CN106245779A - Integral prefabricated modular architectural construction technology based on UHPC material and system - Google Patents
Integral prefabricated modular architectural construction technology based on UHPC material and system Download PDFInfo
- Publication number
- CN106245779A CN106245779A CN201610518864.1A CN201610518864A CN106245779A CN 106245779 A CN106245779 A CN 106245779A CN 201610518864 A CN201610518864 A CN 201610518864A CN 106245779 A CN106245779 A CN 106245779A
- Authority
- CN
- China
- Prior art keywords
- prefabricated components
- prefabricated
- equipment
- uhpc material
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/348—Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a kind of integral prefabricated modular architectural construction technology based on UHPC material and system, this technique includes: reserve one piece of ground the most smooth at the construction field (site), parking prefabricated components and produce equipment car, and reserve component laydown area, component laydown area need to be in the range of crane works;Utilizing prefabricated components to produce equipment car and produce the prefabricated components based on UHPC material in units of room, according to number order, prefabricated components are placed on component laydown area, the internally installed pipeline of each prefabricated components and equipment also complete inside fitting;According to numbering one by one by modular structure lifting construction.Utilize UHPC to make with room as unit and comprise the prefabricated components of upholstery, pipeline and equipment, durability is high, body of wall is thin, light weight, the tradition size of prefabricated components, weight can be solved to transport and the restriction of lifting, and the field fabrication of prefabricated components can be realized, avoid the long distance transportation of prefabricated components, be effectively increased efficiency of construction.
Description
Technical field
The present invention relates to assembled architecture technical field of construction, particularly relate to integral prefabricated modularity based on UHPC material
Architectural construction technology and system.
Background technology
Modular architectural is a kind of novel architecture structure form, modular architectural structural system, using single room as
One module carries out prefabricated in factory, and can be arranged module interior space in factory and fit up, and then transport is to scene
Reliably it is connected as building entirety by module by lifting.The prefabricated ratio of modular construction system is high, it is possible to realize parallel construction,
Efficiently reduce construction volume at the scene, effectively shorten the completion time of project of whole project, and human and material resources can be saved, reduce work
Phase, environmental protection.
But, owing to module needs to be prefabricated in the factory, and factory might not need in factory's handling near construction site
On haulage vehicle, it is then passed through long-distance transportation, transport to construction site, is more reliably connected as building by module by lifting
Build entirety, therefore, cause substantial amounts of cost of transportation, and cause the waste of duration.
Summary of the invention
It is an object of the invention to provide a kind of integral prefabricated modular architectural construction technology based on UHPC material and be
Uniting, it utilizes UHPC to make with room as unit and comprises the prefabricated components of upholstery, pipeline and equipment, modular construction body
It is that prefabricated ratio is high, a large amount of human and material resources can be saved, reduce the duration, environmental protection;Prefabricated components have superelevation durability,
The features such as body of wall is thin, light weight, can solve the tradition size of prefabricated components, weight to transport and the restriction of lifting;Use pre-
Component processed produces equipment car, it is possible to achieve the field fabrication of prefabricated components, it is to avoid the long distance transportation of prefabricated components, effectively carries
High efficiency of construction.
For solving above-mentioned technical problem, the present invention provides following technical scheme:
A kind of integral prefabricated modular architectural construction technology based on UHPC material, comprises the steps:
Step one, reserves one piece of ground the most smooth at the construction field (site), parks prefabricated components and produces equipment car, and reserves
Adjacent place is as the component laydown area of prefabricated components, and component laydown area need to be in the range of crane works;
Step 2, utilizes prefabricated components to produce equipment car and produces based on UHPC material the prefabricated structure in units of room
Part, by prefabricated components numbering and is placed on component laydown area according to number order, the internally installed pipeline of each prefabricated components and setting
Standby and complete inside fitting, thus form a modular structure;
Step 3, when waiting the concrete of prefabricated components to reach design strength, executes modular structure lifting one by one according to numbering
Work.
Preferably, in above-mentioned based on UHPC material integral prefabricated modular architectural construction technology, described step 2
In, described prefabricated components use directly to water and build up room form or be assembled into room form on ground by wall, base plate and top board.
Preferably, in above-mentioned based on UHPC material integral prefabricated modular architectural construction technology, described step 3
In, utilize crane by modular structure lifting construction.
Preferably, in above-mentioned based on UHPC material integral prefabricated modular architectural construction technology, described prefabricated structure
Part produces the PC component industrialized production equipment that carries on equipment car.Described PC component industrialized production equipment includes template, pours
Equipment, vibrate equipment and/or maintenance of equipment.
The invention also discloses a kind of integral prefabricated modular architectural construction system based on UHPC material, including crane with
And produce equipment car, described prefabricated structure for producing the prefabricated components of the prefabricated components based on UHPC material in units of room
Part production equipment parking stall is in some central areas planned to build between building, and described prefabricated components produce the side of equipment car and are provided with at least
One for stacking the component laydown area of prefabricated components, described component laydown area need to be in the range of crane works, so that described
Prefabricated part hanging in component laydown area can be planned to build building to correspondence by crane.
Preferably, in above-mentioned based on UHPC material integral prefabricated modular architectural construction system, described prefabricated structure
Part produces the PC component industrialized production equipment that carries on equipment car.
Preferably, in above-mentioned based on UHPC material integral prefabricated modular architectural construction system, described PC component
Industrialized production equipment includes template, placing installation, vibrate equipment and/or maintenance of equipment.
Preferably, in above-mentioned based on UHPC material integral prefabricated modular architectural construction system, described prefabricated structure
Part uses directly to water and builds up room form or be assembled into room form on ground by wall, base plate and top board.
From techniques disclosed above scheme, compared with prior art, there is advantages that
One, the present invention utilizes the superelevation mechanical property of UHPC, can be fabricated to traditional prefabricated components with room as unit
Comprise the box module i.e. modular structure of upholstery, pipeline and equipment, i.e. use modular architectural structural system, with single room
Between carry out prefabricated as unit in engineering, and house interior space be arranged and fit up, forming modular structure, then pass through
Modular structure is reliably connected as building entirety by lifting, and the prefabricated ratio of modular construction system is high, and modular construction can be real
Existing parallel construction, efficiently reduces construction volume at the scene, increases substantially speed of application, thus shorten the construction of whole project
Duration, and human and material resources can be saved, reduce construction rubbish, the advantage with environmental protection.Additionally, in the present invention, outside building
Wall, outer layer finishing etc. do not have high-altitude to construct, and improve the safety of site operation.
Two, the present invention utilizes the superelevation mechanical property of UHPC, can be fabricated to traditional prefabricated components with room as unit
Comprising the box module i.e. modular structure of upholstery, pipeline and equipment, the prefabricated components utilizing UHPC to make have superelevation
Durability, body of wall are thin, light weight weight can alleviate 2/3, make scantling on the premise of meeting construction quality and durability, no
Limited by lifting, use common tower crane can complete to lift work, and speed of application can be increased substantially, such that it is able to solve to pass
The system size of prefabricated components, weight are to transport and the restriction of lifting.And it is the most prefabricated to use moveable prefabricated components to produce equipment
Component produces equipment car, it is achieved a kind of movably construction method, it is possible to field fabrication prefabricated components, eliminates prefabricated components
Long distance transportation, is effectively increased efficiency of construction.
Three, the present invention uses moveable prefabricated components to produce equipment car, and car carries PC component industrialized production equipment,
Such as template, placing installation, vibrate equipment, maintenance of equipment etc., can make prefabricated components at the construction field (site), construction site is no longer by pre-
The impact of member factory processed distance, eliminates the long distance transportation process of prefabricated components.Additionally, these prefabricated components produce equipment
Can recycle between multiple building sites, reduce construction cost.
Accompanying drawing explanation
Fig. 1 is based on UHPC material integral prefabricated modular architectural construction technology and the system of one embodiment of the invention
Horizontal layout schematic diagram;
Fig. 2 is based on UHPC material integral prefabricated modular architectural construction technology and the system of one embodiment of the invention
Facade structures schematic diagram.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.According to description below and right
Claim, advantages and features of the invention will be apparent from.Hereinafter will be combined accompanying drawing by cited embodiment, describe this in detail
Bright technology contents and feature.Need to additionally illustrate, accompanying drawing all use the form simplified very much and all use non-accurately than
Example, only in order to facilitate, to aid in illustrating lucidly the purpose of the embodiment of the present invention.For sake of convenience, described below " on ",
The upper and lower direction of D score and accompanying drawing is consistent, but this can not become the restriction of technical solution of the present invention.
Refer to Fig. 1 to Fig. 2, present embodiment discloses the construction of a kind of integral prefabricated modular architectural based on UHPC material
Technique, plans to build building 1-4 for construction.Described integral prefabricated modular architectural construction technology based on UHPC material, including as follows
Step:
Step one, reserves one piece of ground the most smooth at the construction field (site), parks prefabricated components and produces equipment car 10, and stays
Going out the adjacent place component laydown area 20 as prefabricated components, component laydown area 20 need to be in crane 30 working range.
Step 2, utilizes prefabricated components to produce equipment car 10 and produces based on UHPC material the prefabricated structure in units of room
Part, by prefabricated components numbering and be placed on component laydown area 20 according to number order, the internally installed pipeline of each prefabricated components and
Equipment also completes inside fitting, thus forms a modular structure 40.
Step 3, when waiting the concrete of prefabricated components to reach design strength, lifts modular structure 40 one by one according to numbering
Construction.
On the one hand, the present invention carries out prefabricated as unit in engineering using single room, and house interior space is carried out cloth
Putting and fit up, form modular structure 40, then by lifting, modular structure 40 is reliably connected as building entirety, modularity is tied
The prefabricated ratio of structure system is high, and modular construction is capable of parallel construction, efficiently reduces construction volume at the scene, significantly carries
High speed of application, thus shorten the completion time of project of whole project, and human and material resources can be saved, reduce construction rubbish, have green
The advantage that colour circle is protected.Additionally, external wall, outer layer finishing etc. do not have high-altitude to construct, improve the safety of site operation.Another
Aspect, the prefabricated components that the present invention utilizes UHPC to make have that the durability of superelevation, body of wall be thin, light weight weight can alleviate 2/3,
Make scantling on the premise of meeting construction quality and durability, do not limited by lifting, use common tower crane can complete to hang
Dress work, and speed of application can be increased substantially, such that it is able to solve the tradition size of prefabricated components, weight to transport and lifting
Restriction.Another further aspect, the present invention uses moveable prefabricated components to produce the i.e. prefabricated components of equipment and produces equipment car, it is achieved one
Plant moveable construction method, it is possible to field fabrication prefabricated components, eliminate the long distance transportation of prefabricated components, be effectively increased
Efficiency of construction.
The present invention pours prefabricated components and uses ultra-high performance concrete, is called for short UHPC, also referred to as RPC, tool
There are the durability of superelevation and the mechanical property of superelevation.Use UHPC can build the structure of high-strength light and high tenacity, thoroughly change
Become xoncrete structure " fat beams and columns " state;Durability that its structure is had and working life, surmount far away steel, aluminum, plastics
Deng other all structural materials.
Preferably, in above-mentioned based on UHPC material integral prefabricated modular architectural construction technology, described step 2
In, described prefabricated components use directly to water and build up room form or be assembled into room form on ground by wall, base plate and top board.
Preferably, in above-mentioned based on UHPC material integral prefabricated modular architectural construction technology, described step 3
In, utilize common crane 30 by modular structure 40 lifting construction.
Preferably, in above-mentioned based on UHPC material integral prefabricated modular architectural construction technology, described prefabricated structure
Part produces the PC component industrialized production equipment that carries on equipment car 10.Described PC component industrialized production equipment includes template, waters
Building equipment, vibrate equipment and/or maintenance of equipment, to realize job site making prefabricated components, construction site is no longer by prefabricated structure
The impact of part component factory distance, eliminates the long distance transportation process of prefabricated components.Additionally, these prefabricated components produce equipment can be
Recycle between multiple building sites, reduce construction cost.
Please continue to refer to Fig. 1 and Fig. 2, the present embodiment also discloses a kind of integral prefabricated modularity based on UHPC material and builds
Build construction system, including crane 30 and for producing the prefabricated structure of the prefabricated components based on UHPC material in units of room
Part produces equipment car 10, and described prefabricated components production equipment car 10 is in some central areas planned to build between building, described prefabricated
Component produces the side of equipment car 10 and is provided with at least one for the component laydown area 20 stacking prefabricated components, the stacking of described component
District 20 need to be in crane 30 working range, so that described crane can be by the prefabricated part hanging in component laydown area 20 to right
Building should be planned to build.
Preferably, in above-mentioned based on UHPC material integral prefabricated modular architectural construction system, described prefabricated structure
Part produces the PC component industrialized production equipment that carries on equipment car 10.Described PC component industrialized production equipment includes template, waters
Build equipment, vibrate equipment and/or maintenance of equipment.Produce equipment car 10 by prefabricated components and can produce prefabricated structure at the construction field (site)
Part, it is to avoid the transport that prefabricated components are built from factory to job site, is effectively increased construction speed.
Preferably, in above-mentioned based on UHPC material integral prefabricated modular architectural construction system, described prefabricated structure
Part uses directly to water and builds up room form or be assembled into room form on ground by wall, base plate and top board.
In sum, there is advantages that
One, the present invention utilizes the superelevation mechanical property of UHPC, can be fabricated to traditional prefabricated components with room as unit
Comprise the box module i.e. modular structure of upholstery, pipeline and equipment, i.e. use modular architectural structural system, with single room
Between carry out prefabricated as unit in engineering, and house interior space be arranged and fit up, forming modular structure, then pass through
Modular structure is reliably connected as building entirety by lifting, and the prefabricated ratio of modular construction system is high, and modular construction can be real
Existing parallel construction, efficiently reduces construction volume at the scene, increases substantially speed of application, thus shorten the construction of whole project
Duration, and human and material resources can be saved, reduce construction rubbish, the advantage with environmental protection.Additionally, in the present invention, outside building
Wall, outer layer finishing etc. do not have high-altitude to construct, and improve the safety of site operation.
Two, the present invention utilizes the superelevation mechanical property of UHPC, can be fabricated to traditional prefabricated components with room as unit
Comprising the box module i.e. modular structure of upholstery, pipeline and equipment, the prefabricated components utilizing UHPC to make have superelevation
Durability, body of wall are thin, light weight weight can alleviate 2/3, make scantling on the premise of meeting construction quality and durability, no
Limited by lifting, use common tower crane can complete to lift work, and speed of application can be increased substantially, such that it is able to solve to pass
The system size of prefabricated components, weight are to transport and the restriction of lifting.And it is the most prefabricated to use moveable prefabricated components to produce equipment
Component produces equipment car, it is achieved a kind of movably construction method, it is possible to field fabrication prefabricated components, eliminates prefabricated components
Long distance transportation, is effectively increased efficiency of construction.
Three, the present invention uses moveable prefabricated components to produce equipment car, and car carries PC component industrialized production equipment,
Such as template, placing installation, vibrate equipment, maintenance of equipment etc., can make prefabricated components at the construction field (site), construction site is no longer by pre-
The impact of member factory processed distance, eliminates the long distance transportation process of prefabricated components.Additionally, these prefabricated components produce equipment
Can recycle between multiple building sites, reduce construction cost.
Foregoing description is only the description to present pre-ferred embodiments, not any restriction to the scope of the invention, this
Any change that the those of ordinary skill in bright field does according to the disclosure above content, modification, belong to the protection of claims
Scope.
Claims (9)
1. an integral prefabricated modular architectural construction technology based on UHPC material, it is characterised in that comprise the steps:
Step one, reserves one piece of ground the most smooth at the construction field (site), parks prefabricated components and produces equipment car, and reserves adjacent
Place as the component laydown area of prefabricated components, component laydown area need to be in the range of crane works;
Step 2, utilizes prefabricated components to produce equipment car and produces the prefabricated components based on UHPC material in units of room, will
Prefabricated components numbering is also placed on component laydown area according to number order, and the internally installed pipeline of each prefabricated components and equipment are the completeest
Become inside fitting, thus form a modular structure;
Step 3, when waiting the concrete of prefabricated components to reach design strength, according to numbering one by one by modular structure lifting construction.
2. integral prefabricated modular architectural construction technology based on UHPC material as claimed in claim 1, it is characterised in that institute
Stating in step 2, described prefabricated components use directly to water and build up room form or be assembled into by wall, base plate and top board on ground
Room form.
3. integral prefabricated modular architectural construction technology based on UHPC material as claimed in claim 1, it is characterised in that institute
State in step 3, utilize crane by modular structure lifting construction.
4. integral prefabricated modular architectural construction technology based on UHPC material as claimed in claim 1, it is characterised in that institute
State prefabricated components and produce the PC component industrialized production equipment that carries on equipment car.
5. integral prefabricated modular architectural construction technology based on UHPC material as claimed in claim 4, it is characterised in that institute
State PC component industrialized production equipment and include template, placing installation, vibrate equipment and/or maintenance of equipment.
6. an integral prefabricated modular architectural construction system based on UHPC material, it is characterised in that include crane and use
Prefabricated components in the prefabricated components based on UHPC material produced in units of room produce equipment car, and described prefabricated components are raw
Product equipment parking stall is in some central areas planned to build between building, and described prefabricated components produce the side of equipment car and are provided with at least one
For stacking the component laydown area of prefabricated components, described component laydown area need to be in the range of crane works, so that described crane
Prefabricated part hanging in component laydown area can be planned to build building to correspondence.
7. integral prefabricated modular architectural construction system based on UHPC material as claimed in claim 6, it is characterised in that institute
State prefabricated components and produce the PC component industrialized production equipment that carries on equipment car.
8. integral prefabricated modular architectural construction system based on UHPC material as claimed in claim 7, it is characterised in that institute
State PC component industrialized production equipment and include template, placing installation, vibrate equipment and/or maintenance of equipment.
9. integral prefabricated modular architectural construction system based on UHPC material as claimed in claim 6, it is characterised in that institute
State prefabricated components to use and directly water and build up room form or be assembled into room form on ground by wall, base plate and top board.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610518864.1A CN106245779A (en) | 2016-07-05 | 2016-07-05 | Integral prefabricated modular architectural construction technology based on UHPC material and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610518864.1A CN106245779A (en) | 2016-07-05 | 2016-07-05 | Integral prefabricated modular architectural construction technology based on UHPC material and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106245779A true CN106245779A (en) | 2016-12-21 |
Family
ID=57613110
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610518864.1A Pending CN106245779A (en) | 2016-07-05 | 2016-07-05 | Integral prefabricated modular architectural construction technology based on UHPC material and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106245779A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108867991A (en) * | 2018-06-27 | 2018-11-23 | 东南大学 | Precast concrete insulation board, modular architectural unit and production method based on UHPC |
CN108867875A (en) * | 2018-08-13 | 2018-11-23 | 张剑 | A kind of building structure module that building house and house and its method of construction |
CN109057404A (en) * | 2018-08-13 | 2018-12-21 | 张剑 | A kind of dividing method of house desigh and its application |
CN109079962A (en) * | 2018-08-13 | 2018-12-25 | 张剑 | A kind of building structure module and preparation method thereof |
CN109129825A (en) * | 2018-08-13 | 2019-01-04 | 张剑 | A kind of building element and preparation method thereof |
CN113818712A (en) * | 2021-08-31 | 2021-12-21 | 上海宝冶集团有限公司 | Method for reinforcing underground space of corresponding area of component stacking area |
CN115405109A (en) * | 2022-11-01 | 2022-11-29 | 北京城建集团有限责任公司 | Construction method for synthesizing large public building through modular assembly |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101451397A (en) * | 2007-12-05 | 2009-06-10 | 中冶天工建设有限公司 | Steel structure modularization construction process |
CN102733614A (en) * | 2012-06-29 | 2012-10-17 | 中广核工程有限公司 | Method for constructing room module of nuclear power plant |
CN103104112A (en) * | 2011-11-14 | 2013-05-15 | 江门市共盈钢结构有限公司 | Movable production system |
CN103993654A (en) * | 2014-04-09 | 2014-08-20 | 北京工业大学 | Modularized assembly type steel structure house building system |
CN105298157A (en) * | 2015-10-14 | 2016-02-03 | 中建钢构有限公司 | Maritime green habitation system and modularized construction method of same |
CN205857395U (en) * | 2016-07-05 | 2017-01-04 | 上海建工二建集团有限公司 | Integrated precast modular architectural construction system based on UHPC material |
-
2016
- 2016-07-05 CN CN201610518864.1A patent/CN106245779A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101451397A (en) * | 2007-12-05 | 2009-06-10 | 中冶天工建设有限公司 | Steel structure modularization construction process |
CN103104112A (en) * | 2011-11-14 | 2013-05-15 | 江门市共盈钢结构有限公司 | Movable production system |
CN102733614A (en) * | 2012-06-29 | 2012-10-17 | 中广核工程有限公司 | Method for constructing room module of nuclear power plant |
CN103993654A (en) * | 2014-04-09 | 2014-08-20 | 北京工业大学 | Modularized assembly type steel structure house building system |
CN105298157A (en) * | 2015-10-14 | 2016-02-03 | 中建钢构有限公司 | Maritime green habitation system and modularized construction method of same |
CN205857395U (en) * | 2016-07-05 | 2017-01-04 | 上海建工二建集团有限公司 | Integrated precast modular architectural construction system based on UHPC material |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108867991A (en) * | 2018-06-27 | 2018-11-23 | 东南大学 | Precast concrete insulation board, modular architectural unit and production method based on UHPC |
CN108867875A (en) * | 2018-08-13 | 2018-11-23 | 张剑 | A kind of building structure module that building house and house and its method of construction |
CN109057404A (en) * | 2018-08-13 | 2018-12-21 | 张剑 | A kind of dividing method of house desigh and its application |
CN109079962A (en) * | 2018-08-13 | 2018-12-25 | 张剑 | A kind of building structure module and preparation method thereof |
CN109129825A (en) * | 2018-08-13 | 2019-01-04 | 张剑 | A kind of building element and preparation method thereof |
CN113818712A (en) * | 2021-08-31 | 2021-12-21 | 上海宝冶集团有限公司 | Method for reinforcing underground space of corresponding area of component stacking area |
CN115405109A (en) * | 2022-11-01 | 2022-11-29 | 北京城建集团有限责任公司 | Construction method for synthesizing large public building through modular assembly |
CN115405109B (en) * | 2022-11-01 | 2023-02-28 | 北京城建集团有限责任公司 | Construction method for synthesizing large public building through modular assembly |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106245779A (en) | Integral prefabricated modular architectural construction technology based on UHPC material and system | |
CN106150079B (en) | Make building machine in the air | |
CN203514814U (en) | Overhead building putting-up machine | |
CN201526051U (en) | Plug-in type movable tower crane base | |
CN108049666B (en) | A kind of echelon installation method of super plane multilayer steel truss electronic workshop steel construction | |
CN108582466A (en) | A kind of steel reinforcement cage of prefabricated box girder mould | |
CN106836475A (en) | Modular many high level assembling type steel structure systems | |
CN103485574A (en) | Method for constructing reinforced concrete structure of tower top of prilling tower | |
CN110438904A (en) | A kind of device and method for installing anticollision wall form | |
CN205857395U (en) | Integrated precast modular architectural construction system based on UHPC material | |
CN1423020A (en) | Multiple-story building construction method and its special lifting equipment | |
CN202865996U (en) | Room modular structure for nuclear power plant | |
CN109296082A (en) | A kind of frame or half inverted construction structure of cylinder load-bearing high level modular architectural and construction method | |
CN104652853B (en) | Quick lifting installation building structure | |
CN102322138A (en) | The modular sliding formwork | |
CN204850469U (en) | Commercial mansion system that builds | |
CN1020645C (en) | Integral elevating system for out-mould scaffold of super-high buildings | |
CN103112766A (en) | Construction elevator suspending over basement roof of building and construction method thereof | |
CN203795459U (en) | Foundation structure of tower crane for high-altitude roofs | |
CN105625732A (en) | Supporting-free construction method of ultrahigh overhung steel-structure truss | |
CN205100543U (en) | Novel construction system of commercial mansion | |
CN104261269A (en) | Special hoisting mechanism for annular dual-rail sliding track | |
CN204096948U (en) | Annular double track sliding rail Special hoisting mechanism | |
CN209293173U (en) | Module-type steel structure trestle external verandahs | |
CN113802858A (en) | Reverse hanging construction method for steel structure roof tile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161221 |