CN108301441A - A kind of prefabricated underground pipe gallery box culvert - Google Patents

A kind of prefabricated underground pipe gallery box culvert Download PDF

Info

Publication number
CN108301441A
CN108301441A CN201810356660.1A CN201810356660A CN108301441A CN 108301441 A CN108301441 A CN 108301441A CN 201810356660 A CN201810356660 A CN 201810356660A CN 108301441 A CN108301441 A CN 108301441A
Authority
CN
China
Prior art keywords
plate
partition board
side plate
link slot
junction steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810356660.1A
Other languages
Chinese (zh)
Inventor
窦立军
沈子贺
吴云龙
李鑫
张亚伟
刘振岐
宋迪
窦忠宪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changchun Institute of Applied Chemistry of CAS
Changchun Institute Technology
Original Assignee
Changchun Institute Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changchun Institute Technology filed Critical Changchun Institute Technology
Priority to CN201810356660.1A priority Critical patent/CN108301441A/en
Publication of CN108301441A publication Critical patent/CN108301441A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)

Abstract

A kind of prefabricated underground pipe gallery box culvert, it is characterised in that:Including bottom plate, top plate, side plate and partition board, bottom plate and the upper surface of side plate and partition board are reserved with link slot respectively, it is embedded with junction steel plate below top plate and side plate and partition board, side plate and partition board are inserted into the link slot on bottom plate by following junction steel plate and use structure glue Nian Jie with bottom plate, and top plate is inserted into the link slot above side plate and partition board by following junction steel plate and uses structure glue Nian Jie with side plate and partition board.The present invention reserves link slot in bottom plate and the upper surface of side plate and partition board, it is embedded with junction steel plate below top plate and side plate and partition board, by junction steel plate and link slot grafting and it is bonded, realize that the fabricated construction of underground pipe gallery, the drawbacks of overcoming cast-in-place piping lane improve construction efficiency, it reduces environmental pollution, cost is reduced, energy consumption is saved, meets the industrialized development trend of construction industry.It solves the disadvantage that the prefabricated piping lane weight of segmentation is heavy, sectional dimension is big, not readily transportable and lifting, assembled piping lane is made to be easier to realize.

Description

A kind of prefabricated underground pipe gallery box culvert
Technical field
The present invention relates to underground pipe gallery more particularly to a kind of box culverts of novel fabricated underground pipe gallery.
Background technology
Currently, domestic underground pipe gallery is mostly based on cast-type, long construction period, is constructed into wasting manpower and material resources This height, energy consumption are big, do not meet the requirement for the building pollution-free industry advocated in China.
Since underground pipe gallery section is tall and big, quality weight is not easy to be segmented prefabricated transport, and lifts and need bigger Lifting equipment, be badly in need of developing a kind of novel fabricated pipe gallery that fragment is prefabricated.
Invention content
It is an object of the invention to overcome the shortcomings of cast-in-place pipe gallery, the difficulty of segmentation prefabricated transport and lifting is solved, Develop it is a kind of it is easy to connect, be readily transported, be easy installation novel fabricated underground pipe gallery.
To achieve the above object, the present invention provides a kind of prefabricated underground pipe gallery box culvert, it is characterised in that:Packet Include bottom plate, top plate, side plate and partition board, bottom plate and the upper surface of side plate and partition board be reserved with respectively link slot, top plate and side plate and every Junction steel plate, side plate and partition board is embedded with below plate to be inserted into the link slot on bottom plate and using knot by following junction steel plate Structure glue is Nian Jie with bottom plate, and top plate is inserted into the link slot above side plate and partition board by following junction steel plate and uses structure glue It is Nian Jie with side plate and partition board.
The bottom plate, top plate, side plate and partition board side be embedded with hanging ring.
The outer carbon fibre reinforced polymer of the seam crossing of bottom plate, top plate and the side plate and partition board.
The present invention reserves link slot in bottom plate and the upper surface of side plate and partition board, is embedded with below top plate and side plate and partition board Junction steel plate by junction steel plate and link slot grafting and is bonded, realizes the fabricated construction of underground pipe gallery, overcomes existing The drawbacks of pouring piping lane improves construction efficiency, reduces environmental pollution, and reduces cost, saves energy consumption, meets the industrialized hair of construction industry Exhibition trend.It solves the disadvantage that the prefabricated piping lane weight of segmentation is heavy, sectional dimension is big, not readily transportable and lifting, makes assembled pipe Corridor is easier to realize.
Description of the drawings
Fig. 1 is component assembling schematic diagram;
Fig. 2 is floor diagram;
Fig. 3 is bottom plate sectional view;
Fig. 4 is top plate schematic diagram;
Fig. 5 is top plate sectional view;
Fig. 6 is side plate schematic diagram;
Fig. 7 is side plate sectional view;
Fig. 8 is partition board schematic diagram;
Fig. 9 is partition board sectional view;
Figure 10 is that schematic diagram is completed in component assembly.
Reference sign:
1 --- bottom plate;2 --- top plate;3 --- side plate;4 --- partition board
5 --- junction steel plate;6 --- link slot;7 --- carbon cloth
8 --- hanging ring.
Specific implementation mode
- Fig. 9 referring to Fig.1, bottom plate 1 reserve link slot 6 at the position being connect with side plate 3 and partition board 4, pre- on the outside of both sides Bury hanging ring 8.The pre-buried junction steel plate 5 at the position being connect with side plate 3 and partition board 4 of top plate 2, the pre-buried hanging ring 8 on the outside of both sides.Side Remain for the reserved link slot 6 being connect with top plate at the top of plate in advance, the pre-buried junction steel plate for being connect with bottom plate in bottom, both sides are pre- Bury hanging ring 8.The construction of partition board is identical as side plate.Side plate and partition board are inserted by following junction steel plate in the link slot on bottom plate And it is Nian Jie with bottom plate using structure glue, in the link slot that top plate is inserted by following junction steel plate above side plate and partition board and make It is Nian Jie with side plate and partition board with structure glue.Carbon fibre reinforced polymer 7 outside the seam crossing of bottom plate, top plate and the side plate and partition board.
The present invention component manufacturing process be:Prefabricated panel 1, top plate 2, side plate 3 and partition board 4 in the factory.The system of bottom plate 1 It is to be laid with bar-mat reinforcement in template as process, junction steel plate 5 and component 8 is fixed on the corresponding position of bar-mat reinforcement, then is poured Concrete simultaneously conserves.The manufacturing process of top plate 2 is that bar-mat reinforcement is laid in template, then by the mould used in component 8 and link slot 6 Plate is fixed on the corresponding position of bar-mat reinforcement, and casting concrete simultaneously conserves.The manufacturing process of side plate 3 is that reinforcing bar is laid in template Net, then the template of junction steel plate 5, component 8 and link slot 6 is fixed on the corresponding position of bar-mat reinforcement, casting concrete is simultaneously Maintenance.The manufacturing process of partition board 4 is the same as side plate 3.It, be in seam crossing in the making of bottom plate 1, top plate 2, side plate 3, partition board 4 is constituted Section carry out surface roughness processing, be conducive to structure glue and component bonded.
Scene assembling sequence be:First bottom plate 1 is placed on construction location, is filled in the link slot 6 on 1 top of bottom plate The pre-buried junction steel plate 5 of side plate 3 and 4 bottom of partition board is inserted into the link slot 6 on 1 top of bottom plate, makes structure glue by structure glue later Spilling is paved with entire seam, plays the role of waterproof.Structure glue is filled in the link slot 6 at 4 top of side plate 3 and partition board again, it will Pre-buried junction steel plate 5 is inserted into the link slot 6 at 4 top of side plate 3 and partition board in top plate 2, so that structure glue spilling is paved with and is entirely connect Seam.Finally deposit of the seam crossing outer patch fiber cloth as joint strength between components completes the assembling of a box culvert at this time.

Claims (3)

1. a kind of prefabricated underground pipe gallery box culvert, it is characterised in that:Including bottom plate, top plate, side plate and partition board, bottom plate Be reserved with respectively below link slot, top plate and side plate and partition board with the upper surface of side plate and partition board and be embedded with junction steel plate, side plate and Partition board is inserted into the link slot on bottom plate by following junction steel plate and uses structure glue Nian Jie with bottom plate, and top plate passes through following Junction steel plate be inserted into it is in the link slot above side plate and partition board and Nian Jie with side plate and partition board using structure glue.
2. a kind of prefabricated underground pipe gallery box culvert according to claim 1, it is characterised in that:The bottom Plate, top plate, side plate and partition board side be embedded with hanging ring.
3. a kind of prefabricated underground pipe gallery box culvert according to claim 1, it is characterised in that:The bottom The outer carbon fibre reinforced polymer of the seam crossing of plate, top plate and side plate and partition board.
CN201810356660.1A 2018-04-20 2018-04-20 A kind of prefabricated underground pipe gallery box culvert Pending CN108301441A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810356660.1A CN108301441A (en) 2018-04-20 2018-04-20 A kind of prefabricated underground pipe gallery box culvert

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810356660.1A CN108301441A (en) 2018-04-20 2018-04-20 A kind of prefabricated underground pipe gallery box culvert

Publications (1)

Publication Number Publication Date
CN108301441A true CN108301441A (en) 2018-07-20

Family

ID=62847580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810356660.1A Pending CN108301441A (en) 2018-04-20 2018-04-20 A kind of prefabricated underground pipe gallery box culvert

Country Status (1)

Country Link
CN (1) CN108301441A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109723458A (en) * 2018-12-29 2019-05-07 浙江万川装饰设计工程有限公司 A kind of municipal tunnel
CN110847053A (en) * 2019-11-29 2020-02-28 中铁二院工程集团有限责任公司 Construction method of vacuum magnetic suspension prefabricated assembly type pipeline beam
CN110965579A (en) * 2019-11-30 2020-04-07 四川鸥鹏建筑工程公司 Double-bin spliced underground comprehensive pipe gallery

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105256837A (en) * 2015-11-03 2016-01-20 深圳华瀚管廊物业服务有限公司 Pipe gallery prefabricated member and assembled comprehensive pipe gallery
CN105625471A (en) * 2016-03-14 2016-06-01 青岛润国生态科技发展有限公司 Prefabricated comprehensive pipe gallery
CN105839666A (en) * 2016-06-03 2016-08-10 长沙远大住宅工业集团股份有限公司 Total-prefabricated superimposed assembly type underground pipe gallery and connecting node thereof
CN206844147U (en) * 2017-05-19 2018-01-05 西安交通大学 Full prefabricated modular assembled pipe gallery
CN208072464U (en) * 2018-04-20 2018-11-09 长春工程学院 A kind of prefabricated underground pipe gallery box culvert

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105256837A (en) * 2015-11-03 2016-01-20 深圳华瀚管廊物业服务有限公司 Pipe gallery prefabricated member and assembled comprehensive pipe gallery
CN105625471A (en) * 2016-03-14 2016-06-01 青岛润国生态科技发展有限公司 Prefabricated comprehensive pipe gallery
CN105839666A (en) * 2016-06-03 2016-08-10 长沙远大住宅工业集团股份有限公司 Total-prefabricated superimposed assembly type underground pipe gallery and connecting node thereof
CN206844147U (en) * 2017-05-19 2018-01-05 西安交通大学 Full prefabricated modular assembled pipe gallery
CN208072464U (en) * 2018-04-20 2018-11-09 长春工程学院 A kind of prefabricated underground pipe gallery box culvert

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
闫滨: "《病险水库除险加固技术》", 辽宁科学技术出版社, pages: 212 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109723458A (en) * 2018-12-29 2019-05-07 浙江万川装饰设计工程有限公司 A kind of municipal tunnel
CN110847053A (en) * 2019-11-29 2020-02-28 中铁二院工程集团有限责任公司 Construction method of vacuum magnetic suspension prefabricated assembly type pipeline beam
CN110965579A (en) * 2019-11-30 2020-04-07 四川鸥鹏建筑工程公司 Double-bin spliced underground comprehensive pipe gallery

Similar Documents

Publication Publication Date Title
CN204531066U (en) Assembly concrete-filled steel tube shear wall splits assembled syndeton
CN206052779U (en) A kind of prefabricated pipe gallery splicing structure
CN105839666A (en) Total-prefabricated superimposed assembly type underground pipe gallery and connecting node thereof
CN104727467A (en) Assembly type concrete filled steel tube shear wall splitting and assembling connection structure and assembling connection method
CN205662947U (en) Coincide assembled underground pipe gallery system
CN207348091U (en) A kind of assembled pipe gallery
CN108301441A (en) A kind of prefabricated underground pipe gallery box culvert
CN205742265U (en) Complete prefabricated overlapping assembled underground pipe gallery and connection node thereof
CN108560586A (en) Half prefabricated assembled pipe gallery and its construction method
CN103343503B (en) Bridge-type prefabricated reinforced concrete trough slab wear resistant road surface structural system and construction method
CN208072464U (en) A kind of prefabricated underground pipe gallery box culvert
CN105625466A (en) Assembled prefabricated comprehensive pipe gallery
CN103334360B (en) The dark beam slab wear-resistant pavement system of bridge-type prefabricated reinforced concrete and construction method thereof
CN205894280U (en) Hollow superstructure beam -columns system's integral basement of coincide assembly
CN205369299U (en) Pin -connected panel precast reinforced concrete piping lane
CN205894278U (en) Solid superstructure beam -columns system's integral basement of coincide assembly
CN205116220U (en) Pour cable pit after assembly of L type precast concrete spare
CN102003026A (en) Combined hollow box body for cast-in-place energy-saving hollow floor
CN101994358A (en) Combined hollow box body used for cast-in-place energy-saving hollow floor system
CN206554283U (en) Prefabricated board connecting structure
CN210887303U (en) Coincide assembled utility tunnel structure
CN103850163B (en) Bridge-type steel plate pavement system and construction method thereof
CN204590360U (en) A kind of cavity plate continuously
CN111535490B (en) Fabricated floor and construction method thereof
CN218205192U (en) Assembled light fiber cement prefabricated slab

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180720