CN109227920A - Centrifugal concrete pile production line - Google Patents

Centrifugal concrete pile production line Download PDF

Info

Publication number
CN109227920A
CN109227920A CN201810748843.8A CN201810748843A CN109227920A CN 109227920 A CN109227920 A CN 109227920A CN 201810748843 A CN201810748843 A CN 201810748843A CN 109227920 A CN109227920 A CN 109227920A
Authority
CN
China
Prior art keywords
workshop
area
production line
mold
concrete pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810748843.8A
Other languages
Chinese (zh)
Inventor
俞向阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810748843.8A priority Critical patent/CN109227920A/en
Publication of CN109227920A publication Critical patent/CN109227920A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B21/00Methods or machines specially adapted for the production of tubular articles
    • B28B21/02Methods or machines specially adapted for the production of tubular articles by casting into moulds
    • B28B21/10Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means
    • B28B21/22Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means using rotatable mould or core parts
    • B28B21/30Centrifugal moulding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B21/00Methods or machines specially adapted for the production of tubular articles
    • B28B21/56Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts
    • B28B21/60Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts prestressed reinforcements
    • B28B21/62Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts prestressed reinforcements circumferential laterally tensioned

Abstract

The present invention relates to a kind of centrifugal concrete pile production line, including feeding mould closing section, be centrifuged area, conserve area, it is characterised in that: further include mould carriage and successively sequence it is adjacent first across workshop, second across workshop, third across workshop;First across in workshop be equipped with for shelve maintenance after the first area with pile die;Second across the second area for handling mold upper mold section is equipped in workshop, in third across being equipped with third region for steel reinforcement cage to be installed on to mold female die in workshop, alternatively, being used for the second area of handling mold upper mold section across being equipped in workshop across the third region being equipped in workshop for steel reinforcement cage to be installed on to mold female die, in third second;Mould carriage can be moved back and forth with second across workshop first across workshop, and mould carriage can be moved back and forth across workshop and third across workshop along die length direction second.It is a kind of centrifugal concrete pile production line that is rationally distributed, ensuring demoulding and production orderly function, in favor of improving the automatization level of concrete-pile production.

Description

Centrifugal concrete pile production line
Technical field
The present invention relates to a kind of production lines of centrifugal concrete pile.
Background technique
Pretensioned prestressing centrifugal concrete pile is a kind of important pile foundation material in China, belongs to concrete product The eighties of last century sixties can be traced in class technical field, the factorial production, in last century the eighties, as a kind of heavy type Prefabricated components, master operation are reinforcing bar customized cut-off, and reinforcing bar installs end plate, belt end plate steel reinforcement cage is put at cage modle Bed die clears up upper mold and bed die, separant coating, concrete stirring, cloth, molding, tensioning, centrifugal forming, steam curing, demoulding Etc. processes, in order to realize the factorial production of centrifugation prefabricated pile, it would be desirable to which according to production efficiency, safety etc. carries out each process Arrangement, to form reasonable assembly line, from that day for having centrifugal pile, the design of assembly line is always the sector professional weight Point considers the problems of and whether an important ring for centrifugal concrete pile production technology, assembly line are reasonable, is related to product matter Amount, production safety, production efficiency, labour labor intensity, be also relate to energy-saving and environmental protection now and whether have automatic Change, the basis of intelligence production.
The present centrifugal concrete pile in China is mainly two kinds of flowing water forms: one is longitudinal flowing water, see " prestressed concrete Tubular pole " Ruan Qinan work P30;A kind of factory of 55mPHC tubular pole disclosed in patent application No. is 200710036609.4 Room.Another kind is lateral flowing water, wherein lateral flowing water divides single span reciprocation type transverse direction the flowing water, " concrete-pile as written by Xiao Zou Wen again With cement products " the 8th phase page 32 in 2012;And application No. is a kind of precast concretes of 201010604071.4 patent disclosure The production method of stake;A kind of novel high-efficiency and energy-saving, environmentally-friendly centrifugal coagulation with the patent disclosure of application number 200910186075.2 Native stake manufacture system.With the circulating lateral flowing water of multispan, such as " concrete-pile and cement products " the 5th phase in 2006 of the grand work of tight will Page 21.
The common single span in China now is not disclosed only in aforementioned document and multispan recycles lateral flowing water, is also disclosed with Korea Spro The current horizontal assembly line layout of state and Japanese two countries.Longitudinal flowing water is mainly used in length greater than 30 meters in China, and diameter is big In φ 600mm, centrifugal pile production, due to its one across that there are flowing water in workshop, between each process is unintelligible, crane is round-trip It is easy to meet and discuss and is thus only limitted to the production of long stake.(because long stake is as with lateral flowing water, workshop width is very wide in production It is unrealistic).Production as 30 meters or less centrifugal piles now generallys use lateral flowing water, has Single Span Workshop With production method, also has Multi-span factory circulating production line, same crane, which all exists, in the layout of these lateral assembly lines carries difference more than several Property workpiece, and more cranes are set between a standdle carrier, there is evacuation conflict when carrying different workpieces in crane, and The good mold of prestressed stretch-draw is both needed to laterally be hoisted on centrifuge by crane, or therefrom turntable vehicle be laterally hoisted to from In scheming, process of the mold on assembly line is by mold with crane from a setting to another setting, when two It when across being operated between workshop, is then mainly had bad luck by trolley, i.e., mold is hung on by trolley by crane, arrived another across workshop When, and place of working is hung to from trolley, all these all serious productions for restricting centrifugal concrete piles are to automation, intelligence side To development.It can be seen that the work that these crane facilities are all engaged in multiple and different property processes from these background technique assembly lines Make, for mold in place of working all without precise positioning, these are all unfavorable for automation, intelligentized realization.
Such as there are more in " concrete-pile and cement products " the 8th phase page 32 in 2012 written by Zou Wengang, the scheme of disclosure There is conflict in crane, multispan circular route is located in three cranes in demoulding area in single span two-way process, in addition to one Heavy-duty machine is exclusively used in being hung to stake autoclave (equipment of high-pressure steaming and cultivating), and other two cranes will tear upper mold open again will be upper and lower Mould is transported to cloth stockline, there are round-trip conflict, has two cranes should will be on the good mold of automatic die assembly in Japanese production line Cloth platform, the mold inverted running after again getting well cloth are lifted to tensioning, cross cloth platform again after prestressed stretch-draw is good and be hung to Centrifuge centrifugation.In South Korea's production line, also there are two cranes to need the upper and lower mould of handling interval process, there are round-trip conflicts. Now due to the gradually disappearance of China human mortality bonus, recruitment hardly possible, the status for staying work to be more difficult will restrict the production of China's prefabricated pile for a long time Enterprise development.
How around centrifugal concrete pile mold transport, design it is reasonable there is automation and intelligent production line, It has been the task of top priority, otherwise after three, five years, prefabricated pile enterprise will can be used without work.
Summary of the invention
The technical problem to be solved by the present invention is to provide for above-mentioned state of the art, one kind is rationally distributed, ensures Demoulding and the centrifugal concrete pile production line for producing orderly function, in favor of improving the Automated water of concrete-pile production It is flat.
The technical scheme of the invention to solve the technical problem is: a kind of centrifugal concrete pile production line, including Feeding mould closing section is centrifuged area, conserves area, it is characterised in that: further include mould carriage and successively sequence adjacent first across workshop, Second across workshop, third across workshop;First across in workshop be equipped with for shelve maintenance after the first area with pile die;? Two across in workshop be equipped with for handling mold upper mold section second area, third across in workshop be equipped with for steel reinforcement cage to be installed In the third region of mold female die, alternatively, second across in workshop be equipped with for steel reinforcement cage to be installed on mold female die Third region, third across in workshop be equipped with for handling mold upper mold section second area;The mould carriage can be long along mold Degree direction is moved back and forth with second across workshop first across workshop, mould carriage can along die length direction second across workshop and the Three move back and forth across workshop.
In addition, mold female die by mould carriage can second across workshop and third across being transported between workshop.
Because, across being equipped in workshop for shelving the first area with pile die after maintenance, and being centrifuged, conserving and tearing open first Die bolt process is successively adjacent three process, therefore above-mentioned centrifugation area, maintenance area, first area are located at first across workshop Interior is a kind of preferable layout, preferably, being that will conserve area's setting between centrifugation area and first area, can be reduced handling in this way Distance.
In the present invention, first across workshop, the second supply line across the mould carriage moved back and forth in workshop, with second across Workshop, third can be mutual disconnected different supply line across the supply line for the mould carriage that workshop moves back and forth, to transport mould Vehicle only directly cannot continuously run to third across workshop from first across workshop across running between workshop adjacent two.As most Excellent scheme, above-mentioned mould carriage can be moved back and forth across workshop and third across workshop first across workshop, second along die length direction, And mould carriage straight line on same supply line moves back and forth.Mould carriage in this way on same linear transport line only needs one , save cost, and mould carriage straight line on same supply line move back and forth in first across, second across, third across factory Room, three supply lines across workshop communicate, and transport is more coherent smooth, also can be reduced space occupied, and utilization of area rate is high.It certainly can also To use two mould carriages on same linear transport line, wherein one moves back and forth with second across workshop first across workshop, Another moves back and forth across workshop and third across workshop second.
Further improve, the side of the mould carriage be provided with can along die length direction first across workshop and the The two pile transport vehicles moved back and forth across workshop.Pile transport vehicle is moved back and forth along die length direction can be reduced space occupied, utilization of area Rate is high, and in addition pile transport vehicle is arranged in the side of mould carriage, and quickly the concrete-pile on mould carriage can be hung on pile transport vehicle, then It allows pile transport vehicle to pass through second along die length direction and pile transport is rapidly completed across workshop.One mould carriage and a pile transport vehicle constitute one Multiple groups delivery unit can be set side by side in a delivery unit, this production line, can make full use of each regional space, optimization layout.
It is further improved, between the third region and second area, is provided with the equipment for clearing up mold female die.? Be shelved with the mould carriage of female die from second area via lower die cleaning equipment into third region moving process, lower die cleaning is set Standby can be automatically performed removes the impurity on female die, without spending extra time to clear up mold.Clear up mold lower half The equipment of mould can be automatic rotary brush, scrape the conventional equipments such as equipment clearly.
Support crab bolt equipment is torn open preferably, being equipped in above-mentioned first area.In above-mentioned first area or second It is equipped in region and tears die bolt equipment open, selection is completed to tear support plate open in first area and tears die bolt process open, and stream is conducive to The optimization of journey.Tearing support crab bolt equipment open can be used existing equipment.During tearing support crab bolt and support plate open, mold is put It sets on mould carriage, the mold after the completion of removing can transport second area to by mould carriage, guarantee the automated job of assembly line.
It is further improved, the anchor of disassembly concrete-pile end is provided in the third region or in the second area The equipment of solid plate and stretch board.Because in second area or third region (preferably second area) by concrete-pile from mould carriage On hang, therefore tensioning crab bolt equipment is torn in setting open in second area or third region (preferably second area), to complete to tear open Pulling plate process, this set is best, carries out tearing stretch board operation open again it is not necessary that centrifugal concrete pile is transported to other regions, shortens fortune Defeated route optimizes assembly line, raising efficiency.Preferably during tearing tensioning crab bolt and stretch board open, the centrifugation coagulation Native stake is shelved on pile transport vehicle.
As further optimization layout, upper mold section clearing zone is equipped in the second area side.It can be by upper mold section side To upper mold section clearing zone is quickly hung to, completion to upper mold section is cleared up.Upper mold clearing zone, which refers to, carries out clearly the upper mold section of mold The region of reason removes the impurity in upper mold section, can also be to upper mold section oiling.
As optimization, above-mentioned second across in workshop be equipped with the second feeding mould closing section, the second area, upper mold section clearing zone Second is respectively positioned on across workshop;Upper mold section clearing zone is most preferably, after clearing up in this way to be arranged between second area and mould closing section Upper half touches and also can quickly be hung to mould closing section and molded, and between the amount of making full use of region idle region, and can be reduced handling away from From.It is described for steel reinforcement cage to be installed on to the area of mold female die in the third across being equipped with the first feeding mould closing section in workshop Domain and steel reinforcement cage processing district are respectively positioned on the third across in workshop;First feeding mould closing section and the second feeding mould closing section are together Constitute the feeding mould closing section.Second feeding mould closing section refers to that being irrigated concrete to the female die equipped with steel reinforcement cage feeds Material, then region that mold upper mold section is covered to molding;First feeding mould closing section refers to the mold after molding to feeding Carry out the region of prestressed stretch-draw.Each regional function division of labor is clear, when the second molding feeding zone carries out feeding molding process It waits, has no effect on the steel reinforcement cage tension operation of the first feeding mould closing section, reduce time cost.
As advanced optimizing for space layout, steel reinforcement cage processing district is equipped in third region side.It in this way can be fast Speed touches the lower half that steel reinforcement cage is hung in third region interior.
Preferably, tearing die bolt, demoulding tool upper mold section open, steel reinforcement cage being installed on mold female die in the fortune mould It is completed on vehicle.
For convenience of lifting, first across workshop, second across workshop and third across being respectively equipped with lifting equipment in workshop.And it is each The running track of lifting equipment in workshop is independently arranged, and is parallel to each other, so that the lifting equipment complete independently in each workshop Respective process avoids the interference in production between each lifting equipment, keeps production process more smooth.
Mould carriage and pile transport vehicle can be band idler wheel trolley, are also possible to the chain mat machine transported with chain, are also possible to lean on The means of transports such as the trolley of support roller rotation operation.
Compared with the prior art, the advantages of the present invention are as follows: by successively sequence adjacent first across workshop, second across factory The region of different demoulding functions is arranged across workshop in room, third in each workshop, rationally distributed, do not interfere with each other, and between workshop It is concatenated by mould carriage, makes entire demoulding assembly line more unobstructed, process is in good order, for the automation for realizing centrifugal concrete pile Production provides may.When operation, mould carriage is run to the first first area across workshop, will be passed through by lifting equipment steam-cured The mold with centrifugal concrete pile be hung to fortune template vehicle on, and on mould carriage complete tear open die bolt operation, it is optimal It is to complete to tear support plate process open in first area;Then by mould carriage run to be located at second across in workshop or third across Upper mold section is laterally hung second area by lifting equipment by the second area in workshop, then again will by weight handling appliance Centrifugal concrete pile in mold is hung, optimal, and tearing open for the stretch board on centrifugal concrete pile is completed in third region It removes, the mould carriage for being shelved with lower mold is run to third across the third region or second in workshop from second area across in workshop Third region, and the process that steel reinforcement cage is installed on mold female die by completion in third region.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the embodiment of the present invention;
Fig. 2 is the structural schematic diagram that demoulding takes a region in the embodiment of the present invention.
Specific embodiment
The present invention will be described in further detail below with reference to the embodiments of the drawings.
It as shown in Figure 1, 2, is a preferred embodiment of the present invention.
A kind of centrifugal concrete pile production line, including feeding mould closing section B, centrifugation area A, maintenance area C, mould carriage 1 and successively Across the workshop F1 of sequentially adjacent first, the second across workshop F2, across the workshop F3 of third;It is centrifuged area A, maintenance area C is located at first across factory In room F1.Upper mold section clearing zone E is equipped in the side second area Q2.Upper mold section clearing zone E is preferably located at second area Q2 and feeds Expect between the B of mould closing section.Steel reinforcement cage processing district D is equipped in the third region side Q3.
The first area Q1 for tearing die bolt open is equipped in the described first across workshop F1;In the described second across workshop F2 It is interior to be equipped with the second area Q2 for demoulding tool upper mold section, be equipped in across the workshop F3 of third for steel reinforcement cage to be installed on mold The third region Q3 of female die.As an alternative, it is also possible to be equipped in the described second across workshop F2 for by steel reinforcement cage It is installed on the third region Q3 of mold female die, is equipped with the second area for having upper mold section for demoulding in across the workshop F3 of third Q2;Between third region Q3 and second area Q2, it is provided with the equipment 6 of cleaning mold female die.It is set in the Q1 of first area Tear support crab bolt equipment 4 open.The disassembly anchor plate of concrete-pile end and setting for stretch board are provided in second area Q2 Standby 5.
Mould carriage 1 can be round-trip in the first across workshop F1, the second across workshop F2 and across the workshop F3 of third along die length direction Operation, and the straight line on same supply line of mould carriage 1 moves back and forth.It tears die bolt, demoulding tool upper mold section open, pacify steel reinforcement cage It is completed on mould carriage 1 loaded on mold female die.Mold female die by mould carriage 1 the second across workshop F2 and third across It is transported between workshop F3.Lifting equipment 2 is respectively equipped in the first across workshop F1, the second across workshop F2 and across the workshop F3 of third. Lifting equipment 2 touches to the upper lower half of lateral handling mold, mold, concrete-pile, steel reinforcement cage etc..
Being provided in the side of mould carriage 1 can be round-trip in the first across workshop F1 and the second across workshop F2 along die length direction The pile transport vehicle 3 of operation.Pile transport vehicle 3 is also moved back and forth along preset route straight line.One mould carriage and a pile transport vehicle constitute one Multiple groups delivery unit can be set side by side in a delivery unit, this production line,
The second feeding mould closing section B2 is equipped in second across workshop F2, second area Q2, upper mold section clearing zone E are respectively positioned on second Across workshop F2;The first feeding mould closing section B1 is equipped in across the workshop F3 of third, for steel reinforcement cage to be installed on mold female die Region Q3 and steel reinforcement cage processing district D are respectively positioned in across the workshop F3 of third;First feeding mould closing section B1 and the second feeding mould closing section B2 Feeding mould closing section B is constituted together.
The operation principle and process of this assembly line embodiment is as follows
By the operation of mould carriage 1 to first area Q1, steam-cured band will be passed through by the lifting equipment 2 in the first across workshop F1 There is the mold (mold and centrifugal concrete pile are not shown in drawing) of centrifugal concrete pile to be hung to first area from centrifugation area A It on mould carriage 1 in Q1, then carries out tearing die bolt operation open in the Q1 of first area again, tearing die bolt operation open can be used now There is mode, and complete to tear support plate process open in the Q1 of first area, support plate is the plate of tensioning, is resisted against mold side On outer end face;Then mould carriage 1 is run along preset track straight line (direction shown in drawing arrow) to second area Q2, The upper mold section of mold is laterally hung into second area Q2 to upper mold section clearing zone E by the lifting equipment 2 in the second across workshop F2, Then the centrifugal concrete pile in mold is hung on pile transport vehicle 3 by the lifting equipment 2 in the second across workshop F2, optimal, fortune Stake is transported to Q3 region of the third across workshop by stake vehicle 3, is completed on centrifugal concrete pile on the pile transport vehicle 3 in the Q3 of third region The dismounting mode of the dismounting of stretch board (stretch board is not shown in drawing), stretch board can refer to the prior art, and stretch board is torn open After removing, pile transport vehicle 3 finally transports first area Q1 via second area Q2, first area Q1 from third region Q3;Or it directly transports The region Q3 out.Be shelved with the mould carriage 1 of lower mold half from second area Q2 via the equipment 6 of cleaning mold female die toward third area Q3 movement is moved in domain, and lower die cleaning equipment 6 can remove the impurity on female die, and the mould carriage 1 for being shelved with lower mold enters third Q3 is moved in region, steel reinforcement cage is hung to by the lifting equipment 2 in across the workshop F3 of third from perimeter be shelved on mould carriage 1 under In half module, then the lifting equipment 2 in across the workshop F3 of third also hangs out the female die for being placed with steel reinforcement cage from third region Q3 To the first feeding mould closing section B1.
Through the first adjacent across workshop F1 of successively sequence, the second across workshop F2, across the workshop F3 of third, in each workshop The region of different demoulding functions is set, it is rationally distributed, do not interfere with each other, and concatenated between workshop by mould carriage 3, allow entire demoulding Assembly line is more unobstructed, and process is in good order, to realize that the automated production of centrifugal concrete pile provides possibility.Major advantage is Demoulding takes stake, female die cleaning, dress steel reinforcement cage to complete on the car, and production capacity of each process on each operation ground compares Equilibrium, each lifting equipment do not conflict mutually in operation, are easy to implement reasonable line tact, place of working quantity and position, from It and is that good framework is established in the automation of entire assembly line and intelligentized realization.The assembly line is that lateral multispan follows bad production Technique.
Although the preferred embodiment of the present invention has been described in detail above, it is to be clearly understood that for this field Technical staff for, the invention may be variously modified and varied.Done within the spirit and principles of the present invention What modification, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (13)

1. a kind of centrifugal concrete pile production line, including feeding mould closing section (B) are centrifuged area (A), conserve area (C), feature exists In: further include mould carriage (1) and successively sequence adjacent first across workshop (F1), second across workshop (F2), third across workshop (F3);Described first across being equipped in workshop (F1) for shelving the first area (Q1) with pile die after maintenance;Described Two are used for the second area (Q2) of handling mold upper mold section across being equipped in workshop (F2), are used in third across interior be equipped with of workshop (F3) Steel reinforcement cage is installed on to the third region (Q3) of mold female die, alternatively, being used to incite somebody to action across interior be equipped with of workshop (F2) described second Steel reinforcement cage is installed on the third region (Q3) of mold female die, is used for handling mold upper mold section across interior be equipped with of workshop (F3) in third Second area (Q2);The mould carriage (1) can along die length direction first across workshop (F1) with second across workshop (F2) It moves back and forth, the mould carriage (1) can transport back and forth across workshop (F2) and third across workshop (F3) along die length direction second Row.
2. centrifugal concrete pile production line according to claim 1, it is characterised in that: the centrifugation area (A), maintenance area (C) it is located at first across in workshop (F1).
3. centrifugal concrete pile production line according to claim 1, it is characterised in that: the mould carriage (1) can be along mold Length direction is moved back and forth across workshop (F2) and third across workshop (F3) first across workshop (F1), second, and mould carriage (1) exists Straight line moves back and forth on same supply line.
4. centrifugal concrete pile production line according to claim 1, it is characterised in that: in the side of the mould carriage (1) Be provided with can along die length direction first across workshop (F1) and the second pile transport vehicle (3) moved back and forth across workshop (F2).
5. centrifugal concrete pile production line according to claim 1, it is characterised in that: in the third region (Q3) and the Between two regions (Q2), it is provided with the equipment (6) of cleaning mold female die.
6. centrifugal concrete pile production line according to claim 1, it is characterised in that: set in the first area (Q1) Tear support crab bolt equipment (4) open.
7. centrifugal concrete pile production line according to claim 1, it is characterised in that: in the first area (Q1) or It is equipped in second area (Q2) and tears die bolt equipment open.
8. centrifugal concrete pile production line according to claim 1, it is characterised in that: in the second area (Q2) or The anchor plate of disassembly concrete-pile end and the equipment (5) of stretch board are provided in the third region (Q3).
9. centrifugal concrete pile production line according to claim 1, it is characterised in that: in the side the second area (Q2) Equipped with upper mold section clearing zone (E).
10. centrifugal concrete pile production line according to claim 9, it is characterised in that: described second across in workshop (F2) Equipped with the second feeding mould closing section (B2), the second area (Q2), upper mold section clearing zone (E) are respectively positioned on second across workshop (F2); It is interior equipped with the first feeding mould closing section (B1) across workshop (F3) in the third, it is described for steel reinforcement cage to be installed on mold female die Region (Q3) and steel reinforcement cage processing district (D) be respectively positioned on the third across in workshop (F3);First feeding mould closing section (B1) The feeding mould closing section (B) is constituted together with the second feeding mould closing section (B2).
11. centrifugal concrete pile production line according to claim 1, it is characterised in that: in the third region (Q3) one Side is equipped with steel reinforcement cage processing district (D).
12. centrifugal concrete pile production line according to claim 1, it is characterised in that: tear die bolt, demoulding tool upper half open Steel reinforcement cage is installed on mold female die and completes on the mould carriage (1) by mould.
13. centrifugal concrete pile production line according to claim 1, it is characterised in that: described first across workshop (F1), Second across workshop (F2) and third across being respectively equipped with lifting equipment (2) in workshop (F3).
CN201810748843.8A 2018-07-10 2018-07-10 Centrifugal concrete pile production line Pending CN109227920A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810748843.8A CN109227920A (en) 2018-07-10 2018-07-10 Centrifugal concrete pile production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810748843.8A CN109227920A (en) 2018-07-10 2018-07-10 Centrifugal concrete pile production line

Publications (1)

Publication Number Publication Date
CN109227920A true CN109227920A (en) 2019-01-18

Family

ID=65071951

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810748843.8A Pending CN109227920A (en) 2018-07-10 2018-07-10 Centrifugal concrete pile production line

Country Status (1)

Country Link
CN (1) CN109227920A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110774437A (en) * 2019-08-27 2020-02-11 杨红平 Automatic production line for concrete pipe piles

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2032793A1 (en) * 1969-07-03 1971-06-24 Siler Ag, Luzern (Schweiz) System and method for shuttering and demoulding, cleaning and emptying of molds
CN101224602A (en) * 2007-01-18 2008-07-23 中交三航局第三工程有限公司 Production workshop for 55mPHC tubular pile
CN101885208A (en) * 2009-09-21 2010-11-17 宁波一中管桩有限公司 Method for manufacturing novel high-efficiency, energy-saving and environmentally-friendly centrifugal concrete pile
CN202062499U (en) * 2011-04-15 2011-12-07 海通能源集团有限公司 Twin-span rotary-type concrete tubular pile manufacturing device
CN102275219A (en) * 2011-08-18 2011-12-14 广东建华管桩有限公司 Automatic production line for pipe pile
CN102398305A (en) * 2010-12-24 2012-04-04 宁波一中管桩有限公司 Method for producing precast concrete piles
CN202357269U (en) * 2011-09-16 2012-08-01 海通能源集团有限公司 Three-span rotary type concrete pile tube manufacturing apparatus
CN202805405U (en) * 2012-06-21 2013-03-20 上海中技桩业股份有限公司 Automatic production line of centrifugal pile
CN202805406U (en) * 2012-06-21 2013-03-20 上海中技桩业股份有限公司 Improved production line of centrifugal pile
CN104710155A (en) * 2013-12-12 2015-06-17 青岛昊河水泥制品有限责任公司 Production technology of precast reinforced concrete piles
CN204566363U (en) * 2015-03-30 2015-08-19 江苏扬泰中天管桩有限公司 A kind of concrete tubular pile production system
JP2015218481A (en) * 2014-05-16 2015-12-07 三谷セキサン株式会社 Steel composite concrete pile, and manufacturing method for steel composite concrete pile
CN206346520U (en) * 2016-10-31 2017-07-21 重庆锦川电力设施有限公司 A kind of concurrent plant layout structure
CN209319993U (en) * 2018-07-10 2019-08-30 俞向阳 Centrifugal concrete pile production line

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2032793A1 (en) * 1969-07-03 1971-06-24 Siler Ag, Luzern (Schweiz) System and method for shuttering and demoulding, cleaning and emptying of molds
CN101224602A (en) * 2007-01-18 2008-07-23 中交三航局第三工程有限公司 Production workshop for 55mPHC tubular pile
CN101885208A (en) * 2009-09-21 2010-11-17 宁波一中管桩有限公司 Method for manufacturing novel high-efficiency, energy-saving and environmentally-friendly centrifugal concrete pile
CN102398305A (en) * 2010-12-24 2012-04-04 宁波一中管桩有限公司 Method for producing precast concrete piles
CN202062499U (en) * 2011-04-15 2011-12-07 海通能源集团有限公司 Twin-span rotary-type concrete tubular pile manufacturing device
CN102275219A (en) * 2011-08-18 2011-12-14 广东建华管桩有限公司 Automatic production line for pipe pile
CN202357269U (en) * 2011-09-16 2012-08-01 海通能源集团有限公司 Three-span rotary type concrete pile tube manufacturing apparatus
CN202805405U (en) * 2012-06-21 2013-03-20 上海中技桩业股份有限公司 Automatic production line of centrifugal pile
CN202805406U (en) * 2012-06-21 2013-03-20 上海中技桩业股份有限公司 Improved production line of centrifugal pile
CN104710155A (en) * 2013-12-12 2015-06-17 青岛昊河水泥制品有限责任公司 Production technology of precast reinforced concrete piles
JP2015218481A (en) * 2014-05-16 2015-12-07 三谷セキサン株式会社 Steel composite concrete pile, and manufacturing method for steel composite concrete pile
CN204566363U (en) * 2015-03-30 2015-08-19 江苏扬泰中天管桩有限公司 A kind of concrete tubular pile production system
CN206346520U (en) * 2016-10-31 2017-07-21 重庆锦川电力设施有限公司 A kind of concurrent plant layout structure
CN209319993U (en) * 2018-07-10 2019-08-30 俞向阳 Centrifugal concrete pile production line

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110774437A (en) * 2019-08-27 2020-02-11 杨红平 Automatic production line for concrete pipe piles

Similar Documents

Publication Publication Date Title
CN208788805U (en) A kind of concrete precast pile automatic production line
CN102744779B (en) PHC (prestressed concrete pipe pile) pile streamline conveying production line
CN103128847B (en) Double-block type sleeper production line and production process thereof
CN209319993U (en) Centrifugal concrete pile production line
CN109352815A (en) Line is deposited in a kind of prefabricated components production line and the production with the prefabricated components production line
CN207711039U (en) A kind of pre-stress rail plate tinuous production
WO2020232744A1 (en) Prefabricated component production line having temporary storage function
WO2020232745A1 (en) Prefabricated component production line with bench formwork temporary storage unit
CN208163960U (en) The production system of concrete precast pile automatic production line workshop and prefabricated pile
CN109227920A (en) Centrifugal concrete pile production line
CN109333800A (en) A kind of prefabricated components production line
CN110142862A (en) The production system of concrete precast pile automatic production line workshop and prefabricated pile
CN108789809A (en) A kind of centrifugal concrete pile production line
CN209319994U (en) A kind of centrifugal concrete pile production line
CN109129872B (en) Prefabricated component production line
CN102862214B (en) High-pressure toilet moulding machine capable of producing ring and body together
CN102398305A (en) Method for producing precast concrete piles
CN204703070U (en) A kind of bridge precast beam diaphragm Side Template structure
CN111618992A (en) Concrete pile production system
CN209491933U (en) A kind of prefabricated components production line
CN202668745U (en) Production stream line for conveying prestress high concrete (PHC) pipe piles
CN208716703U (en) Mold after feeding is sent to the mold handling apparatus to centrifuge
CN201103104Y (en) Three supporting legs automatically spanning rotation type mobile mould frame bridging machine
CN210910546U (en) Prefabricated component production line
CN211030564U (en) Prefabricated component production line

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination