CN206091299U - A floor buried sleeve fixing device for aluminum alloy template - Google Patents
A floor buried sleeve fixing device for aluminum alloy template Download PDFInfo
- Publication number
- CN206091299U CN206091299U CN201621098267.XU CN201621098267U CN206091299U CN 206091299 U CN206091299 U CN 206091299U CN 201621098267 U CN201621098267 U CN 201621098267U CN 206091299 U CN206091299 U CN 206091299U
- Authority
- CN
- China
- Prior art keywords
- circular steel
- steel plate
- steel sheet
- aluminum alloy
- buried
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model provides a floor buried sleeve fixing device for aluminum alloy template, include less bottom circular steel sheet (1) and great top circular steel sheet (2) of diameter of diameter of just taking the centre bore with the axle center, weld fixation nut (4) of centre bore position on bottom circular steel sheet (1), set up between bottom circular steel sheet (1) and top circular steel sheet (2) and bottom pre -buried steel sleeve pipe (5) of suit outside the circular steel sheet in bottom, the vertical bottom circular steel sheet (1) that passes, pre -buried steel sleeve pipe (5), screw rod (3) of fixation nut (4) and top circular steel sheet (2), join in marriage and adorn in screw rod both ends and adjusting nut (6) of terminal surface outside lieing in bottom circular steel sheet (1) and top circular steel sheet (2) respectively. The utility model provides an aluminum alloy template construction fixed insecure problem of buried sleeve of the time wearing the floor, but easy operation, convenience reuse.
Description
Technical field
This utility model is related to construction engineering technical field, is primarily adapted for use in the pre-buried of aluminum alloy mould plate floor service sleeve
It is fixed.
Background technology
With the development and building construction technology continuous improvement of society, aluminum alloy mould plate construction technology is obtained in architectural engineering
In having arrived positive popularization, particularly high residential building, the safety construction of quality and scene to structure brings pole
Big progress.Compared to plank sheathing, aluminum alloy mould plate possesses good strength and stiffness.At present using aluminum alloy mould plate construction
Adopt more mode and steel thimble is welded on reinforcing bar fixed, in concreting process middle sleeve the pressure of concrete and outer is subject to
Power is also easy to produce position skew, easily causes subsequent pipeline to install perpendicularity and deviation occurs.
The content of the invention
The purpose of this utility model be solve aluminum alloy mould plate construction in hydropower installation service sleeve be difficult to fixation,
It is also easy to produce the problem of position skew, there is provided a kind of simple, convenient, repeatable floor for aluminum alloy mould plate for utilizing is pre-
Bushing burying fixing device.
The purpose of this utility model is achieved by the following technical solution:
A kind of floor pre-buried sleeve fixing device for aluminum alloy mould plate, including concentric and diameter with centre bore compared with
Little bottom circular steel plate and the top circular steel plate being relatively large in diameter, the fixation for being welded in central hole location on bottom circular steel plate
Nut, it is arranged between bottom circular steel plate and top circular steel plate and pre-buried steel bushing that bottom is set in outside bottom circular steel plate
Manage, pass vertically through the screw rod of bottom circular steel plate, pre-buried steel thimble, fixing nut and top circular steel plate, be fitted to screw rod two
Hold and be located at respectively the adjusting nut of bottom circular steel plate and top circular steel plate outer face.
The thickness of bottom circular steel plate of the present utility model and top circular steel plate is 3mm, a diameter of 12mm of screw rod.
This utility model is made one kind and is fixed for aluminum alloy mould plate floor service sleeve using circular steel plate, split bolt
Device, can pass through adjusting screw rod on adjusting nut, fix to clamp upper and lower two pieces it is pre- between circular steel plate and circular steel plate
Bushing burying, so as to play a part of fixed service sleeve.Service sleeve is tightly placed in outside bottom circular steel plate, can avoid concrete
Middle cement mortar penetrates into from service sleeve edge.This utility model is worn the service sleeve of floor and is consolidated when solving aluminum alloy mould plate construction
Fixed unstable problem, compared to the mode being welded on service sleeve on beam reinforced steel bar, this utility model only needs 1 operator
Member can complete model sheetinstallat and dismounting.
Content of the present utility model is expanded on further with reference to Figure of description.
Description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the schematic diagram that this utility model is arranged on major structure of construction.
Specific embodiment
In the floor pre-buried sleeve fixing device for aluminum alloy mould plate as shown in Figure 1 and Figure 2, including concentric and band
The less bottom circular steel plate 1 of diameter in heart hole and be relatively large in diameter top circular steel plate 2, be welded on bottom circular steel plate 1
The fixing nut 4 of central hole location, it is arranged between bottom circular steel plate 1 and top circular steel plate 2 and bottom is set in bottom
Pre-buried steel thimble 5 outside circular steel plate, pass vertically through bottom circular steel plate 1, pre-buried steel thimble 5, fixing nut 4 and top circular
The screw rod 3 of steel plate 2, it is fitted to screw rod two ends and is located at the regulation of bottom circular steel plate 1 and the outer face of top circular steel plate 2 respectively
Nut 6.The thickness of bottom circular steel plate 1 and top circular steel plate 2 is 3mm, a diameter of 12mm of screw rod.
