CN201443161U - High-span roofing space pipe truss structure for heavy industry - Google Patents
High-span roofing space pipe truss structure for heavy industry Download PDFInfo
- Publication number
- CN201443161U CN201443161U CN2009200144125U CN200920014412U CN201443161U CN 201443161 U CN201443161 U CN 201443161U CN 2009200144125 U CN2009200144125 U CN 2009200144125U CN 200920014412 U CN200920014412 U CN 200920014412U CN 201443161 U CN201443161 U CN 201443161U
- Authority
- CN
- China
- Prior art keywords
- pipe
- pipes
- vertical
- truss
- lower chord
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 29
- 239000010959 steel Substances 0.000 claims abstract description 29
- 238000003466 welding Methods 0.000 description 5
- 238000004804 winding Methods 0.000 description 5
- 238000010276 construction Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000009439 industrial construction Methods 0.000 description 2
- 238000004378 air conditioning Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005755 formation reaction Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Images
Abstract
The utility model discloses a high-span roofing space pipe truss structure for heavy industry, comprising a plurality of horizontal pipe trusses and vertical pipe trusses which are mutually connected. The high-span roofing space pipe truss structure is characterized in that the horizontal pipe trusses comprise horizontal upper chord pipes, horizontal lower chord pipes and a plurality of horizontal branch pipes, wherein each horizontal upper chord pipe comprises two steel pipes; each horizontal lower chord pipe is one steel pipe under the center of the two steel pipes forming one horizontal upper chord pipe; and the horizontal branch pipes are connected with the horizontal upper chord pipes and the horizontal lower chord pipes; and the vertical pipe trusses comprise vertical upper chord pipes, vertical lower chord pipes and a plurality of vertical branch pipes, wherein each vertical upper chord pipe and each vertical lower chord pipe are respectively one steel pipe, and the vertical branch pipes are connected with the vertical upper chord pipes and the vertical lower chord pipes. The high-span roofing space pipe truss structure is economical and practical, and has better social and economic benefits.
Description
Technical field
The utility model belongs to the industrial construction field, relates to a kind of heavy industry long-span roofing form of structure, especially a kind of heavy industry long-span roofing space tube truss structure.
Background technology
At present, the roof structure form relates to multiplely in the industrial construction, mainly is divided into steel work and concrete structure two big classes.Concrete structure generally is prefabricated thin webbed girder structure, is fit to the factory building of 9 meters to 18 meters of spans; Steel work generally is triangle steel roof truss, trapezoidal steel roof truss, portal frame etc., wherein triangle steel roof truss, trapezoidal steel roof truss are fit to the factory building of 18 meters to 36 meters of spans, portal-rigid frames generally are applied in the light Steel-Structure Factory with Steel, triangle steel roof truss, trapezoidal steel roof truss etc. are the form of structure that present heavy industry factory building often adopts, but their common feature all belongs to the plane structure system.When the factory building span was big, concrete structure was not suitable for, as adopts above-mentioned steel roof truss form, and roof truss height and rod member size increase thereupon, and steel quantity consumption is very big, the cost height.
The utility model content
In order to overcome above-mentioned defective, technical problem to be solved in the utility model is to provide a kind of economical and practical heavy industry long-span roofing space tube truss structure.
For achieving the above object, technical solutions of the utility model are as follows:
Roofing space tube truss structure comprises the interconnected transverse pipe truss of some Pin and vertically manages truss, it is characterized in that: the transverse pipe truss is made up of the pipe that laterally winds up, horizontal lower chord tube and several athwartship legs, the pipe that laterally winds up is made up of 2 steel pipes, laterally lower chord tube is 1 steel pipe, be positioned at the central lower of 2 steel pipes of the pipe that laterally winds up, athwartship leg is connected with horizontal lower chord tube with the pipe that laterally winds up; Vertically the pipe truss is by the pipe that vertically winds up, vertically lower chord tube and several vertical arms are formed, vertically wind up pipe and vertically lower chord tube be 1 steel pipe, vertically arm is connected with vertically winding up to manage with vertical lower chord tube.
The utility model is applied in the large span heavy industry factory building roof structure, be particularly suitable for large-tonnage heavy-duty and factory building span greater than the large span mill construction more than the 50m, function of use when normally moving except satisfying crane requires, because space tube truss system integral rigidity and bending-twisting ability that the space is formed in length and breadth are big, the operating condition that more can adapt to the industrial premises complexity, with traditional roof truss structure contrast, the pipe trussed construction is saved the construction costs cost and is reached more than 20%, has good social and economic benefit.
Description of drawings
Fig. 1 is an overall space schematic diagram of the present utility model;
Fig. 2 is a transverse pipe truss plan view of the present utility model;
Fig. 3 is a transverse pipe truss elevation of the present utility model;
Fig. 4 is a transverse pipe truss sectional view of the present utility model;
Fig. 5 is vertical pipe truss elevation of the present utility model.
Wherein, the 1st, the transverse pipe truss, the 2nd, vertically manage truss, the 3rd, the pipe that laterally winds up, the 4th, horizontal lower chord tube, the 5th, athwartship leg, the 6th, skylight, the 7th, ball node, the 8th, roof purline, the 9th, the pipe that vertically winds up, the 10th, vertical lower chord tube, the 11st, vertical arm.
The specific embodiment
Below in conjunction with accompanying drawing the specific embodiment of the present utility model is described further:
As shown in Figure 1, the utility model is according to technological requirement, and its factory building span is 56.05m, and roofing space tube truss structure comprises the interconnected transverse pipe truss 1 of some Pin and vertically manages truss 2.
Shown in Fig. 2,3 and 4, transverse pipe truss 1 is by the pipe 3 that laterally winds up, laterally lower chord tube 4 and several athwartship legs 5 are formed, and the pipe 3 of laterally winding up is made up of 2 steel pipes, employing pair sloping roof trusses, and the every steel pipe gradient is 1/15; Laterally lower chord tube 4 is 1 steel pipe, is positioned at the central lower of 2 steel pipes of the pipe 3 that laterally winds up; Laterally wind up pipe 3 with laterally be provided with athwartship leg 5 between the lower chord tube 4, and with pipe 3 and laterally lower chord tube 4 welding of laterally winding up, thereby the transverse pipe truss 1 of formation del is provided with 11 Pin transverse pipe truss 1 altogether.
Roof purline 8 is set on transverse pipe truss 1, is used for factory building roof is gone along with sb. to guard him the support of steel plate.
Every Pin transverse pipe truss 1 and hollow ball node 7 welding, ball node 7 is seated on the factory building column cap.
As shown in Figure 5, in the both sides of transverse pipe truss 1 and the skylight 4 roads be set respectively for 6 times vertically manage truss 2, vertically pipe truss 2 is single truss structure, form by the pipe 9 that vertically winds up, vertical lower chord tube 10 and several vertical arms 11, the pipe 9 that vertically winds up is 1 steel pipe with vertical lower chord tube 10, vertically arm 11 and pipe 9 and vertical lower chord tube 10 welding of vertically winding up.
Vertically the pipe 9 that vertically winds up of pipe truss 2 is managed 3 welding with laterally winding up of transverse pipe truss 1, vertically lower chord tube 10 and hollow ball node 7 welding.Thereby factory building roof has formed the space that can bear the large-tonnage heavy duty crane stable, large span and has managed truss stability structural system in length and breadth.
The utility model bar cross section has adopted the pipe cross section, in use can be according to technology and total figure arrangement requirement, determine factory building columns distance and span, the factory building span is generally to be advisable more than 45 meters, the crane tonnage can be unrestricted, calculate to determine the height of pipe truss and the caliber and the wall thickness of each chord member and arm by structural analysis, also can be according to the material situation of locality, change the pipe cross section into I-shaped, rectangle and square tube cross section.Arrange the size and the position in skylight by building and air-conditioning requirement.
