CN205875086U - A ecological brick for side slope protection - Google Patents

A ecological brick for side slope protection Download PDF

Info

Publication number
CN205875086U
CN205875086U CN201620751224.0U CN201620751224U CN205875086U CN 205875086 U CN205875086 U CN 205875086U CN 201620751224 U CN201620751224 U CN 201620751224U CN 205875086 U CN205875086 U CN 205875086U
Authority
CN
China
Prior art keywords
brick
brick body
ecological
groove
ladder type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620751224.0U
Other languages
Chinese (zh)
Inventor
刘学应
周杰
沈佳辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University of Water Resources and Electric Power
Original Assignee
Zhejiang University of Water Resources and Electric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University of Water Resources and Electric Power filed Critical Zhejiang University of Water Resources and Electric Power
Priority to CN201620751224.0U priority Critical patent/CN205875086U/en
Application granted granted Critical
Publication of CN205875086U publication Critical patent/CN205875086U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses an ecological brick for side slope protection, including the brick body, the rear side of the brick body is equipped with the native portion that keeps off, is equipped with go back to the type groove on the top surface of the brick body, returns the type inslot and is equipped with the boss, and the symmetric distribution has the rectangle protruding on the boss, is equipped with the recess on the bottom surface of the brick body, and the recess is corresponding with the rectangle arch, and one side of the brick body is equipped with ladder type ka tai, and the opposite side of the brick body is equipped with two card strips, forms ladder type draw -in groove, ladder type draw -in groove and ladder type card platform phase -match between two card strips. The utility model has the advantages of simple structure, construction simple to operate, stability is high, and the manger plate is effectual, and the ecological bank protection intensity of building by laying bricks or stones is high.

Description

A kind of ecological brick for side slope protection
Technical field
This utility model belongs to water construction field of material technology, particularly relates to a kind of ecological brick for side slope protection.
Background technology
For construction of modern beauty new rural village, renovate rivers environment, combing Zhen Cun river also blue montains and green waters, be to advance new agriculture The important step of village's river improvement, a lot of rivers are the most in bad repair, from un-dredged, add long soil erosion last year and narrow and shoal, mud Horizontal filling, in length and breadth, some river courses block brambles, some places fish and shrimp extinction, and some places have become open dump, summer foul smell Soaring, ecological situation is increasingly serious.
At present, the wall on the ground such as park, the dykes and dams of reservoir, the shore protection in rivers and creeks, the inclined-plane of road, mostly use concrete Brick, concrete wall or to lay bricks be main construction, this is to give priority to soil stabilization and the result of inclined plane protection.Existing concrete Brick is generally the solid shape of square, does not has hole, be typically made up of cement, aggregate, Sha Heshui inside it.Build a river levee institute Being to make both link into an integrated entity casting cement between two pieces of bricks, brick is solid heavier-weight, operation inconvenience, does not also allow readily removable Removing, produced relatively costly, work huge the spent time is the longest, and because pouring into an integrated entity so that intensity not Height, poor stability, service life is shorter, and timing needs repairing;Fish and shrimp in river can be flushed in side slope by tidewater at the incoming tide, ebb Fish and shrimp in rear side slope are died because lacking water, thus cause the phenomenon such as fish and shrimp extinction in river.
Utility model content
This utility model purpose is to solve above-mentioned technical problem present in prior art, it is provided that a kind of anti-for side slope The ecological brick protected, has simple in construction, and construction and installation are convenient, and stability is high, and dash is effective, the ecological revetment intensity built by laying bricks or stones High advantage.
In order to solve above-mentioned technical problem, this utility model adopts the following technical scheme that
A kind of ecological brick for side slope protection, including brick body, the rear side of brick body is provided with gear soil portion, it is characterised in that: brick The end face of body is provided with hollow groove, is provided with boss in hollow groove, and boss is symmetrically distributed with rectangular preiection, and the bottom surface of brick body sets Fluted, groove is corresponding with rectangular preiection, and the side of brick body is provided with ladder type chuck, and the opposite side of brick body is provided with two card articles, Forming ladder type draw-in groove between two card articles, ladder type draw-in groove matches with ladder type chuck;This ecological brick has simple in construction, construction peace Dress is convenient, and stability is high, and dash is effective, the advantage that the ecological revetment intensity built by laying bricks or stones is high.
Further, the side in gear soil portion is provided with tapered, and the opposite side in gear soil portion is provided with stopper slot, stopper slot and tapered Corresponding, when ecological brick is piled up in left and right, the ecological brick of side blocks the tapered of adjacent side ecological brick by stopper slot is spacing Platform, mutually pins down, it is impossible to disengage, it is achieved the screens of the adjacent ecological brick in left and right connects, and increases stability overall after piling up, and increases The shearing strength of ecological brick heap, improves crashworthiness.
Further, the end face of brick body is provided with positioning convex, and the bottom surface of brick body is provided with hole, location, hole, location and convex Rise corresponding, when piling up ecological brick up and down, the positioning convex of the ecological brick being below is stuck in the ecological brick being in top In hole, location on bottom surface, so make upper and lower ecological brick be difficult to disengage, add stability when ecological brick is piled up up and down, side Just workmen's construction working, improves efficiency of construction, shortens the construction period, reduces cost.
Further, brick body is provided with passage, and passage extends transversely through brick body, strengthens the gas exchange rate of brick body, improves The breathability of ecological brick and heat stability, increase the service life.
Further, the front side of brick body is provided with arc buffering face, and arc buffering face not only acts as the souring keeping out river, Also act as the effect of decoration bank protection, improve enjoying value.
Further, between brick body and gear soil portion, it is provided with lozenges, when ecological brick is piled into ecological revetment, phase up and down Forming half opening space between the lozenges of adjacent ecological brick, this half opening space can become Fish and lay eggs, takes refuge, water plant The place of growth, effectively makes the ecological environment of side slope land and water ecology and landscape.
Further, the length of groove is more than the length of boss, when ecological brick is piled into ecological revetment, by be below The symmetrical rectangular projection of ecological brick is stuck in the groove on the ecological brick bottom surface being in top, and ecological revetment is by constantly by river Wash away, it may occur that transverse shifting, this offset deviation of the gap filling left between groove and boss so that ecological revetment Stability be greatly improved.
This utility model, owing to have employed technique scheme, has the advantages that
Being symmetrically distributed with rectangular preiection in this utility model on boss, the bottom surface of brick body is provided with groove, groove and rectangle Protruding corresponding, when ecological brick is piled into ecological revetment, two symmetrical rectangular projections of the ecological brick being below are stuck in It is in the groove on the ecological brick bottom surface of top, so makes neighbouring ecological brick be difficult to disengage, and the length of groove More than the length of boss, the ecological revetment after piling up constantly is washed away by river for a long time, it may occur that transverse shifting, and groove is with convex This offset deviation of the gap filling left between platform so that the stability of ecological revetment is greatly improved;The side of brick body sets Having ladder type chuck, the opposite side of brick body is provided with two card articles, forms ladder type draw-in groove, ladder type draw-in groove and ladder type card between two card articles Platform matches, when ecological brick is piled up in left and right, and the ecological brick of the side ladder type by ladder type draw-in groove clamping adjacent side ecological brick Chuck, it is achieved the screens of the adjacent ecological brick in left and right connects, increases stability overall after piling up, and makes shape between brick body up and down Become a flexible entirety, increase the shearing strength of ecological brick, improve crashworthiness.
The end face of brick body is provided with positioning convex, and the bottom surface of brick body is provided with hole, location, and hole, location is relative with positioning convex Should, when piling up ecological brick up and down, the positioning convex of the ecological brick being below is stuck on the ecological brick bottom surface being in top Hole, location in, so make upper and lower ecological brick be difficult to disengage, add stability when ecological brick is piled up up and down, convenient construction Personnel's construction working, improves efficiency of construction, shortens the construction period, reduces cost.
This utility model simple in construction, construction and installation are convenient, and dash is effective, and the intensity of the ecological revetment built by laying bricks or stones is high, Good stability, ecological benefits are high, are available for Fish, aquatic plants growth, effectively protect side slope, improve the anti-flood capacity of side slope.
Accompanying drawing explanation
The utility model is described in further detail below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation of a kind of ecological brick for side slope protection of this utility model;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the upward view of Fig. 1;
Fig. 4 be in Fig. 1 A to structural representation;
Fig. 5 is the structural representation after brick body is piled up in this utility model.
In figure: 1-brick body;2-passage;3-arc buffering face;4-lozenges;5-hollow groove;6-boss;7-rectangle is convex Rise;8-groove;9-positioning convex;10-positions hole;11-ladder type chuck;12-card article;13-ladder type draw-in groove;14-keeps off soil portion;15- Tapered;16-stopper slot.
Detailed description of the invention
As shown in Figures 1 to 5, for a kind of ecological brick for side slope protection of this utility model, including brick body 1, in brick body 1 Being provided with passage 2, passage 2 extends transversely through brick body 1, strengthens the gas exchange rate of brick body 1, improves breathability and the heat of ecological brick Stability, increases the service life, and is mutually communicated through passage 2 between the ecological brick that left and right is adjacent after piling up, and breathability is higher.Brick The front side of body 1 is provided with arc buffering face 3, and arc buffering face 3 not only acts as the souring keeping out river, also acts as decoration bank protection Effect, improve enjoying value.The rear side of brick body 1 is provided with gear soil portion 14, is provided with lozenges 4 between brick body 1 and gear soil portion 14, when When ecological brick is piled into ecological revetment, forming half opening space between the lozenges 4 of the most adjacent ecological brick, this is half-open Mouthful space can become Fish and lay eggs, takes refuge, the place of aquatic plants growth, effectively makes side slope land and water ecology and landscape Ecological environment.
The end face of brick body 1 is provided with hollow groove 5, is provided with boss 6, boss 6 is symmetrically distributed with rectangular preiection in hollow groove 5 7, the bottom surface of brick body 1 is provided with groove 8, and groove 8 is corresponding with rectangular preiection 7, when ecological brick is piled into ecological revetment, at general Two symmetrical rectangular projections 7 of the ecological brick in lower section are stuck in the groove 8 on the ecological brick bottom surface being in top, so make Neighbouring ecological brick is difficult to disengage, and adds stability when ecological brick is piled up up and down.The length of groove 8 is more than boss 6 Length, when ecological brick is piled into ecological revetment, the symmetrical rectangular projection 7 of the ecological brick being below is stuck in be in top Ecological brick bottom surface on groove 8 in, ecological revetment is constantly washed away by river, it may occur that transverse shifting, groove 8 is with convex This offset deviation of the gap filling left between platform 6 so that the stability of ecological revetment is greatly improved.In hollow groove 5 Grout injection so that upper and lower two pieces of brick body are bonded into one, improves stability when brick body is piled up up and down.
The end face of brick body 1 is provided with positioning convex 9, and the bottom surface of brick body 1 is provided with hole 10, location, hole 10, location and convex Rise 9 corresponding, when piling up ecological brick up and down, the positioning convex 9 of the ecological brick being below is stuck in the ecology being in top In hole, location 10 on brick bottom surface, so make upper and lower ecological brick be difficult to disengage, add stablizing when ecological brick is piled up up and down Property, convenient construction personnel's construction working, improves efficiency of construction, shortens the construction period, reduce cost.
The side of brick body 1 is provided with ladder type chuck 11, and the opposite side of brick body 1 is provided with two card articles 12, between two card articles 12 Forming ladder type draw-in groove 13, ladder type draw-in groove 13 matches with ladder type chuck 11, and when ecological brick is piled up in left and right, the ecological brick of side leads to Cross the ladder type chuck 11 of ladder type draw-in groove 13 clamping adjacent side ecological brick, it is achieved the screens of the adjacent ecological brick in left and right connects, increase Stability overall after piling up and shearing strength.The side in gear soil portion 14 is provided with tapered 15, and the opposite side in gear soil portion 14 is provided with Stopper slot 16, stopper slot 16 is 15 corresponding with tapered, and when ecological brick is piled up in left and right, the ecological brick of side passes through stopper slot 16 Spacing block adjacent side ecological brick tapered 15, mutually pins down, it is impossible to disengage, it is achieved the screens of the adjacent ecological brick in left and right is even Connect, increase stability overall after piling up, increase the shearing strength of ecological brick heap, improve crashworthiness.
Being symmetrically distributed with rectangular preiection 7 in this utility model on boss 6, the bottom surface of brick body 1 is provided with groove 8, groove 8 with Rectangular preiection 7 is corresponding, when ecological brick is piled into ecological revetment, and two the symmetrical rectangular projections of ecological brick that will be below 7 are stuck in the groove 8 on the ecological brick bottom surface being in top, so make neighbouring ecological brick be difficult to disengage, and groove 8 Length more than the length of boss 6, the ecological revetment after piling up constantly is washed away by river for a long time, it may occur that transverse shifting, This offset deviation of the gap filling left between groove 8 and boss 6 so that the stability of ecological revetment is greatly improved;Brick The side of body 1 is provided with ladder type chuck 11, and the opposite side of brick body 1 is provided with two card articles 12, forms ladder type card between two card articles 12 Groove 13, ladder type draw-in groove 13 matches with ladder type chuck 11, and when ecological brick is piled up in left and right, the ecological brick of side passes through ladder type draw-in groove The ladder type chuck 11 of 13 clamping adjacent side ecological bricks, it is achieved the screens of the adjacent ecological brick in left and right connects, increases after piling up overall Stability, make to be formed between brick body 1 up and down a flexible entirety, increase the shearing strength of ecological brick, improve crashproof Performance.
This utility model simple in construction, construction and installation are convenient, and dash is effective, and the intensity of the ecological revetment built by laying bricks or stones is high, Good stability, ecological benefits are high, are available for Fish, aquatic plants growth, effectively protect side slope, improve the anti-flood capacity of side slope.
These are only specific embodiment of the utility model, but technical characteristic of the present utility model is not limited thereto.Appoint How based on this utility model, for solving essentially identical technical problem, it is achieved essentially identical technique effect, done Simple change, equivalent or modification etc., be all covered by among protection domain of the present utility model.

Claims (7)

1., for an ecological brick for side slope protection, including brick body, the rear side of brick body is provided with gear soil portion, it is characterised in that: The end face of brick body is provided with hollow groove, is provided with boss, described boss is symmetrically distributed with rectangular preiection in described hollow groove, The bottom surface of brick body is provided with groove, and described groove is corresponding with described rectangular preiection, and the side of brick body is provided with ladder type Chuck, the opposite side of brick body is provided with two card articles, between two described card articles formed ladder type draw-in groove, described ladder type draw-in groove with Described ladder type chuck matches.
A kind of ecological brick for side slope protection the most according to claim 1, it is characterised in that: the side in described gear soil portion Being provided with tapered, the opposite side in described gear soil portion is provided with stopper slot, described stopper slot with described tapered corresponding.
A kind of ecological brick for side slope protection the most according to claim 1, it is characterised in that: on the end face of brick body Being provided with positioning convex, the bottom surface of brick body is provided with hole, location, and hole, described location is corresponding with described positioning convex.
A kind of ecological brick for side slope protection the most according to claim 1, it is characterised in that: brick body is provided with logical Pore, described passage extends transversely through brick body.
A kind of ecological brick for side slope protection the most according to claim 1, it is characterised in that: the front side of brick body sets There is arc buffering face.
A kind of ecological brick for side slope protection the most according to claim 1, it is characterised in that: brick body and described gear Soil is provided with lozenges between portion.
A kind of ecological brick for side slope protection the most according to claim 1, it is characterised in that: the length of described groove is big Length in described boss.
CN201620751224.0U 2016-07-14 2016-07-14 A ecological brick for side slope protection Expired - Fee Related CN205875086U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620751224.0U CN205875086U (en) 2016-07-14 2016-07-14 A ecological brick for side slope protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620751224.0U CN205875086U (en) 2016-07-14 2016-07-14 A ecological brick for side slope protection

Publications (1)

Publication Number Publication Date
CN205875086U true CN205875086U (en) 2017-01-11

Family

ID=57695180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620751224.0U Expired - Fee Related CN205875086U (en) 2016-07-14 2016-07-14 A ecological brick for side slope protection

Country Status (1)

Country Link
CN (1) CN205875086U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108651060A (en) * 2017-03-29 2018-10-16 江苏聚慧科技有限公司 A kind of Ecological flowerpot brick

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108651060A (en) * 2017-03-29 2018-10-16 江苏聚慧科技有限公司 A kind of Ecological flowerpot brick

Similar Documents

Publication Publication Date Title
CN202284289U (en) Combined ecological river bank revetment structure
CN208167654U (en) A kind of ecology disappears wave type water conservancy protective slope structure
CN105507208A (en) Locking-type stacked ecological building block
CN103088787A (en) Construction method of ecological river bank
CN206127992U (en) Mutual -nesting type ecological building block
CN205116110U (en) Interlocking formula of shocking resistance ecological block
CN205875086U (en) A ecological brick for side slope protection
CN206189348U (en) A ecological brick for river levee soil and water conservation
CN110894714B (en) Hydraulic engineering protection river bank and protection method thereof
CN205875085U (en) A ecological brick for ecological bank protection
CN104695379A (en) Ecological river channel revetment structure
CN106522163A (en) Ecological brick for riverway
CN206127993U (en) A ecological brick for protecting river levee
CN107956216A (en) A kind of inter-embedding type ecological block
CN202055261U (en) Landslide-proofing retaining wall
CN205012282U (en) Novel ecology landscape bank protection system
CN206127991U (en) A flood fighting brick for river course protection
CN205100158U (en) Utilize vegetation to come scour prevention's ecology to add muscle net
CN209555882U (en) A kind of hydraulic engineering ecological protection slope
CN206273887U (en) A kind of ecological brick for river course
CN208363029U (en) A kind of hard revetment restoration of the ecosystem structure
CN203034420U (en) Ecological roof brick for river levee
CN206956656U (en) T-shaped mixture of piles and concrete wall formula retaining wall and channel revetment
CN201362840Y (en) Novel dam slope protection block
CN216787010U (en) Hydraulic engineering is with high-efficient durable flood bank

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170111

Termination date: 20170714

CF01 Termination of patent right due to non-payment of annual fee