CN206127991U - A flood fighting brick for river course protection - Google Patents

A flood fighting brick for river course protection Download PDF

Info

Publication number
CN206127991U
CN206127991U CN201621130364.2U CN201621130364U CN206127991U CN 206127991 U CN206127991 U CN 206127991U CN 201621130364 U CN201621130364 U CN 201621130364U CN 206127991 U CN206127991 U CN 206127991U
Authority
CN
China
Prior art keywords
brick
brick body
type
raised
flood fighting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621130364.2U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201621130364.2U priority Critical patent/CN206127991U/en
Application granted granted Critical
Publication of CN206127991U publication Critical patent/CN206127991U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a flood fighting brick for river course protection, which comprises a brick body, the front side of the brick body is equipped with L type arch, first one of the brick body is located to a L type arch, the bellied height of a L type is lighter than the height of the brick body, the rear side of the brick body is equipped with the 2nd L type arch, the lower half of the brick body is located to the 2nd L type arch, the bellied height of the 2nd L type is lighter than the height of the brick body, protruding and the protruding phase -match of the 2nd L type of a L type, the symmetric distribution has the corner protruding on the top surface of the brick body, the symmetric distribution has the corner recess on the bottom surface of the brick body, corner recess and the protruding phase -match of corner. The utility model has the advantages of simple structure, construction convenience, installation set close the flexibility, and the shore protection intensity of building by laying bricks or stones is high, and structural stability is strong, and shock resistance is strong, effectively protects the river to carry, improve the anti -flood capacity in river course.

