017-10-27 2018-01-19 重庆添讯园科技有限公司 A kind of light steel integrated house basis rapid construction device and method of green

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107604934A (en) * 2017-10-27 2018-01-19 重庆添讯园科技有限公司 A kind of light steel integrated house basis rapid construction device and method of green

Similar Documents

Publication Publication Date Title
CN202185971U (en) Automatic spraying equipment for small-sizedminiature prefabricated component
CN106245779A (en) Integral prefabricated modular architectural construction technology based on UHPC material and system
CN207469280U (en) A kind of green light steel integrated housing basis rapid construction device
CN203320760U (en) Modularization curtain wall
CN202627198U (en) Novel steel structure system
CN203640115U (en) Modular curtain wall panel
Ma et al. A brief introduction to 3D printing technology
CN106759933A (en) Prefabricated post composite beam intermediate layer interior joint connection method in assembled RC frame-shear structures
CN203485655U (en) Landscape simulation fruit-like sculpture
CN204609298U (en) Turnover plate type entirety hangs sky stair template
CN107604934A (en) A kind of light steel integrated house basis rapid construction device and method of green
CN203848836U (en) Column type marking pier
CN206090817U (en) Steel construction assemblyization house
CN108068206A (en) The spray pipe network support device of concrete curing and its automation curing system
CN203891272U (en) Modularized curtain wall board
CN106759882A (en) Prefabricated post composite beam top story exterior joints connection method in assembled RC frame-shear structures
CN204899034U (en) Prefabricated wall post
CN106869331A (en) The connection method of precast shear wall composite beam in assembled RC frame-shear structures
CN202937002U (en) Metal net supporting fabricated formwork
CN202577706U (en) Floor slab with prefabricated pipelines and prefabricated joints
CN201762721U (en) W-shaped steel plate supporting continuous wall
CN206144151U (en) Solid locking device of quick detachable concrete form
CN2837443Y (en) Migration type residence building
CN207332426U (en) A kind of packaged type hydraulic pressure load-bearing flag platform
CN203296264U (en) Structural column of building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180608

Termination date: 20201027