CN107604934A - A kind of light steel integrated house basis rapid construction device and method of green - Google Patents
A kind of light steel integrated house basis rapid construction device and method of green Download PDFInfo
- Publication number
- CN107604934A CN107604934A CN201711025835.2A CN201711025835A CN107604934A CN 107604934 A CN107604934 A CN 107604934A CN 201711025835 A CN201711025835 A CN 201711025835A CN 107604934 A CN107604934 A CN 107604934A
- Authority
- CN
- China
- Prior art keywords
- green
- integrated
- bletillae
- steel joist
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The invention belongs to technical field of buildings, disclose a kind of light steel integrated house basis rapid construction device and method of green, underground is implanted into using special purpose machinery; thin-walled integrates lightgage steel joist frame and is seamlessly connected with Pseudobulbus Bletillae (Rhizoma Bletillae); plug-in steel mesh is connected according to design requirement using the steel mesh and dedicated hanging part of different model with lightgage steel joist frame; keel shoe is completed, i.e., is cast in using the spray of modified gypsum machine in the integrated lightgage steel joist frame.The present invention through chemical synthesis, reduces industrial emissions pollution environment using trade waste (gypsum);Pseudobulbus Bletillae (Rhizoma Bletillae) is added to be constructed using integrated lightgage steel joist skeleton and steel net structure, quick construction;Substantial amounts of water is saved, it is electric, the resource such as transport, substantially increase labor productivity;Production and job site make use of large number of industrial waste gypsum without any waste discharge, be very beneficial for the protection of ecological environment;Total quality is particularly lightweight, greatly saves transport, reduces energy consumption.
Description
Technical field
The invention belongs to technical field of buildings, more particularly to a kind of light steel integrated house basis rapid construction device of green and
Method.
Background technology
At present, house foundation construction needs to use numerous raw materials of industry, is also easy to produce trade waste etc., pollutes environment;It is general
Logical construction method, construction are slow;In-site installation is constructed, it is necessary to expend the resources such as substantial amounts of water, electricity, and total quality weight
Greatly, cost of transportation is high.The indexs such as green, low-carbon, environmental protection, energy-conservation, safety are extremely difficult to, high society's effect is brought to the mankind
Benefit and economic benefit.
In summary, the problem of prior art is present be:Existing construction technology waste discharge is more, pollutes environment, applies
Between man-hour slowly, consuming energy is more.
The content of the invention
The problem of existing for prior art, the invention provides a kind of light steel integrated house basis rapid construction dress of green
Put and method, green, low-carbon, fast, safety, quality is secure.
The present invention is achieved in that a kind of light steel integrated house basis rapid construction device of green, the light steel of green
Rapid construction device in integrated house basis is provided with:
Integrated lightgage steel joist frame;
The integrated lightgage steel joist frame is connected with Pseudobulbus Bletillae (Rhizoma Bletillae);
Steel mesh is connected using dedicated hanging part with integrated lightgage steel joist frame;
The spray of modified gypsum machine is cast in the integrated lightgage steel joist frame appearance.
Further, the Pseudobulbus Bletillae (Rhizoma Bletillae) is using machine implantation underground.
Further, the Pseudobulbus Bletillae (Rhizoma Bletillae) uses a diameter of 120mm, and the Pseudobulbus Bletillae (Rhizoma Bletillae) is connected with the integrated lightgage steel joist frame and adopted
Connected with riveting technology.
Further, the modified gypsum is constructed using high pressure painting method.
Another object of the present invention is to provide a kind of the green of light steel integrated house basis rapid construction device of the green
The light steel integrated house basis rapid constructing method of color, the light steel integrated house basis rapid constructing method of green include:Carry out
In-site measurement first during construction, design Pseudobulbus Bletillae (Rhizoma Bletillae) is calculated by load requirement, determines that lightgage steel joist carries stress scheme.Factory afterwards
Processing, all material is intelligent plant produced;Finished product Pseudobulbus Bletillae (Rhizoma Bletillae), arrangement installation lightgage steel joist are implanted into by construction drawing design requirement
Frame, by the good steel wire of construction drawing requirement cloth, finished product modified gypsum is poured into a mould, finally clears up job site.
The present invention through chemical synthesis, reduces industrial discharge pollution environment using trade waste (gypsum);It is light using integrating
Steel joist skeleton and steel net structure add Pseudobulbus Bletillae (Rhizoma Bletillae) to be constructed, quick construction;Using intellectuality, factorial praluction, in-site installation
Construction, saves the resources such as substantial amounts of water, electricity, substantially increases labor productivity;Job site has without any waste discharge
Beneficial to preserving the ecological environment;Total quality is very light, and saving transport reduces energy consumption.Complete green, low-carbon, environmental protection, energy-conservation, safety
Etc. index, high Social benefit and economic benefit is brought to the mankind.Corporate team by researching and developing and groping to obtain for a long time
The application in building field using the light steel of thin-walled+Pseudobulbus Bletillae (Rhizoma Bletillae) fast-assembling basis is taken.The height of independent research is required according to design load
Intensity Pseudobulbus Bletillae (Rhizoma Bletillae), underground is implanted into using special purpose machinery, thin-walled integrates lightgage steel joist frame and is seamlessly connected with Pseudobulbus Bletillae (Rhizoma Bletillae), plug-in steel mesh root
It is connected according to design requirement using the steel mesh and dedicated hanging part of different model with lightgage steel joist frame, keel shoe is completed, i.e., using modification
The spray of gypsum machine is cast in the integrated lightgage steel joist frame.
Brief description of the drawings
Fig. 1 is integrated lightgage steel joist foundation structure schematic diagram provided in an embodiment of the present invention;
In figure:1st, modified gypsum;2nd, lightgage steel joist frame is integrated;3rd, Pseudobulbus Bletillae (Rhizoma Bletillae);4th, steel wire
Embodiment
In order to further understand the content, features and effects of the present invention, hereby enumerating following examples, and coordinate accompanying drawing
Describe in detail as follows.
The structure of the present invention is explained in detail below in conjunction with the accompanying drawings.
As shown in figure 1, the light steel integrated house basis rapid construction device of green provided in an embodiment of the present invention includes:It is modified
Gypsum 1, integrated lightgage steel joist frame 2, Pseudobulbus Bletillae (Rhizoma Bletillae) 3, steel wire 4.
Pseudobulbus Bletillae (Rhizoma Bletillae) 3 is connected using machine implantation underground, integrated lightgage steel joist frame 2 with Pseudobulbus Bletillae (Rhizoma Bletillae) 3, and steel mesh 4 uses Special hanging
Part is connected with lightgage steel joist frame 2, and the spray of the machine of modified gypsum 1 is cast in the integrated appearance of lightgage steel joist frame 2.
Further, Pseudobulbus Bletillae (Rhizoma Bletillae) 3 uses a diameter of 120mm, and Pseudobulbus Bletillae (Rhizoma Bletillae) 3 is connected with integrated lightgage steel joist frame 2 using riveting skill
Art connects.
Further, modified gypsum 1 is using the construction of high pressure painting method.
In-site measurement first when the present invention is constructed, design Pseudobulbus Bletillae (Rhizoma Bletillae) is calculated by load requirement, determines that lightgage steel joist is held
Carry stress scheme.Factory process afterwards, all material are intelligent plant produced.Spiral shell by construction drawing design requirement implantation finished product
Silk, arrangement installation lightgage steel joist frame, by the good steel wire of construction drawing requirement cloth, pours into a mould finished product modified gypsum, and finally cleaning construction is existing
.
It is described above to be only the preferred embodiments of the present invention, any formal limitation not is made to the present invention,
Every technical spirit according to the present invention belongs to any simple modification, equivalent change and modification made for any of the above embodiments
In the range of technical solution of the present invention.
Claims (5)
- A kind of 1. light steel integrated house basis rapid construction device of green, it is characterised in that the light steel integrated house toft of green Plinth rapid construction device is provided with:Integrated lightgage steel joist frame;The integrated lightgage steel joist frame is connected with Pseudobulbus Bletillae (Rhizoma Bletillae);Steel mesh is connected using dedicated hanging part with integrated lightgage steel joist frame;The spray of modified gypsum machine is cast in the integrated lightgage steel joist frame appearance.
- 2. the light steel integrated house basis rapid construction device of green as claimed in claim 1, it is characterised in that the Pseudobulbus Bletillae (Rhizoma Bletillae) Underground is implanted into using machine.
- 3. the light steel integrated house basis rapid construction device of green as claimed in claim 1, it is characterised in that the Pseudobulbus Bletillae (Rhizoma Bletillae) Using a diameter of 120mm, the Pseudobulbus Bletillae (Rhizoma Bletillae) rivets with the integrated lightgage steel joist frame.
- 4. the light steel integrated house basis rapid construction device of green as claimed in claim 1, it is characterised in that the modified stone Cream is constructed using high pressure painting method.
- A kind of 5. light steel integrated house toft of green of the light steel integrated house basis rapid construction device of green as claimed in claim 1 Plinth rapid constructing method, it is characterised in that the light steel integrated house basis rapid constructing method of green includes:When being constructed In-site measurement first, design Pseudobulbus Bletillae (Rhizoma Bletillae) is calculated by load requirement, determines that lightgage steel joist carries stress scheme;Factory process afterwards, All material is intelligent plant produced;Finished product Pseudobulbus Bletillae (Rhizoma Bletillae) is implanted into by construction drawing design requirement, arrangement installation lightgage steel joist frame, is pressed Construction drawing requires the good steel wire of cloth, pours into a mould finished product modified gypsum, finally clears up job site.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711025835.2A CN107604934A (en) | 2017-10-27 | 2017-10-27 | A kind of light steel integrated house basis rapid construction device and method of green |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711025835.2A CN107604934A (en) | 2017-10-27 | 2017-10-27 | A kind of light steel integrated house basis rapid construction device and method of green |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107604934A true CN107604934A (en) | 2018-01-19 |
Family
ID=61081006
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711025835.2A Pending CN107604934A (en) | 2017-10-27 | 2017-10-27 | A kind of light steel integrated house basis rapid construction device and method of green |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107604934A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101041980A (en) * | 2007-04-13 | 2007-09-26 | 刘辉 | Lightweight plaster wall and integral pouring procedure thereof |
CN104947788A (en) * | 2015-06-18 | 2015-09-30 | 北京大工简筑科技有限公司 | DGC modular fabricated building system and building method thereof |
CN204728355U (en) * | 2015-06-30 | 2015-10-28 | 威海立达尔机械有限公司 | Integrated form building foundation system |
CN105952026A (en) * | 2016-07-15 | 2016-09-21 | 北京东方昊炅科技发展有限公司 | Ecological hardwood house wall system made from industrial waste by-products |
CN207469280U (en) * | 2017-10-27 | 2018-06-08 | 重庆添讯园科技有限公司 | A kind of green light steel integrated housing basis rapid construction device |
-
2017
- 2017-10-27 CN CN201711025835.2A patent/CN107604934A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101041980A (en) * | 2007-04-13 | 2007-09-26 | 刘辉 | Lightweight plaster wall and integral pouring procedure thereof |
CN104947788A (en) * | 2015-06-18 | 2015-09-30 | 北京大工简筑科技有限公司 | DGC modular fabricated building system and building method thereof |
CN204728355U (en) * | 2015-06-30 | 2015-10-28 | 威海立达尔机械有限公司 | Integrated form building foundation system |
CN105952026A (en) * | 2016-07-15 | 2016-09-21 | 北京东方昊炅科技发展有限公司 | Ecological hardwood house wall system made from industrial waste by-products |
CN207469280U (en) * | 2017-10-27 | 2018-06-08 | 重庆添讯园科技有限公司 | A kind of green light steel integrated housing basis rapid construction device |
Non-Patent Citations (1)
Title |
---|
黄强等: "《轻钢轻混凝土结构体系研究与开发》", 《建筑结构学报》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105330333B (en) | Environmentally friendly integrated building lightweight assembled composite wall body material and its production technology | |
CN106245779A (en) | Integral prefabricated modular architectural construction technology based on UHPC material and system | |
CN108518029A (en) | A kind of assembly construction technology of steel skeleton light-duty roofing | |
CN203320760U (en) | Modularization curtain wall | |
CN104005407A (en) | Partially prestressed concrete structure foundation pile | |
CN207469280U (en) | A kind of green light steel integrated housing basis rapid construction device | |
CN204356911U (en) | A kind of Space Free-Form Surface wood net shell assembling type node of variable-angle | |
CN203640115U (en) | Modular curtain wall panel | |
CN104499577A (en) | Angle-variable assembled joint for space free-form surface wooden reticulated shell | |
CN107604934A (en) | A kind of light steel integrated house basis rapid construction device and method of green | |
Ma et al. | A brief introduction to 3D printing technology | |
CN101434088A (en) | Production line of plant fibre building elements | |
CN105544829A (en) | Steel fiber regeneration brick granule concrete single-rib baseboard composite floor slab and manufacturing method thereof | |
CN114561905A (en) | Coal mine white rock gangue cage wall and manufacturing method thereof | |
CN103306573A (en) | Assembling integrated type window frame for steel structure, and construction method of assembling integrated type window frame | |
CN203848836U (en) | Column type marking pier | |
CN208088511U (en) | The combination assembled building element of steel-wood structure | |
CN203891272U (en) | Modularized curtain wall board | |
CN206090817U (en) | Steel construction assemblyization house | |
CN204983902U (en) | Civilian dress formula enclosure hood | |
CN203145375U (en) | Simulated stone covering layer for wall body | |
CN204899034U (en) | Prefabricated wall post | |
CN206440991U (en) | The new material process equipment designed based on energy-conserving and environment-protective theory | |
CN205935386U (en) | Keep warm and decorate integrative wallboard based on building garbage recovery concrete | |
CN203334879U (en) | Assembly integral type window frame for steel structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |