CN108316528A - A kind of prefabricated whole slab assembly dark pipe laying system of building and its prefabricated whole slab - Google Patents

A kind of prefabricated whole slab assembly dark pipe laying system of building and its prefabricated whole slab Download PDF

Info

Publication number
CN108316528A
CN108316528A CN201810300073.0A CN201810300073A CN108316528A CN 108316528 A CN108316528 A CN 108316528A CN 201810300073 A CN201810300073 A CN 201810300073A CN 108316528 A CN108316528 A CN 108316528A
Authority
CN
China
Prior art keywords
prefabricated
pipe laying
prefabricated whole
slab
whole slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810300073.0A
Other languages
Chinese (zh)
Inventor
刘祥锦
张卓
刘俊彦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810300073.0A priority Critical patent/CN108316528A/en
Publication of CN108316528A publication Critical patent/CN108316528A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

The invention discloses a kind of prefabricated whole slab assembly to build dark pipe laying system, including:Dark pipe laying is preset in prefabricated whole slab, dark pipe laying reserves connectivity port in the connection faying face of prefabricated whole slab, dark pipe laying is connected to the dark pipe laying assembly system that prefabricated whole slab is formed at complete pipeline by the reserved connectivity port in the connection joint docking of prefabricated whole slab.The advantage is that situ wet operation can be reduced, site workload is reduced, is constructed to greatest extent in factory.Wet construction is carried out as far as possible in factory, the effect of environmental protection can be improved and improves materials'use washability and quality control.

Description

A kind of prefabricated whole slab assembly dark pipe laying system of building and its prefabricated whole slab
Technical field
The present invention relates to a kind of assembly of building industrialization construction technology buildings, and in particular to a kind of dark pipe laying it is prefabricated whole Slab assembles building system and its prefabricated whole slab.
Background technology
Currently, construction industry is to green building and the future architecture industry developing direction of building industrialization;And assemble the skill of building In China, development is still not perfect art.
The pipeline of assembly building is all site operation at present, specially uses superimposed sheet, the deployment tube on superimposed sheet, then adopt It is secretly buried with rear pouring concrete mode;Or the embedded of pipe is carried out using building screed-coat again after the completion of the structure sheaf of building; Industrialization degree is relatively low, influences industrialization promotion.
Invention content
In order to solve the above-mentioned problems of the prior art, present invention aims at provide one kind industrial metaplasia may be implemented Dark pipe laying system and its prefabricated whole slab are built in the prefabricated whole slab assembly of production.
Dark pipe laying system is built in the prefabricated whole slab assembly of one kind of the present invention, and dark pipe laying is preset in prefabricated whole slab, The dark pipe laying reserves connectivity port in the connection faying face of prefabricated whole slab, and dark pipe laying is by the reserved connectivity port pre- The connection joint docking connection of whole slab is made into complete pipeline, the dark pipe laying for forming prefabricated whole slab assembles system.
Preferably, the dark pipe laying includes spool or water pipe.
Preferably, the dark pipe laying prefabricated whole slab connection faying face reserve connectivity port, connectivity port with it is prefabricated The connection faying face of whole slab is concordant or the connection faying face of whole thick prefabricated board is stretched out in connectivity port.
Preferably, the reserved connectivity port is concordant with the whole thick connection faying face of prefabricated board, described and whole thick prefabricated board The internal diameter of connection faying face concordant connectivity port be more than or equal to connected pipe, or the connection faying face with prefabricated whole slab Concordant connectivity port is connector.
Preferably, the dark pipe laying is connected in the connection joint docking of prefabricated whole slab at complete by reserving connectivity port Whole pipeline, it is all the connection faying face surface with prefabricated whole slab that the dark pipe laying of adjacent two prefabricated whole slab, which reserves connectivity port, Concordantly, its docking is connected into complete pipeline by increasing by one section of pipe in the connection joint of prefabricated whole slab.
Preferably, the dark pipe laying is connected in the connection joint docking of prefabricated whole slab at complete by reserving connectivity port Whole pipeline;Adjacent two prefabricated whole slab, the dark pipe laying of the first prefabricated whole slab therein reserve connectivity port and stretch out its company Faying face is connect, wherein the reserved connectivity port connection faying face of the dark pipe laying of the second prefabricated whole slab is concordant;Adjacent two The dark pipe laying of first prefabricated whole slab is stretched out it and connects the reserved connectivity port of faying face by the connection joint of prefabricated whole slab The dark pipe laying of part docking to the second prefabricated whole slab is reserved on connectivity port concordant with the prefabricated connection faying face of whole slab, from Into complete pipeline.
Preferably, the dark pipe laying is connected in the connection joint docking of prefabricated whole slab at complete by reserving connectivity port The dark pipe laying of whole pipeline, the first prefabricated whole slab reserves connectivity port and the dark pipe laying of the second prefabricated whole slab reserves connecting pin Mouth is all the connection faying face for stretching out whole thick prefabricated board, in the connection junction of prefabricated whole slab, the first prefabricated whole slab with The dark pipe laying of second prefabricated whole slab stretches out the reserved connectivity port part docking connection one of the connection faying face of prefabricated whole slab It rises, from into complete pipeline.
A kind of prefabricated whole slab for building dark pipe laying system for any assembly, interior be equipped with of prefabricated whole slab are secretly buried Pipe, dark pipe laying reserve connectivity port in the combination joint face of prefabricated whole slab, and the dark pipe laying connects in the combination of prefabricated whole slab Junction reserves that connectivity port is concordant with the prefabricated connection faying face of whole slab or the connection knot of prefabricated whole slab is stretched out in connectivity port Conjunction face.
Dark pipe laying system is built in the prefabricated whole slab assembly of one kind of the present invention and its prefabricated whole slab, advantage exist In can reduce situ wet operation, reduce site workload, construct to greatest extent in factory;And current overlapping layers is pre-buried Pipe or the embedded pipe of screed-coat, are all wet constructions, situ wet operation has not environmental protection, materials'use and quality control The influence of profit.Therefore, wet construction is carried out as far as possible in factory, can improve the effect of environmental protection and improve material makes With washability and quality control.It may be implemented to solve the higher prefabricated rate of building industrialization and assembly rate, realize to greatest extent Building assembly.Current overlapping layers is pre-buried or screed-coat is embedded, is all site operation, cannot calculate industrialization.Utilize prefabricated whole thickness Plate can reduce the screed-coat of building, more save building materials, be further reduced building weight;It realizes more environmentally-friendly.It is preferred more Kind of reserved connectivity port and corresponding connection type, diversification construction may be implemented, can select simply to connect as needed or High request connects;Efficiently assembly such as can be used for the not high spool of connection request, (anti-leak-stopping is connected using high request to water pipe Water).The prefabricated whole slab can as in building system floor or prefabricated whole thick wallboard uses, pass through connection joint The connection for matching two adjacent prefabricated whole slabs and its dark pipe laying, can reduce the machining accuracy of prefabricated whole slab;It needs adjacent The prefabricated whole slab pipe interface of connection is not necessarily to complete corresponding position, can be carried out again by connecting joint during the connection process Buffering adjustment.
Description of the drawings
Fig. 1 is the power plane figure that dark pipe laying system embodiment one is built in a kind of prefabricated whole slab assembly of the present invention;
Fig. 2 is the A-A sections of Fig. 1;
Fig. 3 is the C-C sections of Fig. 1;
Fig. 4 is the B-B sections of Fig. 1, is pipeline one connection type;
Fig. 5 is the B-B sections of Fig. 1, is pipeline secondly connection type;
Fig. 6 is the B-B sections of Fig. 1, is pipeline thirdly connection type;
Fig. 7 is the floor heating water pipe plane that dark pipe laying system embodiment two is built in a kind of prefabricated whole slab assembly of the present invention Figure;
Fig. 8 is the D-D sectional views of Fig. 7;
Fig. 9 is that the dark pipe laying synthesis that dark pipe laying system embodiment three is built in a kind of prefabricated whole slab assembly of the present invention is saturating Depending on schematic diagram;
Figure 10 is the E-E diagrammatic cross-sections of Fig. 9.
Reference numeral:The prefabricated whole thick floors of 1a- first, the prefabricated whole thick floors of 1b- second, 2- connections joint, 3- are secretly buried Spool, 4- connectors, the prefabricated whole thick wallboards of 5-, 6- floor heating water pipes, 7- connection faying faces.
Specific implementation mode
The embodiment of the present invention described referring now to the drawings, similar element numbers represent similar element in attached drawing.
Prefabricated whole slab as described herein may include prefabricated whole thick floor and prefabricated whole thick wallboard;The dark pipe laying can wrap Include the water pipe for wearing electric wire, the spool of optical fiber cable and various information line and water flowing;Its system includes plate body and is arranged in plate Internal dark pipe laying is equipped in dark pipe laying end for the reserved connectivity port with adjacent another prefabricated whole slab piping connection. The reserved connectivity port is concordant with plate body side wall or extends plate body side wall.It at least can be real using the prefabricated whole slab Now the embodiment of dark pipe laying system is built in following assembly.
Embodiment one
As shown in figures 1 to 6, the electricity consumption wiring tubes construction drawing of the dark Sunken wire tube 3 (electric wire penetration pipe) of a kind of prefabricated whole slab, It is 3 system of the dark Sunken wire tube signal of a room unit.
Shown in attached drawing 1, which has illuminating line and power receptacle circuit, and the floor of the room unit is by first The prefabricated whole thick floor 1b Unit bis- of prefabricated whole thickness floor 1a and second are assembled into, the first prefabricated whole thick floor 1a components and the Two prefabricated whole thick floor 1b components and prefabricated whole thick 5 component of wallboard have pressed the dark Sunken wire tube of design requirement in plant produced (secretly burying electric wire penetration pipe) and the wire box and consumer unit for using end;Connect joint 2 include the first prefabricated whole thickness floor 1a with Connected between second prefabricated whole thick floor 1b and the first prefabricated whole prefabricated whole thickness floor 1b of thickness floor 1a or second with it is prefabricated whole The coupling part of thick wallboard 5.Dark Sunken wire tube 3 is attached in connection joint 2, pipeline is made to penetrate through.Headlamp is mounted on floor Bottom, control switch are mounted on the prefabricated whole thick wallboard in entrance door side 5, and socket is mounted on the lower part of prefabricated whole thick wallboard 5, two Spool is all connected with the total control switch case reserved on prefabricated whole thick wallboard 5;To dark pipe laying composition from consumer unit to With the spool of electrical socket perforation and from consumer unit to the spool with control switch and light bulb, it is dark that formation was completely connected to wears electric wire Pipe laying system.
It is the A-A sections of Fig. 1 shown in Fig. 2, the dark Sunken wire tube 3 of the first prefabricated whole thick floor 1a and is embedded in prefabricated whole thick wall Spool in plate 5 in the first prefabricated whole thick floor 1a with the spool connected mode schematic diagram in prefabricated whole thick wallboard 5, the spool Line be power receptacle needed for.Dark Sunken wire tube 3 is in the reserved connectivity port of the first prefabricated whole thick floor 1a and the first prefabricated whole thickness The connection faying face 7 of floor 1a is concordant;Dark Sunken wire tube 3 stretches out prefabricated whole thick wall in the reserved connectivity port of prefabricated whole thick wallboard 5 The connection faying face 7 of plate 5;Dark Sunken wire tube 3 is by the reserved connectivity port in the connection of connection 2 docking of joint at complete pipe Road.Its specific practice is that the dark Sunken wire tube 3 of prefabricated whole thick wallboard 5 reserves the connection knot that prefabricated whole thick wallboard 5 is stretched out in connectivity port Conjunction face 7, the dark Sunken wire tube 3 of the first prefabricated whole thick floor 1a are reserved connectivity port and are combined with the connection of the first prefabricated whole thick floor 1a Face 7 is concordant, the dark Sunken wire tube 3 of prefabricated whole thick wallboard 5 is stretched out the reserved connecting pin degree of lip-rounding for being inserted into the first prefabricated whole thick floor 1a At connector 4, from into complete pipeline.
Shown in Fig. 3, shown is the C-C sections of Fig. 1, the dark Sunken wire tube 3 of the second prefabricated whole thick floor 1b and is embedded in prefabricated For spool in whole thickness wallboard 5 in the connected mode schematic diagram of their junctions, the line of the spool is illumination electric wire.Pre-buried secretly buries Spool 3 reserves connectivity port in the connection faying face of the second prefabricated whole thick floor 1b and to connect faying face concordant;Dark Sunken wire tube 3 exists It is concordant with the connection faying face of prefabricated whole thick wallboard 5 that the connection faying face of prefabricated whole thick wallboard 5 reserves connectivity port;Pass through one Connecting pipe is inserted into the reserved connecting pin of the reserved connectivity port and prefabricated whole thick wallboard 5 of the second prefabricated whole thick floor 1b respectively Mouthful, form connecting pipe;From into complete pipeline.The reserved connectivity port of second prefabricated whole thick floor 1b and thickness are prefabricated whole The reserved connectivity port of thick wallboard 5, internal diameter are more than or equal to the outer diameter of connecting pipe.
Shown in Fig. 4, shown is the B-B sections of Fig. 1, the dark Sunken wire tube 3 of the first prefabricated whole thick floor 1a and second prefabricated whole The line of one of 3 type of attachment of dark Sunken wire tube of thick floor 1b schematic diagram, the spool is electric wire.First prefabricated whole thickness floor 1a and It is all concordant with respective connection faying face 7 that the two prefabricated whole thick dark Sunken wire tubes 3 of floor 1b in connection faying face 7 reserve connectivity port; It is inserted into reserved connectivity port and the second prefabricated whole thick floor 1b of the first prefabricated whole thick floor 1a respectively by a connecting pipe Reserved connectivity port, connecting pipe is formed, from into complete pipeline;The first prefabricated whole thickness of prefabricated whole thickness floor 1a and second The reserved connectivity port of floor 1b, internal diameter are all higher than the outer diameter equal to connecting pipe.When being connected to production prefabricated board of the form Convenience is best, but connector more than 4 one.
Shown in Fig. 5, shown is the B-B sections of Fig. 1, the dark Sunken wire tube 3 of the first prefabricated whole thick floor 1a and second prefabricated whole The line of two schematic diagrames of 3 type of attachment of dark Sunken wire tube of thick floor 1b, the spool is electric wire.First prefabricated whole thickness floor 1a and The dark Sunken wire tubes of two prefabricated whole thick floor 1b 3 reserve connectivity port in connection faying face 7 and all stretch out respective connection faying face 7;It is logical A connector 4 is crossed the reserved connectivity port docking of the first prefabricated prefabricated whole thick floor 1b of whole thickness floor 1a and second together, Connecting pipe is formed, from into complete pipeline.The connection reduces connector, easy to connect reliable, can carry out hot-melt adhesive paste.
Shown in Fig. 6, shown is the B-B sections of Fig. 1, the dark Sunken wire tube 3 of the first prefabricated whole thick floor 1a and second prefabricated whole The line of three schematic diagrames of 3 type of attachment of dark Sunken wire tube of thick floor 1b, the spool is electric wire.First prefabricated whole thick floor 1a's is dark Sunken wire tube 3 reserves connectivity port in connection faying face and connect faying face 7 concordantly, and the second prefabricated whole thickness dark Sunken wire tubes of floor 1b are stretched The reserved connectivity port for going out to connect the prefabricated whole thick floor 1a of 7 partial insertion first of faying face, forms connecting pipe, from into complete Pipeline.The centre that the connection effect is connected between above-mentioned two kinds.
The first prefabricated whole prefabricated whole thickness floor 1b of thickness floor 1a and second, which are simply facilitated, illustrates that adjacent two pieces are pre- The relationship of whole slab is made, can be relationship between adjacent prefabricated whole thick floor or adjacent prefabricated whole thick wallboard, it can also It is the relationship between prefabricated whole thick floor and prefabricated whole thick wallboard.
Embodiment two
As Figure 7-8, a kind of dark 6 system of buried hot water pipe of prefabricated whole thick floor, is the hot-water heating of a room unit The dark embedding system signal of underground heat water pipe.The floor of the room unit is by the first prefabricated whole prefabricated whole thick floors of thickness floor 1a and second Bis- module units of 1b are assembled into, and the first prefabricated whole prefabricated whole thick floor 1b components of thickness floor 1a and second have been pressed in plant produced The pre-buried floor heating water pipe 6 of design requirement;It includes the first prefabricated whole prefabricated whole thick floor 1b of thickness floor 1a and second to connect joint 2 Between the interface that connects and connect with the water knockout drum of prefabricated whole thick wallboard 5,6 position of floor heating water pipe secretly buried such as Fig. 7 planes institute Show.
As shown in figure 8, the connection type and floor heating water pipe that the figure shows floor heating water pipes 6 between each prefabricated whole slab are pre- Stay mode.Floor heating water pipe 6 is secretly embedded in the top of the first prefabricated prefabricated whole thick floor 1b of whole thickness floor 1a and second close to upper surface, Floor heating water pipe one end of first prefabricated whole thick floor 1a is reserved connect with the water knockout drum of heat supply, another end reserve with it is second prefabricated whole 6 connecting pin of floor heating water pipe of thick floor 1b, reserved connecting pin all stretch out respective connection faying face 7 and reach certain length, and second 6 connecting pin of floor heating water pipe of prefabricated whole thick floor 1b stretches out joint face 7 and reaches certain length and the first prefabricated whole thickness floor 1a's Floor heating water pipe is connected;It is by a connector 4 (using hot-melt adhesive paste) that the first prefabricated whole thickness floor 1a and second is prefabricated whole The floor heating water pipe 6 of thick floor 1b stretches out the reserved connectivity port docking of connection faying face together, forms connecting pipe, from into complete Whole pipeline.This is easy to connect reliable, using hot-melt adhesive paste or other effectively connections, reaches the connection of water-impervious grade.
Embodiment three
Fig. 9 is the prefabricated whole slab component schematic diagram of dark pipe laying, is that the first of embodiment one and embodiment two is prefabricated whole Perspective diagram after the overlapping of the dark pipe laying (dark Sunken wire tube 3 and floor heating water pipe 6) of thick floor 1a, dark Sunken wire tube 3 shown in figure Connectivity port is being reserved in conjunction with joint face 7 and to connect faying face concordant, and pre-buried connector 4 is at port, it is shown secretly to sunken cord For its physical location of pipe 3 above the matched reinforcing bar in lower part of the first prefabricated whole thick floor 1a, the section in Figure 10 can see illumination The 3 right side dotted line of solid line and plate interpolation block spool of spool 3;Connection faying face 7 is all stretched out in 6 connecting pin of floor heating water pipe shown in Fig. 9 Reach certain length, shown in floor heating water pipe 6 the section in the upper surface of the first prefabricated whole thick floor 1a, Figure 10 can be with The dotted line seen the section of floor heating water pipe 6 and be secretly embedded in plate, top institute of the physical location in the first prefabricated whole thick floor 1a With the dark pipe laying below reinforcing bar, therefore in the first prefabricated whole thick floor 1a among upper and lower arrangement of reinforcement.Schematic diagram does not draw steel Muscle, one skilled in the art that the reinforcing bar allocation position of whole thickness precast floor slab.
Above-mentioned case is some preferred case introductions, and the built-in pipe of prefabricated whole slab can also include that various buildings need Pipe;Connection joint as described herein be connecting portion between prefabricated whole slab it include rear pouring concrete connect band, after The tie-beam etc. poured.For those skilled in the art, technical solution that can be as described above and design, make Various other corresponding changes and deformation, and all these change and deformation should all belong to the claims in the present invention Within protection domain.