Claims (1)
1. a heavy industry is with long-span roofing space tube truss structure, comprise the interconnected transverse pipe truss of some Pin (1) and vertically manage truss (2), it is characterized in that: transverse pipe truss (1) is made up of the pipe (3) that laterally winds up, horizontal lower chord tube (4) and several athwartship legs (5), the pipe (3) that laterally winds up is made up of 2 steel pipes, laterally lower chord tube (4) is 1 steel pipe, be positioned at the central lower of 2 steel pipes of the pipe (3) that laterally winds up, athwartship leg (5) is connected with horizontal lower chord tube (4) with the pipe (3) that laterally winds up; Vertically pipe truss (2) is made up of the pipe (9) that vertically winds up, vertical lower chord tube (10) and several vertical arms (11), vertically wind up pipe (9) and vertically lower chord tube (10) be 1 steel pipe, vertically arm (11) is connected with vertical lower chord tube (10) with the pipe (9) that vertically winds up.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009200144125U CN201443161U (en) | 2009-06-04 | 2009-06-04 | High-span roofing space pipe truss structure for heavy industry |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009200144125U CN201443161U (en) | 2009-06-04 | 2009-06-04 | High-span roofing space pipe truss structure for heavy industry |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201443161U true CN201443161U (en) | 2010-04-28 |
Family
ID=42547836
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009200144125U Expired - Fee Related CN201443161U (en) | 2009-06-04 | 2009-06-04 | High-span roofing space pipe truss structure for heavy industry |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201443161U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109281435A (en) * | 2018-11-16 | 2019-01-29 | 中建二局安装工程有限公司 | A kind of double slope roof trusses of the recessed fish-bellied type of large span and its installation method |
CN113152904A (en) * | 2021-04-21 | 2021-07-23 | 天津天一建设集团有限公司 | Construction method of large-span folded plate type steel roof truss |
-
2009
- 2009-06-04 CN CN2009200144125U patent/CN201443161U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109281435A (en) * | 2018-11-16 | 2019-01-29 | 中建二局安装工程有限公司 | A kind of double slope roof trusses of the recessed fish-bellied type of large span and its installation method |
CN109281435B (en) * | 2018-11-16 | 2020-11-24 | 中建二局安装工程有限公司 | Large-span concave fish belly type double-slope roof truss and installation method thereof |
CN113152904A (en) * | 2021-04-21 | 2021-07-23 | 天津天一建设集团有限公司 | Construction method of large-span folded plate type steel roof truss |
CN113152904B (en) * | 2021-04-21 | 2022-08-02 | 天津天一建设集团有限公司 | Construction method of large-span folded plate type steel roof truss |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203334425U (en) | Steel structure unit and steel structure system | |
CN202324340U (en) | Combined type large steel-pipe truss | |
CN105442705A (en) | Large-span steel truss structure and installation method thereof | |
CN105442701A (en) | Space truss structure and construction method thereof | |
CN203097361U (en) | Novel steel structure workshop | |
CN201443161U (en) | High-span roofing space pipe truss structure for heavy industry | |
CN100422468C (en) | Large-span large-column distance quasi-ribbed floor type prestressed steel grid roof structure | |
CN101294368A (en) | Novel steel tube longeron combination grinder bridge | |
CN202090483U (en) | Round structure with prestressed sheet metal roof | |
CN2923870Y (en) | Large-span large-pillar-distance quasi-rib type building-cover type prestress steel-grid roofing | |
CN203034345U (en) | Coal transporting trestle of integral continuous steel truss | |
CN203174879U (en) | Quick-install truss and quick-install house using same | |
CN202509667U (en) | Combined steel bar truss floor bearing plate | |
CN205557290U (en) | Monolithic purlin formula annular passenger footbridge | |
CN102235030A (en) | Extra-large-span cross-section-variable pre-stressed normally placed evacuating quadrangular pyramid space grid and manufacturing method thereof | |
CN212866332U (en) | Steel construction factory building | |
CN201753475U (en) | Steel grid structure of strut-framed prestress orthogonal space pipe truss | |
CN201141048Y (en) | Upper girder frame structure of aluminum cell | |
CN201052944Y (en) | Combined truss type steel crane beam | |
CN202790959U (en) | Steel pipe truss structure based on aloft lateral support | |
CN201972290U (en) | Roof steel structure of very long span stadium | |
CN204001192U (en) | Three-dimensional intersection truss conversion layer structure | |
CN201486038U (en) | Steel roof system | |
CN204001417U (en) | Long-span roofing truss purlins | |
CN203113908U (en) | Full assembly structure with enclosing wall and advertising board integrated |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100428 Termination date: 20160604 |