WO2013177989A1 - Floor slab with prefabricated pipelines and prefabricated joints - Google Patents

Floor slab with prefabricated pipelines and prefabricated joints Download PDF

Info

Publication number
WO2013177989A1
WO2013177989A1 PCT/CN2013/074609 CN2013074609W WO2013177989A1 WO 2013177989 A1 WO2013177989 A1 WO 2013177989A1 CN 2013074609 W CN2013074609 W CN 2013074609W WO 2013177989 A1 WO2013177989 A1 WO 2013177989A1
Authority
WO
WIPO (PCT)
Prior art keywords
prefabricated
floor slab
joints
pipes
pipelines
Prior art date
Application number
PCT/CN2013/074609
Other languages
French (fr)
Chinese (zh)
Inventor
张跃
Original Assignee
Zhang Yue
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhang Yue filed Critical Zhang Yue
Publication of WO2013177989A1 publication Critical patent/WO2013177989A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/48Special adaptations of floors for incorporating ducts, e.g. for heating or ventilating
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00Vertical ducts; Channels, e.g. for drainage

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Sink And Installation For Waste Water (AREA)
  • Branch Pipes, Bends, And The Like (AREA)

Abstract

A floor slab with prefabricated pipelines and prefabricated joints. Pipelines (1, 2, 5, and 6) are prefabricated in the floor slab. The pipeline joints (3, 4, 7, and 8) are prefabricated on the floor slab, and are connected with the prefabricated pipelines (1, 2, 5, and 6). The prefabricated pipelines comprise a ventilation pipeline, a water supply pipeline, a drainage pipeline and/or a smoke exhaust pipeline. The prefabricated pipelines in the floor slab and the prefabricated pipeline joints on the floor slab are produced and assembled in a factory. The floor slab can implement factorized and standardized production, and has high construction strength.

Description

一种预制管道及接头的楼板  Prefabricated pipe and joint floor
技术领域 Technical field
本实用新型涉及固定建筑物技术领域, 具体涉及一种预制管道及接头 的楼板。  The utility model relates to the technical field of fixed buildings, in particular to a floor board of prefabricated pipes and joints.
背景技术 Background technique
低碳节能, 是全球人类共同的任务和目标, 而可持续科学发展的低碳 节能建筑是其中的一个重要方面。 现有的固定建筑物大都为钢筋混凝土结 构, 现场浇注, 现场施工, 原材料浪费严重, 建筑垃圾多, 费工费时, 速 度慢, 能耗高, 质量不可控, 不能实现标准化、 工厂化生产, 不符合国家 的环保节能政策, 是一种淘汰的落后工艺方法。  Low-carbon energy conservation is the common task and goal of human beings around the world, and low-carbon energy-efficient buildings with sustainable scientific development are an important aspect. Most of the existing fixed buildings are reinforced concrete structures, on-site pouring, on-site construction, serious waste of raw materials, construction waste, time and labor, slow speed, high energy consumption, uncontrollable quality, and cannot achieve standardization and factory production. In line with the national environmental protection and energy conservation policy, it is a backward process method that is eliminated.
发明内容 Summary of the invention
本实用新型所要解决的技术问题是: 解决上述现有技术存在的问题, 而提供一种工厂化标准化生产、 现场组装、 省工省时、 速度快、 无建筑垃 圾、 节省原材料、 抗震、 建筑强度高、 环保节能的预制管道及接头的楼板。  The technical problem to be solved by the utility model is: solving the problems existing in the prior art mentioned above, and providing a factory standardized production, on-site assembly, saving labor and time, high speed, no construction waste, saving raw materials, earthquake resistance, building strength High, environmentally friendly and energy efficient prefabricated pipes and joints.
本实用新型采用的技术方案是:  The technical solution adopted by the utility model is:
一种预制管道及接头的楼板, 在楼板内预制管道, 在楼板上预制管道 接头, 预制管道接头与预制管道连接。  A prefabricated pipe and joint slab, prefabricated pipes in the slab, prefabricated pipe joints on the slab, and prefabricated pipe joints connected to the prefabricated pipes.
上述技术方案中, 所述的预制管道包括通风管道、 供水管道、 排水管 道和 /或排烟管道。  In the above technical solution, the prefabricated pipeline includes a ventilation duct, a water supply duct, a drain duct and/or a smoke exhaust duct.
上述技术方案中, 所述的楼板内预制管道和楼板上预制管道接头在工 厂内生产装配完成。 本实用新型完全改变了传统落后的钢筋混凝土现场浇注施工方法, 而 采用新型钢结构系统, 这样就可实现工厂化标准化生产, 质量可控, 现场 组装, 省工省时, 速度快, 质量好, 节省原材料, 无建筑垃圾, 环保节能, 而且建筑强度高, 抗震抗灾, 是建筑领域的重大创新。 In the above technical solution, the prefabricated pipes in the floor and the prefabricated pipe joints on the floor are produced and assembled in the factory. The utility model completely changes the traditional backward reinforced concrete on-site pouring construction method, and adopts a new steel structure system, thereby realizing factory standardized production, quality controllable, on-site assembly, saving labor and time, high speed, good quality, It saves raw materials, has no construction waste, is environmentally friendly and energy-saving, and has high building strength, earthquake resistance and disaster resistance. It is a major innovation in the construction field.
附图说明 DRAWINGS
图 1为本实用新型实施例结构示意图。  Figure 1 is a schematic view showing the structure of an embodiment of the present invention.
图中, 1一热水主管, 2—冷水主管, 3—热水主管接头, 4一冷水主管 接头, 5—冷水支管, 6—热水支管, 7—热水支管接头, 8—冷水支管接头。 具体实施方式  In the figure, 1 hot water main, 2 - cold water main, 3 - hot water main joint, 4 cold water main joint, 5 - cold water branch, 6 - hot water branch, 7 - hot water branch joint, 8 - cold water branch joint . detailed description
参见图 1, 本实用新型的预制管道及接头的楼板, 在楼板内预制管道, 在楼板上预制管道接头, 预制管道接头与预制管道连接。  Referring to Figure 1, the prefabricated pipe and joint floor of the utility model are prefabricated in the floor, the pipe joint is prefabricated on the floor, and the prefabricated pipe joint is connected with the prefabricated pipe.
上述技术方案中, 所述的预制管道包括通风管道、 供水管道、 排水管 道和 /或排烟管道。  In the above technical solution, the prefabricated pipeline includes a ventilation duct, a water supply duct, a drain duct and/or a smoke exhaust duct.
上述技术方案中, 所述的楼板内预制管道和楼板上预制管道接头在工 厂内生产装配完成。  In the above technical solution, the prefabricated pipes in the floor and the prefabricated pipe joints on the floor are assembled and assembled in the factory.

Claims

权利要求 Rights request
1、 一种预制管道及接头的楼板, 其特征在于: 在楼板内预制管道, 在 楼板上预制管道接头, 预制管道接头与预制管道连接。 1. A floor slab with prefabricated pipes and joints, characterized in that: pipes are prefabricated in the floor slab, pipe joints are prefabricated on the floor slab, and the prefabricated pipe joints are connected to the prefabricated pipes.
2、 根据权利要求 1所述的预制管道及接头的楼板, 其特征在于: 所述 的预制管道包括通风管道、 供水管道、 排水管道和 /或排烟管道。 2. The floor slab with prefabricated pipes and joints according to claim 1, characterized in that: the prefabricated pipes include ventilation pipes, water supply pipes, drainage pipes and/or smoke exhaust pipes.
3、 根据权利要求 1所述的预制管道及接头的楼板, 其特征在于: 所述 的楼板内预制管道和楼板上预制管道接头在工厂内生产装配完成。 3. The floor slab with prefabricated pipes and joints according to claim 1, characterized in that: the prefabricated pipes in the floor slab and the prefabricated pipe joints on the floor slab are produced and assembled in the factory.
PCT/CN2013/074609 2012-05-30 2013-04-24 Floor slab with prefabricated pipelines and prefabricated joints WO2013177989A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN 201220248494 CN202577706U (en) 2012-05-30 2012-05-30 Floor slab with prefabricated pipelines and prefabricated joints
CN201220248494.1 2012-05-30

Publications (1)

Publication Number Publication Date
WO2013177989A1 true WO2013177989A1 (en) 2013-12-05

Family

ID=47247133

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2013/074609 WO2013177989A1 (en) 2012-05-30 2013-04-24 Floor slab with prefabricated pipelines and prefabricated joints

Country Status (2)

Country Link
CN (1) CN202577706U (en)
WO (1) WO2013177989A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202577706U (en) * 2012-05-30 2012-12-05 远大可建科技有限公司 Floor slab with prefabricated pipelines and prefabricated joints
AU2014250650B2 (en) * 2014-10-15 2019-11-28 Hickory Design Pty Ltd A method of installing a plumbing flange, and a transportable base

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3988867A (en) * 1973-05-18 1976-11-02 Olavi Vaananen Drain and duct system for buildings
GB1454992A (en) * 1972-07-27 1976-11-10 Drake Scull Eng Ltd Electrical installations and building constructions manufacture of nicle
DE4205812A1 (en) * 1992-02-26 1993-09-16 Schmidt Reuter Underfloor double cable-way duct with clips over butted sections - has jointing and sealing by flanged clips snapped over ribs extending along lines where grounded flanges meet sloping sidewalls
CN2312272Y (en) * 1997-11-25 1999-03-31 罗兴宇 Prefabricated floor
CN2632190Y (en) * 2003-07-07 2004-08-11 有利华建筑预制件(深圳)有限公司 Prefabricated construction panel with wire pipe
CN202577706U (en) * 2012-05-30 2012-12-05 远大可建科技有限公司 Floor slab with prefabricated pipelines and prefabricated joints
CN202706297U (en) * 2012-05-30 2013-01-30 远大可建科技有限公司 Floorslab with prefabricated water and electricity components

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1454992A (en) * 1972-07-27 1976-11-10 Drake Scull Eng Ltd Electrical installations and building constructions manufacture of nicle
US3988867A (en) * 1973-05-18 1976-11-02 Olavi Vaananen Drain and duct system for buildings
DE4205812A1 (en) * 1992-02-26 1993-09-16 Schmidt Reuter Underfloor double cable-way duct with clips over butted sections - has jointing and sealing by flanged clips snapped over ribs extending along lines where grounded flanges meet sloping sidewalls
CN2312272Y (en) * 1997-11-25 1999-03-31 罗兴宇 Prefabricated floor
CN2632190Y (en) * 2003-07-07 2004-08-11 有利华建筑预制件(深圳)有限公司 Prefabricated construction panel with wire pipe
CN202577706U (en) * 2012-05-30 2012-12-05 远大可建科技有限公司 Floor slab with prefabricated pipelines and prefabricated joints
CN202706297U (en) * 2012-05-30 2013-01-30 远大可建科技有限公司 Floorslab with prefabricated water and electricity components

Also Published As

Publication number Publication date
CN202577706U (en) 2012-12-05

Similar Documents

Publication Publication Date Title
WO2007134517A1 (en) Composite concrete shear wall for heat insulation
CN204163196U (en) A kind of embedded concrete-filled steel square tubular column in T-steel top flange and steel beam connecting joint
WO2013135108A1 (en) Assembled steel structure hollow building
CN209277334U (en) A kind of prefabricated combined assembled insulation construction integrated wallboard
CN205530780U (en) Wall body door and window mouth structure
CN203569739U (en) Heat preservation outer mold composite board for cast-in-place concrete
WO2013177989A1 (en) Floor slab with prefabricated pipelines and prefabricated joints
CN203961116U (en) A kind of Dual-layer insulation board double leaf steel wire net rack concrete sandwich composite thermal-insulation external wall panel
WO2017197852A1 (en) Fire-prevention, insulation, noise-elimination combined floor slab
CN201512869U (en) Cast-in-situ thermal insulation structure of building wall body
CN206616808U (en) Assembled architecture precast facade energy-saving thermal insulation layer is constructed
CN203475600U (en) Steel-structure concrete inside and outside heat-preservation integrated module-built house
CN203684522U (en) Lightweight composite prefabricated wall plate for house
WO2013177988A1 (en) Floor slab with prefabricated water and electricity components
CN206368457U (en) A kind of steel building wall
CN106284681B (en) Assembly concrete is whole without heat bridge board wall and the connection method of running-on floor
CN204609051U (en) Outer wall template insulation composite integrated system that two-sided ladder type is seamless
CN204059675U (en) A kind of concrete composite heat insulation wall
CN207597695U (en) One body composite board of Fast Installation heat insulation decorative load-bearing
CN208501989U (en) A kind of novel external wall equipped with disassembly-free thermal-insulation form board
CN205012583U (en) Take outer insulation construction of inorganic light -weight aggregate mortar outer wall of T shape strip
CN106284739B (en) Assembly concrete is whole without heat bridge gusset
CN207633634U (en) A kind of sandwich heat preservation Side fascia template stainless steel heat preservation tension member
CN207332030U (en) Carrying wall between the incomparable steel column of pin-connected panel
CN104775532A (en) Insulation board structure

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13797366

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205 DATED 11/06/2015)

122 Ep: pct application non-entry in european phase

Ref document number: 13797366

Country of ref document: EP

Kind code of ref document: A1