Claims (8)

1. dark pipe laying system is built in a kind of prefabricated whole slab assembly, which is characterized in that dark pipe laying is preset in prefabricated whole slab, it is described Dark pipe laying reserves connectivity port in the connection faying face of prefabricated whole slab, and dark pipe laying is by the reserved connectivity port prefabricated whole At complete pipeline, the dark pipe laying for forming prefabricated whole slab assembles system for the connection joint docking connection of slab.
2. dark pipe laying system is built in a kind of prefabricated whole slab assembly according to claim 1, which is characterized in that described secretly buries Pipe includes spool or water pipe.
3. dark pipe laying system is built in a kind of prefabricated whole slab assembly according to claim 1, which is characterized in that the dark pipe laying Prefabricated whole slab connection faying face reserve connectivity port, connectivity port it is concordant with the prefabricated connection faying face of whole slab or The connection faying face of whole thick prefabricated board is stretched out in connectivity port.
4. dark pipe laying system is built in a kind of prefabricated whole slab assembly according to claim 3, which is characterized in that described pre- to linger on Connect that port is concordant with the whole thick connection faying face of prefabricated board, the connectivity port that connect faying face concordant with whole thick prefabricated board Internal diameter be more than or equal to connected pipe, or with the concordant connectivity port of connection faying face of prefabricated whole slab be connector.
5. dark pipe laying system is built in a kind of prefabricated whole slab assembly according to claim 1, which is characterized in that the dark pipe laying It is connected into complete pipeline, adjacent two prefabricated whole slab in the connection joint docking of prefabricated whole slab by reserving connectivity port Dark pipe laying to reserve connectivity port be all connection faying face flush with prefabricated whole slab, pass through the company in prefabricated whole slab It connects joint and increases by one section of pipe the connection of its docking into complete pipeline.
6. dark pipe laying system is built in a kind of prefabricated whole slab assembly according to claim 1, which is characterized in that the dark pipe laying It is connected into complete pipeline in the connection joint docking of prefabricated whole slab by reserving connectivity port;Adjacent two prefabricated whole thickness Plate, the dark pipe laying of the first prefabricated whole slab therein reserve connectivity port and stretch out its connection faying face, and therein second is prefabricated It is concordant that the dark pipe laying of whole slab reserves connectivity port connection faying face;It is engaged in the connection of adjacent two prefabricated whole slab Place, the reserved connectivity port part docking for the dark pipe laying of the first prefabricated whole slab being stretched out its connection faying face are prefabricated whole to second The dark pipe laying of slab is reserved on connectivity port concordant with the prefabricated connection faying face of whole slab, from into complete pipeline.
7. dark pipe laying system is built in a kind of prefabricated whole slab assembly according to claim 1, which is characterized in that the dark pipe laying It is connected into complete pipeline in the connection joint docking of prefabricated whole slab by reserving connectivity port, the first prefabricated whole slab The reserved connectivity port of dark pipe laying that dark pipe laying reserves connectivity port and the second prefabricated whole slab is all the company for stretching out whole thick prefabricated board Faying face is connect, in the connection junction of prefabricated whole slab, the dark pipe laying of the first prefabricated whole slab and the second prefabricated whole slab is stretched The reserved connectivity port part docking for going out the connection faying face of prefabricated whole slab connects, from into complete pipeline.
8. a kind of prefabricated whole slab for building dark pipe laying system for any assembly of claim 1-7, which is characterized in that pre- It makes and is equipped with dark pipe laying in whole slab, dark pipe laying reserves connectivity port in the combination joint face of prefabricated whole slab, and the dark pipe laying exists The reserved connectivity port of the combination joint face of prefabricated whole slab is concordant with the prefabricated connection faying face of whole slab or connectivity port is stretched out The connection faying face of prefabricated whole slab.
CN201810300073.0A 2018-04-04 2018-04-04 A kind of prefabricated whole slab assembly dark pipe laying system of building and its prefabricated whole slab Pending CN108316528A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810300073.0A CN108316528A (en) 2018-04-04 2018-04-04 A kind of prefabricated whole slab assembly dark pipe laying system of building and its prefabricated whole slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810300073.0A CN108316528A (en) 2018-04-04 2018-04-04 A kind of prefabricated whole slab assembly dark pipe laying system of building and its prefabricated whole slab

Publications (1)

Publication Number Publication Date
CN108316528A true CN108316528A (en) 2018-07-24

Family

ID=62896089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810300073.0A Pending CN108316528A (en) 2018-04-04 2018-04-04 A kind of prefabricated whole slab assembly dark pipe laying system of building and its prefabricated whole slab

Country Status (1)

Country Link
CN (1) CN108316528A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853832A (en) * 2019-01-18 2019-06-07 江苏南通六建建设集团有限公司 A kind of construction method of filling wall masonry and electrical pre-embedded pipe synchronous construction
CN118187263A (en) * 2024-03-08 2024-06-14 湖北工业大学 Assembled reinforced concrete beam column system with embedded pipes and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0941538A (en) * 1995-05-19 1997-02-10 Sekisui Plastics Co Ltd Base board for concrete slab having embedded material with recessed groove on a part thereof and construction method and structure of concrete slab using the base board
CN1483906A (en) * 2003-08-04 2004-03-24 有利华建筑预制件(深圳)有限公司 Semi-prefabricated construction method for prefabricated floorslab and buliding floorslab with wire pipe
WO2013177988A1 (en) * 2012-05-30 2013-12-05 Zhang Yue Floor slab with prefabricated water and electricity components
CN105986632A (en) * 2015-01-29 2016-10-05 当代节能置业股份有限公司 Prefabricated radiation floor and manufacturing method and construction method thereof
CN207092381U (en) * 2017-07-19 2018-03-13 远大住宅工业(杭州)有限公司 Prefabricated elements and the electric preburied component of assembled
CN208122059U (en) * 2018-04-04 2018-11-20 刘祥锦 A kind of prefabricated whole slab assembly dark pipe laying system of building and its prefabricated whole slab

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0941538A (en) * 1995-05-19 1997-02-10 Sekisui Plastics Co Ltd Base board for concrete slab having embedded material with recessed groove on a part thereof and construction method and structure of concrete slab using the base board
CN1483906A (en) * 2003-08-04 2004-03-24 有利华建筑预制件(深圳)有限公司 Semi-prefabricated construction method for prefabricated floorslab and buliding floorslab with wire pipe
WO2013177988A1 (en) * 2012-05-30 2013-12-05 Zhang Yue Floor slab with prefabricated water and electricity components
CN105986632A (en) * 2015-01-29 2016-10-05 当代节能置业股份有限公司 Prefabricated radiation floor and manufacturing method and construction method thereof
CN207092381U (en) * 2017-07-19 2018-03-13 远大住宅工业(杭州)有限公司 Prefabricated elements and the electric preburied component of assembled
CN208122059U (en) * 2018-04-04 2018-11-20 刘祥锦 A kind of prefabricated whole slab assembly dark pipe laying system of building and its prefabricated whole slab

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853832A (en) * 2019-01-18 2019-06-07 江苏南通六建建设集团有限公司 A kind of construction method of filling wall masonry and electrical pre-embedded pipe synchronous construction
CN118187263A (en) * 2024-03-08 2024-06-14 湖北工业大学 Assembled reinforced concrete beam column system with embedded pipes and method

Similar Documents

Publication Publication Date Title
CN206052779U (en) A kind of prefabricated pipe gallery splicing structure
CN108316528A (en) A kind of prefabricated whole slab assembly dark pipe laying system of building and its prefabricated whole slab
CN107386321A (en) Piping lane movement joint waterproof slab structure and construction method
CN107386427A (en) The electric preburied component of prefabricated elements, assembled and electric distribution method
CN105971018A (en) Tubular cross section steel buckled plate city utility tunnel
CN206143899U (en) Crossover node structure suitable for sewer line incorporates utility tunnel in
CN208122059U (en) A kind of prefabricated whole slab assembly dark pipe laying system of building and its prefabricated whole slab
CN209760515U (en) Interior partition plate for housing construction
CN206128441U (en) Precast concrete wall panel of pre -buried pipeline and installation fossil fragments
CN106906843A (en) Underground pipe gallery and its construction method
CN207453225U (en) A kind of superstructure unit and assembly concrete integrated floor
CN205063961U (en) Push pipe tube coupling structure
CN109629664A (en) Basement construction method based on assembled resin concrete drainage ditch
CN207092381U (en) Prefabricated elements and the electric preburied component of assembled
CN205894103U (en) Prefabricated parabola type utility tunnel
CN108301441A (en) A kind of prefabricated underground pipe gallery box culvert
CN108709019A (en) The construction method for connecting of built-in pipe box and penetration pipe in Bars In Poured Concrete Slab in PC components
CN104499625A (en) Profiled steel sheet and composite floor
CN102003026A (en) Combined hollow box body for cast-in-place energy-saving hollow floor
CN208136954U (en) Precast splice type Pipe rack
CN115897760A (en) Pipeline installation method based on one-time pouring of concrete base
CN109469099A (en) Assembled underground pipe gallery
CN201908403U (en) Structural system for indoor electrical design and laying of pipelines
CN205875472U (en) A concrete inside casing partition wall installation node for steel frame
CN208280385U (en) A kind of connecting structure of multifunctional light partition plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination