CN103924793B - Old house reinforcement structure and reinforcement means thereof - Google Patents
Old house reinforcement structure and reinforcement means thereof Download PDFInfo
- Publication number
- CN103924793B CN103924793B CN201410190614.0A CN201410190614A CN103924793B CN 103924793 B CN103924793 B CN 103924793B CN 201410190614 A CN201410190614 A CN 201410190614A CN 103924793 B CN103924793 B CN 103924793B
- Authority
- CN
- China
- Prior art keywords
- tie beam
- collar tie
- newly
- steel plate
- section steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410190614.0A CN103924793B (en) | 2014-05-06 | 2014-05-06 | Old house reinforcement structure and reinforcement means thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410190614.0A CN103924793B (en) | 2014-05-06 | 2014-05-06 | Old house reinforcement structure and reinforcement means thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103924793A CN103924793A (en) | 2014-07-16 |
CN103924793B true CN103924793B (en) | 2016-05-04 |
Family
ID=51143170
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410190614.0A Active CN103924793B (en) | 2014-05-06 | 2014-05-06 | Old house reinforcement structure and reinforcement means thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103924793B (en) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105257014B (en) * | 2015-09-11 | 2017-10-27 | 浙江理工大学 | Cushion cap bean column node replaces the construction method of advance reinforcement hooping structure |
CN105257015B (en) * | 2015-09-11 | 2017-07-04 | 浙江理工大学 | Cushion cap bean column node replaces advance reinforcement hooping structure construction method |
CN106088641A (en) * | 2016-06-03 | 2016-11-09 | 河海大学 | Load bearing wall underpinning structure and method |
CN206562792U (en) * | 2016-10-13 | 2017-10-17 | 浙江杰地建筑设计有限公司 | Overlapping for existing structure strengthening reconstruction changes antitorque structure |
CN108518079B (en) * | 2016-11-10 | 2020-02-21 | 叶香菲 | Method for reinforcing high-altitude brick-concrete house |
CN108978713B (en) * | 2018-08-27 | 2023-12-15 | 江苏船谷重工有限公司 | Factory prefabricated elevator shaft pit and installation method thereof |
CN109958294A (en) * | 2019-04-15 | 2019-07-02 | 中国建筑第四工程局有限公司 | A kind of assembled anti-knock ruggedized construction of brick mix structure wall |
CN110397303B (en) * | 2019-07-26 | 2021-05-14 | 苏州固鑫建筑技术有限公司 | Building reinforced structure |
CN114293805A (en) * | 2021-12-27 | 2022-04-08 | 上海建工二建集团有限公司 | Underpinning structure and method for opening bearing wall |
CN114427306A (en) * | 2022-03-18 | 2022-05-03 | 机械工业第六设计研究院有限公司 | Method for opening door and window hole in rear of brick-concrete structure wall |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1141480C (en) * | 2002-09-05 | 2004-03-10 | 杜旌 | Method for pre-stressed reinforcing concrete compression member |
JP4752876B2 (en) * | 2008-06-27 | 2011-08-17 | 株式会社大林組 | Member reinforcement structure and member reinforcement method |
CN102561717B (en) * | 2011-12-31 | 2014-10-29 | 北京筑福国际工程技术有限责任公司 | Method for reinforcing brick-concrete structure by utilizing angle steel frame |
CN102926550B (en) * | 2012-10-11 | 2016-09-14 | 北京筑福建筑事务有限责任公司 | System and method for reinforcing masonry structure by using cross wall and flat steel draw bar |
CN103243815B (en) * | 2013-04-10 | 2015-07-01 | 北京筑福国际工程技术有限责任公司 | End-anchored composite beam structure and corresponding reinforcing construction method |
CN203201172U (en) * | 2013-04-10 | 2013-09-18 | 北京筑福建设工程有限责任公司 | Existing masonry structure adopting technology of directly increasing layers by lightweight steel construction |
CN103321446B (en) * | 2013-06-21 | 2015-07-29 | 叶香竹 | The construction method of the fiber cloth reinforced wooden frame of prestressed glass |
CN103352578B (en) * | 2013-07-09 | 2015-08-05 | 北京筑福国际工程技术有限责任公司 | A kind of construction method of carbon fiber cloth steel member composite reinforcement beam |
CN103758358B (en) * | 2014-01-06 | 2016-05-04 | 北京筑福国际工程技术有限责任公司 | Steel plate angle steel composite construction post and sticky anchor steel plate reinforced masonry wall structure and construction method |
CN103758360B (en) * | 2014-01-28 | 2016-02-10 | 河海大学 | There is RC framework-Nei infilled wall structure and the reinforcement means of profiled sheet support |
CN203905525U (en) * | 2014-05-06 | 2014-10-29 | 北京筑福建筑事务有限责任公司 | Old house reinforcement structure |
-
2014
- 2014-05-06 CN CN201410190614.0A patent/CN103924793B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN103924793A (en) | 2014-07-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103924793B (en) | Old house reinforcement structure and reinforcement means thereof | |
CN105113797A (en) | Pouring device and method for constructional columns connected with ring beam | |
CN104405399A (en) | Construction method for excavating support body in tunnel by crossing quicksand stratum | |
CN104405139B (en) | Strengthening method for stone wall body | |
CN105178980A (en) | Skylight-forming lining structure repair method for tunnels | |
CN104213717A (en) | Integrated reconstruction method for multi-storey residential | |
CN105780719A (en) | Heightened construction method for active service stone building bank protecting wall | |
CN105369826A (en) | Basement bearing platform side mold construction method | |
CN106193644B (en) | Basement reconstruction structure with raft foundation building | |
CN108775084A (en) | Steel-concrete combines precast beam and prefabricated post connection structure and construction method | |
CN208702421U (en) | The tunnel support structure of existing pile foundation building is worn under a kind of | |
CN103790168A (en) | Application method of soil nailing wall in deep foundation pit supporting | |
CN203905525U (en) | Old house reinforcement structure | |
CN204825920U (en) | Underground structure outer wall with go along with sb. to guard him vertical load -bearing of campshed integration structure | |
CN209211748U (en) | A kind of structure node of assembled ceiling radiating system | |
CN203603525U (en) | Reinforcing structure with clamp plate girder and clamp plate column externally arranged for stone structure | |
CN102877859A (en) | End mould structure for tunnel secondary lining and mounting method thereof | |
CN103498572B (en) | The construction method of the additional clamping plate beam of stone structure and clamping plate post ruggedized construction | |
CN106193120A (en) | Basement is encorbelmented, and base plate is inverse makees structure and construction method | |
CN204238264U (en) | A kind of sole plate post-poured strip structure | |
CN103276645A (en) | Precast pile, beam and slab renovation technology for diseases of existing line tunnel base | |
CN104047381B (en) | Assembled integral rare-reinforcement concrete shear wall structure | |
CN207376488U (en) | A kind of road and bridge crack bracing means | |
CN105297771A (en) | Highway masonry retaining wall reinforcement structure and reinforcement method | |
CN104746873A (en) | Novel GRC cement board molding bed construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20171206 Address after: 225300 Zhao Wang community of Xu Zhuang Street, Taizhou City, Jiangsu Province Patentee after: Beijing Yong Bo Science and Technology Ltd. Address before: 100043 Shijingshan District, Yang Yang Street, No. 69, No. 1, building an international Park, Fu International Patentee before: Beijing Bless Building Co., Ltd. |
|
TR01 | Transfer of patent right |
Effective date of registration: 20181108 Address after: 210024 1 Xikang Road, Gulou District, Nanjing, Jiangsu Patentee after: Chen Deyan Address before: 225300 Zhao Wang community, Xu Zhuang Street, Gao Gang, Taizhou, Jiangsu Patentee before: Beijing Yong Bo Science and Technology Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20191209 Address after: 315000 15th floor, No.35, Changchun Road, Haishu District, Ningbo City, Zhejiang Province Patentee after: Kaisheng Construction Co., Ltd Address before: Xikang Road, Gulou District of Nanjing city of Jiangsu Province, No. 1 210024 Patentee before: Chen Deyan |
|
TR01 | Transfer of patent right |