WO2013177988A1 - Floor slab with prefabricated water and electricity components - Google Patents
Floor slab with prefabricated water and electricity components Download PDFInfo
- Publication number
- WO2013177988A1 WO2013177988A1 PCT/CN2013/074607 CN2013074607W WO2013177988A1 WO 2013177988 A1 WO2013177988 A1 WO 2013177988A1 CN 2013074607 W CN2013074607 W CN 2013074607W WO 2013177988 A1 WO2013177988 A1 WO 2013177988A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- water
- floor slab
- prefabricated
- hot water
- meter
- Prior art date
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 63
- 230000005611 electricity Effects 0.000 title claims abstract 7
- 238000010276 construction Methods 0.000 abstract description 10
- 238000004519 manufacturing process Methods 0.000 abstract description 5
- 230000007613 environmental effect Effects 0.000 abstract description 3
- 239000002994 raw material Substances 0.000 abstract description 3
- 239000002699 waste material Substances 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 241000282414 Homo sapiens Species 0.000 description 2
- 229910052799 carbon Inorganic materials 0.000 description 2
- 238000004134 energy conservation Methods 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000004887 air purification Methods 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D3/00—Hot-water central heating systems
- F24D3/10—Feed-line arrangements, e.g. providing for heat-accumulator tanks, expansion tanks ; Hydraulic components of a central heating system
- F24D3/1058—Feed-line arrangements, e.g. providing for heat-accumulator tanks, expansion tanks ; Hydraulic components of a central heating system disposition of pipes and pipe connections
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D19/00—Details
- F24D19/10—Arrangement or mounting of control or safety devices
- F24D19/1006—Arrangement or mounting of control or safety devices for water heating systems
- F24D19/1051—Arrangement or mounting of control or safety devices for water heating systems for domestic hot water
- F24D19/1063—Arrangement or mounting of control or safety devices for water heating systems for domestic hot water counting of energy consumption
Definitions
- the invention relates to the technical field of fixed buildings, and in particular to a floor panel of prefabricated hydroelectric components. Background technique
- Low-carbon energy conservation is the common task and goal of human beings around the world, and low-carbon energy-efficient buildings with sustainable scientific development are an important aspect.
- Most of the existing fixed buildings are reinforced concrete structures, on-site pouring, on-site construction, serious waste of raw materials, construction waste, time and labor, slow speed, high energy consumption, uncontrollable quality, and cannot achieve standardization and factory production.
- it is a backward process method that is eliminated.
- the technical problem to be solved by the present invention is: to solve the problems existing in the prior art described above, and to provide a factory standardized production, on-site assembly, labor saving, fast speed, no construction waste, material saving, earthquake resistance, high building strength The floor of environmentally-friendly and energy-saving prefabricated hydroelectric components.
- a slab for prefabricated hydroelectric components with pre-assembled valve blocks, heat meters, water meters, water pipes, lights and wires in the slab.
- the valve group includes a hot water valve and a cold water valve;
- the water meter comprises a hot water meter and a cold water meter;
- the water pipe comprises a hot water main pipe, a cold water main pipe, a hot water branch pipe and a cold water branch pipe.
- the hydroelectric components pre-installed in the floor slab are assembled and assembled in the factory.
- the invention completely changes the traditional backward reinforced concrete on-site pouring construction method, and adopts a new steel structure system, thereby realizing factory standardized production, quality controllable, on-site assembly, saving labor and time, high speed, good quality, saving Raw materials, no construction waste, environmental protection and energy saving, and high building strength, earthquake resistance and disaster resistance are major innovations in the construction field.
- the slab using the prefabricated hydroelectric component of the present invention together with other industrialized and standardized production of seismic energy-saving and purifying building components can realize 9-degree seismic resistance, 5 times energy saving, 20 times air purification, 7% of construction work, 93%
- Figure 1 is a schematic view of the structure of the present invention.
- the floor panel of the prefabricated hydroelectric component of the present invention is pre-assembled with a valve block, a heat meter, a water meter, a water pipe, a lamp and a wire in the floor.
- the valve group includes a hot water valve 3 and a cold water valve 7;
- the water meter includes a hot water meter 4 and a cold water meter 6;
- the water pipe includes a hot water main pipe 2, a cold water main pipe, and a hot water pipe.
- the hydroelectric components pre-installed in the floor slab are assembled and assembled in the factory.
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Domestic Plumbing Installations (AREA)
- Steam Or Hot-Water Central Heating Systems (AREA)
Abstract
A floor slab with prefabricated water and electricity components. A valve group, a heat meter, a water meter, a water pipe, a lamp and an electrical wire are arranged in the floor slab in advance. The valve group comprises a hot water valve and a cold water valve. The water meter comprises a hot water meter and a cold water meter. The water pipe comprises a hot water main pipe, a cold water main pipe, a hot water branch pipe, and a cold water branch pipe. The water and electricity components prefabricated in the floor slab are produced and assembled in a factory. The present invention can implement factorized and standardized production, and has advantages of controllable quality, on-site assembling, laborsaving, timesaving, fast speed, good quality, raw material saving, construction garbage free, environmental protection, energy saving, high construction strength, earthquake resistance, and disaster resistance, thereby being a great innovation in construction field.
Description
一种预制水电部件的楼板 Floor board for prefabricated hydroelectric components
技术领域 Technical field
本发明涉及固定建筑物技术领域, 具体涉及一种预制水电部件的楼板。 背景技术 The invention relates to the technical field of fixed buildings, and in particular to a floor panel of prefabricated hydroelectric components. Background technique
低碳节能, 是全球人类共同的任务和目标, 而可持续科学发展的低碳 节能建筑是其中的一个重要方面。 现有的固定建筑物大都为钢筋混凝土结 构, 现场浇注, 现场施工, 原材料浪费严重, 建筑垃圾多, 费工费时, 速 度慢, 能耗高, 质量不可控, 不能实现标准化、 工厂化生产, 不符合国家 的环保节能政策, 是一种淘汰的落后工艺方法。 Low-carbon energy conservation is the common task and goal of human beings around the world, and low-carbon energy-efficient buildings with sustainable scientific development are an important aspect. Most of the existing fixed buildings are reinforced concrete structures, on-site pouring, on-site construction, serious waste of raw materials, construction waste, time and labor, slow speed, high energy consumption, uncontrollable quality, and cannot achieve standardization and factory production. In line with the national environmental protection and energy conservation policy, it is a backward process method that is eliminated.
发明内容 Summary of the invention
本发明所要解决的技术问题是: 解决上述现有技术存在的问题, 而提 供一种工厂化标准化生产、 现场组装、 省工省时、 速度快、 无建筑垃圾、 节省原材料、 抗震、 建筑强度高、 环保节能的预制水电部件的楼板。 The technical problem to be solved by the present invention is: to solve the problems existing in the prior art described above, and to provide a factory standardized production, on-site assembly, labor saving, fast speed, no construction waste, material saving, earthquake resistance, high building strength The floor of environmentally-friendly and energy-saving prefabricated hydroelectric components.
本发明采用的技术方案是: The technical solution adopted by the invention is:
一种预制水电部件的楼板, 在楼板内预先装好阀组、 热量表、 水表、 水管、 灯和电线。 A slab for prefabricated hydroelectric components, with pre-assembled valve blocks, heat meters, water meters, water pipes, lights and wires in the slab.
上述技术方案中, 所述的阀组包括热水阀和冷水阀; 所述的水表包括 热水表和冷水表; 所述的水管包括热水主管、 冷水主管、 热水支管和冷水 支管。 In the above technical solution, the valve group includes a hot water valve and a cold water valve; the water meter comprises a hot water meter and a cold water meter; and the water pipe comprises a hot water main pipe, a cold water main pipe, a hot water branch pipe and a cold water branch pipe.
上述技术方案中, 所述的楼板内预装的水电部件在工厂内生产装配完 成。
本发明完全改变了传统落后的钢筋混凝土现场浇注施工方法, 而采用 新型钢结构系统, 这样就可实现工厂化标准化生产, 质量可控, 现场组装, 省工省时, 速度快, 质量好, 节省原材料, 无建筑垃圾, 环保节能, 而且 建筑强度高, 抗震抗灾, 是建筑领域的重大创新。 采用本发明的预制水电 部件的楼板与其它工厂化标准化生产的抗震节能净化建筑部件一起构建可 持续建筑能实现 9度抗震, 5倍节能, 20倍空气净化, 7 %的建筑用工量, 93 %的工厂化程度, 360小时建 30层高楼, 改写了人类的建筑历史。 In the above technical solution, the hydroelectric components pre-installed in the floor slab are assembled and assembled in the factory. The invention completely changes the traditional backward reinforced concrete on-site pouring construction method, and adopts a new steel structure system, thereby realizing factory standardized production, quality controllable, on-site assembly, saving labor and time, high speed, good quality, saving Raw materials, no construction waste, environmental protection and energy saving, and high building strength, earthquake resistance and disaster resistance are major innovations in the construction field. The slab using the prefabricated hydroelectric component of the present invention together with other industrialized and standardized production of seismic energy-saving and purifying building components can realize 9-degree seismic resistance, 5 times energy saving, 20 times air purification, 7% of construction work, 93% The degree of factoryization, built a 30-story high-rise building in 360 hours, rewrote the history of human architecture.
附图说明 DRAWINGS
图 1为本发明结构示意图。 Figure 1 is a schematic view of the structure of the present invention.
图中, 1一冷水主管, 2—热水主管, 3—热水阀, 4一热水表, 5—冷水 支管, 6—冷水表, 7—冷水阀, 8—热水支管。 In the figure, 1 cold water main, 2 - hot water main, 3 - hot water valve, 4 hot water meter, 5 - cold water branch pipe, 6 - cold water meter, 7 - cold water valve, 8 - hot water branch pipe.
具体实施方式 detailed description
参见图 1, 本发明的预制水电部件的楼板, 在楼板内预先装好阀组、 热 量表、 水表、 水管、 灯和电线。 Referring to Figure 1, the floor panel of the prefabricated hydroelectric component of the present invention is pre-assembled with a valve block, a heat meter, a water meter, a water pipe, a lamp and a wire in the floor.
上述技术方案中,所述的阀组包括热水阀 3和冷水阀 7 ;所述的水表包 括热水表 4和冷水表 6; 所述的水管包括热水主管 2、 冷水主管 1、 热水支 管 8和冷水支管 5。 In the above technical solution, the valve group includes a hot water valve 3 and a cold water valve 7; the water meter includes a hot water meter 4 and a cold water meter 6; the water pipe includes a hot water main pipe 2, a cold water main pipe, and a hot water pipe. Branch pipe 8 and cold water branch pipe 5.
上述技术方案中, 所述的楼板内预装的水电部件在工厂内生产装配完 成。
In the above technical solution, the hydroelectric components pre-installed in the floor slab are assembled and assembled in the factory.
Claims
1、 一种预制水电部件的楼板, 其特征在于: 在楼板内预先装好阀组、 热量表、 水表、 水管、 灯和电线。 1. A floor slab with prefabricated water and electricity components, characterized by: valve groups, heat meters, water meters, water pipes, lights and wires are pre-installed in the floor slab.
2、 根据权利要求 1所述的预制水电部件的楼板, 其特征在于: 所述的 阀组包括热水阀和冷水阀。 2. The floor slab of prefabricated water and electricity components according to claim 1, characterized in that: the valve group includes a hot water valve and a cold water valve.
3、 根据权利要求 1所述的预制水电部件的楼板, 其特征在于: 所述的 水表包括热水表和冷水表。 3. The floor slab of prefabricated water and electricity components according to claim 1, characterized in that: the water meter includes a hot water meter and a cold water meter.
4、 根据权利要求 1所述的预制水电部件的楼板, 其特征在于: 所述的 水管包括热水主管、 冷水主管、 热水支管和冷水支管。 4. The floor slab of prefabricated water and electricity components according to claim 1, characterized in that: the water pipes include a hot water main pipe, a cold water main pipe, a hot water branch pipe and a cold water branch pipe.
5、 根据权利要求 1所述的预制水电部件的楼板, 其特征在于: 所述的 楼板内预装的水电部件在工厂内生产装配完成。
5. The floor slab with prefabricated hydropower components according to claim 1, characterized in that: the prefabricated hydropower components in the floor slab are produced and assembled in a factory.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210172549.XA CN103452220A (en) | 2012-05-30 | 2012-05-30 | Floor slab with prefabricated water and electric components |
CN201210172549.X | 2012-05-30 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2013177988A1 true WO2013177988A1 (en) | 2013-12-05 |
Family
ID=49672379
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CN2013/074607 WO2013177988A1 (en) | 2012-05-30 | 2013-04-24 | Floor slab with prefabricated water and electricity components |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN103452220A (en) |
WO (1) | WO2013177988A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108316528A (en) * | 2018-04-04 | 2018-07-24 | 刘祥锦 | A kind of prefabricated whole slab assembly dark pipe laying system of building and its prefabricated whole slab |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105986632A (en) * | 2015-01-29 | 2016-10-05 | 当代节能置业股份有限公司 | Prefabricated radiation floor and manufacturing method and construction method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001055828A (en) * | 1999-08-17 | 2001-02-27 | Sumai Kobo:Kk | Floor heating structure and its construction method |
CN1483906A (en) * | 2003-08-04 | 2004-03-24 | 有利华建筑预制件(深圳)有限公司 | Semi-prefabricated construction method for prefabricated floorslab and buliding floorslab with wire pipe |
DE202007001982U1 (en) * | 2007-02-10 | 2007-05-10 | Aretz, Gordon | Roof for buildings, designed to recover solar energy, includes concrete panels with sealing, insulation, framework, embedded pipes and photovoltaic cells |
KR200439571Y1 (en) * | 2008-03-25 | 2008-04-17 | 이영암 | Grounding stone made by concrete |
CN202706297U (en) * | 2012-05-30 | 2013-01-30 | 远大可建科技有限公司 | Floorslab with prefabricated water and electricity components |
-
2012
- 2012-05-30 CN CN201210172549.XA patent/CN103452220A/en active Pending
-
2013
- 2013-04-24 WO PCT/CN2013/074607 patent/WO2013177988A1/en active Application Filing
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001055828A (en) * | 1999-08-17 | 2001-02-27 | Sumai Kobo:Kk | Floor heating structure and its construction method |
CN1483906A (en) * | 2003-08-04 | 2004-03-24 | 有利华建筑预制件(深圳)有限公司 | Semi-prefabricated construction method for prefabricated floorslab and buliding floorslab with wire pipe |
DE202007001982U1 (en) * | 2007-02-10 | 2007-05-10 | Aretz, Gordon | Roof for buildings, designed to recover solar energy, includes concrete panels with sealing, insulation, framework, embedded pipes and photovoltaic cells |
KR200439571Y1 (en) * | 2008-03-25 | 2008-04-17 | 이영암 | Grounding stone made by concrete |
CN202706297U (en) * | 2012-05-30 | 2013-01-30 | 远大可建科技有限公司 | Floorslab with prefabricated water and electricity components |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108316528A (en) * | 2018-04-04 | 2018-07-24 | 刘祥锦 | A kind of prefabricated whole slab assembly dark pipe laying system of building and its prefabricated whole slab |
Also Published As
Publication number | Publication date |
---|---|
CN103452220A (en) | 2013-12-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101565976B (en) | Multi-ribbed composite wallboard outer insulation integrated technology and construction process thereof | |
CN204163196U (en) | A kind of embedded concrete-filled steel square tubular column in T-steel top flange and steel beam connecting joint | |
WO2013135108A1 (en) | Assembled steel structure hollow building | |
CN202706297U (en) | Floorslab with prefabricated water and electricity components | |
CN107165307A (en) | Light steel integrated assembled type wall | |
CN103452187A (en) | Steel structure concrete internal-external thermal insulation integration module house | |
WO2013177988A1 (en) | Floor slab with prefabricated water and electricity components | |
CN201762833U (en) | Prefabricated external wall panel adopting sandwich heat insulation | |
CN102251640A (en) | Non-load bearing building energy-saving wallboard and preparation method thereof | |
CN203475600U (en) | Steel-structure concrete inside and outside heat-preservation integrated module-built house | |
CN203867053U (en) | Novel prefabricated composite wall plate with thermal insulating function | |
CN102912929A (en) | Multi-ribbed insulation wallboard | |
CN106284681B (en) | Assembly concrete is whole without heat bridge board wall and the connection method of running-on floor | |
WO2013177989A1 (en) | Floor slab with prefabricated pipelines and prefabricated joints | |
CN102146702B (en) | Profile steel gypsum combined building structure | |
CN203320691U (en) | Light steel and concrete house building system | |
CN202117166U (en) | Shape steel gypsum combined type building structure | |
CN202157458U (en) | Thermal insulation building energy conservation wallboard | |
CN106223532B (en) | Assembly concrete is whole without heat bridge wallboard | |
CN106284739B (en) | Assembly concrete is whole without heat bridge gusset | |
CN207332030U (en) | Carrying wall between the incomparable steel column of pin-connected panel | |
CN208023783U (en) | A kind of prefabricated light gauge cold-formed steel shape regeneration concrete assembled wall | |
CN206616695U (en) | A kind of concrete panel and girt strip floor dry type connecting node | |
Yin et al. | The development of new sandwich thermal insulation composite wall based on the housing industrialization | |
Li et al. | Comparison and Analysis of Lightweight Steel Structure Residential Housing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 13796800 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
32PN | Ep: public notification in the ep bulletin as address of the adressee cannot be established |
Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205 DATED 11/06/1205) |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 13796800 Country of ref document: EP Kind code of ref document: A1 |