CN110107088A - A kind of steel sleeve Embedment Construction technique - Google Patents

A kind of steel sleeve Embedment Construction technique Download PDF

Info

Publication number
CN110107088A
CN110107088A CN201910404850.0A CN201910404850A CN110107088A CN 110107088 A CN110107088 A CN 110107088A CN 201910404850 A CN201910404850 A CN 201910404850A CN 110107088 A CN110107088 A CN 110107088A
Authority
CN
China
Prior art keywords
casing
steel sleeve
screw rod
reinforced
floor template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910404850.0A
Other languages
Chinese (zh)
Inventor
陈岳平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201910404850.0A priority Critical patent/CN110107088A/en
Publication of CN110107088A publication Critical patent/CN110107088A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/06Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The present invention relates to a kind of steel sleeve Embedment Construction techniques, comprising: is positioned by casing unwrapping wire, is then drilled at floor template cannula center;It puts casing well, screw rod will be reinforced and worn from inside pipe casing to floor template bottom;It carries out tightening reinforcing to screw rod is reinforced in floor template bottom;Circular casing cover board is made, then according to unwrapping wire, circular hole is bored in cover plate central, is then tightened on the cover board using nut reinforcing;After casing is installed, structure floor concrete pouring construction is carried out, the present invention accelerates construction speed, also ensures the quality requirement of casing and structure construction.

Description

A kind of steel sleeve Embedment Construction technique
Technical field
The present invention relates to technical field of building construction more particularly to a kind of steel sleeve Embedment Construction techniques.
Background technique
It periphery of spigot is utilized in the construction of flooring steel sleeve in engineering at present nails and fixed then tied up using iron wire The fixation of the fixed method progress casing of bundle, but the method constructed using which, need iron wire to penetrate floor, and Iron wire can not be removed at all, and steel sleeve is usually used in hoistway, toilet, kitchen, balcony etc. between boiled water room, and iron wire passes through position The place of setting can make floor there is infiltration hidden danger, and rises repairing is difficult, therefore use this method to structurally waterproof there are badly damaged, So far not there is no the construction method of other excellent effects.
Summary of the invention
In view of the above problems, the embodiment of the invention discloses a kind of steel sleeve Embedment Construction technique, building is avoided The seepage problem of plate, both accelerates construction speed, also ensures the quality requirement of casing and structure construction.
The embodiment of the invention discloses a kind of steel sleeve Embedment Construction techniques, comprising:
It is positioned by casing unwrapping wire, is then drilled at floor template cannula center;
It puts casing well, screw rod will be reinforced and worn from inside pipe casing to floor template bottom;
It carries out tightening reinforcing to screw rod is reinforced in floor template bottom;
Circular casing cover board is made, then according to unwrapping wire, circular hole is bored in cover plate central, is then added on the cover board using nut Admittedly tightening;
After casing is installed, structure floor concrete pouring construction is carried out.
The aperture to drill at floor template cannula center is 6mm, and the diameter for reinforcing screw rod is 6mm, and Circularhole diameter is 6mm。
It carries out tightening reinforcing to screw rod is reinforced using nut in floor template bottom.
Cover board is 20mm bigger than casing diameter.
The present invention has the advantage that
The present invention realizes under the premise of meeting casing installation requirement, avoids causing structure floor to seep water because of installation casing The problem of.The installation of structure floor steel sleeve is carried out using the present invention, casing fixation does not deviate, and with same using tradition The construction technology of iron wire binding, is most significantly just that of avoiding the seepage problem of floor, both accelerates construction speed, also ensure The quality requirement of casing and structure construction.
Detailed description of the invention
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, the present invention and its feature, outer Shape and advantage will become more apparent.Identical label indicates identical part in all the attached drawings.Not can according to than Example draws attached drawing, it is preferred that emphasis is shows the gist of the present invention.
Fig. 1 is floor template of embodiment of the present invention drilling schematic diagram.
Fig. 2 is that the embodiment of the present invention wears reinforcing screw rod schematic diagram.
Fig. 3 is that the embodiment of the present invention carries out tightening reinforcing schematic diagram in floor template bottom to screw rod is reinforced.
Fig. 4 is the fixed cover plate schematic diagram of the embodiment of the present invention.
Fig. 5 is that mixed mud of the embodiment of the present invention pours rear schematic diagram.
Specific embodiment
The structure in the present invention is further described with specific embodiment with reference to the accompanying drawing, but not as this The restriction of invention.
As shown in fig. 1~fig. 5, the embodiment of the invention discloses a kind of steel sleeve Embedment Construction techniques, comprising:
It is positioned by casing unwrapping wire, is then drilled at 1 center of floor template casing;
It puts casing 1 well, screw rod 2 will be reinforced and worn from inside pipe casing to 3 bottom of floor template;
It carries out tightening reinforcing to screw rod is reinforced in 1 bottom of floor template;
Circular casing cover board 5 is made, then according to unwrapping wire, circular hole is bored in cover plate central, then uses nut 4 on the cover board Reinforcing is tightened;
After casing is installed, structure floor concrete pouring construction is carried out.
It reinforces lead screw and plays the role of reinforcing sleeve, floor template and cover board intensity, prevent from deforming.It plays simultaneously fixed Effect.
The aperture to drill at floor template cannula center is 6mm, and the diameter for reinforcing screw rod is 6mm, and Circularhole diameter is 6mm。
It carries out tightening reinforcing using 4 pairs of reinforcing screw rods of nut in floor template bottom.
Cover board is 20mm bigger than casing diameter.
The present invention mode fixed instead of iron wire, seeps water after preventing iron wire from removing.Accelerate construction speed.
The present invention is applied in Yuyao blue light glorious north of a road side east side Hua Changlu plot residential estate project structure floor steel sleeve It is tested in work, expected design effect is fully achieved after tested.
Presently preferred embodiments of the present invention is described above.It is to be appreciated that the invention is not limited to above-mentioned Particular implementation, devices and structures not described in detail herein should be understood as gives reality with the common mode in this field It applies;Anyone skilled in the art, without departing from the scope of the technical proposal of the invention, all using the disclosure above Methods and technical content many possible changes and modifications are made to technical solution of the present invention, or be revised as equivalent variations etc. Embodiment is imitated, this is not affected the essence of the present invention.Therefore, anything that does not depart from the technical scheme of the invention, foundation Technical spirit of the invention any simple modifications, equivalents, and modifications made to the above embodiment, still fall within the present invention In the range of technical solution protection.

Claims (4)

1. a kind of steel sleeve Embedment Construction technique characterized by comprising
It is positioned by casing unwrapping wire, is then drilled at floor template cannula center;
It puts casing well, screw rod will be reinforced and worn from inside pipe casing to floor template bottom;
It carries out tightening reinforcing to screw rod is reinforced in floor template bottom;
Circular casing cover board is made, then according to unwrapping wire, circular hole is bored in cover plate central, is then reinforced and twisted using nut on the cover board Tightly;
After casing is installed, structure floor concrete pouring construction is carried out.
2. a kind of steel sleeve Embedment Construction technique as described in claim 1, which is characterized in that at floor template cannula center The aperture of drilling is 6mm, and the diameter for reinforcing screw rod is 6mm, Circularhole diameter 6mm.
3. a kind of steel sleeve Embedment Construction technique as described in claim 1, which is characterized in that use spiral shell in floor template bottom Mother carries out tightening reinforcing to screw rod is reinforced.
4. a kind of steel sleeve Embedment Construction technique as described in claim 1, which is characterized in that cover board is bigger than casing diameter 20mm。
CN201910404850.0A 2019-05-15 2019-05-15 A kind of steel sleeve Embedment Construction technique Pending CN110107088A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910404850.0A CN110107088A (en) 2019-05-15 2019-05-15 A kind of steel sleeve Embedment Construction technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910404850.0A CN110107088A (en) 2019-05-15 2019-05-15 A kind of steel sleeve Embedment Construction technique

Publications (1)

Publication Number Publication Date
CN110107088A true CN110107088A (en) 2019-08-09

Family

ID=67490353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910404850.0A Pending CN110107088A (en) 2019-05-15 2019-05-15 A kind of steel sleeve Embedment Construction technique

Country Status (1)

Country Link
CN (1) CN110107088A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201695679U (en) * 2010-06-02 2011-01-05 中国三冶集团有限公司第二建筑工程公司 Limiting device for concrete floorslab
CN102121315A (en) * 2011-01-07 2011-07-13 中建五局第三建设有限公司 Hole reserving construction method for tightly-fixed steel sleeve
CN202644990U (en) * 2012-06-01 2013-01-02 中建三局建设工程股份有限公司 Fixing device for reserved pipeline or hole template
CN206091299U (en) * 2016-09-30 2017-04-12 云南省建设投资控股集团有限公司 A floor buried sleeve fixing device for aluminum alloy template
CN106760514A (en) * 2017-01-23 2017-05-31 中国华冶科工集团有限公司 Downcomer hole to be provided service sleeve and built-in process

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201695679U (en) * 2010-06-02 2011-01-05 中国三冶集团有限公司第二建筑工程公司 Limiting device for concrete floorslab
CN102121315A (en) * 2011-01-07 2011-07-13 中建五局第三建设有限公司 Hole reserving construction method for tightly-fixed steel sleeve
CN202644990U (en) * 2012-06-01 2013-01-02 中建三局建设工程股份有限公司 Fixing device for reserved pipeline or hole template
CN206091299U (en) * 2016-09-30 2017-04-12 云南省建设投资控股集团有限公司 A floor buried sleeve fixing device for aluminum alloy template
CN106760514A (en) * 2017-01-23 2017-05-31 中国华冶科工集团有限公司 Downcomer hole to be provided service sleeve and built-in process

Similar Documents

Publication Publication Date Title
CN103924793B (en) Old house reinforcement structure and reinforcement means thereof
CN102776899B (en) Anti-floating structure of shallow-buried shield tunnel
CN105756059A (en) Back anchor type anti-floating anchor and construction method
CN103422501A (en) Anti-floating anchor structure in sand layer geology and construction method thereof
CN103556819A (en) Construction method for reserving constructional column holes in beam plate
CN209211748U (en) A kind of structure node of assembled ceiling radiating system
CN210917406U (en) Prestressing force soil nail assembled supporting construction
CN107435390A (en) The structure and construction method that a kind of steel structure keel combines with concrete prefabricated hanging plate
CN110107088A (en) A kind of steel sleeve Embedment Construction technique
CN107975248A (en) A kind of toilet leak method for maintaining
CN204001270U (en) A kind of reinforced concrete wall and masonry wall syndeton
CN206071050U (en) Mould is hung in a kind of pipeline pipe root closure
JP2008303608A (en) Steel pipe-soil cement composite pile
CN202755385U (en) Anti-floating structure of shallow-buried shield tunnel
CN205636744U (en) Position slip casting device is connected with bottom plate in ground even wall
CN205839812U (en) A kind of post-cast strip pretreatment unit
CN206337814U (en) A kind of plumbing hole to be provided sleeve pipe
CN106013143A (en) Anchor rod for underground engineering anti-floating system construction and construction method
CN103352568A (en) Method for building constructional column on foundation pad
CN207469520U (en) The structure that a kind of steel structure keel is combined with concrete prefabricated hanging plate
CN210066764U (en) Large-scale foundation pit supporting and waterproof structure
JP2007009980A (en) Real pipe sleeve with collar made of vinyl chloride
JP2013087603A (en) Immersion method for caisson
CN206844276U (en) A kind of pit shaft mounting structure of road inspection well
CN105839941B (en) A kind of wall body slit reinforced structure of epoxy resin slurry

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190809