CN202627315U - Double-head steel structure vertical column - Google Patents

Double-head steel structure vertical column Download PDF

Info

Publication number
CN202627315U
CN202627315U CN 201220248493 CN201220248493U CN202627315U CN 202627315 U CN202627315 U CN 202627315U CN 201220248493 CN201220248493 CN 201220248493 CN 201220248493 U CN201220248493 U CN 201220248493U CN 202627315 U CN202627315 U CN 202627315U
Authority
CN
China
Prior art keywords
vertical column
steel structure
double
column
steel work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220248493
Other languages
Chinese (zh)
Inventor
张跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhang Yue
Original Assignee
BROAD SUSTAINABLE BUILDING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BROAD SUSTAINABLE BUILDING Co Ltd filed Critical BROAD SUSTAINABLE BUILDING Co Ltd
Priority to CN 201220248493 priority Critical patent/CN202627315U/en
Application granted granted Critical
Publication of CN202627315U publication Critical patent/CN202627315U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model discloses a double-head steel structure vertical column. Bracket structures extend out of two sides of the upper end and/or the lower end of the steel structure vertical column, and double guide heads are fixed on the bracket structures. Vertical column flanges are fixed on the bracket structures at the upper end and/or the lower end of the vertical column and connected with steel structure floor flanges on the two sides of the vertical column. The double guide heads are respectively sleeved into steel structure floor guide pipes on the two sides. The double-head steel structure vertical column can realize factory standardized production, is controllable in quality, labor-saving, time-saving, high in speed, high in quality, environment-friendly, energy-saving, high in building strength, anti-seismic and anti-disaster, and can be assembled in the site. Raw materials are saved, building waste is eliminated, and the double-head steel structure vertical column is an important innovation in the field of building.

Description

A kind of double end steel work column
Technical field
The utility model relates to technical field of fixed buildings, is specifically related to a kind of double end steel work column.
Background technology
Low-carbon energy-saving is the common task and goal of global human, and the low-carbon energy-saving of sustainable scientific development building is one of them importance.The existing fixed building mostly is a reinforced concrete structure, cast-in-site, site operation; Waste of raw materials is serious, and building waste is many, and is time-consuming; Speed is slow, and energy consumption is high, and quality is uncontrollable; Can not realize standardization, batch production production, not meet the environmental protection and energy saving policy of country, be a kind of superseded backward process.
Summary of the invention
The utility model technical problem to be solved is: solve the problem that above-mentioned prior art exists, and provide that a kind of batch production standardized production, assembled on site, saving of work and time, speed are fast, no building waste, save the double end steel work column of raw material, antidetonation, building intensity height, environmental protection and energy saving.
The technical scheme that the utility model adopts is:
This double end steel work column stretches out bracket structure in the upper end and/or the both sides, lower end of steel work column, is fixed with two guide heads on the bracket structure.
In the technique scheme, be fixed with the column flange on described steel work column upper end and/or the lower end bracket structure, the column flange is connected with the steel work floor flange on column both sides.
In the technique scheme, described pair of guide head is inserted in respectively in the steel work floor guide pipe of both sides.
The utility model has changed the steel concrete cast-in-site job practices of traditional backwardness fully, and adopts the new steel structure system, so just can realize the batch production standardized production, and is quality controllable; Assembled on site, saving of work and time, speed is fast, and quality is good; Save raw material, no building waste, environmental protection and energy saving; And building intensity is high, and antidetonation is combated a natural disaster, and is the great innovation of building field.The double end steel work column that adopts the utility model purifies building component with the earthquake-proof energy-saving of other batch production standardized production and makes up Sustainable Building and can realize 9 degree antidetonations; 5 times energy-conservation; 20 times of air purifications, 7% the building amount of labour used, 93% batch production degree; Build the 30th floor height buildings in 360 hours, rewritten human building history.
Description of drawings
Fig. 1 is the utility model mounting structure sketch map;
Fig. 2 is the utility model end structure enlarged drawing;
Fig. 3 is the vertical view of Fig. 2.
Among the figure, 1-steel work column, 2-bracket, 3-guide head, the guide pipe on 4-floor, 5-steel work floor, 6-column flange.
The specific embodiment
Referring to Fig. 1, Fig. 2, Fig. 3, the double end steel work column of the utility model stretches out bracket structure 2 in the upper end and/or the both sides, lower end of steel work column 1, is fixed with two guide heads 3 on the bracket structure 2.
Be fixed with column flange 6 on above-mentioned steel work column 1 upper end and/or the lower end bracket structure 2, column flange 6 is connected with steel work floor 5 flanges on column 1 both sides.
Two guide heads 3 of above-mentioned steel work are inserted in respectively in the guide pipe 4 on the floor of both sides.

Claims (3)

1. double end steel work column, it is characterized in that: bracket structure is stretched out in upper end and/or both sides, lower end at the steel work column, is fixed with two guide heads on the bracket structure.
2. double end steel work column according to claim 1 is characterized in that: be fixed with the column flange on described steel work column upper end and/or the lower end bracket structure, the column flange is connected with the steel work floor flange on column both sides.
3. double end steel work column according to claim 1 is characterized in that: described pair of guide head is inserted in respectively in the steel work floor guide pipe of both sides.
CN 201220248493 2012-05-30 2012-05-30 Double-head steel structure vertical column Expired - Fee Related CN202627315U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220248493 CN202627315U (en) 2012-05-30 2012-05-30 Double-head steel structure vertical column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220248493 CN202627315U (en) 2012-05-30 2012-05-30 Double-head steel structure vertical column

Publications (1)

Publication Number Publication Date
CN202627315U true CN202627315U (en) 2012-12-26

Family

ID=47380524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220248493 Expired - Fee Related CN202627315U (en) 2012-05-30 2012-05-30 Double-head steel structure vertical column

Country Status (1)

Country Link
CN (1) CN202627315U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013177994A1 (en) * 2012-05-30 2013-12-05 Zhang Yue Double-head steel structure upright post

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013177994A1 (en) * 2012-05-30 2013-12-05 Zhang Yue Double-head steel structure upright post
CN103452239A (en) * 2012-05-30 2013-12-18 张跃 Double-head steel structure vertical column

Similar Documents

Publication Publication Date Title
CN204163196U (en) A kind of embedded concrete-filled steel square tubular column in T-steel top flange and steel beam connecting joint
CN202627198U (en) Novel steel structure system
CN202509683U (en) Steel reinforced concrete mixing structure for FRP (Fiber Reinforce Plastic) pipe
CN203795847U (en) Formwork set for concrete specially-shaped section column
CN202706297U (en) Floorslab with prefabricated water and electricity components
CN204418510U (en) Floor support plate steel bar girder structure
CN202627315U (en) Double-head steel structure vertical column
CN202627316U (en) Steel structure upright
CN203514531U (en) Square steel tube concrete column and steel beam node connecting structure with internal diaphragms
CN202627314U (en) Integral steel structure upright post
CN202627289U (en) Floor slab with preformed air ports
CN203613796U (en) Recoverable eave tile bolt formwork system of steel-reinforced concrete column
CN204282824U (en) Prefabricated setting prop rises beam composite frame structure
CN204899034U (en) Prefabricated wall post
CN201874088U (en) Combined column with construction steel structure
CN203394093U (en) Fabricated multilayer brick-concrete reinforced structure
CN103452238A (en) Integral steel structure upright post
CN103452239A (en) Double-head steel structure vertical column
CN203393904U (en) Reinforcement fabric hoop
CN203334545U (en) Double-end steel structure stand column
CN202689278U (en) Superimposed hollow slab
CN204590413U (en) A kind of region constrained concrete circular columns
CN203429852U (en) Factory-like produced roof
CN101984203A (en) Technique for refurbishment and reconstruction of old buildings in old quarters
CN202627284U (en) Floor slab with elevator host

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ZHANG YUE

Free format text: FORMER OWNER: BROAD SUSTAINABLE BUILDING TECHNOLOGY CO., LTD.

Effective date: 20130315

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 414600 YUEYANG, HUNAN PROVINCE TO: 410000 CHANGSHA, HUNAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20130315

Address after: 410000 No. 1, far main road, Changsha, Hunan

Patentee after: Zhang Yue

Address before: Port 414600 Xiangyin Wenxing town Hunan County ambitious to build Technology Co. Ltd.

Patentee before: Broad Sustainable Building Co., Ltd.

EE01 Entry into force of recordation of patent licensing contract

Assignee: Broad Sustainable Building Co., Ltd.

Assignor: Zhang Yue

Contract record no.: 2015430000053

Denomination of utility model: Double-head steel structure vertical column

Granted publication date: 20121226

License type: Exclusive License

Record date: 20150525

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121226

Termination date: 20210530

CF01 Termination of patent right due to non-payment of annual fee