CN210658355U - Steel-pipe pile construction guider - Google Patents

Steel-pipe pile construction guider Download PDF

Info

Publication number
CN210658355U
CN210658355U CN201920677651.2U CN201920677651U CN210658355U CN 210658355 U CN210658355 U CN 210658355U CN 201920677651 U CN201920677651 U CN 201920677651U CN 210658355 U CN210658355 U CN 210658355U
Authority
CN
China
Prior art keywords
steel
pipe pile
guide frame
limiting
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920677651.2U
Other languages
Chinese (zh)
Inventor
张俊
郑德江
董文进
邹飞仁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201920677651.2U priority Critical patent/CN210658355U/en
Application granted granted Critical
Publication of CN210658355U publication Critical patent/CN210658355U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model provides a steel-pipe pile construction guider, including last leading truck and lower leading truck, the relevant position of going up leading truck and lower leading truck is provided with the last locating hole and the lower locating hole that are used for fixing a position the steel-pipe pile equidistantly respectively, has laid the operation platform with last leading truck fixed connection between two adjacent last locating holes, every goes up the locating hole spacing bolt of leading truck top fixedly connected with all around, and spacing bolt's one end is provided with the lock nut who is used for locking the limiting plate. The utility model discloses can make the steel-pipe pile location accurate, the straightness that hangs down obtains guaranteeing, labour saving and time saving, raises the efficiency.

Description

Steel-pipe pile construction guider
Technical Field
The utility model discloses a steel trestle construction technical field, more specifically relates to a steel-pipe pile construction guider.
Background
In the construction process of the steel trestle, the construction quantity of the steel pipe piles is large, and currently, each hole is manually positioned by measuring personnel. However, in the actual construction process, because the number of pipe piles is large, the hydrological conditions are complex, the positioning of the steel pipe piles is difficult, the verticality of the steel pipe piles is difficult to control, a large amount of time and energy of managers and constructors are consumed in the construction process, and the construction efficiency of the trestle is reduced. In the prior art, a device capable of efficiently completing construction and positioning of the steel pipe pile is urgently needed.
SUMMERY OF THE UTILITY MODEL
The utility model provides a steel-pipe pile construction guider that location is accurate, simple structure, can practice thrift manpower and time cost again to the not enough of above-mentioned prior art.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes:
a steel pipe pile construction guide device comprises a device body, wherein the device body comprises an upper guide frame and a lower guide frame, upper positioning holes and lower positioning holes for positioning the steel pipe piles are respectively arranged at corresponding positions of the upper guide frame and the lower guide frame at equal intervals, an operation platform fixedly connected with the upper guide frame is laid between every two adjacent upper positioning holes, a limiting bolt is fixedly connected above the upper guide frame at the periphery of each upper positioning hole, a limiting plate corresponding to the limiting bolt is arranged at the periphery of each upper positioning hole, a hollow limiting groove is arranged in the middle of each limiting plate, the limiting groove is matched with the diameter of the limiting bolt, each limiting plate penetrates through the limiting bolt of the limiting groove through one end and is fixedly connected with the upper guide frame, and a locking nut used for locking the limiting plate is arranged at one end of the limiting bolt.
The upper guide frame and the lower guide frame are respectively composed of I-shaped steel which is vertically arranged relatively and channel steel which is fixedly connected with the upper end and the bottom end of the I-shaped steel in pairs and is perpendicular to the I-shaped steel.
The I-shaped steel and the channel steel are connected in a welding mode.
The operating platform is made of a wire mesh sheet.
The iron wire mesh is fixedly connected to the upper guide frame in a spot welding mode.
Compared with the prior art, the utility model beneficial effect be: the steel pipe can be positioned by arranging the operation platform, the limiting plate, the limiting bolt and the like, so that the steel pipe pile is accurately positioned, and the verticality is ensured; moreover, constructors can manufacture the device by themselves according to needs, the structure is simple, the safety can be guaranteed, time and labor are saved, steel pipe piles can be constructed continuously, the quality is guaranteed, and the construction efficiency of the trestle is improved.
Drawings
Fig. 1 is a schematic top view of the present invention.
Fig. 2 is a schematic view of the top view structure in the working state of the present invention.
Fig. 3 is a schematic side view of the present invention.
Fig. 4 is a partial enlarged view of the position a of the present invention.
Reference numerals: 1-I-shaped steel, 2-limiting plates, 3-steel pipe piles, 4-limiting bolts, 5-operating platforms, 6-channel steel, 7-limiting grooves, 8-locking nuts and 9-upper positioning holes.
Detailed Description
The present invention will be further described with reference to the following examples.
The steel pipe pile construction guide device shown in the attached figures 1-3 comprises a device body, wherein the device body comprises an upper guide frame and a lower guide frame, the upper guide frame and the lower guide frame are respectively composed of I-shaped steel 1 which is vertically arranged relatively and channel steel 6 which is fixedly connected with the upper end and the bottom end of the I-shaped steel 1 in pairs and is perpendicular to the I-shaped steel 1, and the relative positions of the I-shaped steel 1 and the channel steel 6 are determined according to the actual situation of trestle arrangement and are connected in a welding mode; the corresponding positions of the upper guide frame and the lower guide frame are respectively provided with an upper positioning hole 9 and a lower positioning hole which are used for positioning the steel pipe pile 3 at equal intervals, an operation platform 5 which is fixedly connected with the upper guide frame and is made of wire netting pieces is laid between every two adjacent upper positioning holes 9, and the wire netting pieces are fixedly connected onto the upper guide frame in a spot welding mode.
As shown in fig. 4, each upper positioning hole 9 is fixedly connected with a limiting bolt 4 above the upper guide frame, a limiting plate 2 corresponding to the limiting bolt 4 is arranged around each upper positioning hole 9, a hollow limiting groove 7 is formed in the middle of each limiting plate 2, the diameter of the limiting groove 7 is matched with that of the limiting bolt 4, each limiting plate 2 passes through the limiting bolt 4 of the limiting groove 7 through one end and is fixedly connected with the upper guide frame, and a locking nut 8 used for locking the limiting plate 2 is arranged at one end of the limiting bolt 4.
During operation, hang this steel-pipe pile construction guider and put in the tubular pile position department of treating the construction, the limiting plate 2 accessible is around, control the side-to-side movement, adjustable location aperture size, and the adjustment is finished the back, screws up nut 8 and fixes the steel-pipe pile, through the steel-pipe pile 3 of fine setting accurate positioning intermediate position, confirms the steel-pipe pile 3 position at both ends simultaneously. The steel pipe pile 3 is lowered by using the crawler crane, and passes through an upper positioning hole 9 and a lower positioning hole 10 which are surrounded by the limiting plate 2 and the limiting bolt 4, so that lowering positioning is accurately completed.
The above description is only the preferred embodiment of the present invention, but the present invention is not limited to the above-mentioned specific embodiments, and for those skilled in the art, a plurality of modifications and improvements can be made without departing from the inventive concept of the present invention, and these modifications and improvements all belong to the protection scope of the present invention.

Claims (5)

1. The steel pipe pile construction guide device is composed of a device body and is characterized in that the device body comprises an upper guide frame and a lower guide frame, the corresponding positions of the upper guide frame and the lower guide frame are respectively provided with an upper positioning hole (9) and a lower positioning hole (10) which are used for positioning a steel pipe pile (3) at equal intervals, two adjacent positioning holes are paved between the upper positioning holes (9), an operation platform (5) fixedly connected with the upper guide frame is laid between the upper positioning holes (9), each upper positioning hole (9) is fixedly connected with a limiting bolt (4) above the peripheral upper guide frame, each upper positioning hole (9) is provided with a limiting plate (2) corresponding to the limiting bolt (4), the middle of each limiting plate (2) is provided with a hollow limiting groove (7), the limiting groove (7) is matched with the diameter of the limiting bolt (4), and each limiting plate (2) penetrates through one end of the limiting bolt (4) of the limiting groove (7) ) And the upper guide frame is fixedly connected, and one end of the limiting bolt (4) is provided with a locking nut (8) for locking the limiting plate (2).
2. The guide device for the construction of the steel pipe pile as claimed in claim 1, wherein the upper guide frame and the lower guide frame are respectively composed of I-shaped steel (1) which is vertically arranged relatively and channel steel (6) which is fixedly connected with the upper end and the bottom end of the I-shaped steel (1) in pairs and is perpendicular to the I-shaped steel (1).
3. The guide device for steel pipe pile construction as claimed in claim 2, wherein the I-shaped steel (1) and the channel steel (6) are connected by welding.
4. The guide device for steel pipe pile construction as claimed in claim 1, wherein the operation platform (5) is made of a wire mesh sheet.
5. The guide device for steel pipe pile construction as claimed in claim 4, wherein the iron mesh sheet is fixedly connected to the upper guide frame by spot welding.
CN201920677651.2U 2019-05-13 2019-05-13 Steel-pipe pile construction guider Active CN210658355U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920677651.2U CN210658355U (en) 2019-05-13 2019-05-13 Steel-pipe pile construction guider

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920677651.2U CN210658355U (en) 2019-05-13 2019-05-13 Steel-pipe pile construction guider

Publications (1)

Publication Number Publication Date
CN210658355U true CN210658355U (en) 2020-06-02

Family

ID=70840752

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920677651.2U Active CN210658355U (en) 2019-05-13 2019-05-13 Steel-pipe pile construction guider

Country Status (1)

Country Link
CN (1) CN210658355U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110172972A (en) * 2019-05-13 2019-08-27 中国建筑第六工程局有限公司 A kind of steel-pipe pile construction guiding device
CN111877345A (en) * 2020-07-20 2020-11-03 浙江中天恒筑钢构有限公司 Steel pipe pile positioning device for steel trestle construction in water area and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110172972A (en) * 2019-05-13 2019-08-27 中国建筑第六工程局有限公司 A kind of steel-pipe pile construction guiding device
CN111877345A (en) * 2020-07-20 2020-11-03 浙江中天恒筑钢构有限公司 Steel pipe pile positioning device for steel trestle construction in water area and construction method
CN111877345B (en) * 2020-07-20 2021-05-21 浙江中天恒筑钢构有限公司 Steel pipe pile positioning device for steel trestle construction in water area and construction method

Similar Documents

Publication Publication Date Title
CN210658355U (en) Steel-pipe pile construction guider
CN206233102U (en) A kind of packaged type faces side operation work platform
CN109968522A (en) The mounting device and installation method of prefabricated case beam bottom web reinforcement skeleton
CN206016220U (en) High-altitude column structure construction operation platform
CN212450263U (en) Integral hoisting tool for steel bars suitable for caisson standard layer
CN209716333U (en) A kind of mounting device for prefabricated case beam bottom web reinforcement skeleton
CN209975509U (en) Pile foundation steel reinforcement cage adjusting and positioning device
DE202022102234U1 (en) Precast steel trestle bridge
CN212406744U (en) Template platform truck is filled to high-speed railway tunnel center ditch secondary
CN208803390U (en) Bridge strengthening hoistable platform
CN211421883U (en) Prestressed tensioning jack lifting device
CN210216428U (en) Guide device for pile driver
CN112726426A (en) Novel movable protective shed of bracket and steel pipe column combined gantry type
CN214940049U (en) Pile head cover plate
CN111119470A (en) Full-automatic hydraulic walking dragging mold
CN205077876U (en) Machine and stressing jack linkage are worn to restraint by prestress wire
CN217096402U (en) Template assembly for welding ground plate
CN210395124U (en) Pylon installation positioner
CN214497216U (en) Novel movable protective shed of bracket and steel pipe column combined gantry type
CN218258444U (en) Special device for installing track shoe on rail chain assembly
CN215287784U (en) A auxiliary device for concrete placement template sets up
CN213538689U (en) Sliding construction platform for assisting welding seam of welding steel beam
CN214264497U (en) Box culvert steel bar welding bed-jig
CN217122234U (en) Convenient-to-strip rectangular pipe jacking or box culvert net rib welding bench
CN217750077U (en) Reinforcing bar net piece welding die carrier

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant