CN108316528A - A kind of prefabricated whole slab assembly dark pipe laying system of building and its prefabricated whole slab - Google Patents
A kind of prefabricated whole slab assembly dark pipe laying system of building and its prefabricated whole slab Download PDFInfo
- Publication number
- CN108316528A CN108316528A CN201810300073.0A CN201810300073A CN108316528A CN 108316528 A CN108316528 A CN 108316528A CN 201810300073 A CN201810300073 A CN 201810300073A CN 108316528 A CN108316528 A CN 108316528A
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- pipe laying
- prefabricated whole
- slab
- whole slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000003032 molecular docking Methods 0.000 claims abstract description 18
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 11
- 238000010276 construction Methods 0.000 abstract description 7
- 230000000694 effects Effects 0.000 abstract description 3
- 230000007613 environmental effect Effects 0.000 abstract description 3
- 239000000463 material Substances 0.000 abstract description 3
- 238000003908 quality control method Methods 0.000 abstract description 3
- 239000008236 heating water Substances 0.000 description 16
- 238000010586 diagram Methods 0.000 description 9
- 239000004831 Hot glue Substances 0.000 description 3
- 230000003014 reinforcing effect Effects 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000005286 illumination Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000035515 penetration Effects 0.000 description 2
- 206010054949 Metaplasia Diseases 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000003139 buffering effect Effects 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 230000015689 metaplastic ossification Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 210000003205 muscle Anatomy 0.000 description 1
- 239000013307 optical fiber Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000009738 saturating Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Steam Or Hot-Water Central Heating Systems (AREA)
Abstract
The invention discloses a kind of prefabricated whole slab assembly to build dark pipe laying system, including:Dark pipe laying is preset in prefabricated whole slab, dark pipe laying reserves connectivity port in the connection faying face of prefabricated whole slab, dark pipe laying is connected to the dark pipe laying assembly system that prefabricated whole slab is formed at complete pipeline by the reserved connectivity port in the connection joint docking of prefabricated whole slab.The advantage is that situ wet operation can be reduced, site workload is reduced, is constructed to greatest extent in factory.Wet construction is carried out as far as possible in factory, the effect of environmental protection can be improved and improves materials'use washability and quality control.
Description
Technical field
The present invention relates to a kind of assembly of building industrialization construction technology buildings, and in particular to a kind of dark pipe laying it is prefabricated whole
Slab assembles building system and its prefabricated whole slab.
Background technology
Currently, construction industry is to green building and the future architecture industry developing direction of building industrialization;And assemble the skill of building
In China, development is still not perfect art.
The pipeline of assembly building is all site operation at present, specially uses superimposed sheet, the deployment tube on superimposed sheet, then adopt
It is secretly buried with rear pouring concrete mode;Or the embedded of pipe is carried out using building screed-coat again after the completion of the structure sheaf of building;
Industrialization degree is relatively low, influences industrialization promotion.
Invention content
In order to solve the above-mentioned problems of the prior art, present invention aims at provide one kind industrial metaplasia may be implemented
Dark pipe laying system and its prefabricated whole slab are built in the prefabricated whole slab assembly of production.
Dark pipe laying system is built in the prefabricated whole slab assembly of one kind of the present invention, and dark pipe laying is preset in prefabricated whole slab,
The dark pipe laying reserves connectivity port in the connection faying face of prefabricated whole slab, and dark pipe laying is by the reserved connectivity port pre-
The connection joint docking connection of whole slab is made into complete pipeline, the dark pipe laying for forming prefabricated whole slab assembles system.
Preferably, the dark pipe laying includes spool or water pipe.
Preferably, the dark pipe laying prefabricated whole slab connection faying face reserve connectivity port, connectivity port with it is prefabricated
The connection faying face of whole slab is concordant or the connection faying face of whole thick prefabricated board is stretched out in connectivity port.
Preferably, the reserved connectivity port is concordant with the whole thick connection faying face of prefabricated board, described and whole thick prefabricated board
The internal diameter of connection faying face concordant connectivity port be more than or equal to connected pipe, or the connection faying face with prefabricated whole slab
Concordant connectivity port is connector.
Preferably, the dark pipe laying is connected in the connection joint docking of prefabricated whole slab at complete by reserving connectivity port
Whole pipeline, it is all the connection faying face surface with prefabricated whole slab that the dark pipe laying of adjacent two prefabricated whole slab, which reserves connectivity port,
Concordantly, its docking is connected into complete pipeline by increasing by one section of pipe in the connection joint of prefabricated whole slab.
Preferably, the dark pipe laying is connected in the connection joint docking of prefabricated whole slab at complete by reserving connectivity port
Whole pipeline;Adjacent two prefabricated whole slab, the dark pipe laying of the first prefabricated whole slab therein reserve connectivity port and stretch out its company
Faying face is connect, wherein the reserved connectivity port connection faying face of the dark pipe laying of the second prefabricated whole slab is concordant;Adjacent two
The dark pipe laying of first prefabricated whole slab is stretched out it and connects the reserved connectivity port of faying face by the connection joint of prefabricated whole slab
The dark pipe laying of part docking to the second prefabricated whole slab is reserved on connectivity port concordant with the prefabricated connection faying face of whole slab, from
Into complete pipeline.
Preferably, the dark pipe laying is connected in the connection joint docking of prefabricated whole slab at complete by reserving connectivity port
The dark pipe laying of whole pipeline, the first prefabricated whole slab reserves connectivity port and the dark pipe laying of the second prefabricated whole slab reserves connecting pin
Mouth is all the connection faying face for stretching out whole thick prefabricated board, in the connection junction of prefabricated whole slab, the first prefabricated whole slab with
The dark pipe laying of second prefabricated whole slab stretches out the reserved connectivity port part docking connection one of the connection faying face of prefabricated whole slab
It rises, from into complete pipeline.
A kind of prefabricated whole slab for building dark pipe laying system for any assembly, interior be equipped with of prefabricated whole slab are secretly buried
Pipe, dark pipe laying reserve connectivity port in the combination joint face of prefabricated whole slab, and the dark pipe laying connects in the combination of prefabricated whole slab
Junction reserves that connectivity port is concordant with the prefabricated connection faying face of whole slab or the connection knot of prefabricated whole slab is stretched out in connectivity port
Conjunction face.
Dark pipe laying system is built in the prefabricated whole slab assembly of one kind of the present invention and its prefabricated whole slab, advantage exist
In can reduce situ wet operation, reduce site workload, construct to greatest extent in factory;And current overlapping layers is pre-buried
Pipe or the embedded pipe of screed-coat, are all wet constructions, situ wet operation has not environmental protection, materials'use and quality control
The influence of profit.Therefore, wet construction is carried out as far as possible in factory, can improve the effect of environmental protection and improve material makes
With washability and quality control.It may be implemented to solve the higher prefabricated rate of building industrialization and assembly rate, realize to greatest extent
Building assembly.Current overlapping layers is pre-buried or screed-coat is embedded, is all site operation, cannot calculate industrialization.Utilize prefabricated whole thickness
Plate can reduce the screed-coat of building, more save building materials, be further reduced building weight;It realizes more environmentally-friendly.It is preferred more
Kind of reserved connectivity port and corresponding connection type, diversification construction may be implemented, can select simply to connect as needed or
High request connects;Efficiently assembly such as can be used for the not high spool of connection request, (anti-leak-stopping is connected using high request to water pipe
Water).The prefabricated whole slab can as in building system floor or prefabricated whole thick wallboard uses, pass through connection joint
The connection for matching two adjacent prefabricated whole slabs and its dark pipe laying, can reduce the machining accuracy of prefabricated whole slab;It needs adjacent
The prefabricated whole slab pipe interface of connection is not necessarily to complete corresponding position, can be carried out again by connecting joint during the connection process
Buffering adjustment.
Description of the drawings
Fig. 1 is the power plane figure that dark pipe laying system embodiment one is built in a kind of prefabricated whole slab assembly of the present invention;
Fig. 2 is the A-A sections of Fig. 1;
Fig. 3 is the C-C sections of Fig. 1;
Fig. 4 is the B-B sections of Fig. 1, is pipeline one connection type;
Fig. 5 is the B-B sections of Fig. 1, is pipeline secondly connection type;
Fig. 6 is the B-B sections of Fig. 1, is pipeline thirdly connection type;
Fig. 7 is the floor heating water pipe plane that dark pipe laying system embodiment two is built in a kind of prefabricated whole slab assembly of the present invention
Figure;
Fig. 8 is the D-D sectional views of Fig. 7;
Fig. 9 is that the dark pipe laying synthesis that dark pipe laying system embodiment three is built in a kind of prefabricated whole slab assembly of the present invention is saturating
Depending on schematic diagram;
Figure 10 is the E-E diagrammatic cross-sections of Fig. 9.
Reference numeral:The prefabricated whole thick floors of 1a- first, the prefabricated whole thick floors of 1b- second, 2- connections joint, 3- are secretly buried
Spool, 4- connectors, the prefabricated whole thick wallboards of 5-, 6- floor heating water pipes, 7- connection faying faces.
Specific implementation mode
The embodiment of the present invention described referring now to the drawings, similar element numbers represent similar element in attached drawing.
Prefabricated whole slab as described herein may include prefabricated whole thick floor and prefabricated whole thick wallboard;The dark pipe laying can wrap
Include the water pipe for wearing electric wire, the spool of optical fiber cable and various information line and water flowing;Its system includes plate body and is arranged in plate
Internal dark pipe laying is equipped in dark pipe laying end for the reserved connectivity port with adjacent another prefabricated whole slab piping connection.
The reserved connectivity port is concordant with plate body side wall or extends plate body side wall.It at least can be real using the prefabricated whole slab
Now the embodiment of dark pipe laying system is built in following assembly.
Embodiment one
As shown in figures 1 to 6, the electricity consumption wiring tubes construction drawing of the dark Sunken wire tube 3 (electric wire penetration pipe) of a kind of prefabricated whole slab,
It is 3 system of the dark Sunken wire tube signal of a room unit.
Shown in attached drawing 1, which has illuminating line and power receptacle circuit, and the floor of the room unit is by first
The prefabricated whole thick floor 1b Unit bis- of prefabricated whole thickness floor 1a and second are assembled into, the first prefabricated whole thick floor 1a components and the
Two prefabricated whole thick floor 1b components and prefabricated whole thick 5 component of wallboard have pressed the dark Sunken wire tube of design requirement in plant produced
(secretly burying electric wire penetration pipe) and the wire box and consumer unit for using end;Connect joint 2 include the first prefabricated whole thickness floor 1a with
Connected between second prefabricated whole thick floor 1b and the first prefabricated whole prefabricated whole thickness floor 1b of thickness floor 1a or second with it is prefabricated whole
The coupling part of thick wallboard 5.Dark Sunken wire tube 3 is attached in connection joint 2, pipeline is made to penetrate through.Headlamp is mounted on floor
Bottom, control switch are mounted on the prefabricated whole thick wallboard in entrance door side 5, and socket is mounted on the lower part of prefabricated whole thick wallboard 5, two
Spool is all connected with the total control switch case reserved on prefabricated whole thick wallboard 5;To dark pipe laying composition from consumer unit to
With the spool of electrical socket perforation and from consumer unit to the spool with control switch and light bulb, it is dark that formation was completely connected to wears electric wire
Pipe laying system.
It is the A-A sections of Fig. 1 shown in Fig. 2, the dark Sunken wire tube 3 of the first prefabricated whole thick floor 1a and is embedded in prefabricated whole thick wall
Spool in plate 5 in the first prefabricated whole thick floor 1a with the spool connected mode schematic diagram in prefabricated whole thick wallboard 5, the spool
Line be power receptacle needed for.Dark Sunken wire tube 3 is in the reserved connectivity port of the first prefabricated whole thick floor 1a and the first prefabricated whole thickness
The connection faying face 7 of floor 1a is concordant;Dark Sunken wire tube 3 stretches out prefabricated whole thick wall in the reserved connectivity port of prefabricated whole thick wallboard 5
The connection faying face 7 of plate 5;Dark Sunken wire tube 3 is by the reserved connectivity port in the connection of connection 2 docking of joint at complete pipe
Road.Its specific practice is that the dark Sunken wire tube 3 of prefabricated whole thick wallboard 5 reserves the connection knot that prefabricated whole thick wallboard 5 is stretched out in connectivity port
Conjunction face 7, the dark Sunken wire tube 3 of the first prefabricated whole thick floor 1a are reserved connectivity port and are combined with the connection of the first prefabricated whole thick floor 1a
Face 7 is concordant, the dark Sunken wire tube 3 of prefabricated whole thick wallboard 5 is stretched out the reserved connecting pin degree of lip-rounding for being inserted into the first prefabricated whole thick floor 1a
At connector 4, from into complete pipeline.
Shown in Fig. 3, shown is the C-C sections of Fig. 1, the dark Sunken wire tube 3 of the second prefabricated whole thick floor 1b and is embedded in prefabricated
For spool in whole thickness wallboard 5 in the connected mode schematic diagram of their junctions, the line of the spool is illumination electric wire.Pre-buried secretly buries
Spool 3 reserves connectivity port in the connection faying face of the second prefabricated whole thick floor 1b and to connect faying face concordant;Dark Sunken wire tube 3 exists
It is concordant with the connection faying face of prefabricated whole thick wallboard 5 that the connection faying face of prefabricated whole thick wallboard 5 reserves connectivity port;Pass through one
Connecting pipe is inserted into the reserved connecting pin of the reserved connectivity port and prefabricated whole thick wallboard 5 of the second prefabricated whole thick floor 1b respectively
Mouthful, form connecting pipe;From into complete pipeline.The reserved connectivity port of second prefabricated whole thick floor 1b and thickness are prefabricated whole
The reserved connectivity port of thick wallboard 5, internal diameter are more than or equal to the outer diameter of connecting pipe.
Shown in Fig. 4, shown is the B-B sections of Fig. 1, the dark Sunken wire tube 3 of the first prefabricated whole thick floor 1a and second prefabricated whole
The line of one of 3 type of attachment of dark Sunken wire tube of thick floor 1b schematic diagram, the spool is electric wire.First prefabricated whole thickness floor 1a and
It is all concordant with respective connection faying face 7 that the two prefabricated whole thick dark Sunken wire tubes 3 of floor 1b in connection faying face 7 reserve connectivity port;
It is inserted into reserved connectivity port and the second prefabricated whole thick floor 1b of the first prefabricated whole thick floor 1a respectively by a connecting pipe
Reserved connectivity port, connecting pipe is formed, from into complete pipeline;The first prefabricated whole thickness of prefabricated whole thickness floor 1a and second
The reserved connectivity port of floor 1b, internal diameter are all higher than the outer diameter equal to connecting pipe.When being connected to production prefabricated board of the form
Convenience is best, but connector more than 4 one.
Shown in Fig. 5, shown is the B-B sections of Fig. 1, the dark Sunken wire tube 3 of the first prefabricated whole thick floor 1a and second prefabricated whole
The line of two schematic diagrames of 3 type of attachment of dark Sunken wire tube of thick floor 1b, the spool is electric wire.First prefabricated whole thickness floor 1a and
The dark Sunken wire tubes of two prefabricated whole thick floor 1b 3 reserve connectivity port in connection faying face 7 and all stretch out respective connection faying face 7;It is logical
A connector 4 is crossed the reserved connectivity port docking of the first prefabricated prefabricated whole thick floor 1b of whole thickness floor 1a and second together,
Connecting pipe is formed, from into complete pipeline.The connection reduces connector, easy to connect reliable, can carry out hot-melt adhesive paste.
Shown in Fig. 6, shown is the B-B sections of Fig. 1, the dark Sunken wire tube 3 of the first prefabricated whole thick floor 1a and second prefabricated whole
The line of three schematic diagrames of 3 type of attachment of dark Sunken wire tube of thick floor 1b, the spool is electric wire.First prefabricated whole thick floor 1a's is dark
Sunken wire tube 3 reserves connectivity port in connection faying face and connect faying face 7 concordantly, and the second prefabricated whole thickness dark Sunken wire tubes of floor 1b are stretched
The reserved connectivity port for going out to connect the prefabricated whole thick floor 1a of 7 partial insertion first of faying face, forms connecting pipe, from into complete
Pipeline.The centre that the connection effect is connected between above-mentioned two kinds.
The first prefabricated whole prefabricated whole thickness floor 1b of thickness floor 1a and second, which are simply facilitated, illustrates that adjacent two pieces are pre-
The relationship of whole slab is made, can be relationship between adjacent prefabricated whole thick floor or adjacent prefabricated whole thick wallboard, it can also
It is the relationship between prefabricated whole thick floor and prefabricated whole thick wallboard.
Embodiment two
As Figure 7-8, a kind of dark 6 system of buried hot water pipe of prefabricated whole thick floor, is the hot-water heating of a room unit
The dark embedding system signal of underground heat water pipe.The floor of the room unit is by the first prefabricated whole prefabricated whole thick floors of thickness floor 1a and second
Bis- module units of 1b are assembled into, and the first prefabricated whole prefabricated whole thick floor 1b components of thickness floor 1a and second have been pressed in plant produced
The pre-buried floor heating water pipe 6 of design requirement;It includes the first prefabricated whole prefabricated whole thick floor 1b of thickness floor 1a and second to connect joint 2
Between the interface that connects and connect with the water knockout drum of prefabricated whole thick wallboard 5,6 position of floor heating water pipe secretly buried such as Fig. 7 planes institute
Show.
As shown in figure 8, the connection type and floor heating water pipe that the figure shows floor heating water pipes 6 between each prefabricated whole slab are pre-
Stay mode.Floor heating water pipe 6 is secretly embedded in the top of the first prefabricated prefabricated whole thick floor 1b of whole thickness floor 1a and second close to upper surface,
Floor heating water pipe one end of first prefabricated whole thick floor 1a is reserved connect with the water knockout drum of heat supply, another end reserve with it is second prefabricated whole
6 connecting pin of floor heating water pipe of thick floor 1b, reserved connecting pin all stretch out respective connection faying face 7 and reach certain length, and second
6 connecting pin of floor heating water pipe of prefabricated whole thick floor 1b stretches out joint face 7 and reaches certain length and the first prefabricated whole thickness floor 1a's
Floor heating water pipe is connected;It is by a connector 4 (using hot-melt adhesive paste) that the first prefabricated whole thickness floor 1a and second is prefabricated whole
The floor heating water pipe 6 of thick floor 1b stretches out the reserved connectivity port docking of connection faying face together, forms connecting pipe, from into complete
Whole pipeline.This is easy to connect reliable, using hot-melt adhesive paste or other effectively connections, reaches the connection of water-impervious grade.
Embodiment three
Fig. 9 is the prefabricated whole slab component schematic diagram of dark pipe laying, is that the first of embodiment one and embodiment two is prefabricated whole
Perspective diagram after the overlapping of the dark pipe laying (dark Sunken wire tube 3 and floor heating water pipe 6) of thick floor 1a, dark Sunken wire tube 3 shown in figure
Connectivity port is being reserved in conjunction with joint face 7 and to connect faying face concordant, and pre-buried connector 4 is at port, it is shown secretly to sunken cord
For its physical location of pipe 3 above the matched reinforcing bar in lower part of the first prefabricated whole thick floor 1a, the section in Figure 10 can see illumination
The 3 right side dotted line of solid line and plate interpolation block spool of spool 3;Connection faying face 7 is all stretched out in 6 connecting pin of floor heating water pipe shown in Fig. 9
Reach certain length, shown in floor heating water pipe 6 the section in the upper surface of the first prefabricated whole thick floor 1a, Figure 10 can be with
The dotted line seen the section of floor heating water pipe 6 and be secretly embedded in plate, top institute of the physical location in the first prefabricated whole thick floor 1a
With the dark pipe laying below reinforcing bar, therefore in the first prefabricated whole thick floor 1a among upper and lower arrangement of reinforcement.Schematic diagram does not draw steel
Muscle, one skilled in the art that the reinforcing bar allocation position of whole thickness precast floor slab.
Above-mentioned case is some preferred case introductions, and the built-in pipe of prefabricated whole slab can also include that various buildings need
Pipe;Connection joint as described herein be connecting portion between prefabricated whole slab it include rear pouring concrete connect band, after
The tie-beam etc. poured.For those skilled in the art, technical solution that can be as described above and design, make
Various other corresponding changes and deformation, and all these change and deformation should all belong to the claims in the present invention
Within protection domain.
Claims (8)
1. dark pipe laying system is built in a kind of prefabricated whole slab assembly, which is characterized in that dark pipe laying is preset in prefabricated whole slab, it is described
Dark pipe laying reserves connectivity port in the connection faying face of prefabricated whole slab, and dark pipe laying is by the reserved connectivity port prefabricated whole
At complete pipeline, the dark pipe laying for forming prefabricated whole slab assembles system for the connection joint docking connection of slab.
2. dark pipe laying system is built in a kind of prefabricated whole slab assembly according to claim 1, which is characterized in that described secretly buries
Pipe includes spool or water pipe.
3. dark pipe laying system is built in a kind of prefabricated whole slab assembly according to claim 1, which is characterized in that the dark pipe laying
Prefabricated whole slab connection faying face reserve connectivity port, connectivity port it is concordant with the prefabricated connection faying face of whole slab or
The connection faying face of whole thick prefabricated board is stretched out in connectivity port.
4. dark pipe laying system is built in a kind of prefabricated whole slab assembly according to claim 3, which is characterized in that described pre- to linger on
Connect that port is concordant with the whole thick connection faying face of prefabricated board, the connectivity port that connect faying face concordant with whole thick prefabricated board
Internal diameter be more than or equal to connected pipe, or with the concordant connectivity port of connection faying face of prefabricated whole slab be connector.
5. dark pipe laying system is built in a kind of prefabricated whole slab assembly according to claim 1, which is characterized in that the dark pipe laying
It is connected into complete pipeline, adjacent two prefabricated whole slab in the connection joint docking of prefabricated whole slab by reserving connectivity port
Dark pipe laying to reserve connectivity port be all connection faying face flush with prefabricated whole slab, pass through the company in prefabricated whole slab
It connects joint and increases by one section of pipe the connection of its docking into complete pipeline.
6. dark pipe laying system is built in a kind of prefabricated whole slab assembly according to claim 1, which is characterized in that the dark pipe laying
It is connected into complete pipeline in the connection joint docking of prefabricated whole slab by reserving connectivity port;Adjacent two prefabricated whole thickness
Plate, the dark pipe laying of the first prefabricated whole slab therein reserve connectivity port and stretch out its connection faying face, and therein second is prefabricated
It is concordant that the dark pipe laying of whole slab reserves connectivity port connection faying face;It is engaged in the connection of adjacent two prefabricated whole slab
Place, the reserved connectivity port part docking for the dark pipe laying of the first prefabricated whole slab being stretched out its connection faying face are prefabricated whole to second
The dark pipe laying of slab is reserved on connectivity port concordant with the prefabricated connection faying face of whole slab, from into complete pipeline.
7. dark pipe laying system is built in a kind of prefabricated whole slab assembly according to claim 1, which is characterized in that the dark pipe laying
It is connected into complete pipeline in the connection joint docking of prefabricated whole slab by reserving connectivity port, the first prefabricated whole slab
The reserved connectivity port of dark pipe laying that dark pipe laying reserves connectivity port and the second prefabricated whole slab is all the company for stretching out whole thick prefabricated board
Faying face is connect, in the connection junction of prefabricated whole slab, the dark pipe laying of the first prefabricated whole slab and the second prefabricated whole slab is stretched
The reserved connectivity port part docking for going out the connection faying face of prefabricated whole slab connects, from into complete pipeline.
8. a kind of prefabricated whole slab for building dark pipe laying system for any assembly of claim 1-7, which is characterized in that pre-
It makes and is equipped with dark pipe laying in whole slab, dark pipe laying reserves connectivity port in the combination joint face of prefabricated whole slab, and the dark pipe laying exists
The reserved connectivity port of the combination joint face of prefabricated whole slab is concordant with the prefabricated connection faying face of whole slab or connectivity port is stretched out
The connection faying face of prefabricated whole slab.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810300073.0A CN108316528A (en) | 2018-04-04 | 2018-04-04 | A kind of prefabricated whole slab assembly dark pipe laying system of building and its prefabricated whole slab |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810300073.0A CN108316528A (en) | 2018-04-04 | 2018-04-04 | A kind of prefabricated whole slab assembly dark pipe laying system of building and its prefabricated whole slab |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108316528A true CN108316528A (en) | 2018-07-24 |
Family
ID=62896089
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810300073.0A Pending CN108316528A (en) | 2018-04-04 | 2018-04-04 | A kind of prefabricated whole slab assembly dark pipe laying system of building and its prefabricated whole slab |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108316528A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109853832A (en) * | 2019-01-18 | 2019-06-07 | 江苏南通六建建设集团有限公司 | A kind of construction method of filling wall masonry and electrical pre-embedded pipe synchronous construction |