Description

A kind of flood fighting brick for channel protection
Technical field
This utility model belongs to hydraulic engineering field, more particularly to a kind of flood fighting brick for channel protection.
Background technology
For construction of modern beauty new rural village, rivers environment is renovated, combing Zhen Cun rivers also blue montains and green waters is the new agriculture of propulsion The important step of village's river improvement, many rivers are in bad repair for many years, from un-dredged, add older soil erosion and narrow and shoal, mud Horizontal filling, in length and breadth, some river courses are blocked brambles, some places fish and shrimp extinction, and some places are into open dump, summer foul smell Soaring, ecological situation is increasingly serious.
At present, the wall on the ground such as park, the dykes and dams of reservoir, the shore protection in rivers and creeks, the inclined-plane of road, mostly using concrete Brick, concrete wall are constructed based on laying bricks, and this is the result for giving priority to soil stabilization and inclined plane protection.Existing concrete Brick is generally the solid shape of square, and it is internal without hole, is typically made up of cement, aggregate, Sha Heshui.Build a river levee institute It is to make both link into an integrated entity casting cement between two pieces of bricks, brick is solid heavier-weight, operation inconvenience is not allowed readily removable yet Remove, produced is relatively costly, work huge the spent time is also longer, and because pour into an integrated entity so that intensity not Height, stability is poor, and service life is shorter, regularly needs repairing;At the incoming tide the fish and shrimp in river can be flushed on river levee by tidewater, ebb Afterwards the fish and shrimp on river levee are died because lacking water, so as to cause river in fish and shrimp extinction etc. phenomenon.
Utility model content
This utility model purpose is to solve above-mentioned technical problem present in prior art, there is provided a kind of anti-for river course The flood fighting brick of shield, with simple structure, easy construction, installs the shore protection intensity height that combination is flexible, builds by laying bricks or stones, structural stability By force, shock resistance is strong, and effective protection river carries, and improves the anti-flood capacity in river course.
In order to solve above-mentioned technical problem, this utility model is adopted the following technical scheme that:
A kind of flood fighting brick for channel protection, including brick body, it is characterised in that:The first L-type is provided with front side of brick body convex Rise, the raised first half located at brick body of the first L-type, the raised height of the first L-type is provided with less than the height of brick body on rear side of brick body Second L-type is raised, and the raised lower half located at brick body of the second L-type, the raised height of the second L-type is less than the height of brick body, a L Type projection matches with the second L-type projection, and corner projection is symmetrically distributed with the top surface of brick body, symmetrical on the bottom surface of brick body There is corner groove, corner groove matches with corner projection;The flood fighting brick has simple structure, and combination spirit is installed in easy construction Living, the shore protection intensity built by laying bricks or stones is high, and structural stability is strong, and shock resistance is strong, and effective protection river carries, and improves the flood fighting energy in river course Power.
Further, the side of brick body is provided with connection bump, and the opposite side of brick body is provided with stopper slot, stopper slot and connection bump Match, when ecological brick is piled up in left and right, the ecological brick of side is clamped on the spacing of adjacent side ecological brick by connection bump In groove, the screens connection of the adjacent ecological brick in left and right is realized, increase stability overall after piling up, the shearing resistance for increasing ecological brick heap is strong Degree, improves crashworthiness.
Further, the top surface of brick body is provided with positioning convex, and the bottom surface of brick body is provided with location hole, location hole and convex Rise and match, when ecological brick is piled up up and down, the positioning convex on the ecological brick top surface being below is stuck in top In location hole on ecological brick bottom surface, mutually pin down, be difficult to disengage, increased the stability after ecological block is piled up up and down.
Further, the both sides of brick body are equipped with square groove, and square groove synthesizes one when the adjacent two pieces of ecological bricks in left and right are piled up Complete slip casting passage, the grout injection into the slip casting passage so that two pieces of left and right brick body is bonded into one are stable firm.
Further, Anchoring recess is transversely provided with brick body, Anchoring recess is semicircular arc, is conducive to the ecology built by laying bricks or stones up and down Anchoring recess between brick forms complete toroidal, convenient to fix, and increases the permeability built by laying bricks or stones between rear ecological brick.
Further, brick body is provided with the air-vent of left and right insertion, increases the contact area of brick body and air, accelerates air and hands over Efficiency is changed, so as to improve the breathability and heat stability of brick body.
Further, brick body is provided with stock tank ditch, the grout injection into stock tank ditch so that upper and lower two pieces of brick bodies are bonded into one Body, improves stability when ecological brick is piled up up and down.
Further, the first L-type projection is provided with the first arcwall face, and the second arcwall face, the second arc are provided with rear side of brick body Face matches with the first arcwall face, and the first arcwall face and the second arcwall face all play beautiful decoration effect, and ecology is piled up before and after During brick, the mutual steady conjunction of the first arcwall face and the second arcwall face so that in front and back the contact surface between adjacent ecological brick is changed into soft Property, the bump effect produced between adjacent ecological brick before and after buffering is played, so as to protect brick body, the first arcwall face is also as gear The water surface, plays the souring for keeping out river.
This utility model has the advantages that as a result of above-mentioned technical proposal:
The first L-type projection matches with the second L-type projection in this utility model, when piling up ecological brick before and after, will be in The termination that second L-type of front ecological brick is raised is stuck in the raised groove of the first L-type in rear ecological brick, while first The raised termination of L-type is just also stuck in the raised groove of the second L-type, and ecological brick is mutually pind down before and after realization, is difficult to disengage, It is mutually twisted integral, stability height, the now mutual steady conjunction of the first arcwall face and the second arcwall face so that adjacent life in front and back Contact surface between state brick is changed into flexible, the bump effect produced between adjacent ecological brick before and after buffering is played, so as to protect Brick body, the first arcwall face also as obstructing surface, plays the souring for keeping out river;Corner is symmetrically distributed with the top surface of brick body Projection, is symmetrically distributed with corner groove on the bottom surface of brick body, when ecological brick is piled up up and down, by the ecological brick top surface being below On corner projection be stuck in the corner groove on the ecological brick bottom surface of top, mutually pin down, it is not easy to which horizontal position occurs Move, increased the stability after ecological block is piled up up and down;This utility model has simple structure, and combination is installed in easy construction Flexibly, the shore protection intensity built by laying bricks or stones is high, and structural stability is strong, and shock resistance is strong, and effective protection river carries, and improves the flood fighting in river course Ability.
Description of the drawings
Below in conjunction with the accompanying drawings the utility model is described in further detail:
Fig. 1 is a kind of structural representation of the flood fighting brick for channel protection of this utility model;
Fig. 2 be Fig. 1 in A to structural representation;
Fig. 3 is the top view of Fig. 1;
Fig. 4 is the upward view of Fig. 1;
Fig. 5 be this utility model in brick body build by laying bricks or stones after structural representation.
In figure:1- brick bodies;2- air-vents;3- stock tank ditches;4- Anchoring recess;5- connection bumps;6- stopper slots;7- is square Groove;The L-types of 8- first are raised;The L-types of 9- second are raised;The arcwall faces of 10- first;The arcwall faces of 11- second;12- corners are raised;13- turns Angle groove;14- positioning convex;15- location holes.
Specific embodiment
As shown in Figures 1 to 5, it is a kind of flood fighting brick for channel protection of this utility model, including brick body 1, in brick body 1 The air-vent 2 of left and right insertion is provided with, increases the contact area of brick body 1 and air, accelerate air change efficiency, so as to improve brick body 1 breathability and heat stability.Brick body 1 is provided with stock tank ditch 3, the grout injection into stock tank ditch 3 so that upper and lower two pieces of brick bodies 1 is bonded into one, and improves stability when ecological brick is piled up up and down.Anchoring recess 4 is transversely provided with brick body 1, Anchoring recess 4 is in Semicircle arcuation, is conducive to the Anchoring recess 4 between the ecological brick built by laying bricks or stones up and down to form complete toroidal, convenient to fix, and increases Plus build permeability between rear ecological brick by laying bricks or stones.
The side of brick body 1 is provided with connection bump 5, and the opposite side of brick body 1 is provided with stopper slot 6, stopper slot 6 and connection bump 5 Match, when ecological brick is piled up in left and right, the ecological brick of side is clamped on the spacing of adjacent side ecological brick by connection bump 5 In groove 6, the screens connection of the adjacent ecological brick in left and right is realized, increase stability overall after piling up increases the shearing resistance of ecological brick heap Intensity, improves crashworthiness.The both sides of brick body 1 are equipped with square groove 7, and square groove 7 is closed when the adjacent two pieces of ecological bricks in left and right are piled up Into a complete slip casting passage, the grout injection into the slip casting passage so that two pieces of left and right brick body 1 is bonded into one, surely It is fixed firm.
The front side of brick body 1 is provided with the first L-type projection 8, and the first L-type raised 8 is located at the first half of brick body 1, and the first L-type is raised 8 height is less than the height of brick body 1, and the rear side of brick body 1 is provided with the second L-type projection 9, and the second L-type raised 9 is under brick body 1 Half portion, the height of the second L-type projection 9 is less than the height of brick body 1, and the first L-type raised 8 matches with the second L-type projection 9, front After when piling up ecological brick, the termination of the second L-type projection 9 in front ecological brick is stuck in the L in rear ecological brick In the groove of type projection 8, while the termination of the first L-type projection 8 is just also stuck in the groove of the second L-type projection 9, before and after realization Mutually pining down for ecological brick, is difficult to disengage, and is mutually twisted integral, stability height.First L-type projection 8 is provided with the first arc Face 10, the rear side of brick body 1 is provided with the second arcwall face 11, and the second arcwall face 11 matches with the first arcwall face 10, the first arcwall face 10 and second arcwall face 11 all play beautiful decoration effect, when piling up ecological brick before and after, the first arcwall face 10 and the second arc The mutual steady conjunction in face 11 so that in front and back the contact surface between adjacent ecological brick is changed into flexible, plays adjacent ecology before and after buffering The bump effect produced between brick, so as to protect brick body 1, the first arcwall face 10 to play and keep out river also as obstructing surface Souring.
Corner projection 12 is symmetrically distributed with the top surface of brick body 1, corner groove 13 is symmetrically distributed with the bottom surface of brick body 1, Corner groove 13 matches with corner projection 12, when ecological brick is piled up up and down, by turning on the ecological brick top surface being below Angle projection 12 is stuck in the corner groove 13 on the ecological brick bottom surface of top, it is not easy to which lateral displacement occurs, and stability is high. The top surface of brick body 1 is provided with positioning convex 14, and the bottom surface of brick body 1 is provided with location hole 15, location hole 15 and the phase of positioning convex 14 Matching, when ecological brick is piled up up and down, the positioning convex 14 on the ecological brick top surface being below is stuck in the life in top In location hole 15 on state brick bottom surface, mutually pin down, be difficult to disengage, increased the stability after ecological block is piled up up and down.
The first L-type raised 8 matches with the second L-type projection 9 in this utility model, when piling up ecological brick before and after, will locate It is stuck in the groove in the first L-type projection 8 of rear ecological brick in the termination of the second L-type projection 9 of front ecological brick, while The termination of the first L-type projection 8 is just also stuck in the groove of the second L-type projection 9, and ecological brick is mutually pind down before and after realization, no Easily disengage, be mutually twisted integral, stability height, the now mutual steady conjunction of the first arcwall face 10 and the second arcwall face 11 so that In front and back the contact surface between adjacent ecological brick is changed into flexible, plays the collision produced between adjacent ecological brick before and after buffering and makees With so as to protect brick body 1, the first arcwall face 10 also as obstructing surface, to play the souring for keeping out river;The top of brick body 1 Corner projection 12 is symmetrically distributed with face, corner groove 13 is symmetrically distributed with the bottom surface of brick body 1, ecological brick is being piled up up and down When, the corner projection 12 on the ecological brick top surface being below is stuck in into the corner groove 13 on the ecological brick bottom surface of top It is interior, mutually pin down, it is not easy to which lateral displacement occurs, increased the stability after ecological block is piled up up and down;This utility model has There is simple structure, the shore protection intensity height that combination is flexible, builds by laying bricks or stones is installed in easy construction, and structural stability is strong, shock resistance By force, effective protection river carries, and improves the anti-flood capacity in river course.
Specific embodiment of the utility model is these are only, but technical characteristic of the present utility model is not limited thereto.Appoint How it is to solve essentially identical technical problem based on this utility model, realizes essentially identical technique effect, it is done Simple change, equivalent or modification etc., among being all covered by protection domain of the present utility model.

Claims (8)

1. a kind of flood fighting brick for channel protection, including brick body, it is characterised in that:The first L-type is provided with front side of brick body Projection, the raised first half located at brick body of first L-type, the raised height of first L-type is less than brick body Highly, the second L-type is provided with rear side of brick body raised, the raised lower half located at brick body of second L-type, described the The raised height of two L-types is less than the height of brick body, and first L-type is raised to match with the second L-type projection, described Corner is symmetrically distributed with the top surface of brick body raised, corner groove is symmetrically distributed with the bottom surface of brick body, the corner is recessed Groove matches with the corner projection.
2. a kind of flood fighting brick for channel protection according to claim 1, it is characterised in that:The side of brick body sets The opposite side for having connection bump, brick body is provided with stopper slot, and the stopper slot matches with the connection bump.
3. a kind of flood fighting brick for channel protection according to claim 1, it is characterised in that:On the top surface of brick body Positioning convex is provided with, the bottom surface of brick body is provided with location hole, and the location hole matches with the positioning convex.
4. a kind of flood fighting brick for channel protection according to claim 1, it is characterised in that:The both sides of brick body are equal It is provided with square groove.
5. a kind of flood fighting brick for channel protection according to claim 1, it is characterised in that:Laterally set in brick body There is Anchoring recess.
6. a kind of flood fighting brick for channel protection according to claim 1, it is characterised in that:Brick body is provided with a left side The air-vent of right insertion.
7. a kind of flood fighting brick for channel protection according to claim 1, it is characterised in that:Brick body is provided with slurry Groove.
8. a kind of flood fighting brick for channel protection according to claim 1, it is characterised in that:First L-type is raised The first arcwall face is provided with, the second arcwall face, second arcwall face and first arcwall face are provided with rear side of brick body Match.
CN201621130364.2U 2016-10-15 2016-10-15 A flood fighting brick for river course protection Expired - Fee Related CN206127991U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621130364.2U CN206127991U (en) 2016-10-15 2016-10-15 A flood fighting brick for river course protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621130364.2U CN206127991U (en) 2016-10-15 2016-10-15 A flood fighting brick for river course protection

Publications (1)

Publication Number Publication Date
CN206127991U true CN206127991U (en) 2017-04-26

Family

ID=58573410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621130364.2U Expired - Fee Related CN206127991U (en) 2016-10-15 2016-10-15 A flood fighting brick for river course protection

Country Status (1)

Country Link
CN (1) CN206127991U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109306678A (en) * 2017-07-26 2019-02-05 天津市水利科学研究院 A kind of hollow ventilated antiseepage revetment brick and its moulding process

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109306678A (en) * 2017-07-26 2019-02-05 天津市水利科学研究院 A kind of hollow ventilated antiseepage revetment brick and its moulding process

Similar Documents

Publication Publication Date Title
CN202284289U (en) Combined ecological river bank revetment structure
CN104060619A (en) Construction method and structure of hydraulic core-wall rockfill dam without cofferdams
CN206127992U (en) Mutual -nesting type ecological building block
CN114718012A (en) Composite dyke body ecological sea dike structure on soft soil foundation and construction method thereof
CN206127991U (en) A flood fighting brick for river course protection
CN106759093A (en) T-shaped mixture of piles and concrete wall formula retaining wall and riverbank berm
CN207582477U (en) A kind of concrete cofferdam and earth rock cofferdam combined cofferdam
CN206127993U (en) A ecological brick for protecting river levee
CN110894714B (en) Hydraulic engineering protection river bank and protection method thereof
CN209555882U (en) A kind of hydraulic engineering ecological protection slope
CN205116095U (en) Chain concrete slab piece
CN205875085U (en) A ecological brick for ecological bank protection
CN107956216A (en) A kind of inter-embedding type ecological block
CN206189348U (en) A ecological brick for river levee soil and water conservation
CN207553030U (en) It is a kind of to reinforce permeable water conservancy diversion groynes
CN106522163A (en) Ecological brick for riverway
CN205875086U (en) A ecological brick for side slope protection
CN216194457U (en) Ecological slope protection structure of hydraulic engineering
CN215801392U (en) Ecological pine-imitating pile view revetment
CN107956215A (en) A kind of flood fighting brick for channel protection
CN210917227U (en) Hydraulic engineering slope protection structure
CN210013225U (en) Side slope with greening and water draining functions
CN207846344U (en) One kind being used for bank of river composite permeable building block
CN201962646U (en) Ecological sandy soil dike structure
CN206273887U (en) A kind of ecological brick for river course

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170426

Termination date: 20171015