CN202627314U - Integral steel structure upright post - Google Patents

Integral steel structure upright post Download PDF

Info

Publication number
CN202627314U
CN202627314U CN 201220248487 CN201220248487U CN202627314U CN 202627314 U CN202627314 U CN 202627314U CN 201220248487 CN201220248487 CN 201220248487 CN 201220248487 U CN201220248487 U CN 201220248487U CN 202627314 U CN202627314 U CN 202627314U
Authority
CN
China
Prior art keywords
steel
upright post
fixed
column
steel structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220248487
Other languages
Chinese (zh)
Inventor
张跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhang Yue
Original Assignee
Broad Sustainable Building Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Broad Sustainable Building Co filed Critical Broad Sustainable Building Co
Priority to CN 201220248487 priority Critical patent/CN202627314U/en
Application granted granted Critical
Publication of CN202627314U publication Critical patent/CN202627314U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model provides an integral steel structure upright post, wherein inclined struts and a steel column are connected and fixed into a whole; guide heads and steel upright post flanges are fixed at the two ends of the steel column; and four inclined struts vertically and correspondingly arranged are connected and fixed on the steel column. The integral steel structure upright post realizes the industrial standardized production, realizes controllable quality and on-site assembly, saves labor and time, is high in speed and good in quality, saves raw materials, avoids construction waste, is environment-friendly and energy-saving, has high construction strength, is shock-resistant and anti-disaster, and is greatly innovative in the construction field.

Description

A kind of whole steel work column
Technical field
The utility model relates to technical field of fixed buildings, is specifically related to a kind of whole steel work column.
Background technology
Low-carbon energy-saving is the common task and goal of global human, and the low-carbon energy-saving of sustainable scientific development building is one of them importance.The existing fixed building mostly is a reinforced concrete structure, cast-in-site, site operation; Waste of raw materials is serious, and building waste is many, and is time-consuming; Speed is slow, and energy consumption is high, and quality is uncontrollable; Can not realize standardization, batch production production, not meet the environmental protection and energy saving policy of country, be a kind of superseded backward process.
Summary of the invention
The utility model technical problem to be solved is: solve the problem that above-mentioned prior art exists, and provide that a kind of batch production standardized production, assembled on site, saving of work and time, speed are fast, no building waste, save the whole steel work column of raw material, antidetonation, building intensity height, environmental protection and energy saving.
The technical scheme that the utility model adopts is:
This whole steel work column, diagonal brace are connected being fixed as one with steel column whole.
In the technique scheme, the two ends of steel column are fixed with guide head and steel post flange.
In the technique scheme, connecting fixing diagonal brace on the said steel column is four corresponding up and down diagonal braces.
The utility model has changed the steel concrete cast-in-site job practices of traditional backwardness fully, and adopts the new steel structure system, so just can realize the batch production standardized production, and is quality controllable; Assembled on site, saving of work and time, speed is fast, and quality is good; Save raw material, no building waste, environmental protection and energy saving; And building intensity is high, and antidetonation is combated a natural disaster, and is the great innovation of building field.The whole steel work column that adopts the utility model purifies building component with the earthquake-proof energy-saving of other batch production standardized production and makes up Sustainable Building and can realize 9 degree antidetonations; 5 times energy-conservation; 20 times of air purifications, 7% the building amount of labour used, 93% batch production degree; Build the 30th floor height buildings in 360 hours, rewritten human building history.
Description of drawings
Fig. 1 is the structural representation of the utility model;
Fig. 2 is the utility model mounting structure sketch map;
Among the figure, 1-steel column, 2-diagonal brace, 3-steel post flange, 4-steel work floor, 5-guide head.
The specific embodiment
Referring to Fig. 1, Fig. 2, the whole steel work column of the utility model, diagonal brace 2 are connected being fixed as one with steel column 1 whole.
In the technique scheme, the two ends of steel column 1 are fixed with guide head 5 and steel post flange 3.
Connecting fixing diagonal brace 2 on the above-mentioned steel column is four corresponding up and down diagonal braces.

Claims (3)

1. whole steel work column is characterized in that: diagonal brace is connected being fixed as one with steel column whole.
2. whole steel work column according to claim 1 is characterized in that: the two ends of described steel column are fixed with guide head and steel post flange.
3. whole steel work column according to claim 1 is characterized in that: connect fixing diagonal brace on the described steel column and be four corresponding up and down diagonal braces.
CN 201220248487 2012-05-30 2012-05-30 Integral steel structure upright post Expired - Fee Related CN202627314U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220248487 CN202627314U (en) 2012-05-30 2012-05-30 Integral steel structure upright post

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220248487 CN202627314U (en) 2012-05-30 2012-05-30 Integral steel structure upright post

Publications (1)

Publication Number Publication Date
CN202627314U true CN202627314U (en) 2012-12-26

Family

ID=47380523

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220248487 Expired - Fee Related CN202627314U (en) 2012-05-30 2012-05-30 Integral steel structure upright post

Country Status (1)

Country Link
CN (1) CN202627314U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013177993A1 (en) * 2012-05-30 2013-12-05 Zhang Yue Integral steel structure upright post

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013177993A1 (en) * 2012-05-30 2013-12-05 Zhang Yue Integral steel structure upright post
CN103452238A (en) * 2012-05-30 2013-12-18 张跃 Integral steel structure upright post

Similar Documents

Publication Publication Date Title
CN203334425U (en) Steel structure unit and steel structure system
CN202627198U (en) Novel steel structure system
CN201874087U (en) Construction steel structure system
CN202706297U (en) Floorslab with prefabricated water and electricity components
CN204418510U (en) Floor support plate steel bar girder structure
CN204491828U (en) Can restore funcitons frame structure system
CN202627314U (en) Integral steel structure upright post
CN202627316U (en) Steel structure upright
CN202627315U (en) Double-head steel structure vertical column
CN103452238A (en) Integral steel structure upright post
CN202577706U (en) Floor slab with prefabricated pipelines and prefabricated joints
CN201874088U (en) Combined column with construction steel structure
CN202627289U (en) Floor slab with preformed air ports
CN201746847U (en) Combined multifunctional base of tower crane
CN205024850U (en) Hidden power consumption connecting piece of font timber structure returns
CN205206140U (en) Compound web plate power consumption wood joist
CN204282824U (en) Prefabricated setting prop rises beam composite frame structure
CN203334426U (en) Steel structure cable-stayed support for building
CN203429852U (en) Factory-like produced roof
CN205839963U (en) A kind of safety and firmness formed steel construction Factory Building
CN103452220A (en) Floor slab with prefabricated water and electric components
CN103452240A (en) Steel structure upright post
CN114439105A (en) Prefabricated post connection structure of assembled
CN201991136U (en) Fiber reinforced prefabricated concrete tubular pile
CN103452239A (en) Double-head steel structure vertical column

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ZHANG YUE

Free format text: FORMER OWNER: BROAD SUSTAINABLE BUILDING TECHNOLOGY CO., LTD.

Effective date: 20130315

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 414600 YUEYANG, HUNAN PROVINCE TO: 410000 CHANGSHA, HUNAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20130315

Address after: 410000 No. 1, far main road, Changsha, Hunan

Patentee after: Zhang Yue

Address before: Port 414600 Xiangyin Wenxing town Hunan County ambitious to build Technology Co. Ltd.

Patentee before: Broad Sustainable Building Co., Ltd.

EE01 Entry into force of recordation of patent licensing contract

Assignee: Broad Sustainable Building Co., Ltd.

Assignor: Zhang Yue

Contract record no.: 2015430000053

Denomination of utility model: Integral steel structure upright post

Granted publication date: 20121226

License type: Exclusive License

Record date: 20150525

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121226

Termination date: 20210530