CN118187263A (en) * | 2024-03-08 | 2024-06-14 | 湖北工业大学 | Assembled reinforced concrete beam column system with embedded pipes and method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0941538A (en) * | 1995-05-19 | 1997-02-10 | Sekisui Plastics Co Ltd | Base board for concrete slab having embedded material with recessed groove on a part thereof and construction method and structure of concrete slab using the base board |
CN1483906A (en) * | 2003-08-04 | 2004-03-24 | 有利华建筑预制件(深圳)有限公司 | Semi-prefabricated construction method for prefabricated floorslab and buliding floorslab with wire pipe |
WO2013177988A1 (en) * | 2012-05-30 | 2013-12-05 | Zhang Yue | Floor slab with prefabricated water and electricity components |
CN105986632A (en) * | 2015-01-29 | 2016-10-05 | 当代节能置业股份有限公司 | Prefabricated radiation floor and manufacturing method and construction method thereof |
CN207092381U (en) * | 2017-07-19 | 2018-03-13 | 远大住宅工业(杭州)有限公司 | Prefabricated elements and the electric preburied component of assembled |
CN208122059U (en) * | 2018-04-04 | 2018-11-20 | 刘祥锦 | A kind of prefabricated whole slab assembly dark pipe laying system of building and its prefabricated whole slab |
-
2018
- 2018-04-04 CN CN201810300073.0A patent/CN108316528A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0941538A (en) * | 1995-05-19 | 1997-02-10 | Sekisui Plastics Co Ltd | Base board for concrete slab having embedded material with recessed groove on a part thereof and construction method and structure of concrete slab using the base board |
CN1483906A (en) * | 2003-08-04 | 2004-03-24 | 有利华建筑预制件(深圳)有限公司 | Semi-prefabricated construction method for prefabricated floorslab and buliding floorslab with wire pipe |
WO2013177988A1 (en) * | 2012-05-30 | 2013-12-05 | Zhang Yue | Floor slab with prefabricated water and electricity components |
CN105986632A (en) * | 2015-01-29 | 2016-10-05 | 当代节能置业股份有限公司 | Prefabricated radiation floor and manufacturing method and construction method thereof |
CN207092381U (en) * | 2017-07-19 | 2018-03-13 | 远大住宅工业(杭州)有限公司 | Prefabricated elements and the electric preburied component of assembled |
CN208122059U (en) * | 2018-04-04 | 2018-11-20 | 刘祥锦 | A kind of prefabricated whole slab assembly dark pipe laying system of building and its prefabricated whole slab |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109853832A (en) * | 2019-01-18 | 2019-06-07 | 江苏南通六建建设集团有限公司 | A kind of construction method of filling wall masonry and electrical pre-embedded pipe synchronous construction |
CN118187263A (en) * | 2024-03-08 | 2024-06-14 | 湖北工业大学 | Assembled reinforced concrete beam column system with embedded pipes and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206052779U (en) | A kind of prefabricated pipe gallery splicing structure | |
CN108316528A (en) | A kind of prefabricated whole slab assembly dark pipe laying system of building and its prefabricated whole slab | |
CN107386321A (en) | Piping lane movement joint waterproof slab structure and construction method | |
CN107386427A (en) | The electric preburied component of prefabricated elements, assembled and electric distribution method | |
CN105971018A (en) | Tubular cross section steel buckled plate city utility tunnel | |
CN206143899U (en) | Crossover node structure suitable for sewer line incorporates utility tunnel in | |
CN208122059U (en) | A kind of prefabricated whole slab assembly dark pipe laying system of building and its prefabricated whole slab | |
CN209760515U (en) | Interior partition plate for housing construction | |
CN206128441U (en) | Precast concrete wall panel of pre -buried pipeline and installation fossil fragments | |
CN106906843A (en) | Underground pipe gallery and its construction method | |
CN207453225U (en) | A kind of superstructure unit and assembly concrete integrated floor | |
CN205063961U (en) | Push pipe tube coupling structure | |
CN109629664A (en) | Basement construction method based on assembled resin concrete drainage ditch | |
CN207092381U (en) | Prefabricated elements and the electric preburied component of assembled | |
CN205894103U (en) | Prefabricated parabola type utility tunnel | |
CN108301441A (en) | A kind of prefabricated underground pipe gallery box culvert | |
CN108709019A (en) | The construction method for connecting of built-in pipe box and penetration pipe in Bars In Poured Concrete Slab in PC components | |
CN104499625A (en) | Profiled steel sheet and composite floor | |
CN102003026A (en) | Combined hollow box body for cast-in-place energy-saving hollow floor | |
CN208136954U (en) | Precast splice type Pipe rack | |
CN115897760A (en) | Pipeline installation method based on one-time pouring of concrete base | |
CN109469099A (en) | Assembled underground pipe gallery | |
CN201908403U (en) | Structural system for indoor electrical design and laying of pipelines | |
CN205875472U (en) | A concrete inside casing partition wall installation node for steel frame | |
CN208280385U (en) | A kind of connecting structure of multifunctional light partition plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |