- CN203334425U CN203334425U CN2013202611246U CN201320261124U CN203334425U CN 203334425 U CN203334425 U CN 203334425U CN 2013202611246 U CN2013202611246 U CN 2013202611246U CN 201320261124 U CN201320261124 U CN 201320261124U CN 203334425 U CN203334425 U CN 203334425U
- Authority
- CN
- China
- Prior art keywords
- steel
- unit
- work
- frame
- structural upright
- Prior art date
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 163
- 239000010959 steel Substances 0.000 title claims abstract description 163
- 238000010276 construction Methods 0.000 claims description 6
- 238000004519 manufacturing process Methods 0.000 abstract description 5
- 239000002994 raw materials Substances 0.000 abstract description 3
- 239000002699 waste materials Substances 0.000 description 3
- 229910052799 carbon Inorganic materials 0.000 description 2
- 239000010410 layers Substances 0.000 description 2
- 238000000034 methods Methods 0.000 description 2
- 231100000078 corrosive Toxicity 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 238000005516 engineering processes Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 239000000463 materials Substances 0.000 description 1
- 239000000203 mixtures Substances 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
Abstract
Description
Technical field
The utility model relates to technical field of fixed buildings, is specifically related to a kind of steel work for fixed buildings unit and steel work system.
Background technology
Low-carbon energy-saving, be the common task and goal of global human, and the low-carbon energy-saving of sustainable scientific development building is one of them importance.Existing fixed buildings is mostly reinforced concrete structure, cast-in-site, site operation, time-consuming, speed is slow, waste of raw materials is serious, and building waste is many, and energy consumption is high, quality is uncontrollable, can not realize standardization, batch production production, not meet national environmental protection and energy saving policy, be a kind of backward process.
The utility model content
(1) technical problem that will solve
The purpose of this utility model is to provide a kind of steel work unit and steel work system to overcome above-mentioned defect.
(2) technical scheme
For reaching above-mentioned purpose, the utility model provides a kind of steel work system, comprises underframe, top frame and at least four steel structural upright columns that vertically arrange; Described underframe and top frame be the rectangular configuration for being in turn connected to form by four steel structure girders all, and the two ends of each steel structural upright column are connected with the top frame with underframe respectively.
Preferably, the cross section of described steel structure girder is I shape, and its beam that is C shape by two cross sections assembles.
Preferably, the two ends of described steel structural upright column are that plug-in type is connected with steel structure girder.
Preferably, the two ends of described steel structural upright column are connected with described steel structure girder by flange.
Preferably, the junction of described steel structural upright column and described steel structure girder is provided with steel-structure connecting plate, and the two ends of described steel-structure connecting plate are connected with steel structure girder with steel structural upright column respectively.
Preferably, described steel structure girder junction plate is a plurality of, and a plurality of steel-structure connecting plates circumferentially are uniformly distributed along steel structural upright column.
Preferably, on each rectangular surfaces of described steel work unit, be equipped with the steel work cable-stayed support, described steel work cable-stayed support comprises two cross-coupled steel structure support plates, and four ends of two described steel structure support plates are connected with four ends of each rectangular surfaces respectively.
Preferably, described steel structure support plate is connected by " L " type pad with described steel structural upright column, and the vertical portion of described " L " type pad is connected with steel structural upright column, and its horizontal component is connected with described steel structure support plate.
Preferably, the end of described steel structure support plate is provided with the first screwed hole, the horizontal component of described " L " type pad is provided with the second screwed hole, and the horizontal component of described steel structure support plate and described " L " type pad is by being connected with the bolt of the second screwed hole through described the first screwed hole.
The utility model provides also a kind of steel work system, comprises a plurality of steel work unit described above, each steel work unit horizontal and/or vertically be connected to form the steel work system.
(3) beneficial effect
Steel work unit and steel clone system that the utility model is assembled into by adopting steel work, can realize the batch production standardized production, quality controllable, Assembling, saving of work and time, speed is fast, and quality is good, saves raw material, without building waste, environmental protection and energy saving, and also building intensity is high, Anti-seismic and disaster resistant.
The accompanying drawing explanation
The structural representation that Fig. 1 is the utility model embodiment 1;
The structural representation that Fig. 2 is the utility model embodiment 2.
In figure, 1: steel structure girder; 2: steel structural upright column; 3: the steel structure support plate; 4: " L " type pad; 5: steel-structure connecting plate; 6: sleeve.
The specific embodiment
Below in conjunction with drawings and Examples, the specific embodiment of the present utility model is described in further detail.Following examples are used for the utility model is described, but are not used for limiting scope of the present utility model.
Embodiment 1
Referring to Fig. 1, the present embodiment provides a kind of steel work unit, and the steel work unit is frame construction, comprises underframe, top frame and at least four steel structural upright columns 2 that vertically arrange; The rectangular configuration that underframe and top frame all are in turn connected to form for the end by four steel structure girders 1, the two ends of each steel structural upright column 2 are connected with the top frame with underframe respectively.In the present embodiment, all parts are steel construction piece and can adopt Q345 material steel, adopt steel construction piece to have the following advantages:
(1) construction quality is light, and intensity is high, and span is large;
(2) the building operations duration short, cost of investment is low;
(3) building fire protection is high, and anticorrosive property is strong; Anti-seismic and disaster resistant;
(4) steel building is moved conveniently, reclaims pollution-free; Energy-conserving and environment-protective.
Wherein, the cross section of steel structure girder 1 is I shape, and beam that is C shape by two cross sections is back-to-back by bolt, assembles for it.In order to alleviate dead load, have through hole on web, the through hole shape of cross section is hexagon, also can be circle, rectangle or triangle.Preferably through hole is uniformly distributed along the length direction of steel structure girder 1.
Wherein, the cross section of steel structural upright column 2 is circular, for the cylinder type steel structure, easy to process, can accomplish long-term non-corrosive and keep structural strength.The two ends of steel structural upright column 2 are with steel structure girder 1 for plug-in type is connected, and intensity is high, easily assembling and maintenance and inspection.The two ends of steel structural upright column 2 are connected with steel structure girder 1 by flange.
Further, steel structural upright column 2 is provided with steel-structure connecting plate 53 with the junction of steel structure girder 1, and the two ends of steel-structure connecting plate 5 are connected with steel structure girder 1 with steel structural upright column 2 respectively.Steel-structure connecting plate 5 is a plurality of, and a plurality of steel-structure connecting plates 5 circumferentially are uniformly distributed along steel structural upright column 2, by steel-structure connecting plate 5, reinforces, and has improved steel structural upright column 2 and the stability that steel structure girder 1 is connected, and building structure is totally strengthened.Steel-structure connecting plate 5 can adopt steel plate to make.
Wherein, on each rectangular surfaces of described steel work unit, be equipped with the steel work cable-stayed support, described steel work cable-stayed support comprises that four ends of 3, two described steel structure support plates 3 of two cross-coupled steel structure support plates are connected with four ends of each rectangular surfaces respectively.For the ease of assembly and disassembly, two steel structure support plate 3 intersections are with bolts.
The steel work cable-stayed support is connected by " L " type pad 4 with steel structural upright column 2, and the vertical portion of " L " type pad 4 is connected with steel structural upright column 2, and its horizontal component is connected with the steel work cable-stayed support.The end of steel work cable-stayed support is provided with the first screwed hole, and the horizontal component of " L " type pad 4 is provided with the second screwed hole, and the horizontal component of steel work cable-stayed support and " L " type pad 4 is by being connected with the bolt of the second screwed hole through the first screwed hole.In order to save steel, preferably the cross section of steel work cable-stayed support is rectangle.The present embodiment makes the stability of whole building stronger by the steel work cable-stayed support is set, and the wind resistance anti-seismic performance is strong.
Embodiment 2,
The present embodiment provides a kind of steel work system, comprises a plurality of steel work unit described above, and the steel work unit is frame construction, comprises underframe, top frame and at least four steel structural upright columns 2; Underframe and top frame be the rectangular frame for being connected to form by four steel structure girder 1 ends all, and the two ends of each steel structural upright column 2 are connected with the top frame with underframe respectively.Each steel work unit horizontal and/or vertically be connected to form the steel work system.Each steel work unit vertically is connected to form the multi-storey steel structure system.Figure 2 shows that 3 layers of steel work system that formed by 15 steel work unit combination.
Wherein, but alternate layout on steel work cable-stayed support along continuous straight runs, and as shown in Figure 2, the steel work cable-stayed support is arranged alternately in each steel work unit that is arranged in same layer.
The steel work system that is comprised of two steel work unit of below take illustrates the annexation between each unit as example:
The left and right sides, top of steel structural upright column 2 is respectively steel structure girder 1 in the first steel work unit and the steel structure girder 1 in the second steel work unit, steel structure girder 1 in two different steel work unit is fixedly connected with by being arranged at two sleeves 6 between steel steel structure girder 1, and the top of steel structural upright column 2 is inserted in sleeve 6 and by flange and is fixedly connected with sleeve 6 with bolt.Preferably the cross section of sleeve 6 is rectangle so that sleeve 6 is connected with steel structure girder 1.The bottom of steel structural upright column 2 and top all are inserted in sleeve 6.Steel structural upright column 2 is fixedly connected with sleeve 6 by flange.
It is only below preferred embodiment of the present utility model; it should be pointed out that for those skilled in the art, under the prerequisite that does not break away from the utility model know-why; can also make some improvement and replacement, these improvement and replacement also should be considered as protection domain of the present utility model.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013202611246U CN203334425U (en) | 2013-05-14 | 2013-05-14 | Steel structure unit and steel structure system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013202611246U CN203334425U (en) | 2013-05-14 | 2013-05-14 | Steel structure unit and steel structure system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203334425U true CN203334425U (en) | 2013-12-11 |
Family
ID=49703105
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013202611246U CN203334425U (en) | 2013-05-14 | 2013-05-14 | Steel structure unit and steel structure system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203334425U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104358316A (en) * | 2014-10-28 | 2015-02-18 | 四川华铁钢结构有限公司 | Composite framework for building steel structure houses |
CN104358309A (en) * | 2014-10-28 | 2015-02-18 | 四川华铁钢结构有限公司 | Quickly installed high-strength house structure |
CN104358313A (en) * | 2014-10-28 | 2015-02-18 | 四川华铁钢结构有限公司 | Steel structure frame of house |
WO2016077943A1 (en) * | 2014-11-17 | 2016-05-26 | 仙泊绿建筑有限公司 | Building supporting unit and building supporting structure employing same |
CN105780957A (en) * | 2014-12-26 | 2016-07-20 | 宝钢建筑系统集成有限公司 | Light rectangular pipe-inclined support structure system |
CN108843004A (en) * | 2018-07-04 | 2018-11-20 | 中国电子科技集团公司第三十八研究所 | A kind of high-precision support unit and its assembling method |
-
2013
- 2013-05-14 CN CN2013202611246U patent/CN203334425U/en active IP Right Grant
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104358316A (en) * | 2014-10-28 | 2015-02-18 | 四川华铁钢结构有限公司 | Composite framework for building steel structure houses |
CN104358309A (en) * | 2014-10-28 | 2015-02-18 | 四川华铁钢结构有限公司 | Quickly installed high-strength house structure |
CN104358313A (en) * | 2014-10-28 | 2015-02-18 | 四川华铁钢结构有限公司 | Steel structure frame of house |
WO2016077943A1 (en) * | 2014-11-17 | 2016-05-26 | 仙泊绿建筑有限公司 | Building supporting unit and building supporting structure employing same |
CN105780957A (en) * | 2014-12-26 | 2016-07-20 | 宝钢建筑系统集成有限公司 | Light rectangular pipe-inclined support structure system |
CN108843004A (en) * | 2018-07-04 | 2018-11-20 | 中国电子科技集团公司第三十八研究所 | A kind of high-precision support unit and its assembling method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102979177B (en) | Industrialized assembled multi-story high-rise steel structure eccentrically-braced system | |
CN102979172B (en) | Industrialized assembled multi-story high-rise steel structure prestressed centrally-braced system | |
JP3218530U (en) | Central assembly steel structure | |
CN102979167B (en) | Multi-story high-rise assembled steel structure prestressed centrally-braced system | |
CN104912190A (en) | Dry type joggle frame structure | |
CN102979169B (en) | Multi-story high-rise assembled steel structure centrally-braced system | |
CN102979162B (en) | Multi-story high-rise assembled steel structure frame - prestressed centrally-braced system | |
CN102995744B (en) | Industrialized multi-high-rise assembly type steel structure frame-pre-stressed center support system | |
CN103195170B (en) | Prefabricated reinforced concrete frame structure system | |
CN103334490B (en) | One how high-rise assembling type steel structure frame supported system | |
CN103184762B (en) | Multi-story/high-rise fabricated steel structural prestressed supporting system capable of realizing rigid connection of joints | |
CN102979168B (en) | Industrialized multi-story high-rise assembled steel structure frame - centrally-braced system | |
CN103669570B (en) | A kind of novel shake easily repairs steel hetermorphiscal column-prestressing force center support afterwards | |
CN102979176B (en) | Industrialized multi-story high-rise assembled steel structure system | |
CN103114648B (en) | Multi-high-layer assembly type steel structure frame-center supporting system | |
CN201883600U (en) | Fiber reinforced plastic (FRP) and concrete composite board | |
CN103334491B (en) | One how high-rise assembling type steel structure hetero-columns frame support system | |
CN102979175A (en) | Industrialized multi-story high-rise assembled steel structure frame - prestressed eccentrically-braced system | |
CN103216023B (en) | FRP section bar buckling-resistant support structure | |
CN103290920B (en) | A kind of assembling type steel structure center support frame system | |
CN103195163B (en) | Multiple high-level assembly steel structure system capable of realizing rigid node connections | |
CN202273319U (en) | Connection node device for concrete-filled steel tube column and reinforced concrete beam | |
CN102979173B (en) | Industrialized assembled multi-story high-rise steel structure prestressed eccentrically-braced system | |
CN103276833B (en) | A kind of industrialization assembling shaped pile frame-steel plate shear force wall steel structure system | |
CN202017346U (en) | Late poured band hanging formwork structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170613 Address after: 264500 Rushan Bay New District, Weihai, Shandong Patentee after: The green building Co., Ltd of celestial pool Address before: 614407 Daxing County, Qianwei County, Daxing County, Sichuan Province, No. 18 Patentee before: Pan Cunxun |