When making this utility model, first the home position of the pre-buried set steel thimble of correspondence and top are justified on aluminum alloy mould plate 7
Shape steel plate and bottom circular steel plate center drill diameter are the hole of φ 12mm, and fixing nut 4 is welded on into bottom circular steel plate
Central hole location, then respectively penetrate aluminum alloy mould plate 7, bottom circular steel plate 1 and fixing nut 4 with the screw rods 3 of φ 12, then twist
The adjusting nut 6 of tight screw rod bottom, makes bottom circular steel plate 1, screw rod 3 fix fastening with aluminum alloy mould plate 7.Treat structural beams slab
Before muscle colligation, the bottom of pre-buried steel thimble 5 of prior well cutting is sleeved on outside bottom circular steel plate, on pre-buried steel thimble 5
Top circular steel plate 2 is penetrated on screw rod 3, and tightens the adjusting nut 6 on screw rod top.After beam reinforced steel bar colligation is finished, casting beams
Hardened structure concrete eight, checks whether adjusting nut loosens in concreting process, tightens in time if any loosening.Concrete is poured
Build after finishing, orderly release top adjusting nut 6, top circular steel plate 1, screw rod 3, bottom circular steel plate 1 is with aluminium alloy mould
Plate 7 is removed, installed simultaneously.
This utility model simple structure, finished product is easy to make, installs, and can effectively solve the problem that pre-buried steel thimble is difficult to fix
In the problem of aluminum alloy mould plate, the fixed operability on aluminum alloy mould plate of service sleeve and steadiness are improve, using upper
Lower two pieces of circular steel plates, can effectively prevent the infiltration of cement mortar in concrete, it is to avoid traditional method is sealed using a large amount of adhesive plasters
The operating procedure of block sets channel closure, while reducing traditional welding fixes construction technology operation inconvenience, sleeve pipe is moved with structure reinforcing bars
Dynamic fixed unsteady problem.1 workman be it is operable, not only easy construction, reduce labour cost, moreover it is possible to by this device week
Turn to use, reduce construction cost.This utility model can respectively make the finished product of various models according to the diameter of pre-buried pipeline, convenient
Use.
Claims (2)
1. a kind of floor pre-buried sleeve fixing device for aluminum alloy mould plate, it is characterised in that including concentric and band center
The less bottom circular steel plate (1) of diameter in hole and the top circular steel plate (2) being relatively large in diameter, it is welded in bottom circular steel plate
(1) fixing nut (4) of central hole location on, it is arranged between bottom circular steel plate (1) and top circular steel plate (2) and bottom
The pre-buried steel thimble (5) that is set in outside bottom circular steel plate, pass vertically through bottom circular steel plate (1), pre-buried steel thimble (5), solid
Determine the screw rod (3) of nut (4) and top circular steel plate (2), be fitted to screw rod two ends and be located at respectively bottom circular steel plate (1) and
The adjusting nut (6) of top circular steel plate (2) outer face.
2. a kind of floor pre-buried sleeve fixing device for aluminum alloy mould plate according to claim 1, it is characterised in that
The thickness of the bottom circular steel plate (1) and top circular steel plate (2) is 3mm, a diameter of 12mm of screw rod (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621098267.XU CN206091299U (en) | 2016-09-30 | 2016-09-30 | A floor buried sleeve fixing device for aluminum alloy template |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621098267.XU CN206091299U (en) | 2016-09-30 | 2016-09-30 | A floor buried sleeve fixing device for aluminum alloy template |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206091299U true CN206091299U (en) | 2017-04-12 |
Family
ID=58482021
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621098267.XU Active CN206091299U (en) | 2016-09-30 | 2016-09-30 | A floor buried sleeve fixing device for aluminum alloy template |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206091299U (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106978901A (en) * | 2017-05-24 | 2017-07-25 | 湖北高企达建设有限公司 | A kind of anti-loosening embedded water stop joint and its built-in process |
CN107675881A (en) * | 2017-09-25 | 2018-02-09 | 中铁五局集团建筑工程有限责任公司 | A kind of detachable mounting kit and method applied to aluminum alloy mould plate built-in fitting |
CN108643565A (en) * | 2018-06-01 | 2018-10-12 | 中建二局第建筑工程有限公司 | Pre-buried threading casing under aluminum dipping form system and its application method |
CN109025278A (en) * | 2018-07-26 | 2018-12-18 | 重庆新久融科技有限公司 | A kind of fixed device of the pre-buried orifice of aluminum alloy mould plate and its application method |
CN109989581A (en) * | 2019-05-08 | 2019-07-09 | 广东众科建筑技术发展有限公司 | Aluminum alloy mould plate system reserves climbing frame hole pre-embedded device |
CN110094055A (en) * | 2019-06-17 | 2019-08-06 | 中国建筑第七工程局有限公司 | A kind of fixed engineering method of service sleeve and fixed device |
CN110107088A (en) * | 2019-05-15 | 2019-08-09 | 五冶集团上海有限公司 | A kind of steel sleeve Embedment Construction technique |
CN110118015A (en) * | 2018-02-07 | 2019-08-13 | 五冶集团上海有限公司 | The embedding casing methods of aperture on a kind of concrete floor |
-
2016
- 2016-09-30 CN CN201621098267.XU patent/CN206091299U/en active Active
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106978901A (en) * | 2017-05-24 | 2017-07-25 | 湖北高企达建设有限公司 | A kind of anti-loosening embedded water stop joint and its built-in process |
CN107675881A (en) * | 2017-09-25 | 2018-02-09 | 中铁五局集团建筑工程有限责任公司 | A kind of detachable mounting kit and method applied to aluminum alloy mould plate built-in fitting |
CN110118015A (en) * | 2018-02-07 | 2019-08-13 | 五冶集团上海有限公司 | The embedding casing methods of aperture on a kind of concrete floor |
CN108643565A (en) * | 2018-06-01 | 2018-10-12 | 中建二局第建筑工程有限公司 | Pre-buried threading casing under aluminum dipping form system and its application method |
CN109025278A (en) * | 2018-07-26 | 2018-12-18 | 重庆新久融科技有限公司 | A kind of fixed device of the pre-buried orifice of aluminum alloy mould plate and its application method |
CN109025278B (en) * | 2018-07-26 | 2021-07-06 | 重庆新久融科技有限公司 | Aluminum alloy template pre-buried hole piece fixing device and using method thereof |
CN109989581A (en) * | 2019-05-08 | 2019-07-09 | 广东众科建筑技术发展有限公司 | Aluminum alloy mould plate system reserves climbing frame hole pre-embedded device |
CN110107088A (en) * | 2019-05-15 | 2019-08-09 | 五冶集团上海有限公司 | A kind of steel sleeve Embedment Construction technique |
CN110094055A (en) * | 2019-06-17 | 2019-08-06 | 中国建筑第七工程局有限公司 | A kind of fixed engineering method of service sleeve and fixed device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206091299U (en) | A floor buried sleeve fixing device for aluminum alloy template | |
CN106677069B (en) | A kind of construction method of bridge pier integral formwork support one-shot forming structure | |
CN104631706B (en) | One kind exempts from form removal concrete column and its construction method | |
CN104895279B (en) | The cladding attachment structure and its construction method of precast wall panel and precast beam | |
CN107605177A (en) | The construction method of efficient precast floor slab and its independent support frame | |
CN109680830A (en) | Workshop section's shear wall sliding push mode peace tears formwork system and construction method open after deformation joint | |
CN206616862U (en) | Formwork root bracing means | |
CN102953546A (en) | Construction method for mounting deformation joint template at double walls | |
CN207063515U (en) | A kind of scalable aluminium frame template | |
CN110630011A (en) | Template reinforcing system for double shear walls at deformation joint and construction method thereof | |
CN107299773B (en) | Load bearing wall reinforcing construction method | |
CN102518300A (en) | Embedded conical bearing joint type steel structural support and construction method thereof | |
CN208777557U (en) | Exposed inversion reinforcing bar grout sleeve precast concrete column | |
CN207048312U (en) | Tool-type post formwork for Large area reinforced concrete post | |
CN206352340U (en) | Connecting node between precast concrete column and pedestal | |
CN206752693U (en) | A kind of assembled steel reinforced concrete column of stirrup encryption and post splicing node | |
CN105839851B (en) | Using the construction method for the prefabricated frame trestle that segmentation connection is formed | |
CN105952045B (en) | Floor construction method is poured after a kind of prestressing force | |
CN102364004A (en) | Concrete floor hole reserving device capable of being quickly assembled and disassembled | |
CN202509764U (en) | Template bracing structure for constructional column | |
CN209585348U (en) | Workshop section's shear wall sliding push mode peace tears formwork system open after deformation joint | |
CN215443119U (en) | ALC wallboard entrance to a cave pouring structure | |
CN206448272U (en) | Roadbed side slope arched framework one-time-shaped mould | |
CN215055279U (en) | Thickness control device for steel plate concrete shear wall symmetrical wall body | |
CN204781345U (en) | Two substructure drawknot muscle built -in fitting construction structures |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |