CN206016220U - High-altitude column structure construction operation platform - Google Patents

High-altitude column structure construction operation platform Download PDF

Info

Publication number
CN206016220U
CN206016220U CN201621043739.1U CN201621043739U CN206016220U CN 206016220 U CN206016220 U CN 206016220U CN 201621043739 U CN201621043739 U CN 201621043739U CN 206016220 U CN206016220 U CN 206016220U
Authority
CN
China
Prior art keywords
platform
platform body
along
main platform
length
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621043739.1U
Other languages
Chinese (zh)
Inventor
刘金芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201621043739.1U priority Critical patent/CN206016220U/en
Application granted granted Critical
Publication of CN206016220U publication Critical patent/CN206016220U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a kind of high-altitude column structure construction operation platform, including the middle operating platform with hollow region, operating platform includes main platform body, the side of main platform body has can make column structure snap onto the opening at hollow region, it is located at main platform body opening and is provided with the movable platform being flexibly connected with main platform body, main platform body is fixedly connected with the guardrail for extending along its length with the outer side edges edge of movable platform, it is located at length of the guardrail length in movable platform less than the outer side edges edge of movable platform, to form the import and export that workmen can be made to come in and go out.The utility model passes through main platform body and the movable platform being movably connected, and forms intermediate hollow region, snapping in order to column structure, its security during use is higher, installation and removal simultaneously are also convenient for fast, to shorten the construction period, improve efficiency of construction.

Description

High-altitude column structure construction operation platform
Technical field
The utility model is related to the realm of building construction, and in particular to a kind of high-altitude column structure construction operation platform.
Background technology
At present, during the construction of high-altitude column structure, workmen carries out a series of construction operation for convenience, Scaffold would generally be set up in the surrounding of column structure, then at the top of scaffold around the wooden jump of one circle of column structure laying Plate, and by iron wire by each wooden springboard together with the scaffold colligation of relevant position, wooden springboard is fixed.Though So this method is more convenient quick, but its security for using is poor, is susceptible to potential safety hazard.In addition one kind applies Wooden springboard is exactly substituted for steel plate, is spliced in high-altitude by work operating platform, and steel plate is welded on scaffold to be carried out admittedly Fixed, although security is more improved, but the work of the erecting and welding of steel plate and dismounting work during dismounting, it is required for consumption a large amount of Manpower and the time, not only increase the work load of workmen, while also make claim for eot, efficiency of construction reduces.
Utility model content
For above-mentioned the deficiencies in the prior art, technical problem to be solved in the utility model is:How a kind of energy is provided Security in workmen construction operation operation is enough improved, and installation and removal are convenient and swift, can shorten the construction period, improve The high-altitude column structure construction operation platform of efficiency of construction.
In order to solve above-mentioned technical problem, the utility model employs following technical scheme:
A kind of high-altitude column structure construction operation platform, it is characterised in that:Put down including the middle operation with hollow region Platform, operating platform include main platform body, and the side of main platform body has can make column structure snap onto opening at hollow region Mouthful, the movable platform being flexibly connected with main platform body, main platform body and movable platform is provided with main platform body opening , along the guardrail for extending along its length is fixedly connected with, the guardrail length in movable platform is flat less than activity for outer side edges The length on the outer side edges edge of platform, to form the import and export that workmen can be made to come in and go out.
In the utility model, when use, main platform body is hoisted to corresponding height first with crane, by traction Mode so that column structure is snapped onto at hollow region by the opening in main platform body, and is placed on main platform body The top of scaffold, is then fixed to which, and then again movable platform is hoisted at the opening of main platform body, and by activity Platform activity is connected at the opening of main platform body, and this is fixed, and finally, installs shield in main platform body and movable platform Hurdle, and stay the next one make the entrance that operator enters, that is, complete setting up for operating platform.Relative to existing wood at present Matter pedal is improved with splicing steel plate, the not only security in workmen when constructing, while taking in operating platform If on, the form of integral hoisting is employed, installation and removal are all convenient and swift, and may be directed to same column structure repetition Carry out setting up work, not only reduce construction cost, saved manpower and materials, when also reducing operating platform and set up, contracting The short duration, improve efficiency of construction.
Used as optimization, the main platform body includes the L-shaped angle base plate and two of two entirety in same level The linear straight base plate of individual entirety, two angle base plate interval settings, two angle base plates each include mutually extending in 90 ° of directions Transverse panel and longitudinal panel, two transverse panels be oppositely arranged and between the bar that extends along two transverse panel relative directions Shape connecting plate I, uniform intervals are provided with some positioning through hole I along its length respectively for the top surface both sides of strip connecting plate I, and two It is respectively arranged with individual transverse panel and can passes through corresponding positioning through hole I and make transverse panel be fixedly connected on strip connecting plate I On clamping screw I;Two straight base plates be located on the bearing of trend of two longitudinal panels respectively and with longitudinal panel interval setting, The length direction of straight base plate is consistent with the bearing of trend of adjacent longitudinal panel, is provided with edge between straight base plate and adjacent longitudinal panel The strip connecting plate II that its relative direction extends, uniform intervals set along its length respectively for the top surface both sides of strip connecting plate II Some positioning through hole II are equipped with, straight base plate can pass through corresponding positioning through hole II and make straight bottom to being respectively arranged with longitudinal panel Plate and longitudinal panel are respectively fixedly connected with the clamping screw II on strip connecting plate II;The movable platform is included positioned at two The flexible connecting plate of the one end between straight base plate and away from angle base plate, flexible connecting plate can be stretched along two straight base plate relative directions Contract and its two ends is respectively and movably connected on two straight base plates.For the column structure of different size diameter, in order to improve operation The versatility of platform, employs adjustable main platform body and movable platform, adjusts the chi in operating platform intermediate hollow region Very little, to meet the column structure of different size diameter.Adjust the phase between the transverse panel and strip connecting plate I of two angle base plates Should distance, and make the clamping screw I on transverse panel be fixed together through corresponding positioning through hole I, and then can adjust The distance between two longitudinal panels length.The respective distance of longitudinal panel and straight base plate and strip connecting plate II is adjusted, and Make the clamping screw II on longitudinal panel and straight base plate be fixed together through corresponding positioning through hole II, and then horizontal stroke can be adjusted To panel and the distance between movable platform length.Finally by the length of flexible connecting plate is adjusted, two ends activity respectively in fact It is connected on two straight base plates, completes to install.This makes it possible to the size for making the size of hollow region meet column structure, improve The versatility that operating platform is used, reduces use cost.In addition also can ensure that between operating platform and column structure Distance meets requirement, it is to avoid space of the operating platform with column structure between the two is in larger distance, causes operating platform unstability.
Used as optimization, the guardrail includes that the outer side edges along the main platform body are spaced along its length and is fixed on described putting down Many vertical rods in platform main body, the top surface place plane of the length direction of vertical rod perpendicular to the main platform body, adjacent two are stood The many cross bars extended along two neighboring vertical rod relative direction, the two ends of cross bar are arranged at intervals with along vertical rod length direction between bar It is respectively fixedly connected with two adjacent vertical rods.The simple structure of guardrail, installs and is also convenient for fast.
As optimization, it is provided with along two vertical rod relative directions between two vertical rods and near the position of bottom of upright rod The strip-shaped baffle of extension, strip-shaped baffle place plane are located in same level with two neighboring vertical rod place plane, and bar shaped keeps off The two ends of plate are respectively fixedly connected with two adjacent vertical rods.Workmen can be put when construction on the operational platform Various construction instruments are put, so during workmen's movement, the instrument on operating platform is easy for being kicked by pin, holds Easily fall down from operating platform edge, falling object from high altitude has great potential safety hazard.It is located at bar shaped of the vertical rod near bottom position Baffle plate, it becomes possible to which these instruments are provided with blocking effect, effective avoid work high-altitude from dropping, eliminate safe hidden trouble, raising makes Security.
In sum, the beneficial effects of the utility model are:The utility model passes through the platform being movably connected Main body and movable platform, form intermediate hollow region, snapping in order to column structure, and during use, security is more for which Height, while installation and removal are also convenient for fast, to shorten the construction period, improves efficiency of construction.
Description of the drawings
In order that the purpose of utility model, technical scheme and advantage are clearer, new to this practicality below in conjunction with accompanying drawing Type is described in further detail, wherein:
Fig. 1 is three dimensional structure diagram of the present utility model.
Specific embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings.
As shown in figure 1, the high-altitude column structure construction operation platform in this specific embodiment, including middle with hollow The operating platform in region, operating platform include main platform body, and the side of main platform body is with snapping onto can column structure Opening at dummy section, is provided with the movable platform being flexibly connected with main platform body, main platform body at main platform body opening The guardrail for extending along its length is fixedly connected with the outer side edges edge of movable platform, and the guardrail in movable platform is long Length of the degree less than the outer side edges edge of movable platform, to form the import and export that workmen can be made to come in and go out.
In this specific embodiment, the main platform body includes the L-shaped angle of two entirety in same level The linear straight base plate 2 of base plate 1 and two entirety, two 1 interval settings of angle base plate, two angle base plates are each including being mutually in Transverse panel and longitudinal panel that 90 ° of directions extend, two transverse panels be oppositely arranged and between relative along two transverse panels The strip connecting plate I 3 that direction extends, if uniform intervals are provided with along its length respectively for the top surface both sides of strip connecting plate I 3 Dry positioning through hole I, is respectively arranged with two transverse panels and can pass through corresponding positioning through hole I and be fixedly connected transverse panel Clamping screw I on strip connecting plate I;Two straight base plates 2 be located on the bearing of trend of two longitudinal panels respectively and with vertical To panel interval setting, the length direction of straight base plate 2 is consistent with the bearing of trend of adjacent longitudinal panel, and straight base plate 2 is vertical with adjacent To being provided with the strip connecting plate II 4 that extends along its relative direction between panel, the top surface both sides of strip connecting plate II 4 edge respectively Its length direction uniform intervals is provided with some positioning through hole II, is respectively arranged with and can pass through on straight base plate 2 and longitudinal panel Corresponding positioning through hole II and the clamping screw II for making straight base plate 2 and longitudinal panel be respectively fixedly connected with strip connecting plate II 4; The movable platform include between two straight base plates 2 and one end away from angle base plate 1 flexible connecting plate 5, connection of stretching Plate 5 can be flexible along two 2 relative directions of straight base plate and its two ends is respectively and movably connected on two straight base plates 2.
In this specific embodiment, the guardrail includes being spaced fixation along its length along the outer side edges of the main platform body Many vertical rods 6 in the main platform body, the top surface place plane of the length direction of vertical rod 6 perpendicular to the main platform body, The many horizontal strokes extended along 6 relative direction of two neighboring vertical rod are arranged at intervals with along 6 length direction of vertical rod between adjacent two vertical rods 6 Bar 7, the two ends of cross bar 7 are respectively fixedly connected with two adjacent vertical rods 6.
In this specific embodiment, it is provided between two vertical rods 6 and near the position of 6 bottom of vertical rod vertical along two The strip-shaped baffle 8 that 6 relative direction of bar extends, 8 place plane of strip-shaped baffle are located at same water with 6 place plane of two neighboring vertical rod In plane, the two ends of strip-shaped baffle 8 are respectively fixedly connected with two adjacent vertical rods 6.
During being embodied as, the section of the vertical rod 6 is V-arrangement.The vertical rod of v-shaped structure is relative to plain cylindrical form Or square column type vertical rod, not only intensity increased, while weight also decreases.
Also it is fixedly connected with the bottom surface of main platform body and movable platform for increasing the ribs of main platform body intensity, It is prevented from main platform body to deform with movable platform.
It can in addition contain do so, adjacent two vertical rods 6 and between protection network is set at two cross bars 7, further carry The security that height is used.
Finally illustrate, above example is only unrestricted in order to the technical solution of the utility model to be described, although logical Cross and the utility model is described with reference to preferred embodiment of the present utility model, but one of ordinary skill in the art It should be appreciated that various changes can be made to which in the form and details, without departing from appended claims institute The spirit and scope of the present utility model for limiting.

Claims (4)

1. a kind of high-altitude column structure construction operation platform, it is characterised in that:Including the middle operating platform with hollow region, Operating platform includes main platform body, and the side of main platform body has can make column structure snap onto the opening at hollow region, It is located at main platform body opening and is provided with the outside of the movable platform being flexibly connected with main platform body, main platform body and movable platform Edge is fixedly connected with the guardrail for extending along its length, and the guardrail length in movable platform is less than movable platform The length on outer side edges edge, to form the import and export that workmen can be made to come in and go out.
2. column structure construction operation platform in high-altitude according to claim 1, it is characterised in that:The main platform body includes The linear straight base plate of the L-shaped angle base plate of two entirety and two entirety that are located in same level, two angle base plates Interval setting, two angle base plates each include transverse panel and the longitudinal panel for mutually extending, two transverse panels in 90 ° of directions Be oppositely arranged and between the strip connecting plate I that extends along two transverse panel relative directions, the top surface both sides point of strip connecting plate I Uniform intervals are not provided with some positioning through hole I along its length, be respectively arranged with and can pass through phase on two transverse panels Answer positioning through hole I and make the clamping screw I that transverse panel is fixedly connected on strip connecting plate I;Two straight base plates are located at respectively On the bearing of trend of two longitudinal panels and with longitudinal panel interval setting, the length direction of straight base plate and adjacent longitudinal panel Bearing of trend is consistent, is provided with the strip connecting plate II extended along its relative direction, bar between straight base plate and adjacent longitudinal panel Uniform intervals are provided with some positioning through hole II, straight base plate and longitudinal direction along its length respectively for the top surface both sides of shape connecting plate II It is respectively arranged with panel and can passes through corresponding positioning through hole II and straight base plate and longitudinal panel is respectively fixedly connected with bar shaped Clamping screw II on connecting plate II;The movable platform includes between two straight base plates and the one end away from angle base plate Flexible connecting plate, flexible connecting plate can be flexible along two straight base plate relative directions and its two ends is respectively and movably connected to two directly On base plate.
3. column structure construction operation platform in high-altitude according to claim 1, it is characterised in that:The guardrail is included along institute The outer side edges for stating main platform body are spaced many vertical rods being fixed in the main platform body, the length direction of vertical rod along its length Many are arranged at intervals with along vertical rod length direction between the top surface place plane of the main platform body, adjacent two vertical rods Along the cross bar that two neighboring vertical rod relative direction extends, the two ends of cross bar are respectively fixedly connected with two adjacent vertical rods.
4. column structure construction operation platform in high-altitude according to claim 3, it is characterised in that:It is located between two vertical rods And be provided with the strip-shaped baffle extended along two vertical rod relative directions near the position of bottom of upright rod, strip-shaped baffle place plane with Two neighboring vertical rod place plane is located in same level, and the two ends of strip-shaped baffle are respectively fixedly connected with stands at adjacent two On bar.
CN201621043739.1U 2016-09-08 2016-09-08 High-altitude column structure construction operation platform Active CN206016220U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621043739.1U CN206016220U (en) 2016-09-08 2016-09-08 High-altitude column structure construction operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621043739.1U CN206016220U (en) 2016-09-08 2016-09-08 High-altitude column structure construction operation platform

Publications (1)

Publication Number Publication Date
CN206016220U true CN206016220U (en) 2017-03-15

Family

ID=58259028

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621043739.1U Active CN206016220U (en) 2016-09-08 2016-09-08 High-altitude column structure construction operation platform

Country Status (1)

Country Link
CN (1) CN206016220U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107858925A (en) * 2017-10-31 2018-03-30 中国五冶集团有限公司 Platform structure for the operation of pier stud overhead connection
CN108118884A (en) * 2018-02-24 2018-06-05 上海宝钢工程咨询有限公司 A kind of Super High grid operations platform and preparation method thereof
CN110965758A (en) * 2019-12-31 2020-04-07 上海市机械施工集团有限公司 Construction platform and method for column
CN113882647A (en) * 2021-10-18 2022-01-04 中国建筑第八工程局有限公司 Autonomous climbing operation platform and construction method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107858925A (en) * 2017-10-31 2018-03-30 中国五冶集团有限公司 Platform structure for the operation of pier stud overhead connection
CN108118884A (en) * 2018-02-24 2018-06-05 上海宝钢工程咨询有限公司 A kind of Super High grid operations platform and preparation method thereof
CN110965758A (en) * 2019-12-31 2020-04-07 上海市机械施工集团有限公司 Construction platform and method for column
CN113882647A (en) * 2021-10-18 2022-01-04 中国建筑第八工程局有限公司 Autonomous climbing operation platform and construction method thereof
CN113882647B (en) * 2021-10-18 2023-07-25 中国建筑第八工程局有限公司 Autonomous climbing operation platform and construction method thereof

Similar Documents

Publication Publication Date Title
CN206016220U (en) High-altitude column structure construction operation platform
CN202227701U (en) Spliced type horizontal channel device
CN207827674U (en) A kind of special cage of building block pile
CN105484165A (en) Integrated prestress tensioning frame structure and manufacturing and using methods thereof
CN210658355U (en) Steel-pipe pile construction guider
CN207109594U (en) Pier stud constructing operation lantern stand
CN210049385U (en) Detachable design protection operation canopy of construction is built in room
CN203430009U (en) Construction hanging basket
CN203257070U (en) Slippage frame operating platform for gallery daylighting roof curtain wall installation
CN201722937U (en) Sliding platform for installation of net rack
CN202882375U (en) Elevator shaftway tool type scaffold operation platform
CN206016211U (en) A kind of novel operating platform assembled for square pyramid space grid
CN205369044U (en) Integration prestressing force stretch -draw frame construction
CN203729565U (en) Simple travelling table
CN204552051U (en) The cradle structure of high-altitude crossbeam soffit monitoring point layout
CN203345999U (en) Special multifunctional lifting frame for busbar bridge
CN208633477U (en) A kind of construction site scaffold
CN203394008U (en) Suspension type hanging bracket used on plane truss
CN208702127U (en) A kind of large-span steel construction scaffold integral slide device
CN202953755U (en) Novel anti-climbing safety device for tower crane
CN206768613U (en) For the U-shaped beam of auxiliary erection urban rail and the moving hanging basket of tensioning bent cap
CN202214976U (en) Steel wire rope support device
CN110725523A (en) Scaffold for building construction
CN110284598A (en) The installation method and device of spherical net brace roof structure
CN205348720U (en) Take hoisting device's removal scaffold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant