CN104895279B - The cladding attachment structure and its construction method of precast wall panel and precast beam - Google Patents

The cladding attachment structure and its construction method of precast wall panel and precast beam Download PDF

Info

Publication number
CN104895279B
CN104895279B CN201510359230.1A CN201510359230A CN104895279B CN 104895279 B CN104895279 B CN 104895279B CN 201510359230 A CN201510359230 A CN 201510359230A CN 104895279 B CN104895279 B CN 104895279B
Authority
CN
China
Prior art keywords
precast
wall panel
embedded
precast wall
buried
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510359230.1A
Other languages
Chinese (zh)
Other versions
CN104895279A (en
Inventor
张剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN YUANDA ENGINEERING DESIGN CO., LTD.
Original Assignee
Hunan Yuanda Engineering Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Yuanda Engineering Design Co Ltd filed Critical Hunan Yuanda Engineering Design Co Ltd
Priority to CN201510359230.1A priority Critical patent/CN104895279B/en
Publication of CN104895279A publication Critical patent/CN104895279A/en
Application granted granted Critical
Publication of CN104895279B publication Critical patent/CN104895279B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)
  • Panels For Use In Building Construction (AREA)

Abstract

The cladding attachment structure and its construction method of a kind of precast wall panel and precast beam, including the pre-buried being embedded in precast wall panel and the embedded sleeve barrel being embedded in precast beam, its step are as follows:1)Manufacture pre-buried can, 2)Manufacture embedded sleeve barrel, 3)Plant produced makes precast wall panel and is embedded in precast wall panel, 4)Plant produced makes precast beam and is embedded in precast beam, 5)Complete to carry out the construction operation of exterior finish on precast wall panel in factory;6)Carry out building body assembling construction, 7)Hoisting prefabricated Side fascia, 8)Adjust height, left and right precision and the control Side fascia plate stitch width of precast wall panel, 9)Pre-embedded steel slab and the spacing angle steel component of installation, install waterproof, the operation after completion precast wall panel is cladding additional between precast wall panel and precast beam, precast floor slab.The present invention facilitates completion in precast wall panel exterior finish factory, saves work high above the ground, safety, and efficiently, high precision, water resistance is good.

Description

The cladding attachment structure and its construction method of precast wall panel and precast beam
Technical field
The invention belongs to construction engineering technical field, and in particular to precast wall panel and precast beam in total-prefabricated construction Cladding attachment structure and its construction method.
Background technology
Total-prefabricated construction is built relative to traditional cast-type, a undoubtedly technical much progress, total-prefabricated construction Prefabricated components factorial praluction, Assembling, thus can realize prefabricated components standardize, quality controllable, efficient quick, save Material, it is to avoid waste, production scene and job site non-environmental-pollution.Nonetheless, but in many technical problems still need Innovation progress, such as precast wall panel is connected with the wet extension of precast beam, shear wall, precast floor slab, is by being embedded in precast wall panel In connection reinforcing bar epimere stretch into laminated floor slab, the in-situ layer on Prefabricated superposed beam top, cast-in-place concrete is fixedly connected, this wet Hang and connect necessary and building body synchronous construction, it is more long with respect to the duration, error, skew are produced during concrete construction, Cannot be adjusted after solidification, installation accuracy is poor.Additionally, carrying out the precast wall panel of exterior finish in factory, poured in the connection of wet extension During concrete construction, its exterior finish is easily contaminated and damages, and prefabricated component finished product protection difficulty is big.
The content of the invention
The technical problems to be solved by the invention are:Above-mentioned prior art is solved the problems, such as, and provides a kind of prefabricated Side fascia and the cladding attachment structure and its construction method of precast beam, make precast wall panel be flexibly connected with precast beam, are conducive to Antidetonation, facilitates in precast wall panel exterior finish factory and completes, and saves work high above the ground, and plug-in precast wall panel and building body are separated Construction, safety, efficiently, high precision, water resistance is good.
The technical solution adopted by the present invention is:
A kind of cladding attachment structure of precast wall panel and precast beam, including it is embedded in the pre-buried can in precast wall panel With the embedded sleeve barrel being embedded in precast beam, limited block and Side fascia regulating bolt, embedded iron are installed in the pre-buried can Cladding support member is also laterally inserted in box, Side fascia regulating bolt passes through the bolt hole of cladding support member, the cladding support member Sleeve connection hole is provided with outer panel;The embedded sleeve barrel front end being embedded in precast beam passes through cladding support member outer panel Sleeve connection hole, bolt fastener is tightened with embedded sleeve barrel front end internal thread hole and is connected.
In above-mentioned technical proposal, described pre-buried can lateral surface is open and precast wall panel medial surface is in same upright plane It is interior.
In above-mentioned technical proposal, nut is cased with described Side fascia regulating bolt, nut is connected solid with cladding support member It is fixed.
In above-mentioned technical proposal, described embedded sleeve barrel rear end is mounted with the anchoring steel axially vertical with embedded sleeve barrel Muscle, embedded sleeve barrel rear end is embedded in precast beam, and precast beam is stretched out in embedded sleeve barrel front end, and embedded sleeve barrel front end center is machined with interior Screwed hole.
In above-mentioned technical proposal, upright plane right angle setting on the outside of the embedded sleeve barrel axial direction and precast beam.
In above-mentioned technical proposal, the sleeve connection hole being provided with described cladding support member outer panel is elongate holes or ellipse Circular port.
A kind of cladding connection construction method of precast wall panel and precast beam, its step is as follows:
1)Pre-buried can is manufactured, pre-buried can is a kind of open can of lateral surface, installs limited in pre-buried can Cladding support member is also laterally inserted in position block and Side fascia regulating bolt, prefabricated can, Side fascia regulating bolt passes through cladding branch The bolt hole of support member, threaded connecting sleeve loading nut in Side fascia regulating bolt, nut is connected with cladding support member, Side fascia Regulating bolt top is withstood on the inside ceiling panel of pre-buried can, and sleeve connection hole is provided with the cladding support member outer panel;
2)Embedded sleeve barrel is manufactured, embedded sleeve barrel rear end is mounted with the anchoring steel axially vertical with embedded sleeve barrel Muscle, embedded sleeve barrel front end center is machined with internal thread hole, and equipped with the bolt fastener of connection corresponding with the internal thread hole;
3)Plant produced makes precast wall panel, and pre-buried can is embedded in precast wall panel, when pre-buried, embedded iron Box outside is open and precast wall panel medial surface is in same upright plane, and Side fascia regulating bolt is put down with precast wall panel upright plane OK;
4)Plant produced makes precast beam, and embedded sleeve barrel is embedded in precast beam, when pre-buried, embedded sleeve barrel axially with Upright plane is vertical on the outside of precast beam;
5)Complete to carry out the construction operation of exterior finish on precast wall panel in factory;
6)Building body assembling construction is carried out, the assembling construction of precast beam, precast floor slab, post is completed;
7)Hoisting prefabricated Side fascia, the pre-buried can of precast wall panel is aligned the embedded sleeve barrel of precast beam, and bolt is tight Firmware is screwed into embedded sleeve barrel front end center through the sleeve connection hole of the cladding support member outer panel of pre-buried can, bolt fastener Internal thread hole, tightens fixation;Realize the cladding connection of precast wall panel and precast beam;
8)Adjust height, left and right precision and the control Side fascia plate stitch width of precast wall panel, rotation Side fascia regulation spiral shell Bolt, can just be such that precast wall panel jack-up and is fallen, effectively the height of regulation precast wall panel, additionally, regulation embedded sleeve barrel and Bolt fastener position in floor sleeve connection hole elongate holes on the outside of cladding support member or in slotted eye, further regulation Precast wall panel or so precision and control Side fascia plate stitch width;
9)Pre-embedded steel slab and the spacing angle steel component of installation between precast wall panel and precast beam, precast floor slab, upper and lower Install waterproof, the operation after completion precast wall panel is cladding between precast wall panel additional.
Precast wall panel of the invention and the cladding attachment structure and its construction method of precast beam, revolutionize existing skill Precast wall panel and laminated floor slab, shear wall, the wet extension attachment structure of Prefabricated superposed beam in art, that is to say, that revolutionize existing Have that the pre-buried connection reinforcing bar of technology precast wall panel stretches into that Prefabricated superposed beam, shear wall, laminated floor slab in-situ layer be connected is wet Extension technique, and the wet extension technological requirement building body of prior art and the necessary synchronous construction of plug-in precast wall panel, thus relatively Duration is more long, less efficient, and connection reinforcing bar easily error, displacement, cast-in-place coagulation occurs during cast-in-place concrete construction Cannot be adjusted after soil solidification, influence construction quality and installation accuracy.Additionally, the wet extension technique of above-mentioned prior art, makes prefabricated outer The exterior finish of wallboard can not complete in factory in advance, cause high-altitude exterior finish operation labor intensity big, low construction efficiency, peace Full poor performance.Using precast wall panel of the invention and the cladding attachment structure and its construction method of precast beam, make precast facade Plate is connected to become dry-hanging with the installation of building body, and this allows for building body can separate solely with plug-in precast wall panel Vertical construction, shortens the construction period, improves efficiency of construction, accelerates construction speed, and cladding node of the invention, favorably In the upper-lower height and left and right precision and control Side fascia plate stitch width of adjustment precast wall panel, while being conducive to installing anti- Water.This precast wall panel of the invention causes the exterior finish of precast wall panel as pasted with the attachment structure dry-hanging of precast beam Ceramic tile, do wall paint etc. and can be carried out in factory in advance, cast-in-place concrete pollution will not occur during cladding installation and wall face is damaged Phenomenon, it is to avoid the dangerous and labour intensity of precast wall panel exterior finish work high above the ground it is big and set up scaffold, Fei Cai, It is time-consuming, the shortcomings of take a lot of work.Importantly, precast wall panel of the invention is clear and definite with the cladding attachment structure stress of precast beam, Precast wall panel is flexibly connected with the precast beam of building body, is conducive to improving the anti-seismic performance of building.The invention described above Prominent substantive distinguishing features and significant technological progress make total-prefabricated construction quality and technical performance be greatly improved.
Brief description of the drawings
Fig. 1 is structural profile schematic diagram of the present invention;
Fig. 2 is prior art construction generalized section.
Reference:
1- precast wall panels, the pre-buried cans of 2-, 3- pre-embedded steel slabs, the spacing angle steel components of 4-, 5- laminated floor slab in-situ layers, 6- Laminated floor slab preformed layer, 7- precast beams, 8- embedded sleeve barrels, the cladding support members of 9-, 10- limited blocks, 11- Side fascia regulating bolts, 12- connects reinforcing bar.
Specific embodiment
Referring to Fig. 1, the cladding attachment structure of precast wall panel of the invention and precast beam, including it is embedded in precast wall panel Interior pre-buried can and the embedded sleeve barrel being embedded in precast beam, are provided with limited block and Side fascia regulation in the pre-buried can Cladding support member is also laterally inserted in bolt, pre-buried can, Side fascia regulating bolt passes through the bolt hole of cladding support member, exterior wall Plate regulating bolt top is withstood on the inside ceiling panel of pre-buried can, and sleeve connection hole is provided with the cladding support member outer panel;Institute State the embedded sleeve barrel front end that is embedded in precast beam through the sleeve connection hole of cladding support member outer panel, bolt fastener with it is pre- Bury barrel forward end internal thread hole and tighten and be connected.
Above-mentioned pre-buried can lateral surface is open and precast wall panel medial surface is in same upright plane.
Nut is cased with above-mentioned Side fascia regulating bolt, nut is connected with cladding support member.
Above-mentioned embedded sleeve barrel rear end is mounted with the anchor bar axially vertical with embedded sleeve barrel, and embedded sleeve barrel rear end is pre- It is embedded in precast beam, precast beam is stretched out in embedded sleeve barrel front end, embedded sleeve barrel front end center is machined with internal thread hole.
Upright plane right angle setting on the outside of above-mentioned embedded sleeve barrel axial direction and precast beam.
In above-mentioned technical proposal, the sleeve connection hole being provided with described cladding support member outer panel is elongate holes or ellipse Circular port.
A kind of cladding connection construction method of precast wall panel and precast beam, its step is as follows:
1)Pre-buried can is manufactured, pre-buried can is a kind of open can of lateral surface, installs limited in pre-buried can Cladding support member is also laterally inserted in position block and Side fascia regulating bolt, prefabricated can, Side fascia regulating bolt passes through cladding branch The bolt hole of support member, threaded connecting sleeve loading nut in Side fascia regulating bolt, nut is connected with cladding support member, Side fascia Regulating bolt top is withstood on the inside ceiling panel of pre-buried can, and sleeve connection hole is provided with the cladding support member outer panel;
2)Embedded sleeve barrel is manufactured, embedded sleeve barrel rear end is mounted with the anchoring steel axially vertical with embedded sleeve barrel Muscle, embedded sleeve barrel front end center is machined with internal thread hole, and equipped with the bolt fastener of connection corresponding with the internal thread hole;
3)Plant produced makes precast wall panel, and pre-buried can is embedded in precast wall panel, when pre-buried, embedded iron Box outside is open and precast wall panel medial surface is in same upright plane, and Side fascia regulating bolt is put down with precast wall panel upright plane OK;
4)Plant produced makes precast beam, and embedded sleeve barrel is embedded in precast beam, when pre-buried, embedded sleeve barrel axially with Upright plane is vertical on the outside of precast beam;
5)Complete to carry out the construction operation of exterior finish on precast wall panel in factory;
6)Building body assembling construction is carried out, the assembling construction of precast beam, precast floor slab, post is completed;
7)Hoisting prefabricated Side fascia, the pre-buried can of precast wall panel is aligned the embedded sleeve barrel of precast beam, and bolt is tight Firmware is screwed into embedded sleeve barrel front end center through the sleeve connection hole of the cladding support member outer panel of pre-buried can, bolt fastener Internal thread hole, tightens fixation;Realize the cladding connection of precast wall panel and precast beam;
8)Adjust height, left and right precision and the control Side fascia plate stitch width of precast wall panel, rotation Side fascia regulation spiral shell Bolt, can just be such that precast wall panel jack-up and is fallen, effectively the height of regulation precast wall panel, additionally, regulation embedded sleeve barrel and Bolt fastener position in the elongate holes of cladding support member outer panel sleeve connection hole or in slotted eye, further regulation is pre- Side fascia processed or so precision and control Side fascia plate stitch width;
9)Pre-embedded steel slab and the spacing angle steel component of installation between precast wall panel and precast beam, precast floor slab, upper and lower Install waterproof, the operation after completion precast wall panel is cladding between precast wall panel additional.

Claims (2)

1. the cladding attachment structure of a kind of precast wall panel and precast beam, it is characterised in that including being embedded in precast wall panel Pre-buried can and the embedded sleeve barrel that is embedded in precast beam, limited block and Side fascia regulation spiral shell are installed in the pre-buried can Cladding support member is also laterally inserted in bolt, pre-buried can, Side fascia regulating bolt passes through the bolt hole of cladding support member, described dry Hang and be provided with sleeve connection hole on support member outer panel;The embedded sleeve barrel front end being embedded in precast beam passes through cladding support member The sleeve connection hole of outer panel, bolt fastener is tightened with embedded sleeve barrel front end internal thread hole and is connected;Described embedded iron Box lateral surface is open and precast wall panel medial surface is in same upright plane;Nut is cased with described Side fascia regulating bolt, Nut is connected with cladding support member;Described embedded sleeve barrel rear end is mounted with the anchoring axially vertical with embedded sleeve barrel Reinforcing bar, embedded sleeve barrel rear end is embedded in precast beam, and precast beam is stretched out in embedded sleeve barrel front end, and embedded sleeve barrel front end center is machined with Internal thread hole;Upright plane right angle setting on the outside of the embedded sleeve barrel axial direction and precast beam;On described cladding support member outer panel The sleeve connection hole being provided with is elongate holes or slotted eye.
2. a kind of cladding connection construction method of precast wall panel and precast beam, it is characterised in that its step is as follows:
1)Pre-buried can is manufactured, pre-buried can is a kind of open can of lateral surface, and limited block is provided with pre-buried can With Side fascia regulating bolt, cladding support member is also laterally inserted in prefabricated can, Side fascia regulating bolt passes through cladding support member Bolt hole, threaded connecting sleeve loading nut in Side fascia regulating bolt, nut is connected with cladding support member, Side fascia regulation Bolt end head is withstood on the inside ceiling panel of pre-buried can, and sleeve connection hole is provided with the cladding support member outer panel;
2)Embedded sleeve barrel is manufactured, embedded sleeve barrel rear end is mounted with the anchor bar axially vertical with embedded sleeve barrel, in advance Bury barrel forward end center and be machined with internal thread hole, and equipped with the bolt fastener of connection corresponding with the internal thread hole;
3)Plant produced makes precast wall panel, and pre-buried can is embedded in precast wall panel, when pre-buried, outside pre-buried can Side is open and precast wall panel medial surface is in same upright plane, and Side fascia regulating bolt is parallel with precast wall panel upright plane;
4)Plant produced makes precast beam, and embedded sleeve barrel is embedded in precast beam, when pre-buried, embedded sleeve barrel axially with it is prefabricated Upright plane is vertical on the outside of beam;
5)Complete to carry out the construction operation of exterior finish on precast wall panel in factory;
6)Building body assembling construction is carried out, the assembling construction of precast beam, precast floor slab, post is completed;
7)Hoisting prefabricated Side fascia, the pre-buried can of precast wall panel is directed at the embedded sleeve barrel of precast beam, by bolt fastener Through the sleeve connection hole of the cladding support member outer panel of pre-buried can, bolt fastener is screwed into the interior spiral shell of embedded sleeve barrel front end center Pit, tightens fixation;Realize the cladding connection of precast wall panel and precast beam;
8)Height, left and right precision and the control Side fascia plate stitch width of precast wall panel are adjusted, Side fascia regulating bolt is rotated, just Precast wall panel can be made by jack-up and fallen, effectively the height of regulation precast wall panel, additionally, regulation embedded sleeve barrel and bolt are tight Firmware position in floor sleeve connection hole elongate holes on the outside of cladding support member or in slotted eye, further adjusts prefabricated outer Wallboard or so precision and control Side fascia plate stitch width;
9)Pre-embedded steel slab and the spacing angle steel component of installation between precast wall panel and precast beam, precast floor slab, prefabricated up and down Install waterproof, the operation after completion precast wall panel is cladding between Side fascia additional.
CN201510359230.1A 2015-06-26 2015-06-26 The cladding attachment structure and its construction method of precast wall panel and precast beam Active CN104895279B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510359230.1A CN104895279B (en) 2015-06-26 2015-06-26 The cladding attachment structure and its construction method of precast wall panel and precast beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510359230.1A CN104895279B (en) 2015-06-26 2015-06-26 The cladding attachment structure and its construction method of precast wall panel and precast beam

Publications (2)

Publication Number Publication Date
CN104895279A CN104895279A (en) 2015-09-09
CN104895279B true CN104895279B (en) 2017-06-23

Family

ID=54028204

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510359230.1A Active CN104895279B (en) 2015-06-26 2015-06-26 The cladding attachment structure and its construction method of precast wall panel and precast beam

Country Status (1)

Country Link
CN (1) CN104895279B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104912231B (en) * 2015-06-26 2017-07-14 长沙远大住宅工业集团有限公司 The cladding attachment structure and its construction method of prefabricated outer wall panel and shear wall
CN105178451B (en) * 2015-10-21 2017-08-04 湖南远大建工股份有限公司 The anticorrosion structure and its construction method of the cladding node of assembled architecture outer wall
CN106320576A (en) * 2016-11-01 2017-01-11 江苏省建筑科学研究院有限公司 Prefabricated wallboard integrating structure, self-thermal insulation, water resistance and decoration and external suspending connection devices of prefabricated wallboard
CN107859189A (en) * 2017-11-24 2018-03-30 郴州远大住宅工业有限公司 Composite beam and its production method
CN108915140B (en) * 2018-09-18 2023-12-15 中建五局装饰幕墙有限公司 Method for installing full glass curtain wall with arc exceeding 10m Gao Wan
CN109322425A (en) * 2018-09-29 2019-02-12 合肥工业大学 A kind of plug-in connection system of combined wall board and preparation method thereof
CN110805159A (en) * 2019-11-01 2020-02-18 国艺天成建设工程技术有限公司 Assembly type building outer wall connecting joint and construction method thereof
CN114505802B (en) * 2022-03-30 2024-03-22 湖北广盛建筑产业化科技有限公司 Transverse member positioning tool

