CN107972173A - Regeneration concrete precast floor slab structure and production method - Google Patents
Regeneration concrete precast floor slab structure and production method Download PDFInfo
- Publication number
- CN107972173A CN107972173A CN201711251675.3A CN201711251675A CN107972173A CN 107972173 A CN107972173 A CN 107972173A CN 201711251675 A CN201711251675 A CN 201711251675A CN 107972173 A CN107972173 A CN 107972173A
- Authority
- CN
- China
- Prior art keywords
- concrete
- regeneration
- self
- floor slab
- precast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 119
- 230000008929 regeneration Effects 0.000 title claims abstract description 67
- 238000011069 regeneration method Methods 0.000 title claims abstract description 67
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 18
- 238000010276 construction Methods 0.000 claims abstract description 12
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 5
- 239000011376 self-consolidating concrete Substances 0.000 claims description 26
- 230000002787 reinforcement Effects 0.000 claims description 25
- 238000010008 shearing Methods 0.000 claims description 15
- 239000011178 precast concrete Substances 0.000 claims description 13
- 229910000831 Steel Inorganic materials 0.000 claims description 12
- 239000010959 steel Substances 0.000 claims description 12
- 239000002689 soil Substances 0.000 claims description 10
- 238000005056 compaction Methods 0.000 claims description 3
- 230000015271 coagulation Effects 0.000 claims description 2
- 238000005345 coagulation Methods 0.000 claims description 2
- 239000000463 material Substances 0.000 abstract description 4
- 230000018109 developmental process Effects 0.000 description 4
- 230000007613 environmental effect Effects 0.000 description 4
- 239000002699 waste material Substances 0.000 description 4
- 238000000034 method Methods 0.000 description 2
- 238000004064 recycling Methods 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B1/00—Producing shaped prefabricated articles from the material
- B28B1/04—Producing shaped prefabricated articles from the material by tamping or ramming
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
- B28B23/022—Means for inserting reinforcing members into the mould or for supporting them in the mould
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/22—Moulds for making units for prefabricated buildings, i.e. units each comprising an important section of at least two limiting planes of a room or space, e.g. cells; Moulds for making prefabricated stair units
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Panels For Use In Building Construction (AREA)
Abstract
The present invention relates to prefabricated assembled concrete structural construction field, is specially a kind of regeneration concrete precast floor slab structure and production method.The structure includes regeneration concrete Prefabricated stacking floor and regeneration concrete two kinds of precast floor slabs of full precast floor slab, the prefabricated layer segment of Prefabricated stacking floor, the tensile region of the full precast floor slab of regeneration concrete and the less compressive region part that is stressed, made of regeneration concrete, and concrete floor mainly top in stress is under pressure lower part under tension, the pressure that lower part is subject to mainly is undertaken by reinforcing bar, so lower part is using the relatively low regeneration concrete of intensity, and the pressure that top is subject to has the more non-renewable concrete of intensity to undertake, give full play to the mechanical property advantage of respective material, meet actual loading needs.
Description
Technical field
The present invention relates to prefabricated assembled concrete structural construction field, be specially regeneration concrete Prefabricated stacking floor and
The structure and production method of regeneration concrete two kinds of prefabricated board floors of full precast floor slab.
Background technology
It is also increasing to the demand of cement, sandstone now with the development of Building Trade in China, need to largely it cut into a mountain for quarrying
And digging sand, heavy damage ecological environment.Moreover, the high-quality natural aggregate in some areas of China has become withered in recent years
Exhaust, the material used need to transport for long-distance from other places, not only increase the cost of building products, also aggravate the pollution of environment.It is same with this
When, the discharge capacity of waste material of buildings increasingly increases, and so substantial amounts of useless commerical ready-mixed concrete does not only take up the soil of preciousness, and
Cause environment and social concern, the big city being particularly becoming tight in soil with Space Day is even more so.To a large amount of waste concretes
It is considered as the most effective measure for solving the problems, such as waste concrete to carry out recycling, that is, recycled concrete.Assembled
Concrete construction has the advantages that energy-saving and environmental protection, becomes one of the important directions of future architecture development.By regeneration concrete application
In assembled architecture, the effect killed two birds with one stone can be played.For this reason, the present invention provides a kind of regeneration concrete precast floor slab structure
And production method.
The content of the invention
Purpose of the present invention proposition regeneration concrete precast floor slab structure and production method, including regeneration concrete are prefabricated folded
Floor and regeneration concrete two kinds of precast floor slabs of full precast floor slab are closed, realize the recycling of waste concrete, while meet assembled
The requirement of concrete structure, meets actual engineering design construction needs.
Technical scheme:
A kind of regeneration concrete precast floor slab structure, the structure are entirely pre- for recycled concrete superposed floor or regeneration concrete
Floor processed, wherein:
Recycled concrete superposed floor is folded up and down for self-compacting concrete layer and recycled concrete superposed floor prefabricated panel
Structure, the bar-mat reinforcement for setting longitudinal reinforcement, transverse steel to be formed in recycled concrete superposed floor prefabricated panel are closed, self-compaction mixes
Both sides are parallel respectively in solidifying soil layer is evenly arranged negative reinforcement, and self-compacting concrete layer and recycled concrete superposed floor are prefabricated
Connected between bottom plate by the precast concrete shearing resistance key block being evenly arranged;
The full precast floor slab of regeneration concrete is regeneration concrete layer and self-compacting concrete layer iterative structure up and down, self-compaction
The bar-mat reinforcement for setting in concrete layer longitudinal reinforcement, transverse steel to be formed, parallel uniform cloth is distinguished in both sides in regeneration concrete layer
Put negative reinforcement.
The regeneration concrete precast floor slab construction manufacturing method, during using recycled concrete superposed floor, it makes
Method is as follows:
(1) size of template is determined according to the size of recycled concrete superposed floor, first puts longitudinal reinforcement in template lining
And transverse steel, shearing and the pulling force arrangement precast concrete shearing resistance key block born then are needed according to shear key;
(2) regeneration concrete is poured, the height of prefabricated panel is the half of recycled concrete superposed plate height, to be regenerated mixed
Solidifying soil reaches form removal after expected intensity, and precast concrete shearing resistance key block protrudes from recycled concrete superposed floor prefabricated panel
Surface;
(3) after building site is by the recycled concrete superposed floor prefabricated panel positioning with precast concrete shearing resistance key block, so
Afterwards in two rows of negative reinforcements that are arranged in parallel above;
(4) self-compacting concrete is poured, after self-compacting concrete reaches expected intensity, the regeneration with shear key is obtained and mixes
Solidifying soil laminated floor slab, regeneration concrete layer are identical with self-compacting concrete layer height.
The regeneration concrete precast floor slab construction manufacturing method, during precast floor slab complete using regeneration concrete, it is made
It is as follows to make method:
(1) determine the size of template according to the size of recycled concrete superposed floor, first template lining put longitudinal reinforcement,
Transverse steel and negative reinforcement;
(2) regeneration concrete is first poured, regeneration concrete pours 3/4 that height is full prefabricated board height, will regenerate coagulation
Self-compacting concrete is poured after native vibration compacting again, the height of self-compacting concrete is the 1/4 of full prefabricated board height, to be regenerated mixed
Solidifying soil and self-compacting concrete reach form removal after expected intensity, obtain the full precast floor slab of regeneration concrete.
Advantages of the present invention and beneficial effect are:
1st, regeneration concrete precast floor slab structure and production method of the present invention, the prefabricated layer segment of Prefabricated stacking floor, then
The tensile region of the full precast floor slab of growing concrete and the less compressive region part that is stressed, are made of regeneration concrete, and are mixed
Solidifying Tulou plate mainly top in stress is under pressure lower part under tension, and the pressure that lower part is subject to mainly is undertaken by reinforcing bar,
So lower part uses the relatively low regeneration concrete of intensity, and the pressure that top is subject to has the more non-renewable concrete of intensity to undertake, and fills
The mechanical property advantage of respective material is waved in distribution, meets actual loading needs.
2nd, regeneration concrete precast floor slab structure and production method of the present invention because using regeneration concrete, its with it is non-again
Raw cast-in-place concrete floor is compared, and is economized on resources, environmental protection, is more met the development of green building.
3rd, regeneration concrete precast floor slab structure and production method of the present invention, it is same excellent with prefabricated concrete structure
The advantages that point, i.e., greatly reduce with wet construction amount, and on-site consolidation is simpler, and construction quality is easier to ensure that.
Brief description of the drawings
Fig. 1 is the graphics of precast concrete shear key key.
Fig. 2 is the graphics of the shearing resistance key block of recycled concrete superposed floor, template and steel bar arrangement.
Fig. 3 is the graphics of recycled concrete superposed floor prefabricated panel.
Fig. 4 is the graphics that negative bending moment rib is arranged on recycled concrete superposed floor prefabricated panel.
Fig. 5 is the graphics of recycled concrete superposed floor.
Fig. 6 is the template of the full precast floor slab of regeneration concrete and the graphics of steel bar arrangement.
Fig. 7 is the graphics of the full precast floor slab of regeneration concrete.
In figure, 1 precast concrete shearing resistance key block;2 longitudinal reinforcements;3 transverse steels;4 negative reinforcements;5 templates;6 regeneration
Concrete layer;7 self-compacting concrete layers;8 recycled concrete superposed floor prefabricated panels;9 recycled concrete superposed floors;10 again
The full precast floor slab of growing concrete.
Embodiment
As shown in Fig. 1-Fig. 7, regeneration concrete precast floor slab of the present invention has two kinds of structure types, is respectively regeneration concrete
The full precast floor slab of laminated floor slab, regeneration concrete.
(1) as Figure 1-Figure 5, recycled concrete superposed floor construction and production method are as follows:
(1) as shown in Fig. 2, determining the size of template 5 according to the size of recycled concrete superposed floor, first in template lining
Longitudinal reinforcement 2 and transverse steel 3 are put, the shearing and pulling force arrangement precast concrete shear key born is then needed according to shear key
Block 1, forms the structure of Fig. 2.
(2) regeneration concrete is poured on the basis of Fig. 2, the height of prefabricated panel is the one of recycled concrete superposed plate height
Half, concrete to be regenerated reaches form removal after expected intensity, and precast concrete shearing resistance key block 1 protrudes from recycled concrete superposed
The surface of floor prefabricated panel 8, forms Fig. 3 structures.
(3) after the recycled concrete superposed floor prefabricated panel 8 with precast concrete shearing resistance key block 1 is positioned in building site,
Then in two rows of negative reinforcements 4 that are arranged in parallel above, Fig. 4 structures are formed.
(4) self-compacting concrete is poured on the basis of Fig. 4, after self-compacting concrete reaches expected intensity, it is anti-to obtain band
The recycled concrete superposed floor 9 of key is cut, regeneration concrete layer 6 and self-compacting concrete layer 7 are highly identical.
(2) as Figure 6-Figure 7, the full precast floor slab structure of regeneration concrete and production method are as follows:
(1) as shown in fig. 6, determining the size of template 5 according to the size of recycled concrete superposed floor, first in template lining
Longitudinal reinforcement 2, transverse steel 3 and negative reinforcement are put, forms the structure of Fig. 6.
(2) regeneration concrete is first poured on the basis of Fig. 6, regeneration concrete pours 3/4 that height is full prefabricated board height,
Self-compacting concrete will be poured after regeneration concrete vibration compacting again, the height of self-compacting concrete is the 1/ of full prefabricated board height
4, concrete and self-compacting concrete to be regenerated reach form removal after expected intensity, obtain the full precast floor slab of regeneration concrete
10。
Embodiment the result shows that, the present invention there are following features:1. the pressure that regeneration concrete precast floor slab lower part is subject to
Mainly undertaken by reinforcing bar, so lower part uses the relatively low regeneration concrete of intensity, and the pressure that top is subject to has intensity is higher to mix
Solidifying soil undertakes, and gives full play to the mechanical property advantage of respective material, meets actual loading needs;2. using regeneration concrete, save
About resource, environmental protection;3. precast slab uses steel template, make more environmentally friendly, conveniently;4. due to using half it is prefabricated and
Complete prefabricated mode, the wet construction amount at the scene of reducing, saves field fabrication template, energy conservation and environmental protection, the development for according with green building will
Ask.The present invention has very big popularization and application space.
Claims (3)
1. a kind of regeneration concrete precast floor slab structure, it is characterised in that the structure is recycled concrete superposed floor or regeneration
The full precast floor slab of concrete, wherein:
Recycled concrete superposed floor overlaps knot up and down for self-compacting concrete layer and recycled concrete superposed floor prefabricated panel
Structure, the interior bar-mat reinforcement for setting longitudinal reinforcement, transverse steel to be formed of recycled concrete superposed floor prefabricated panel, self-compacting concrete
Both sides are parallel respectively in layer is evenly arranged negative reinforcement, self-compacting concrete layer and recycled concrete superposed floor prefabricated panel
Between connected by the precast concrete shearing resistance key block that is evenly arranged;
The full precast floor slab of regeneration concrete is regeneration concrete layer and self-compacting concrete layer iterative structure up and down, self-compaction coagulation
The bar-mat reinforcement for setting in soil layer longitudinal reinforcement, transverse steel to be formed, in regeneration concrete layer both sides respectively it is parallel be evenly arranged it is negative
Moment at support.
2. the regeneration concrete precast floor slab construction manufacturing method described in a kind of claim 1, it is characterised in that mixed using regeneration
During solidifying soil laminated floor slab, its production method is as follows:
(1) size of template is determined according to the size of recycled concrete superposed floor, first puts longitudinal reinforcement and horizontal stroke in template lining
To reinforcing bar, shearing and the pulling force arrangement precast concrete shearing resistance key block born then are needed according to shear key;
(2) regeneration concrete is poured, the height of prefabricated panel is the half of recycled concrete superposed plate height, concrete to be regenerated
Reach form removal after expected intensity, precast concrete shearing resistance key block protrudes from the table of recycled concrete superposed floor prefabricated panel
Face;
(3) after building site is by the recycled concrete superposed floor prefabricated panel positioning with precast concrete shearing resistance key block, Ran Hou
Be arranged in parallel two rows of negative reinforcements above;
(4) self-compacting concrete is poured, after self-compacting concrete reaches expected intensity, obtains the regeneration concrete with shear key
Laminated floor slab, regeneration concrete layer are identical with self-compacting concrete layer height.
3. the regeneration concrete precast floor slab construction manufacturing method described in a kind of claim 1, it is characterised in that mixed using regeneration
During the full precast floor slab of solidifying soil, its production method is as follows:
(1) size of template is determined according to the size of recycled concrete superposed floor, first puts longitudinal reinforcement, transverse direction in template lining
Reinforcing bar and negative reinforcement;
(2) regeneration concrete is first poured, regeneration concrete pours 3/4 that height is full prefabricated board height, regeneration concrete is shaken
Self-compacting concrete is poured after puddling reality again, the height of self-compacting concrete is the 1/4 of full prefabricated board height, concrete to be regenerated
Reach form removal after expected intensity with self-compacting concrete, obtain the full precast floor slab of regeneration concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711251675.3A CN107972173A (en) | 2017-12-01 | 2017-12-01 | Regeneration concrete precast floor slab structure and production method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711251675.3A CN107972173A (en) | 2017-12-01 | 2017-12-01 | Regeneration concrete precast floor slab structure and production method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107972173A true CN107972173A (en) | 2018-05-01 |
Family
ID=62008817
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711251675.3A Pending CN107972173A (en) | 2017-12-01 | 2017-12-01 | Regeneration concrete precast floor slab structure and production method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107972173A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108858739A (en) * | 2018-06-25 | 2018-11-23 | 青岛农业大学 | A kind of regenerated aggregate concrete prestressing force superimposed sheet preparation method |
CN109877940A (en) * | 2019-04-10 | 2019-06-14 | 赵德云 | The production of prefabricated board, lifting and secondary pour integrated apparatus and construction method |
CN112982809A (en) * | 2021-02-09 | 2021-06-18 | 电联工程技术股份有限公司 | High-strength environment-friendly prefabricated slab and manufacturing method thereof |
CN113062515A (en) * | 2021-03-30 | 2021-07-02 | 浙江泛华工程咨询有限公司 | Light cavity floor slab, mold and machining process |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1012278A (en) * | 1963-02-21 | 1965-12-08 | Leslie Herbert Rothwell | Improvements in or relating to building structures |
EP1908891A2 (en) * | 2006-07-06 | 2008-04-09 | Ingenieria de Prefabricados S.L. | Composite precast slab for flooring |
CN102677901A (en) * | 2012-05-03 | 2012-09-19 | 华南理工大学 | Construction method of horizontal combined member by using large-size waste concrete block |
CN102839773A (en) * | 2012-08-08 | 2012-12-26 | 沈阳建筑大学 | Concrete composite slab floorslab with shear key and prefabricated construction and construction method |
CN104594557A (en) * | 2014-12-05 | 2015-05-06 | 西安建筑科技大学 | Prefabricated reinforced concrete beam with transverse steel partition boards and construction method |
CN204418489U (en) * | 2015-01-23 | 2015-06-24 | 北京鼎创新型建材有限公司 | Regeneration concrete floor |
CN104727475A (en) * | 2015-03-09 | 2015-06-24 | 沈阳建筑大学 | Modified concrete superposition board floor structure with shear keys and connection method |
CN104788054A (en) * | 2015-04-10 | 2015-07-22 | 浙江大学宁波理工学院 | Eco-friendly self-compacting concrete prepared through complete recycling of waste concrete |
CN204590362U (en) * | 2015-03-09 | 2015-08-26 | 沈阳建筑大学 | The concrete folding plate floor of the band shear key improved |
CN105544829A (en) * | 2015-12-09 | 2016-05-04 | 西安建筑科技大学 | Steel fiber regeneration brick granule concrete single-rib baseboard composite floor slab and manufacturing method thereof |
CN207522824U (en) * | 2017-12-01 | 2018-06-22 | 沈阳建筑大学 | A kind of regeneration concrete precast floor slab structure |
-
2017
- 2017-12-01 CN CN201711251675.3A patent/CN107972173A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1012278A (en) * | 1963-02-21 | 1965-12-08 | Leslie Herbert Rothwell | Improvements in or relating to building structures |
EP1908891A2 (en) * | 2006-07-06 | 2008-04-09 | Ingenieria de Prefabricados S.L. | Composite precast slab for flooring |
CN102677901A (en) * | 2012-05-03 | 2012-09-19 | 华南理工大学 | Construction method of horizontal combined member by using large-size waste concrete block |
CN102839773A (en) * | 2012-08-08 | 2012-12-26 | 沈阳建筑大学 | Concrete composite slab floorslab with shear key and prefabricated construction and construction method |
CN104594557A (en) * | 2014-12-05 | 2015-05-06 | 西安建筑科技大学 | Prefabricated reinforced concrete beam with transverse steel partition boards and construction method |
CN204418489U (en) * | 2015-01-23 | 2015-06-24 | 北京鼎创新型建材有限公司 | Regeneration concrete floor |
CN104727475A (en) * | 2015-03-09 | 2015-06-24 | 沈阳建筑大学 | Modified concrete superposition board floor structure with shear keys and connection method |
CN204590362U (en) * | 2015-03-09 | 2015-08-26 | 沈阳建筑大学 | The concrete folding plate floor of the band shear key improved |
CN104788054A (en) * | 2015-04-10 | 2015-07-22 | 浙江大学宁波理工学院 | Eco-friendly self-compacting concrete prepared through complete recycling of waste concrete |
CN105544829A (en) * | 2015-12-09 | 2016-05-04 | 西安建筑科技大学 | Steel fiber regeneration brick granule concrete single-rib baseboard composite floor slab and manufacturing method thereof |
CN207522824U (en) * | 2017-12-01 | 2018-06-22 | 沈阳建筑大学 | A kind of regeneration concrete precast floor slab structure |
Non-Patent Citations (1)
Title |
---|
李秋义,高嵩,薛山: "《绿色混凝土技术》", 中国建材工业出版社, pages: 139 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108858739A (en) * | 2018-06-25 | 2018-11-23 | 青岛农业大学 | A kind of regenerated aggregate concrete prestressing force superimposed sheet preparation method |
CN109877940A (en) * | 2019-04-10 | 2019-06-14 | 赵德云 | The production of prefabricated board, lifting and secondary pour integrated apparatus and construction method |
CN112982809A (en) * | 2021-02-09 | 2021-06-18 | 电联工程技术股份有限公司 | High-strength environment-friendly prefabricated slab and manufacturing method thereof |
CN113062515A (en) * | 2021-03-30 | 2021-07-02 | 浙江泛华工程咨询有限公司 | Light cavity floor slab, mold and machining process |
CN113062515B (en) * | 2021-03-30 | 2022-06-07 | 浙江泛华工程咨询有限公司 | Light cavity floor slab, mold and machining process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20180340334A1 (en) | Method of construction process of a reinforced compound concrete beam containing demolished concrete lumps | |
CN106522440A (en) | Composite floor slab based on polyphenyl granule fiber concrete sandwich insulation and construction method | |
CN107972173A (en) | Regeneration concrete precast floor slab structure and production method | |
CN103615053B (en) | Monolithic reinforced concrete structure post empiricism engineering method | |
CN106284044A (en) | A kind of Novel steel concrete composite bridge and construction method thereof | |
CN103321257A (en) | Anti-cracking seepage-proof construction method for ultra-long mass concrete structure basement | |
CN101285330A (en) | Environment protection type structure thermal insulation concrete block, masonry and method for anti-knock domestic architecture | |
US20170253526A1 (en) | Axial compression steel tubular column with internal local restraint and filled with high strengthen compound concrete containing normal-strength demolished concrete lumps and construction process of such column | |
CN105401654A (en) | Environment-friendly assembled type ecological house and construction method thereof | |
CN102806592B (en) | Manufacturing method for demolition-free textile fiber web reinforced concrete formwork | |
CN104499498B (en) | A kind of construction method of mass concrete building | |
CN106437034A (en) | Steel tube and semi-prefabricated semi-cast-in-place construction waste recycled concrete combined column and preparation method thereof | |
CN203430021U (en) | Split-free polyurethane composite heat insulation template for pouring concrete | |
CN107905424A (en) | Full prefabricated band splicing groove unidirectional harden structure, making and assembly method | |
CN101880141A (en) | Wall form integrated board and manufacturing method thereof | |
CN207522824U (en) | A kind of regeneration concrete precast floor slab structure | |
CN206737210U (en) | A kind of non-dismantling formwork | |
CN107938928A (en) | A kind of assembled light composite floor and preparation method thereof | |
CN104631664A (en) | Construction method for controlling cracking of concrete wall | |
CN108018972A (en) | Full precast floor slab and laminated floor slab combining structure, making and assembly method | |
CN101831971B (en) | Concrete shear wall with short piers | |
CN206205232U (en) | Laminated floor slab based on granular polystyrene fibre concrete sandwiched thermal insulating | |
CN105544829A (en) | Steel fiber regeneration brick granule concrete single-rib baseboard composite floor slab and manufacturing method thereof | |
CN207739500U (en) | A kind of assembled light composite floor | |
CN101806112B (en) | Preparation method of cast-in-situ concrete hollow slab |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180501 |