CN110725523A - Scaffold for building construction - Google Patents

Scaffold for building construction Download PDF

Info

Publication number
CN110725523A
CN110725523A CN201810777490.4A CN201810777490A CN110725523A CN 110725523 A CN110725523 A CN 110725523A CN 201810777490 A CN201810777490 A CN 201810777490A CN 110725523 A CN110725523 A CN 110725523A
Authority
CN
China
Prior art keywords
rods
scaffold
lifting plate
rectangular frame
frame structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810777490.4A
Other languages
Chinese (zh)
Inventor
余家阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810777490.4A priority Critical patent/CN110725523A/en
Publication of CN110725523A publication Critical patent/CN110725523A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F7/00Lifting frames, e.g. for lifting vehicles; Platform lifts
    • B66F7/02Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms suspended from ropes, cables, or chains or screws and movable along pillars
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F7/00Lifting frames, e.g. for lifting vehicles; Platform lifts
    • B66F7/28Constructional details, e.g. end stops, pivoting supporting members, sliding runners adjustable to load dimensions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Movable Scaffolding (AREA)

Abstract

A scaffold for building construction comprises four vertical rods, wherein a rectangular frame structure is formed by the four vertical rods, cross rods and first protective rods, the first protective rods are arranged at two ends of the rectangular frame structure, multiple layers of supporting rods are arranged on the vertical rods, each layer of supporting rod is formed by multiple parallel supporting rods, the supporting rods are arranged at the middle point position between every two adjacent first protective rods, and each layer of supporting rod is provided with a flat plate; a lifting plate is arranged on one side of a rectangular frame structure consisting of the upright rods, the cross rods and the first protection rods. By adopting the structure, the scaffold and the scaffold upper operating platform are more stable in the building construction operation process, potential safety hazards are reduced, building materials do not need to be carried manually, and the construction efficiency is greatly improved.

Description

Scaffold for building construction
Technical Field
The invention relates to the field of building construction, in particular to a scaffold for building construction.
Background
The existing scaffold is generally composed of steel pipes and fasteners, then the existing scaffold is matched with bamboo raft for building construction operation, the stability of the bamboo raft in the construction process is poor, certain potential safety hazards exist, building materials need to be lifted manually, the workload of constructors is large, and the construction efficiency is influenced.
Disclosure of Invention
The invention aims to solve the technical problem of providing a scaffold for building construction, so that a scaffold and a working platform on the scaffold are more stable in the building construction working process, potential safety hazards are reduced, building materials do not need to be carried manually, and the construction efficiency is greatly improved.
In order to solve the technical problems, the technical scheme adopted by the invention is as follows: a scaffold for building construction comprises four vertical rods, wherein a rectangular frame structure is formed by the four vertical rods, cross rods and first protective rods, the first protective rods are arranged at two ends of the rectangular frame structure, multiple layers of supporting rods are arranged on the vertical rods, each layer of supporting rod is formed by multiple parallel supporting rods, the supporting rods are arranged at the middle point position between every two adjacent first protective rods, and each layer of supporting rod is provided with a flat plate;
a lifting plate is arranged on one side of a rectangular frame structure consisting of the upright rods, the cross rods and the first protection rods.
In the preferred scheme, two sides of the flat plate are respectively provided with a notch at the position close to the two ends, the notches are arc notches, the radian of the notches is not more than 180 degrees, and the notches are attached to the side walls of the vertical rods.
In the preferred scheme, one end of the flat plate is provided with a through hole, a ladder stand is arranged in the through hole, the upper end of the ladder stand penetrates through the through hole and is fixedly connected with the top surface of the upper flat plate, and the lower end of the ladder stand is fixed on the top surface of the lower flat plate.
In a preferred scheme, the through holes in two adjacent flat plates are arranged on different ends.
In the preferred scheme, lifter plate top surface be equipped with driving motor and rings on the one side of being close to the pole setting, the fixed haulage rope that is equipped with in the driving motor pivot, the multilayer dull and stereotyped in, the dull and stereotyped one side towards the lifter plate that is located the superiors is equipped with the otic placode, is equipped with the fixed pulley on the otic placode haulage rope one end pass the fixed pulley and with rings fixed connection.
In the preferred scheme, the side surface of one side of the lifting plate facing the vertical rod is provided with a lifting plate positioning piece, the lifting plate positioning piece is of an arc-shaped plate structure, and the lifting plate positioning piece is attached to the vertical rod.
The scaffold for building construction provided by the invention has the following beneficial effects by adopting the structure:
(1) the stability of the flat plate is better, the safety of constructors in the construction process is ensured, and a safer construction operation environment is provided;
(2) in the work progress, building material can promote through the lifter plate, need not the manual work and carries, has alleviateed constructor's the amount of labour, has promoted the efficiency of construction simultaneously.
Drawings
The invention is further illustrated by the following examples in conjunction with the accompanying drawings:
fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic elevation structure of the present invention.
Fig. 3 is a schematic top view of the lifter plate of the present invention.
FIG. 4 is a schematic top view of a flat panel according to the present invention.
Fig. 5 is a schematic perspective view of a flat plate according to the present invention.
In the figure: the lifting device comprises a vertical rod 1, a cross rod 2, a supporting rod 3, a flat plate 4, a notch 401, a ladder stand 5, a through hole 6, a first protection rod 7, a lifting plate 8, a second protection rod 801, a driving motor 9, a traction rope 10, an ear plate 11, a fixed pulley 12, a lifting ring 13 and a lifting plate positioning piece 14.
Detailed Description
As shown in fig. 1-5, a scaffold for building construction comprises four vertical rods 1, a cross rod 2 and first guard bars 7 form a rectangular frame structure, the first guard bars 7 are arranged at two ends of the rectangular frame structure, a plurality of layers of support bars 3 are arranged on the vertical rods 1, each layer of support bar 3 is composed of a plurality of parallel support bars 3, the support bars 3 are arranged at the middle point between two adjacent first guard bars 7, and a flat plate 4 is arranged on each layer of support bar 3;
a lifting plate 8 is arranged on one side of a rectangular frame structure consisting of the upright rods 1, the cross rods 2 and the first protective rods 7.
In the preferred scheme, two side faces of the flat plate 4 are respectively provided with a notch 401 at the position close to the two ends, the notch 401 is an arc-shaped notch, the radian of the notch 401 is not more than 180 degrees, and the notch 401 is attached to the side wall of the vertical rod 1.
In the preferred scheme, one end of the flat plate 4 is provided with a through hole 6, a ladder stand 5 is arranged in the through hole 6, the upper end of the ladder stand 5 penetrates through the through hole 6 and is fixedly connected with the top surface of the upper flat plate 4, and the lower end of the ladder stand 5 is fixed on the top surface of the lower flat plate 4.
In a preferred scheme, the through holes 6 on two adjacent flat plates 4 are arranged on different ends.
In the preferred scheme, 8 top surfaces of lifter plate be equipped with driving motor 9 and rings 13 on being close to one side of pole setting 1, driving motor 9 is fixed in the pivot and is equipped with haulage rope 10, the multilayer dull and stereotyped 4 in, the dull and stereotyped 4 that is located the superiors is equipped with otic placode 11 on one side of lifter plate 8, is equipped with fixed pulley 12 on the otic placode 10 one end pass fixed pulley 12 and with rings 13 fixed connection.
In a preferable scheme, a lifting plate positioning piece 14 is arranged on the side face of one side, facing the vertical rod 1, of the lifting plate 8, the lifting plate positioning piece 14 is of an arc-shaped plate structure, and the lifting plate positioning piece 14 is attached to the vertical rod 1.
In a preferred scheme, in order to ensure that the lifting plate positioning piece 14 is not interfered by other rod pieces in the process of moving the lifting plate up and down, except for the first protective rod 7 at the uppermost layer, the rest first protective rods are all arranged at positions close to the end part of the cross rod 2 through the rod pieces which are vertically arranged (as shown in fig. 1);
meanwhile, the rods are connected by the existing connecting fasteners, so that repeated description is omitted, but the connecting piece between the upright rods 1 and the cross rods 2 needs to ensure that the parts of the coated upright rods 1 do not exceed 180 degrees, and the radian of the lifting plate positioning piece 14 is not greater than 180 degrees, so that the lifting plate positioning piece 14 cannot be interfered by the cross rods 2; the radian of the notch 401 is not more than 180 degrees, and the purpose that the flat plate 4 does not interfere with the lifting plate positioning piece 14 is achieved.
By adopting the structure, the stability of the flat plate is better, the safety of constructors in the construction process is ensured, and a safer construction operation environment is provided; in the work progress, building material can promote through the lifter plate, need not the manual work and carries, has alleviateed constructor's the amount of labour, has promoted the efficiency of construction simultaneously.

Claims (6)

1. The utility model provides a scaffold frame for construction, includes pole setting (1), characterized by: the device is characterized in that the number of the upright posts (1) is four, the four upright posts (1), the cross rods (2) and the first protective rods (7) form a rectangular frame structure, the first protective rods (7) are arranged at two ends of the rectangular frame structure, a plurality of layers of supporting rods (3) are arranged on the upright posts (1), each layer of supporting rods (3) is composed of a plurality of parallel supporting rods (3), the supporting rods (3) are arranged at the middle point position between two adjacent first protective rods (7), and a flat plate (4) is arranged on each layer of supporting rods (3);
a lifting plate (8) is arranged on one side of a rectangular frame structure consisting of the upright rods (1), the cross rods (2) and the first protective rods (7).
2. A scaffold for construction according to claim 1, wherein: two sides of flat board (4) on be equipped with a breach (401) respectively on the position that is close to both ends, breach (401) are the arc breach, the radian of breach (401) is not more than 180, breach (401) and pole setting (1) lateral wall laminating setting.
3. A scaffold for construction according to claim 1, wherein: one end of the flat plate (4) is provided with a through hole (6), a ladder stand (5) is arranged in the through hole (6), the upper end of the ladder stand (5) penetrates through the through hole (6) and is fixedly connected with the top surface of the upper flat plate (4), and the lower end of the ladder stand (5) is fixed on the top surface of the lower flat plate (4).
4. A scaffold for construction according to claim 3, wherein: through holes (6) on two adjacent flat plates (4) are arranged at different ends.
5. A scaffold for construction according to claim 1, wherein: lifter plate (8) top surface be close to one side of pole setting (1) on be equipped with driving motor (9) and rings (13), fixed haulage rope (10), the multilayer of being equipped with in driving motor (9) pivot dull and stereotyped (4) in, be located dull and stereotyped (4) of the superiors and be equipped with otic placode (11) on one side of lifter plate (8), be equipped with fixed pulley (12) on otic placode (11) haulage rope (10) one end pass fixed pulley (12) and with rings (13) fixed connection.
6. A scaffold for construction according to claim 1, wherein: one side of the lifting plate (8) facing the vertical rod (1) is provided with a lifting plate positioning piece (14), the lifting plate positioning piece (14) is of an arc-shaped plate structure, and the lifting plate positioning piece (14) is attached to the vertical rod (1).
CN201810777490.4A 2018-07-16 2018-07-16 Scaffold for building construction Pending CN110725523A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810777490.4A CN110725523A (en) 2018-07-16 2018-07-16 Scaffold for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810777490.4A CN110725523A (en) 2018-07-16 2018-07-16 Scaffold for building construction

Publications (1)

Publication Number Publication Date
CN110725523A true CN110725523A (en) 2020-01-24

Family

ID=69217220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810777490.4A Pending CN110725523A (en) 2018-07-16 2018-07-16 Scaffold for building construction

Country Status (1)

Country Link
CN (1) CN110725523A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113958114A (en) * 2021-09-02 2022-01-21 苏茂兵 Closed tiled structural unit for attached lifting scaffold

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113958114A (en) * 2021-09-02 2022-01-21 苏茂兵 Closed tiled structural unit for attached lifting scaffold

Similar Documents

Publication Publication Date Title
CN203439898U (en) Tube bundle lifting device of large heat exchanger
CN202227701U (en) Spliced type horizontal channel device
CN214831957U (en) Assembled multi-high-rise steel column butt joint operation platform
CN110725523A (en) Scaffold for building construction
CN208200190U (en) Lifting equipment is used in power equipment installation
CN201250058Y (en) Improved lifting trolley
CN213539661U (en) Working platform for attached electric construction platform
CN217106069U (en) Machine-room-less passenger elevator maintenance platform
CN206915674U (en) Hoistable platform bindiny mechanism and lift
CN204357138U (en) Simple steel structure lifting upending frame
CN207047702U (en) A kind of bridge construction scaoffold
CN211470571U (en) Assembled prefabricated component turning device
CN211257761U (en) Lifting type elevator shaft operating platform
CN202831591U (en) Special-shaped truss operation platform capable of hoisting to super high space
CN205892526U (en) Hoist and mount platform of spinning corridor equipment
CN202830787U (en) Duplex beam for bridge construction
CN218371415U (en) Make things convenient for hoist set frame of dismouting combination
CN210918145U (en) Anti-falling building construction support
CN209974155U (en) Stable in structure's hoisting apparatus for construction
CN215160476U (en) Simple crane of offshore oilfield steel wire operation blowout prevention system
CN216949371U (en) Combined high-grade tool
CN214462344U (en) Assembled operating platform for high-altitude in-situ assembly of large-span steel truss
CN214531893U (en) Creeping formwork mechanism adopting lifting type operating platform
CN217557633U (en) Wall attaching support based on attached lifting scaffold
CN213627003U (en) Ground fence connecting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20200124