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101892738B (en) * 2010-08-20 2011-12-07 中太建设集团股份有限公司 Embedded scaffold connecting tube and construction method thereof
JP5801145B2 (en) * 2011-08-31 2015-10-28 株式会社竹中工務店 Building wall structure, sash, and building wall construction method
CN203160618U (en) * 2013-04-11 2013-08-28 厦门大端工业设计有限公司 Dry-hanging wallboard structure
CN203547009U (en) * 2013-11-13 2014-04-16 河南亚鹰钢结构幕墙工程有限公司 Foam concrete wallboard and wallboard dry hanging structure using foam concrete wallboard
CN205063248U (en) * 2015-06-26 2016-03-02 长沙远大住宅工业集团有限公司 Prefabricated exterior wall board and precast beam hang connection structure futilely

Also Published As

Publication number Publication date
CN104895279A (en) 2015-09-09

Similar Documents

Publication Publication Date Title
CN104895279B (en) The cladding attachment structure and its construction method of precast wall panel and precast beam
CN104895193B (en) Prefabricated outer wall panel connects box and connecting node
CN104912231B (en) The cladding attachment structure and its construction method of prefabricated outer wall panel and shear wall
CN104100122B (en) The construction method of the conical storehouse of large-scale silo roof construction
CN108005387B (en) Synchronous construction method for cast-in-place main body of assembled wallboard and short-limb shear wall
CN204983662U (en) To drawing screw rod and steel pipe framed bent combination unilateral formwork device
CN106703306B (en) Precast concrete parapet component and connection structure thereof
CN111236604A (en) Safe construction method for cantilever platform on cylinder main body structure
CN112482434B (en) Shaped large formwork vertical thin-wall side wall and construction method
CN208965714U (en) A kind of prefabricated piping lane main frame structure of assembly concrete
CN105155830A (en) Construction method for combined type fixed and integral lifting of elevator shaft stereotyped operation platform
CN203394027U (en) Semi-assembled construction system for frame-shear wall tube structure
CN103510466B (en) Wet joint construction method for T-shaped beam bridge deck system
CN205063248U (en) Prefabricated exterior wall board and precast beam hang connection structure futilely
CN204875558U (en) Shaped steel runs through inside and outside compound support formula bracket system of encorbelmenting
CN208363650U (en) The mounting bracket of prefabricated components, the precast wall body containing the bracket
CN108951699B (en) Festival segmentation removal centre form and support of utility tunnel
CN110029818A (en) A kind of precast construction rapid constructing method
CN111236681A (en) Hanging die for adding laminated slab at bottom of concrete slab and construction method thereof
CN204728474U (en) Precast wall panel connecting box
CN212427567U (en) Reinforced concrete prefabricated column type steel connecting joint
CN114086758A (en) Loose-spliced bare concrete arc wall formwork and installation method thereof
CN207048163U (en) Large space steel skeleton grid suspended ceiling converting support structure
CN106088576A (en) A kind of steel frame wooden template system construction method
CN111809792A (en) Assembled precast concrete wallboard

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20170303

Address after: 410013 high tech Development Zone, Hunan, Changsha Lu Song and the Eastern Red Road Interchange

Applicant after: HUNAN YUANDA ENGINEERING DESIGN CO., LTD.

Address before: 410013 Changsha high tech Development Zone, Yuelu, Hunan Avenue, Changsha Yuanda Industrial Group Co., Ltd.

Applicant before: CHANGSHA BROAD HOMES INDUSTRIAL INTERNATIONAL CO., LTD.

GR01 Patent grant
GR01 Patent grant