CN202577706U - Floor slab with prefabricated pipelines and prefabricated joints - Google Patents

Floor slab with prefabricated pipelines and prefabricated joints Download PDF

Info

Publication number
CN202577706U
CN202577706U CN 201220248494 CN201220248494U CN202577706U CN 202577706 U CN202577706 U CN 202577706U CN 201220248494 CN201220248494 CN 201220248494 CN 201220248494 U CN201220248494 U CN 201220248494U CN 202577706 U CN202577706 U CN 202577706U
Authority
CN
China
Prior art keywords
prefabricated
floor slab
pipeline
floor
pipelines
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220248494
Other languages
Chinese (zh)
Inventor
张跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhang Yue
Original Assignee
Broad Sustainable Building Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Broad Sustainable Building Co filed Critical Broad Sustainable Building Co
Priority to CN 201220248494 priority Critical patent/CN202577706U/en
Application granted granted Critical
Publication of CN202577706U publication Critical patent/CN202577706U/en
Priority to PCT/CN2013/074609 priority patent/WO2013177989A1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/48Special adaptations of floors for incorporating ducts, e.g. for heating or ventilating
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00Vertical ducts; Channels, e.g. for drainage

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Sink And Installation For Waste Water (AREA)
  • Branch Pipes, Bends, And The Like (AREA)

Abstract

The utility model discloses a floor slab with prefabricated pipelines and prefabricated joints. The prefabricated pipelines are arranged in the floor slab. The prefabricated pipeline joints are arranged on the floor slab, and are connected with the prefabricated pipelines. The prefabricated pipelines comprise a ventilation pipeline, a water supply pipeline, a drainage pipeline and/or a smoke exhaust pipeline. The prefabricated pipelines in the floor slab and the prefabricated pipeline joints on the floor slab are produced and assembled in a factory. Factory standard production can be realized; the quality of the floor slab is controllable; and the floor slab is assembled on the spot, and is labor-saving, time-saving, high in speed and quality, raw material-saving, free from construction waste, environment-friendly, energy-saving, strong in building strength, anti-seismic and anti-disaster, and is a radical innovation in the field of buildings.

Description

The floor of a kind of prefabricated pipeline and joint
Technical field
The utility model relates to technical field of fixed buildings, is specifically related to the floor of a kind of prefabricated pipeline and joint.
Background technology
Low-carbon energy-saving is the common task and goal of global human, and the low-carbon energy-saving of sustainable scientific development building is one of them importance.The existing fixed building mostly is a reinforced concrete structure, cast-in-site, site operation; Waste of raw materials is serious, and building waste is many, and is time-consuming; Speed is slow, and energy consumption is high, and quality is uncontrollable; Can not realize standardization, batch production production, not meet the environmental protection and energy saving policy of country, be a kind of superseded backward process.
Summary of the invention
The utility model technical problem to be solved is: solve the problem that above-mentioned prior art exists, and provide that a kind of batch production standardized production, assembled on site, saving of work and time, speed are fast, no building waste, save raw material, antidetonation, building intensity height, the prefabricated pipeline of environmental protection and energy saving and the floor of joint.
The technical scheme that the utility model adopts is:
The floor of a kind of prefabricated pipeline and joint, prefabricated pipeline in floor, prefabricated pipe joint on floor, prefabricated pipe joint is connected with prefabricated pipeline.
In the technique scheme, described prefabricated pipeline comprises ventilating duct, water supply line, drainage pipe and/or smoke discharging pipe.
In the technique scheme, in the described floor on prefabricated pipeline and the floor prefabricated pipe joint in factory, produce assembling and accomplish.
The utility model has changed the steel concrete cast-in-site job practices of traditional backwardness fully, and adopts the new steel structure system, so just can realize the batch production standardized production, and is quality controllable; Assembled on site, saving of work and time, speed is fast, and quality is good; Save raw material, no building waste, environmental protection and energy saving; And building intensity is high, and antidetonation is combated a natural disaster, and is the great innovation of building field.
Description of drawings
Fig. 1 is the utility model example structure sketch map.
Among the figure, 1-hot water is responsible for, and 2-cold water is responsible for, and 3-hot water is responsible for joint, and 4-cold water is responsible for joint, 5-cold water arm, 6-hot-water branch, 7-hot-water branch joint, 8-cold water branch pipe connection.
The specific embodiment
Referring to Fig. 1, the prefabricated pipeline of the utility model and the floor of joint, prefabricated pipeline in floor, prefabricated pipe joint on floor, prefabricated pipe joint is connected with prefabricated pipeline.
In the technique scheme, described prefabricated pipeline comprises ventilating duct, water supply line, drainage pipe and/or smoke discharging pipe.
In the technique scheme, in the described floor on prefabricated pipeline and the floor prefabricated pipe joint in factory, produce assembling and accomplish.

Claims (3)

1. the floor of prefabricated pipeline and joint is characterized in that: prefabricated pipeline in floor, and prefabricated pipe joint on floor, prefabricated pipe joint is connected with prefabricated pipeline.
2. the floor of prefabricated pipeline according to claim 1 and joint is characterized in that: described prefabricated pipeline comprises ventilating duct, water supply line, drainage pipe and/or smoke discharging pipe.
3. the floor of prefabricated pipeline according to claim 1 and joint is characterized in that: in the described floor on prefabricated pipeline and the floor prefabricated pipe joint in factory, produce assembling and accomplish.
CN 201220248494 2012-05-30 2012-05-30 Floor slab with prefabricated pipelines and prefabricated joints Expired - Fee Related CN202577706U (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN 201220248494 CN202577706U (en) 2012-05-30 2012-05-30 Floor slab with prefabricated pipelines and prefabricated joints
PCT/CN2013/074609 WO2013177989A1 (en) 2012-05-30 2013-04-24 Floor slab with prefabricated pipelines and prefabricated joints

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220248494 CN202577706U (en) 2012-05-30 2012-05-30 Floor slab with prefabricated pipelines and prefabricated joints

Publications (1)

Publication Number Publication Date
CN202577706U true CN202577706U (en) 2012-12-05

Family

ID=47247133

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220248494 Expired - Fee Related CN202577706U (en) 2012-05-30 2012-05-30 Floor slab with prefabricated pipelines and prefabricated joints

Country Status (2)

Country Link
CN (1) CN202577706U (en)
WO (1) WO2013177989A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013177989A1 (en) * 2012-05-30 2013-12-05 Zhang Yue Floor slab with prefabricated pipelines and prefabricated joints
CN105780911A (en) * 2014-10-15 2016-07-20 山核桃设计有限责任公司 A Method Of Installing A Plumbing Flange, And A Transportable Base

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1454992A (en) * 1972-07-27 1976-11-10 Drake Scull Eng Ltd Electrical installations and building constructions manufacture of nicle
FI162373A (en) * 1973-05-18 1974-11-19 Olavi Vaeaenaenen
DE4205812C2 (en) * 1992-02-26 1994-05-19 Schmidt Reuter Underfloor duct
CN2312272Y (en) * 1997-11-25 1999-03-31 罗兴宇 Prefabricated floor
CN2632190Y (en) * 2003-07-07 2004-08-11 有利华建筑预制件(深圳)有限公司 Prefabricated construction panel with wire pipe
CN202577706U (en) * 2012-05-30 2012-12-05 远大可建科技有限公司 Floor slab with prefabricated pipelines and prefabricated joints
CN202706297U (en) * 2012-05-30 2013-01-30 远大可建科技有限公司 Floorslab with prefabricated water and electricity components

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013177989A1 (en) * 2012-05-30 2013-12-05 Zhang Yue Floor slab with prefabricated pipelines and prefabricated joints
CN105780911A (en) * 2014-10-15 2016-07-20 山核桃设计有限责任公司 A Method Of Installing A Plumbing Flange, And A Transportable Base
CN105780911B (en) * 2014-10-15 2021-11-19 山核桃设计有限责任公司 Method for installing pipeline flange and movable base

Also Published As

Publication number Publication date
WO2013177989A1 (en) 2013-12-05

Similar Documents

Publication Publication Date Title
CN105317110A (en) Integrated assembly type steel structure building
CN205444458U (en) Integrated assembled steel construction building
CN204163196U (en) A kind of embedded concrete-filled steel square tubular column in T-steel top flange and steel beam connecting joint
CN206289884U (en) A kind of heat insulation integrated light roof board of fabricated construction
CN202706297U (en) Floorslab with prefabricated water and electricity components
CN202577706U (en) Floor slab with prefabricated pipelines and prefabricated joints
CN202627198U (en) Novel steel structure system
CN204418510U (en) Floor support plate steel bar girder structure
CN201817819U (en) Prefabricated assembled reinforced concrete rectangular inspection well chamber
CN204940585U (en) The precast wall body of assembled-type house
CN202627289U (en) Floor slab with preformed air ports
CN202483117U (en) Steam press light air-entrapping concrete ultrathin plate
CN203320751U (en) Formwork thermal insulation integrated wall body
CN103452220A (en) Floor slab with prefabricated water and electric components
CN202627315U (en) Double-head steel structure vertical column
CN206616695U (en) A kind of concrete panel and girt strip floor dry type connecting node
CN202627314U (en) Integral steel structure upright post
CN204491661U (en) Upper arch prestressed structure pin-connected panel underground pipe gallery
CN201614679U (en) Assembled building reinforced concrete precast plate
CN202627316U (en) Steel structure upright
CN203429852U (en) Factory-like produced roof
CN203429878U (en) Steel-structure floor board prefabricated in factory
CN2789339Y (en) Precast rib aero-concrete roof boarding
CN204940679U (en) The precast wall body of fabricated structure
CN202627284U (en) Floor slab with elevator host

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ZHANG YUE

Free format text: FORMER OWNER: BROAD SUSTAINABLE BUILDING TECHNOLOGY CO., LTD.

Effective date: 20130318

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 414600 YUEYANG, HUNAN PROVINCE TO: 410000 CHANGSHA, HUNAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20130318

Address after: 410000 No. 1, far main road, Changsha, Hunan

Patentee after: Zhang Yue

Address before: Port 414600 Xiangyin Wenxing town Hunan County ambitious to build Technology Co. Ltd.

Patentee before: Broad Sustainable Building Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121205

Termination date: 20210530

CF01 Termination of patent right due to non-payment of annual fee