CN206205232U - Laminated floor slab based on granular polystyrene fibre concrete sandwiched thermal insulating - Google Patents

Laminated floor slab based on granular polystyrene fibre concrete sandwiched thermal insulating Download PDF

Info

Publication number
CN206205232U
CN206205232U CN201621244275.0U CN201621244275U CN206205232U CN 206205232 U CN206205232 U CN 206205232U CN 201621244275 U CN201621244275 U CN 201621244275U CN 206205232 U CN206205232 U CN 206205232U
Authority
CN
China
Prior art keywords
concrete
layer
granular polystyrene
prefabricated panel
heat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621244275.0U
Other languages
Chinese (zh)
Inventor
黄炜
陈建仓
石安仁
吴鹏
徐学坤
罗斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi ` An Industrial Co Ltd
Original Assignee
Xi ` An Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi ` An Industrial Co Ltd filed Critical Xi ` An Industrial Co Ltd
Priority to CN201621244275.0U priority Critical patent/CN206205232U/en
Application granted granted Critical
Publication of CN206205232U publication Critical patent/CN206205232U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Laminated floor slab based on granular polystyrene fibre concrete sandwiched thermal insulating, including prefabricated panel concrete layer, granular polystyrene fiber concrete prefabricated panel heat-insulation layer is provided with prefabricated panel concrete layer, has last layer on granular polystyrene fiber concrete prefabricated panel heat-insulation layer;The utility model is on the basis of regular reinforcement truss laminated floor slab, pour using " sandwich " heat-insulation layer of granular polystyrene fiber concrete, form the novel sandwich insulation laminated floor slab that prefabricated panel concrete layer, granular polystyrene fiber concrete heat-insulation layer, live last layer are combined, realize floor load-bearing, heat insulation integrated, the isothermal holding of later stage roof boarding is eliminated, field operation is reduced;The utility model additionally uses the mode that steel bar girder and mat surface are combined, and steel bar girder combines closely three layers of superimposed sheet through three layers of whole superimposed sheet, improves bearing capacity, shear resistance and the globality of insulation superimposed sheet.

Description

Laminated floor slab based on granular polystyrene fibre concrete sandwiched thermal insulating
Technical field
The utility model belongs to technical field of buildings, more particularly to a kind of to be based on granular polystyrene fibre concrete sandwiched thermal insulating Laminated floor slab.
Background technology
" 13 " planning outline is proposed:Applicable, economic, green, the attractive in appearance building of development, improves Building technology level, peace Full standard and construction quality, promote assembled architecture and steel building.Assembled architecture has design standard, component industry Change, mechanization of building operation, greatly reduce the use of field operation and labour, and green, environmental protection, energy-conservation, are China's future architectures Developing direction.Reinforced concrete slab has can industrialize component, manufacture is not subject to seasonal restrictions, greatly shortens cycle and section The advantages of about a large amount of templates and other resources.Although laminated floor slab realizes the basic demand of the development of assembled architecture, but still There are problems that:Laminated floor slab stills need poured in place concrete;Roof boarding still need to the later stage be incubated, water-proofing treatment etc..
The content of the invention
In order to overcome the shortcoming of above-mentioned prior art, the purpose of this utility model is to provide a kind of fine based on granular polystyrene The concrete sandwich thermal insulated laminated floor slab of dimension, on the basis of regular reinforcement truss laminated floor slab, has innovated structural form, pours Using " sandwich " heat-insulation layer of granular polystyrene fiber concrete, prefabricated panel concrete layer, granular polystyrene fiber coagulation are formed The novel sandwich insulation laminated floor slab that native heat-insulation layer, live last layer are combined, realizes floor load-bearing, heat insulation integrated, The isothermal holding of later stage roof boarding is eliminated, field operation is reduced;The utility model additionally uses steel bar girder and mat surface knot The mode of conjunction, steel bar girder combines closely three layers of superimposed sheet through three layers of whole superimposed sheet, improves insulation folded The bearing capacity of plywood, shear resistance and globality.
To achieve these goals, the technical solution adopted in the utility model is:
Based on the laminated floor slab of granular polystyrene fibre concrete sandwiched thermal insulating, including prefabricated panel concrete layer 2, prefabricated Granular polystyrene fiber concrete prefabricated panel heat-insulation layer 3 is provided with underplate concrete layer 2, it is pre- in granular polystyrene fiber concrete There is last layer 4 on base plate heat-insulation layer 3 processed.
There is baseplate reinforcing bar 1 in the prefabricated panel concrete layer 2, there is last layer distributing bar 6, steel in the last layer 4 The lower end of muscle truss 5 is welded on baseplate reinforcing bar 1, and upper end is welded on last layer distributing bar 6.
The utility model additionally provides the construction of the laminated floor slab based on granular polystyrene fibre concrete sandwiched thermal insulating Method, including:
Step one:Pour prefabricated panel concrete layer 2
The template of prefabricated panel, assembling reinforcement mesh sheet are made first;On the good reinforced mesh of colligation, assembling reinforcement truss 5, then poured with normal concrete;Wharf's pavement quality is carried out after concrete upper strata is floating, mat surface is produced;Last standard is supported Shield 28d, form removal, you can form the prefabricated panel concrete layer 2 with steel bar girder 5.
The steel bar girder 5 has 120mm highly, to wind up and use C10 using C10, lower edge, and web member uses A6, used general Logical concrete marked as C30, pour thickness 60mm.
Step 2:Pour granular polystyrene fiber concrete prefabricated panel heat-insulation layer 3
After prefabricated panel concrete has 75% intensity, the formwork on the basis of prefabricated panel, mixing granular polystyrene is fine Dimension concrete, concretely comprises the following steps:Mixing is mixed with cement, methyl cellulose ether, rubber powder, silica flour, wood-fibred, polypropylene fibre Siccative, after mixing uniform, adds granular polystyrene and adds a small amount of water to continue to stir, and treats that granular polystyrene is substantially all and is wrapped up by siccative Afterwards, add remaining water to stir, form granular polystyrene fiber concrete, then pour granular polystyrene fiber concrete, and And vibrate, pat closely knit, last standard curing 28d, form removal, you can formed and carry granular polystyrene fiber concrete heat-insulation layer 3 prefabricated panel.
Soil body proportioning is cement 333kg, silicon ash 37kg, rubber powder 16.65kg, methyl cellulose ether 2.405kg, polypropylene are fine Dimension 1.665kg, wood-fibred 3.33kg, waterproofing agent 1.11kg, water reducer 3.7kg, air entraining agent 0.74kg.
Step 3:Pour last layer
When the intensity of granular polystyrene fiber concrete prefabricated panel heat-insulation layer 3 reaches more than the 75% of design load, moisten first The wet surface of granular polystyrene fiber concrete prefabricated panel heat-insulation layer 3, installs masterplate;Then last layer distributing bar mesh sheet is laid, Pour common C30 concrete, it is floating after sweep surrounding enviroment.Last standard curing 28 days, so as to form sandwich thermal insulated overlapping building Plate.
Compared with prior art, the beneficial effects of the utility model are:
1st, sandwich thermal insulated laminated floor slab uses sandwich thermal insulated construction, and bearing capacity is higher, and durability more preferably, and can avoid applying The damage in work stage, has the effect of heat preservation energy-saving concurrently again, is truly realized the heat-preserving load-bearing integration of superimposed sheet.
2nd, sandwich thermal insulated laminated floor slab uses granular polystyrene fiber concrete, with good properties of heat preservation and energy saving basis On, again using the construction method of traditional pouring construction so that novel superposed floor makes simple and convenient, it is to avoid special using other Different instrument and Special Training is carried out to workman, production process is simply efficient, and using mode is poured, improves novel superposed building The globality and density of plate, it is to avoid form cold (heat) bridge.
3rd, sandwich thermal insulated laminated floor slab is compared with traditional common precast floor slab, innovatively using steel bar girder " one wears three " Structural form, i.e., steel bar girder connection prefabricated panel, granular polystyrene fiber concrete heat-insulation layer, the form of last layer, significantly The shear resistance and globality of laminated floor slab are improve, with good integrity, anti-seismic performance is superior, and there is stronger bonding to resist The advantages of cutting ability.
Brief description of the drawings
Fig. 1 is the utility model laminated floor slab structural representation.
Fig. 2 is the utility model laminated floor slab organigram.
Specific embodiment
Describe implementation method of the present utility model in detail with reference to the accompanying drawings and examples.
As depicted in figs. 1 and 2, the utility model is based on the laminated floor slab of granular polystyrene fibre concrete sandwiched thermal insulating, bag Prefabricated panel concrete layer 2 is included, the insulation of granular polystyrene fiber concrete prefabricated panel is provided with prefabricated panel concrete layer 2 Layer 3, has last layer 4 on granular polystyrene fiber concrete prefabricated panel heat-insulation layer 3.Wherein, have in prefabricated panel concrete layer 2 Baseplate reinforcing bar 1, the lower end for having last layer distributing bar 6, steel bar girder 5 in last layer 4 is welded on baseplate reinforcing bar 1, upper end weldering It is connected on last layer distributing bar 6.
It can be seen that, this sandwich thermal insulated laminated floor slab is combined by precast concrete base plate, prefabricated thermal insulation layer and live last layer Form, faying face shear-resistant way is steel bar girder and concrete mat surface.Technical points include:
1st, load bearing heat preserving integration:On the basis of regular reinforcement truss superimposed sheet, pour and mixed using granular polystyrene fiber The sandwich insulating layer of soil is coagulated, insulation superimposed sheet is formd, at the scene after rigging out, cast-in-place last layer is formd with base plate Concrete layer 2, granular polystyrene fiber concrete heat-insulation layer 3, the sandwich thermal insulated superimposed sheet of steel bar girder of 4 three layers of last layer, realize It is load-bearing, heat insulation integrated.
2nd, the construction and production method of heat-insulation layer:The utility model laminated floor slab uses granular polystyrene fiber concrete conduct Insulation material, production method is used and pours form.Granular polystyrene fiber concrete specifically proportioning for cement 333kg, silicon ash 37kg, Rubber powder 16.65kg, methyl cellulose ether (200,000 denseness) 2.405kg, polypropylene fibre (10mm) 1.665kg, wood-fibred 3.33kg, waterproofing agent 1.11kg, water reducer 3.7kg, air entraining agent 0.74kg.Granular polystyrene fiber concrete is with heat insulation effect While, adding the additives such as rubber powder, silica flour, methyl cellulose ether, air entraining agent by a certain percentage because of it, intensity is up to 1MPa More than.Using the production method for pouring, heat-insulation layer can be preferably set to form entirety with underplate concrete, it is to avoid to be formed cold (heat) Bridge, improves the globality of novel superposed floor, and it is simple and convenient to pour mode, it is easy to accomplish, simplify the making of heat-insulation layer Flow, is conducive to the application and popularization of sandwich thermal insulated laminated floor slab.Laminated floor slab uses sandwich form, and heat-insulation layer is poured in Interbed, can both play good heat insulation effect, and heat-insulation layer can be well protected again, improve the use longevity of floor and heat-insulation layer Life.
3rd, superposed surfaces occlusion form:Two steel bar girders 5 are arranged when pouring prefabricated panel, and to underplate concrete surface Carry out wharf's pavement quality, formed steel bar girder 5 through prefabricated panel concrete layer 2, granular polystyrene fiber concrete heat-insulation layer 3, after The connected mode of layer 4 is poured, the shear resistance of superposed surfaces has been greatly reinforced, it is ensured that the cooperative work performance of superimposed sheet.
Specific construction process of the present utility model is as follows:
Step one:Prefabricated panel concrete layer is poured.The template of prefabricated panel, assembling reinforcement mesh sheet are made first; On the good reinforced mesh of colligation, colligation has 120mm highly, winds up and use C10, web member to use the reinforcing bar of A6 using C10, lower edge Truss.Then 60mm is poured with the normal concrete marked as C30 thick;Wharf's pavement quality is carried out after concrete upper strata is floating, is made Produce mat surface;Last standard curing 28d, form removal, you can form the prefabricated panel concrete layer with steel bar girder.
Step 2:Prefabricated panel heat-insulation layer is poured.After prefabricated panel concrete has 75% intensity, in prefabricated panel On the basis of formwork, with granular polystyrene fiber concrete processed, concretely comprise the following steps:Cement, methyl cellulose ether, glue are mixed with system Powder, silica flour, wood-fibred, the siccative of polypropylene fibre, after making uniformly, add granular polystyrene simultaneously to add a small amount of water to continue stirring, treat Granular polystyrene is substantially all wrapped up by siccative after, add remaining water to stir, form granular polystyrene fiber concrete.So After-pouring granular polystyrene fiber concrete, and vibrate, pat closely knit.Last standard curing 28d, form removal, you can formed Prefabricated panel with granular polystyrene fiber concrete heat-insulation layer.
Step 3:Novel sandwich insulation superimposed sheet last layer is poured.When prefabricated thermal insulation base plate strength reaches design load When more than 75%, backplate surface is soaked first, install masterplate;Then last layer distributing bar mesh sheet is laid, common C30 is poured and is mixed Solidifying soil, it is floating after sweep surrounding enviroment.Last standard curing 28 days, so as to form sandwich thermal insulated superimposed sheet.

Claims (2)

1. a kind of laminated floor slab based on granular polystyrene fibre concrete sandwiched thermal insulating, including prefabricated panel concrete layer (2), its It is characterised by, granular polystyrene fiber concrete prefabricated panel heat-insulation layer (3) is provided with prefabricated panel concrete layer (2), There is last layer (4) on granular polystyrene fiber concrete prefabricated panel heat-insulation layer (3).
2. the laminated floor slab of granular polystyrene fibre concrete sandwiched thermal insulating is based on according to claim 1, it is characterised in that institute Stating in prefabricated panel concrete layer (2) has baseplate reinforcing bar (1), has last layer distributing bar (6), reinforcing bar in the last layer (4) The lower end of truss (5) is welded on baseplate reinforcing bar (1), and upper end is welded on last layer distributing bar (6).
CN201621244275.0U 2016-11-17 2016-11-17 Laminated floor slab based on granular polystyrene fibre concrete sandwiched thermal insulating Active CN206205232U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621244275.0U CN206205232U (en) 2016-11-17 2016-11-17 Laminated floor slab based on granular polystyrene fibre concrete sandwiched thermal insulating

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621244275.0U CN206205232U (en) 2016-11-17 2016-11-17 Laminated floor slab based on granular polystyrene fibre concrete sandwiched thermal insulating

Publications (1)

Publication Number Publication Date
CN206205232U true CN206205232U (en) 2017-05-31

Family

ID=58749047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621244275.0U Active CN206205232U (en) 2016-11-17 2016-11-17 Laminated floor slab based on granular polystyrene fibre concrete sandwiched thermal insulating

Country Status (1)

Country Link
CN (1) CN206205232U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522440A (en) * 2016-11-17 2017-03-22 西咸新区矩阵实业有限公司 Composite floor slab based on polyphenyl granule fiber concrete sandwich insulation and construction method
CN107587617A (en) * 2017-09-26 2018-01-16 许长程 A kind of heat-insulation and heat-preservation prefabricated board module and preparation method thereof
CN111268969A (en) * 2020-02-26 2020-06-12 西安建筑科技大学 Hybrid fiber concrete prefabricated laminated slab and preparation method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522440A (en) * 2016-11-17 2017-03-22 西咸新区矩阵实业有限公司 Composite floor slab based on polyphenyl granule fiber concrete sandwich insulation and construction method
CN107587617A (en) * 2017-09-26 2018-01-16 许长程 A kind of heat-insulation and heat-preservation prefabricated board module and preparation method thereof
CN111268969A (en) * 2020-02-26 2020-06-12 西安建筑科技大学 Hybrid fiber concrete prefabricated laminated slab and preparation method thereof

Similar Documents

Publication Publication Date Title
CN106522440A (en) Composite floor slab based on polyphenyl granule fiber concrete sandwich insulation and construction method
CN105507462B (en) Have both the combined wall and its construction method of load-bearing and heat insulation function
CN105298133A (en) Construction method to strengthen crack resistance of large-volume concrete baseplate
CN101413326B (en) Flat roof structure and construction method thereof
CN206205232U (en) Laminated floor slab based on granular polystyrene fibre concrete sandwiched thermal insulating
CN108755963A (en) A kind of partial precast assembled steel reinforced concrete giant frame structure and construction method
CN105401654A (en) Environment-friendly assembled type ecological house and construction method thereof
CN105781141B (en) A kind of fiber knitted net enhancing cement base composite board reinforced for concrete flexural member and preparation method thereof
CN107090908B (en) A kind of vertical prefabricated components joint connecting method
CN104478354B (en) Cement foamed heat insulation core material, inorganic compound heat insulation plate, manufacturing method and mold
CN108951966A (en) The decoration integrated assembling type outer wall plate of basalt fibre grid concrete heat-insulating
CN107938928A (en) A kind of assembled light composite floor and preparation method thereof
CN107972173A (en) Regeneration concrete precast floor slab structure and production method
CN215167030U (en) Cast-in-place glass fiber reinforced concrete superimposed sheet of steel bar truss
CN105401687B (en) A kind of assembled combined wall board and its manufacture method based on the processing of mortar external thermal insulation
CN204781524U (en) Sulphur oxygen magnesium steel bar truss board
CN203049846U (en) Permanent compound heat preservation external framework cast-in-situ lightweight concrete wall structure
CN206784638U (en) Include the prefabricated overlapped shear wall of steel plate
CN209011386U (en) The decoration integrated assembling type outer wall plate of basalt fibre grid concrete heat-insulating
CN207739500U (en) A kind of assembled light composite floor
Snoeck et al. Voronoi diagrams and self-healing cementitious materials: a perfect match
CN108071173A (en) A kind of construction method of mass concrete
CN208472958U (en) A kind of partial precast assembled steel reinforced concrete giant frame structure
CN207522824U (en) A kind of regeneration concrete precast floor slab structure
CN105544829A (en) Steel fiber regeneration brick granule concrete single-rib baseboard composite floor slab and manufacturing method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Matrix matrix Industrial Co., Ltd.

Assignor: Xi ` an Industrial Co., Ltd.

Contract record no.: 2019610000016

Denomination of utility model: Composite floor slab based on polyphenyl granule fiber concrete sandwich insulation and construction method

Granted publication date: 20170531

License type: Exclusive License